21CN. Introduction What we expected from 21CN Our end The other end XML and stuff The way forward

Similar documents
MPLS provides multi-site solution

WHOLESALE BROADBAND MANAGED CONNECT

Residential IPv6 IPv6 a t at S wisscom Swisscom a, n an overview overview Martin Gysi

Cisco Networks (ONT) 2006 Cisco Systems, Inc. All rights reserved.

BT 21CN Network IPv6 Transformation

Course Description. Students Will Learn

NetFlow-Lite offers network administrators and engineers the following capabilities:

Copyright 2008 Link Technologies,Inc. A Proud Vendor Member of the

Building a Bigger Pipe: Inverse Multiplexing for Transparent Ethernet Bridging over Bonded T1/E1s

Introduction. Technology background

TAXONOMY OF TELECOM TERMS

Broadband A to Z Glossary

State of Texas. TEX-AN Next Generation. NNI Plan

Initial Access and Basic IPv4 Internet Configuration

Enterprise Broadband Customer Service Description

Central Technology. Seamless IT & Communication Solutions

Next Generation Access Glossary. 21CN: BT s upgrade of their core network (the backbone of the network).

CS419: Computer Networks. Lecture 9: Mar 30, 2005 VPNs

Cisco Which VPN Solution is Right for You?

Virtual Leased Line (VLL) for Enterprise to Branch Office Communications

WHOLESALE BROADBAND CONNECT

The part of the network that connects customers to the exchange, sometimes called the local loop or the last mile.

Debugging With Netalyzr

Service Definition. Internet Service. Introduction. Product Overview. Service Specification

BT Wholesale BT Broadband Bulk Migrations Handbook

Extraordinary UK Ethernet

IPv6, Perspective from small to medium ISP

Meeting the challenge of voice services

White Paper: Virtual Leased Line

Evaluating Bandwidth Optimization Technologies: Bonded Internet

Partner with the UK s leading. Managed Security Service Provider

Truffle Broadband Bonding Network Appliance

Information Crib Sheet Internet Access Service Agreement

Data services. Reliable, high speed data connectivity for business

Network Services Internet VPN

The Future of Communications

Layer 3 Network + Dedicated Internet Connectivity

10 Gigabit Ethernet: Scaling across LAN, MAN, WAN

Reliable high throughput data connections with low-cost & diverse transport technologies

Cloud4 User Guide Reliable connectivity for the cloud from Cloud4

Secured Voice over VPN Tunnel and QoS. Feature Paper

CS 457 Lecture 19 Global Internet - BGP. Fall 2011

Application Note Gigabit Ethernet Port Modes

Feature catalog. Q1-Q MikroTik RouterOS

VLAN 802.1Q. 1. VLAN Overview. 1. VLAN Overview. 2. VLAN Trunk. 3. Why use VLANs? 4. LAN to LAN communication. 5. Management port

Digital Subscriber Line (DSL) Requirements

How To Get The Fastest Connection Possible On A Copper Wire (Fibre) For Business (Wired) Or Copper Wire For Home Use (Wired Or Coax)

Leased Lines Terms and Conditions

Broadband Bonding Network Appliance TRUFFLE BBNA6401

The Evolution of Ethernet

Broadband Network Architecture

ICTTEN6172A Design and configure an IP- MPLS network with virtual private network tunnelling

Data Services. Reliable, high-speed data connectivity

MPLS for ISPs PPPoE over VPLS. MPLS, VPLS, PPPoE

Virtual PortChannels: Building Networks without Spanning Tree Protocol

Benefit from our Hard-Learned Lessons: Evaluating Bandwidth Optimization Technologies

Data Services. Reliable, high-speed data connectivity. in partnership with

White Paper: Broadband Bonding with Truffle PART I - Single Office Setups

VoIP & Internet Telephony

Introduction to MPLS-based VPNs

Implementing Secured Converged Wide Area Networks (ISCW) Version 1.0

Product Datasheet. Broadband. Tel:

MPLS: Key Factors to Consider When Selecting Your MPLS Provider Whitepaper

Data Services. Reliable, high-speed data connectivity

Telecom Business Continuity Solutions FOR INTERNAL USE ONLY

Magnum Network Software DX

Data services. Reliable, high speed data connectivity for business

Broadband Networks Virgil Dobrota Technical University of Cluj-Napoca, Romania

unlimited An ebook from

Configuring IP Load Sharing in AOS Quick Configuration Guide

Redundancy & the Netnod Internet Exchange Points

DSL-2600U. User Manual V 1.0

ADSL MODEM. User Manual V1.0

Simwood Carrier Ethernet

BT Wholesale Catalogue 31 July 2012

GigaVUE-420. The Next Generation. Data Access Switch. Gigamon Systems. Intelligent Data Access Networking

Data Sheet. V-Net Link 700 C Series Link Load Balancer. V-NetLink:Link Load Balancing Solution from VIAEDGE

Layer-2 Design: Link Balancers Simplified

- Multiprotocol Label Switching -

5.0 Network Architecture. 5.1 Internet vs. Intranet 5.2 NAT 5.3 Mobile Network

MPLS Networks A private IP wide area networking service

Ethernet Wide Area Networking, Routers or Switches and Making the Right Choice

An automated system designed to guide a caller through the options of a voice menu. Typically set to answer and route incoming calls.

District of Columbia Courts Attachment 1 Video Conference Bridge Infrastructure Equipment Performance Specification

Layer 2 Network Encryption where safety is not an optical illusion Marko Bobinac SafeNet PreSales Engineer

IPv6 over IPv4/MPLS Networks: The 6PE approach

11/22/

Our EFM network has double the coverage of BT.

TeleGeography Workshop: International Market Trends

Transcription:

21CN Introduction What we expected from 21CN Our end The other end XML and stuff The way forward

Introduction Andrews & Arnold Ltd Niche technical ISP Over 12 years in communications Technical customer base Adrian Kennard Background in software and telecoms Worked in R&D for STC and Nokia Owner and director of A&A FireBrick Hardware and software for routers and firewalls

What we expected from 21CN Convergence Voice, broadband, ethernet, all over common network infrastructure and interconnects. Single voice/broadband line cards at exchange Just as reliable as existing networks New technical features Better broadband, e.g ADSL2+, annex M, etc. Better network, e.g. priority tagging traffic Quicker development of new services Lower costs More scalable costs for us, lower overheads Fewer types of interface and protocol

Our end One big pipe in to BT Scaleable bandwidth costs, low overhead Dual gig WES links to Telehouse Was installed promptly Took a while for BT to be ready As a trial, this was expected Simple BGP link on /30 IPv4 per WES Made for simple fallback Odd arrangement for RADIUS using NAT Did not handle failure at all well Changes since now address this BT happy to work with us to solve such problems

Using BGP Using BGP both ways allows a lot of flexibility and makes fallback easy It would allow BT to make more of their network visible for other 21CN services. Sadly not yet! The links also use VLANs, but this seems to be local to the way the WBMC is set up and not allowing other BT 21CN service to piggyback on the WES links, yet!

RADIUS Platform RADIUS to two pre-configured endpoints on our network BT now allow routing using BGP for this, so fallback works We respond with IPv4 tunnel endpoint details BT then connect to that endpoint, which we can have anywhere on our network announced to BT via BGP Allows simple fixed platform RADIUS to route L2TP directly to resellers (high MTU peering) Circuit ID and speed in RADIUS and L2TP

FB6000 L2TP We have chosen to use our own FireBrick FB6000 L2TP routers to terminate the WMBC connection and handle BT BGP Up to gigabit traffic handling Very low power 1U box (around 30W) Multiple line bonding downlink without MLPPP, and fast fallback (10 seconds) Native and tunneled IPv6 handling Constant quality monitoring with live loss/latency/throughput graphs

The other end End users still split and jumper to MSAN Not using combined PSTN/broadband cards Fast connect as already on card, not! Why not hand over behind modem to LLU? Political ADSL2+ services ADSL1/2+ control at out end Stability options controlling DLM, like 20CN Capped uplink option 448K Elevated traffic priority in network No annex M yet, but soon Some equipment being an issue, lock to ADSL1

New installs New line installs on 21CN usually work fine On-line checker allows our ordering system to offer customers 21CN if their exchange supports it Some exchanges well ahead of schedule Usually new router/modem so no issues with ADSL2+ 40% coverage March 2009 60% coverage March 2010 (maybe) 66% coverage March 2011 (maybe)

Regrading to 21CN Teething problems (to say the least) Regrades not happening Regrades delayed days Engineers messing up jumpers and no service Jumper to equipment not yet in service Jumper to equipment in service but no backhaul to WBMC (e.g. Docklands) Availability checker errors Bulk process 10 lines minimum Bulk process not working Bulk process orders before in service date A lot better now, finally...

Reliability Core network issues Some sort of timeout, probably BGP, internally Randomly losing Birmingham for a few minutes Numerous planned upgrades to bits of network Some weird routing issues at one point Route cache issue in BT core router Again a lot better now Probably at least as good as 20CN, at last

Native IPv6 support Native IPv6 does not work on some 20CN It truncates short native IPv6 packets Known CISCO bug with a 3 year old fix Not going to be fixed. BT state no IPv6 support FB6000 L2TP workaround padding packets Native IPv6 works on 21CN, it seems Customers asking for IPv6 support on 21CN 20CN spec says only IPv4, 21CN does not So 21CN should work with any PPP contractually BT committed to support IPv6 on PPP on 21CN So officially allowing native IPv6 over L2TP BT committed to support IPv6 including PTA Long term project

XML and stuff We were new to XML/SOAP, and we believe we have a better understanding of XML now than some parts of BT - shocked! XML ordering and fault handling was not part of the trial at all, why?!? Novice mistakes delayed any XML handling, e.g. & in our company name Novice mistakes like local time / UTC mixed up, and even use of 12 hour clock on XML timestamps and non standard format Design omissions e.g. getting MAC on WBMC Mostly working now after lots of work

The way forward IPStream connect Putting 20CN end users on our 21CN pipe Massive costs for a small ISP running both Expected early 2008 Expected July 2008 Expected late 2008 Expected early 2009 Expected August 2009 Fingers crossed... We need this to save costs We need this to free up capacity

Ethernet services New services from BT because of 21CN L2 traffic from end users back to us, VLAN Site to site traffic between end users MPLS core in 21CN Ethernet access to users site 100M or 1G fibre (WES) Committed bandwidth in steps e.g. 10M on 100M EFM using multiple copper pairs Our end is a separate gig link and not using same links as broadband. Maybe one day! Exciting new service

Conclusion 21CN offers lots of hope for the future A lot is still hope and not reality There are new services emerging Broadband on 21CN is pretty much ready now. But has taken a lot longer than we or BT expected The future's bright for ISPs prepared to take it on and prepared to work through the issues of any new services