Wood burning stove installation

Similar documents
B. DEFINITIONS LINING OLD CHIMNEYS A. INTRODUCTION C. REASONS FOR LINING

Installation Instructions

Chimneys in Thatched Properties

How to build a Pizza Oven in 4 days

Commissioning of Heat Producing Appliances Burning Solid Fuel

LAYING BLOCK AND BRICK

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

SRP Pricelist 2015 Including VAT. Stoves for every home

The Savannah Steel Series Wood Burning Stoves and Inserts

Troubleshooting Draft Problems in Chimneys

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

The growing popularity of Gas Fireplaces has created a demand for an ever increasing array of styles and sizes to fit every decor and budget.

CHIMNEYS AND FIREPLACES

Wood Heat The Safe Way

A new range of clean burning multifuel stoves

Residential Foundations and Basements

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

SPECIFICATION & INSTALLATION GUIDE FOR MASPORT LE4000 PROVINCIAL INSERT FIRE, NEW ZEALAND MODEL

RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA

If stepping is required, step at 180mm as seen in this picture.

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

woodburning stoves installation and procedures

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

GYPSUM AREA SEPARATION FIREWALLS GA

FIRES WITHOUT COMPROMISE EXCEPTIONAL FIRES JETMASTER INSET STOVE. Installation, Operating and Servicing Instructions JETMASTER MK6

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

1. Input pot circumference: use a soft tape to measure the circumference of the pot at the widest point below the handles.

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Repair of Earthquake-Damaged Masonry Fireplace Chimneys SOUTH NAPA EARTHQUAKE RECOVERY ADVISORY

Chapter. Restoration of Damaged Structures

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Boston, Venice, Kodiak. Enviro Wood Fireplace Inserts

General Guidance on the selection and installation of flues and chimneys for wood burning and multi fuel appliances in residential properties.

Across America. Wood & Coal Brochure

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

Holz Choices & Specifications

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Packaged Terminal Air Conditioner Wall Sleeve Installation

Smoke problems and bad draught are caused by poor design and construction of the chimney insufficient dimensions and an unfavorable site conditions.

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

Brick Veneer Construction

Garden Bothy, Cumnock

Building Condition Assessment: West Lexington Street Baltimore, Maryland

780 CMR CHIMNEYS, FIREPLACES AND SOLID FUEL-BURNING APPLIANCES

Certification: Building Plans Examiner. Exam ID: B3

Masonry Heaters: Planning Guide for Architects, Home Designers and Builders. By Alex Chernov, a Certified Heater Builder.

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES

Wood Pellet Stove 101

Table of Contents Interior Exterior

How to build raised beds page

the stainless steel water-heater for your woodstove USER S MANUAL

Laying the First Course. 1. Excavate the site and construct the footing.

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Heating and cooling a home in Australia amounts to around

Gas-Fired, Residential Storage Type Water Heaters

CHAPTER NO. 27 QUANTITIES OF MATERIALS

plumbing products guide

Timber Decks. Technical Note. March 2007

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

556/586 NEW NEW. One step closer to the fire.

Gas Stoves. H15-10 Direct Vent Gas Stove. Model H15-NG10 H15-LP10. Approved Venting Systems

OPTIONS. for. Replacing Boiler Plant. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

Handcrafted with passion

SIM Spartherm Installation Modules NEW

Part J - The Requirement 5

Shingle Installation Guide

INSTALLATION GUIDE FOR GIROLAMI CAMINETTI OVEN

Wood Burning Safety Guide

MAJESTIC. OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE.

Building Condition Assessment Report

Management Consultancy Training. Asbestos Materials. Residential Guide

rationel WINDOWS WITH VISION

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

THIS BOOK CONTAINS IMPORTANT INFORMATION. PLEASE KEEP IT IN A SAFE PLACE FOR FUTURE REFERENCE.

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

Condensing Boiler Efficiency

Name of course: Residential Construction Site Management (RCSM) Level 1

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

version 1.0 Made by NARVI Oy Finland Kota Kuru 14 and 20 sauna heaters Installation, user and maintenance instructions

ELECTRIC PERISTALTIC MORTAR POINTING PUMP

Construction Masonry - Brick

Guide to working on Public Sewers

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Twinning «Improvement of the Energy Efficiency in Turkey»

HOW MUCH FUEL DOES A GAS STOVE CONSUME AND HOW MUCH DOES IT COST TO OPERATE?

Best Basement Water Management Practices

19 Examples of Wall Insulation

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Special Use Commercial Properties

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

MRI RF SHIELDING DESIGN

Multi-layer Insulation Blanket for Roofs

172 Holesaws Overview Bosch Accessories for Power Tools 09/ Diamond holesaw. with Power-Change adapter. 190 Diamond drill bits

Transcription:

Wood burning stove installation The fireplace and chimney were in bad condition. This meant that a major restoration would be required to return the fireplace to use as a conventional fire. The biggest problem was the chimney, which was no longer capable of safely containing hot combustion gases. The hearth itself had been damaged and modified to take a decorative Victorian fireplace. Behind this was an accumulation of rubble, some of which had been placed there to support the Victorian fireplace and some from the chimney. The early Victorian stone surround was in good condition but was covered with several layers of paint. Figure 1 shows the stone surround and modern badly constructed hearth and rubble fill. Figure 1. The original fireplace and rubble fill. After the fireplace was cleared, a concrete base was laid and the new hearth built using reclaimed bricks. The reclaimed bricks were handmade circa.1800 and sourced from a reclamation yard at a cost of 1 each. The type of brick bond chosen for the construction of the hearth was a variation of Old English Bond, commonly known as

Modified English Bond or English Garden Bond. This style was common in the period the house was built. English Garden Bond consists of rows of headers placed every fourth course as opposed to alternate courses as with Old English Bond. The mortar used in the construction of the hearth was a soft lime rich, cement, lime, sharp sand mortar mix with the ratio 1:3:9. Figure 2. The new hearth and stripped fire surround. Figure 2 shows the completed hearth with concrete base and stripped stone surround. Once the brickwork was complete, the metal work was installed to support the register plate. A frame was produced and fixed to the top of the hearth. The register plate can then be bolted to this frame. Importantly, the register plate can be removed to gain access to the chimney for maintenance.

Figure 3 shows the register plate frame installed into the hearth. It is also possible to see the new steel lintel, fitted during the construction of the hearth. Figure 3. The register plate frame. Figure 4 show the register plate in situ, bolted to the register plate frame. The plate itself was made from 4mm thick high quality laser cut steel, which could take the heat without warping and contain any further rubble falling from the chimney. Figure 4. The register plate fitted into the hearth.

Figure 5 shows the finished fireplace with the hearth stones in place. The hearth stones were reclaimed York slabs, which are used extensively in period homes as flooring. Figure 5. The finished fireplace. Due to the state of the chimney and because a modern multi-fuel stove was to be fitted, a chimney liner was required to contain the flue gases. The liner system chosen was a flexible double skin one piece stainless steel liner. The stainless steel liner was constructed from 904 grade stainless steel. This grade of liner is normally used in situations where the liner will be subject to very high temperatures or heavy condensate formation. To further protect the chimney walls from the higher flue gas temperatures generated by all modern multi-fuel stoves, the liner was fitted with insulation. The insulation chosen was Chimwrap, a woven glass blanket that fits around the liner. The main advantage to using Chimwrap is that it only 12mm thick. This was

particularly important in this case as the chimney was quite narrow towards the top. Figure 6. The flexible stainless liner and Chimwrap insulation. Figure 6 shows the completed liner and Chimwrap insulation prior to installation into the chimney. The insulation material was secured to the liner with stainless steel ties at 300mm intervals along its length.

The chimney brick work needed attention prior to the insertion of the liner and top closing plate. When this was complete the liner was pulled up the chimney. Figure 7. Chimney brickwork The liner and insulation being positioned prior to being pulled up into the chimney. Figure 8. Liner being pulled up the chimney

Once the liner and insulation had been inserted into the chimney, the 8 mm thick steel top closing plate was installed. In this installation the top closing plate was the main support for the liner and insulation. An alternative method uses a thinner top closing plate and requires the clamp to be held by the masonry of the chimney. The stainless steel clamp was then fitted to secure the uppermost part of the liner in place. The top closing plate also had provision for the main chimney vent. Figure 9. The top closing plate incorporating the chimney vent The vent allows heat and condensation that can build up in the main part of the chimney to escape. A similar vent is normally provided in the register plate. The subsequent flow of air keeps the chimney cool and free from condensation. In most installations the chimney vent is drilled into the side of the chimney stack. However, due to the listed status of the property, the vent was incorporated into the top closing plate. A galvanised pipe was then inserted in to the vent hole to take the vent above the cement cap and any standing water that may accumulate inside the chimney pot.

Figure 10 shows the completed fireplace with a 5kW Clearview Pioneer clean burning multi-fuel stove fitted. Figure 10. Clearview stove. Part of any installation is the provision of a chimney and hearth notice plate. The notice plate contains information relating to the performance capabilities of the hearth, fireplace and flue. The notice itself should be located in an unobtrusive but obvious place, such as next to the hearth or electricity consumer unit.

Figure 11. Notice plate.