MIDDLE EAST TECHNICAL UNIVERSITY DEPARTMENT OF ARCHITECTURE / BUILDING SCIENCE PROGRAM

Similar documents
THE ARTICULATED FUNICULATOR and the TUBED MEGA FRAME. The way of the FUTURE

Structural Systems for Tall Buildings Professor Mahjoub Elnimeiri, PhD Fall Lecture 1

sky100 Hong Kong Observation Deck receives global recognition for introducing the world the Hong Kong spirit

Redefining Hong Kong's skyline

Tall Building Form Generation by Parametric Design Process

Skyrise. Engineered to meet the highest of challenges. The Skyrise system delivers:

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

Two IFC and Four Seasons Hotel. David Yau. HKIVM Conference 2008

Art Gallery Ontario Toronto, Ontario, Canada

Structural Design of Reinforced Concrete Tall Buildings

Secondary Loop Chilled Water In Super High-Rise

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

How To Build The Burj Dubai Tower

ctbuh.org/papers The Roles of Construction Management in Super High-Rise Building Projects Title:

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

17 East Main Street Cuba,NewYork Code Enforcement

THE SKYSCRAPER MUSEUM DBQ DOSSIER 2. tools for teaching student guide BOOM & BUST: SKYSCRAPERS & SPECULATION s HISTORICAL CONTEXT TASK

Structural Engineering: Assurance for Your Insurance

1. Name of Property. 6. Function or Use Historic Functions (Enter categories from instructions) Current Functions (Enter categories from instructions)

ARCHITECTURAL/HISTORIC INVENTORY FORM Survey No.: e-rs

KINETICS QuakeLoc Connector

THE MOST TRUSTED AUTHORITY ON GLOBAL ARCHITECTURE IN THE WORLD

Single Family Residential Building Permit Questions & Answers

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

TREEHOUSING 2 GRAND PRIZES OF $6,000 2 PRIZES OF $3,000 2 STUDENT PRIZES OF $2,000

Security in High-Rise Buildings Burj Dubai. Greg Sang Director, Projects Emaar Properties

Enhancing Building Quality With 6D BIM

Ping An: Insurance and Tall Buildings

Brock Commons Phase 1 University of British Columbia, Vancouver, Canada

Commercial Building Valuation Report

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

WORLD S TALLEST TIMBER BUILDING, BERGEN

Winnipeg Water Treatment Program

Challenges to the Designer:

Vibration Isolation in Data Centers

Design Development Quality Management Phase Checklist Project Phase Checklist Series

STATE OF ILLINOIS BUILDING James R. Thompson Center Chicago, Illinois

Abstract: BIM: A Technological Advancement in the Field of Architecture. Introduction:

MINUTES. Date: March 24, 2010 LPC 50/10 Location: 728 St. Helens, Tacoma Municipal Bldg North, Room 16

Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center

change your view 10 Exchange Place Jersey City, NJ

Analysis II Façade Redesign: Architectural Precast Panels

Coming of the Asian Giants: Skyscrapers as Tourist Attractions and as Environmental Issues

Provided by TryEngineering -

NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008

Green and Sustainable Buildings

Safety Zone and Minimum Size (Vertical)

A Tornado is about to take Doha by storm

2D and 3D Framing and Detailing in Chief Architect X4 Dan Baumann, ChiefExperts.com

WISE session two: speaker bios

APPLICATION FOR NEW CONSTRUCTION

Residential Building Permit Process

Residential Deck Safety, Construction, and Repair

NFPA 20 Update 2013 Edition. Revision Cycle. NFPA 20 Update /1/2013. Goals and Objectives

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

HOW TO LOAD A TRUCK OR A CONTAINER IN 5 MINUTES?

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

Architecture After the Industrial Revolution

941 Key Street HPO File No CERTIFICATE OF APPROPRIATENESS

CTBUH Copyright. Formworks for High rise Construction. Jürgen Gnida. PERI Gmbh

A site plan or floor plan clearly identifying the location(s) of all new replacement window(s)

SOLAR PV SYSTEMS PERMITTING PROCESS

8 Chifley Sustainable Structural and Fire Engineering

THE STAR, DARLING HOTEL AND SPA PYRMONT, NSW. Associate Director, Taylor Thomson Whitting Ltd, Sydney, Australia

FOR IMMEDIATE RELEASE

Economic Dashboard - Monthly. Economic Development February 23, 2015

ctbuh.org/papers The Economics of Skyscraper Construction in Manhattan: Past, Present, and Future Title:

ARCHITECTURAL TECHNICIAN PROGRAM (T132)

DESIGN OF NATURAL VENTILATION WITH CFD CHAPTER SEVEN. Qingyan Chen. difficult to understand and model, even for simple

Basic Requirements for Residential Plan Review _

MINNESOTA DEPARTMENT OF PUBLIC SAFETY State Fire Marshal Division STATEMENT OF POLICY. State Fire Marshal

House Design Tutorial

VIEW SHARING COMPARISON. The Alternate Envelope(s) proposed by Lend Lease will result in no additional view loss to Grosvenor Place Tower.

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Personal Information. Professional Education

Staying on Your Feet: Fall Prevention for Construction

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

CHAPTER 2: The Plumbing System

Electricity Gas. Application for utility connections Business premises. Section E PME (Protective Multiple Earthing)

Leading the Way in High & Super High-Rise. USA Hoist An affiliate of Mid-American Elevator Co., Inc.

Tips on Photography What Kind of Images? Photos and more Uses - A good picture speaks 1,000 words

EQUIPMENT OVERVIEW... 4 SETTING UP CALL MANAGER...5

D.K. Schroder, Introduction to Engineering Design. Problems and Solutions

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

Chapter 7: Momentum and Impulse

First 14-storey wood building in the world at Bergen in Norway Premier bâtiment en bois à 14 niveaux au monde à Bergen en Norvège

How To Understand The World Trade Center'S Structural Design

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

One Vanderbilt: Approving Midtown s Tallest Office Building

BUILDING SAFETY UNIT

3901 Calverton Boulevard Beltsville, Maryland

The New Texas Historic Preservation Tax Credit

Transcription:

MIDDLE EAST TECHNICAL UNIVERSITY DEPARTMENT OF ARCHITECTURE / BUILDING SCIENCE PROGRAM BS 536 STUDIES ON TALL BUILDINGS: DESIGN CONSIDERATIONS Fall 2011-2012 Case Study: International Commerce Centre by Fatih Gencür Submitted to: Assoc.Prof.Dr. Mehmet Halis Günel Assoc.Prof.Dr. Ali Murat Tanyer Arch. H.Emre Ilgın (MSc.)

Case Study: International Commerce Centre by Fatih Gencür Submitted to: Günel, Tanyer, Ilgın Fall 2014 GENERAL INFORMATIONS OF THE BUILDING Official Name : International Commerce Centre Location.: Hong Kong, China Use.: Hotel, Office Structural Height...: 484 meters Number of stories.: 108 Construction End...: 2010 INTERNATIONAL COMMERCE CENTRE Architecture...: Kohn Pedersen Fox Associates Structure.: Arup Contractor...: Sanfield Building Contractors Client...: Sun Hung Kai Properties Structural system...: Core-outrigger system (Taranath,1998) (CTBUH, 2010) (skyscraperpage.com, 2011)

GENERAL INFORMATIONS OF THE BUILDING (CTBUH, 2010)

Heading 1 HEADER: IN CAPITAL LETTERS Heading 2 Heading 3 Heading 4 (ctbuh.org, 2011)

FIGURES Height(Architectural) :484.0 meter / 1588 feet Height(Occupied) :468.8 meter / 1538 feet Height(To Tip) :484.0 meter / 1588 feet Height(Observatory) :387.8 meter / 1272 feet Floors Above Ground :108 Floors Below Ground :4 Number of Elevators :83 Top Elevator Speed :9 m/s Tower Ground Floor Area :274,064 m² / 2,950,000 ft² Number of Hotel Rooms :312 Number of Parking Spaces :1700 (CTBUH, 2011)

COMPANIES INVOLVED Owner :Sun Hung Kai Properties Developer :Sun Hung Kai Properties Design Architect :Kohn Pedersen Fox Associates Associate Architect :Wong & Ouyang Structural Engineer :Arup MEP Engineer :J. Roger Preston Group Project Manager :Harbour Vantage Main Contractor :Sanfield Building Contractors Limited Other Consultant :RWDI Material Supplier :Schindler Material Supplier :Permasteelisa Group (CTBUH, 2010)

(Drawn by Fatih Gencür) ABSTRACT More than an iconic statement, the Hong Kong ICC fundamentally alters the way tall buildings are seen today (ctbuh, 2011). Rather than just being objects in isolation, transit integrated tall buildings represent a sustainable model for future high-rise development (ctbuh, 2011).

6 3 5 STRUCTURAL SYSTEMS ACCORDING TO: Taranath Smith Gunel&Ilgın Buyukozturk :Core-outrigger system, :Outrigger-braced system, :Outriggered Frame system, :Core and outrigger system. U T E M (Model by Fatih Gencur) S B

PLAN OF ZONE 1 OFFICE FLOOR (floor12)

PLAN OF ZONE 2 OFFICE FLOOR (floor30)

PLAN OF ZONE 3 OFFICE FLOOR (floor50)

PLAN OF ZONE 4 HOTEL FLOOR (floor70)

PLAN OF ZONE 5 HOTEL FLOOR (floor86)

MECHANICAL FLOOR WITH OUTRIGGER

SECTION OF MECHANICAL FLOOR

STRUCTURAL ISOMETRICS (Modelled by Fatih Gencur) E M U T S B 6 3 5

A Sustainable Paradigm Transit Integrated Tall Buildings: S B 6 3 5 Concept of a building which is a part of a larger ecosystem Building as a horizontal network E M U T (CTBUH, 2010)

THE HORIZONTAL NETWORK SYSTEM (CTBUH, 2010)

SCHEDULE OF A SITE VISIT During the construction of the building, it was organized several site visits to create a public awareness about the relations between the skyscrapers and the mega cities. (edifaltos.com, 2011)

ELEVATION SYSTEM OF THE BUILDING Schindler Model:FM720s Double-Deck Elevator Capable of lifting 11.5 tons 9m/s, carry weight 4.500 kgs 40 double decks (CTBUH, 2010)

REFERENCES Buyukozturk, O. High-Rise Buildings: Evolution and Innovations, Keynote Lecture, CIB2004 World Building Congress, Toronto, CANADA, p.17. Gunel, H. Ilgın, E. Yüksek Binalar, Taşıyıcı Sistem ve Aerodinamik Form, Odtü Mimarlık Fakültesi Basım İşliği, Ankara, TÜRKİYE, 2010, p.55-57. Lebelle Charles, Architecture From the Outside, 2010. Malott, D. CTBUH Journal, Issue IV. 2010, p.12-17. Taranath, B. Steel, Concrete & Composite Design of Tall Buildings, New York: McGraw-Hill Book Company, 1998, p.445-466. Photos in slides2, 4, 6, 19, 20, http://ctbuh.org, last access 15.11.2011. Photos in slide 22, http://www.edifaltos.com, last access 18.11.2011. Photos in slides 24, 25, 26, 27, 28, http://skyscraperpage.com, last access 19.11.2011.