Mark 2 Foucault pendulum

Similar documents
Guidelines for Earthquake Bracing of Residential Water Heaters

Utility Distribution Systems

Guidelines for Earthquake Bracing Residential Water Heaters

FG MOISTURE MONITOR Installation & Operation Manual

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Vision Engravers and Routers PRE-Installation Guide Vision Engraving & Routing Systems

Automatic Door Selection Guide

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

SELF-STEERING AXLE TABLE OF CONTENTS

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

Toroidal Conductivity Sensor

Architect/Contractor Information Package

V1504 Vertical Platform Lift OWNER S MANUAL

Cooktop Low-Profile Ventilation Hoods

LIEBERT VNSA Installation Sheet

ATS Overhead Table Shelf System INSTRUCTION MANUAL

WH/WIH/WIHD/WIHD&M/WIHL AND WIH SERIES

Ceiling Fan Installation Instructions

Atlanta CAUTION READ INSTRUCTIONS CAREFULLY FOR SAFE INSTALLATION AND FAN OPERATION. IF UNSURE CONSULT A QUALIFIED ELECTRICIAN

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

ALL WEATHER W-SERIES QUARTZ TUBE ELECTRIC INFRARED RADIANT HEATER INSTALLATION USE & CARE MANUAL

Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family

Tires and Wheels. Tires and Wheels. Common Tire Terms. Determing Wheel Offset. Determing Bolt Pattern. Dual Wheel/Rim Spacing

MGB Chrome Bumper Conversion

Vehicle Restraint Installation Manual

Roped Hydraulic Residential Elevator Specifications

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

INSTRUCTIONS FOR THE INSTALLATION AND OPERATION OF ACTIVATOR II

V1504 Vertical Platform Lift OWNER S MANUAL

INSTALLATION INSTRUCTIONS

HMI display Installation Guide

MEGA GUARD COLUMN CORE GUARD DAWG COLUMN PROTECTOR. Smart Investments in Plant Safety

Linear Luminaire for Fluorescent Lamps Series EXLUX 6001

Operation and Installation Manual

Packaged Terminal Air Conditioner Wall Sleeve Installation

THERMONET UNDERFLOOR HEATING STANDARD THERMOSTAT KIT STOCK CODE 5260

for Phoenix II-2 Human Cremation Retort

Talk-A-Phone Co. Model WEBS-MT/R Emergency Phone Tower Mount Architectural & Engineering Specification rev. 08/29/2011

Owner s Guide and Installation Manual. Vancouver Model Name , Model No. English Español

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930

Drayton Digistat +2RF/+3RF

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

Advantium 2 Plus Alarm

Talk-A-Phone Co. Model WEBS-MT/R OP5 Emergency Phone Tower Mount Architectural & Engineering Specification rev. 10/28/2011

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

Installation and Operation Guide for PD4000 Series Power Control Center

Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS

STORAGE SYSTEMS PUSH BACK RACK SYSTEMS. Innovative Solutions for Storage and Material Handling Systems

Select Radiators Installation Guide

PCB Design Guidelines for In-Circuit Test

DirectCommand Installation DirectCommand 3-Channel Spreader Kit

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Ceiling Mounted Folding Attic Ladders Installation Instructions

PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

SAFETY RECOMMENDATION

J o y s t i c k s. JS HD series. mechanical

WINEGARD MOTORIZED SENSAR ANTENNA Models MA1055W & MA1055G MADE IN U.S.A. U.S. Patents D500,496 and 7,358,909 INSTALLATION MANUAL

AZEK Rail Install Guide

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

INSTALLATION INSTRUCTION SPEC. SHEET 7/00. City of New York Calendar #40747 ETL LISTED UNDER U.L. STD LOW VOLTAGE TRACK LIGHTING SYSTEM

Electrical Wiring Technical Bulletin

Applied Electronics. Commercial Dimming System UPDATE NOTICE

TWIN EAGLES ALL WEATHER ELECTRIC RADIANT HEATER

CLEAR-DIVISIONS CENTERFOLD

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

CLEAR-DIVISIONS APERTO

[see Figure 3 below] Ferrite tile walls and ceiling RF Absorber parcel walls and ceiling Removable floor section to make fully anechoic

RadianceRail Installation Guide

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Acumen Enterprises, Inc.

Lighting Packages. 230 VAC Fluorescent Enclosure Light:

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GE Lighting. Albeo LED Luminaire. Modular High & Low Bay Lighting. (ABH2 - Series) imagination at work

CRASH RAIL INSTALLATION HEIGHT

Glossary of Common Crane Ter ms:

Cooling Capacity CFM in. w.c. (125 Pa)

TUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE Part #: HT-2

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

GENERAL WIRING RULES FOR HOUSES

Fixtures - Parts - Accessories to shampoo bowls

Machine Safety Switch: SI-LM40 Series Limit Switch Style

One of the most important parts of our business, is protecting yours. Here s how.

Sports and High Mast Lighting Poles Phone: (866) Fax: (817)

Installation. Smart-UPS VT and MGE Galaxy Maintenance Bypass Panel with Power Distribution (wall-mount) kva 208 V

PARTS & SERVICE MANUAL for CONTEMPO SERIES WARMER LAMPS

TABLE 1. Rugged cast aluminum alloy casing,celcon waterways with nichrome parts White (unless stainless steel housing)

CLEAR-DIVISIONS VARIOFOLD

Installation Instructions

GE Lighting Solutions. Albeo LED Luminaire. Modular High & Low Bay Lighting. (ABHX - Series) imagination at work

Chapter 6 ROOF-CEILING SYSTEMS

AMERBRITE UNDERWATER WHITE LED POOL LAMP

92-00 Civic/ Integra/ Del Sol/ CRX Rear Kit Part No

SPIRAL STAIR KIT INSTALLATION MANUAL

cbperformance.com Please read this entire brochure prior to installing your CB Performance Products MAGNASPARK II distributor.

PS4-24 OWNERS MANUAL 24 VAC 90 WATT WALL MOUNTED CCTV POWER SUPPLY

Installation and Operation Manual. Digital Remote Meter for Monitoring System Performance. Version: RM-1

Transcription:

Revised as of 3/26/2011 1

Mark 2 Foucault pendulum Index Page General information ------------------------------------ 3 Specifications ------------------------------------------- 6 Tower Drawing ----------------------------------------- 7 Ball Drawing ------------------------------------------- 8 Mounting platform details --------------------------- 9 Typical floor mount ----------------------------------- 10 Typical hanging mount ------------------------------- 11 Typical wiring schematic ---------------------------- 12 Designers swing chart -------------------------------- 13 Notes ---------------------------------------------------- 14 2

Architectural specifications For the Mark 2 Foucault Pendulum Kit by Academy Pendulum Sales The Mark 2 Foucault Pendulum blends art and science into a stunning display. The 235lb mirror finished brass ball accents this display while swings slowly across the pit demonstrating the Earth s rotation. APS pendulums are easy to install, and will give many years of service with little or no maintenance required. A small amount of electrical power is required to maintain continuous operation. Pendulum Kits; Each pendulum kit contains the following; 1, A 235lb. all brass ball with sculptured end caps. The lower cap contains an adjustable ½ brass pin which may be adjusted to knock down pins, or when replaced with a magnet can operate sensors in the floor. 2, A magnet drive system to keep the ball in motion. 3, An electronic control system to operate the magnet, and control the swing distance of the ball. The control system contains two parts. The control panel and the logic panel. 4, A safety device contains the cable and upper components should the cable suffer a catastrophic failure. (which has not occurred in the 50+ years of production.). 5, 2-1/8 suspension cables. Included is 1 spare cable. 6, An installation tool used to set the ball onto the cable. 7, One 14 h x 10 w brass educational wall plaque with Walnut base. 8, Installation and owners manuals 9, Smoke shields to enclose the unit for fire safety. Prerequisites; To install a pendulum requires a few details be completed during the construction or remodeling of the building. A proper mounting platform (not supplied by APS) must be designed constructed and installed into the building. Some built in electrical requirements must be attended to for the control panel and logic panel to be installed. The mounting platform (mp); The mp is a ½ steel plate measuring 30 (either square, round or octagon in shape). It is to have an 8 hole in the center, and 4 drilled and tapped ½ x 13t holes placed 90 degrees apart on a 8 ½ radius from the center. The Pendulum requires a clear space of 42 directly above the center of the mounting platform for the adjusting bolt and cable. This mounting platform should be mounted solidly to the building, leveled and centered over the pit. The mp should be mounted to the building with the ability to support a 500lb. live load. It should be braced to eliminate the side torque generated by the balls 235lb. swinging mass at the swing distance of 5 degrees from center. Speed of the balls swing will depend on the length of the cable. The bottom of the mp may be sealed to a floor or ceiling (except for the center hole) to keep smoke from traveling upward as required by some city fire codes. (continued) 3

The pendulum base and tower have anti-draft shield to keep smoke from traveling through the pendulum itself. Electrical requirements; For ease of adjustments, the control panel should be mounted in an area where the onboard tone device may be turned on and heard while viewing the ball, or the cable. The control panel box measures 12 h x10 w x 4 d and may be supplied ahead of the pendulums arrival (upon request) with either surface or flush mount as required for your installation. Power requirements; 120VAC 60htz.at 100 watts is required at the control panel only. 1 or 2 additional conduits (depending on the electrical codes for your area) must be installed from the control panel box to the tower area. They should terminate in a J box located within 3ft. of the mounting platform. A 6 length of ½ flexible conduit should be added to the J box with a ½ connector on the end of the flex cable. The wires should extend 12 beyond the fitting so a connection may be made to the logic panel box when installed. The logic panel is normally mounted onto the tower, but may be mounted remotely. Wiring between the control panel and the logic panel; See page 10 for typical wiring layout. From the control panel to the Logic panel require three color coded #14. wires plus a ground wire are required, and 1pr. shielded #18ga. A cable such as the Alpha brand # 2471 cable with a 600VAC insulation is a good choice, and my occupy the same conduit as the 120VAC in most installations, The #14 wires will conduct the 120VAC (which is switched and fused at the control panel) to the logic panel at the tower. The shielded pr. is for the timing control of the logic module. See Page 13 for remote mounting details. Pendulum magnet and suspension tower assembly; The assembled magnet and tower assy. measure 36 h x 18 w This unit is equipped with metal shields to aide in smoke and fire suppression. The magnet and mounting ring are supplied as an assembly, as is the tower cone. Note; In areas that sustain high temperatures such as glass skylights or hot attic spaces, the logic panel may be relocated up to 50 away from the tower. Install 2 #14 thhn, and 2 shielded pairs between the logic panel and the tower. Swing specifications; The height will determine the period of time for the swing. It will also govern the distance of the swing. The Mark 2 pendulum has a maximum swing angle of 5 degrees from center, and a minimum swing angle of 2 degrees from center. To calculate the distance of swing multiply the height (in inches) times the tangent of the angle from center. For 5 degrees the tangent is.08745. to calculate for a 50 pendulum (600 ) you would have 600 x.08745= a radius of 52.49 x2 = diam. Of 105 total swing. An additional 12 for over swing, and 15 for the diameter of the ball. = 132 total swing to the outside of the ball. I suggest railings be at least 3 from the ball to keep unwanted grabbing of the cable. 4

Installation information; The mounting platform and electrical should be installed during the construction phase. An average of 2 to 3 man days is required to assemble and complete the installation of the Foucault pendulum depending upon the difficulty of getting to the tower site. It will require 2 men to move the heavier components like the magnet and the ball. The ball in its crate weighs 290lbs. A special mounting fixture is supplied to aide in the installation of the ball. Installation Information Continued; Installation requires; assembly, leveling, centering, connecting wires, and adjusting controls on control panel. Shipping; The shipment will be 1 pallet of 4crates with a total weight of 640lbs. Shipping is class 70 freight, and is usually shipped by truck or sea. Limited Warranty; Each pendulum is set up and tested before crating. The parts in this product are warranted for a period of 1 year from the date of acceptance of the building, or (in completed buildings) from the date of first usage. The warranty covers parts and defects, but does not cover on site labor. Trouble shooting assistance by phone or Email is always free. Purchasing a Foucault Pendulum within the USA; It is always advisable to contact your seller early when considering the installation of a Foucault pendulum. With 30 years of experience our free consultation often proves helpful in making decisions on mountings, site access and accoutrements for the floor. Ordering a pendulum requires a purchase order accompanied by a down payment of 50% of the selling price and a signed and dated bid proposal. Bid proposals available on line at: <cponchione@netzero.com> Buying a unit from stock may still require machining of the magnet bore to meet the swing specifications for your particular building dimensions. Allow at least 10 weeks for construction (after we receive the required dimensions for the machining), assembling, testing, and crating process. Shipping within the USA may require up to 2 weeks by truck. International shipping will require much longer due to customs etc. It is advisable or order at least 180 days in advance to insure delivery. International sales (Optional); An irrevocable letter of credit may be placed in a bank for the full amount of the sale including shipping and documentation fees. Or you can save money by send the full amount prior to shipping. Price and Availability; Please contact: at cponchione@netzero.com for current pricing and availability. Special note: It is advisable to keep in contact prior to ordering a pendulum. Stock or prices may change. Pendulums are a limited production item, and orders can take up to 6 months to fill when stock is sold out. Only 6 pendulums are ordered for stock at a time. APS. welcomes architects to keep us informed with regards to status of a potential sale. It is also requested that the architects keep APS informed of any changes to pendulum swing dimensions, mountings platforms, and required accessibility to the tower. 5

Mark 2, Pendulum kit Specifications Height: Minimum 20 Maximum 100 Swing: (see chart on page 13) Ball Diameter: Ball Weight: Ball Material: Suspension Cable: Magnet & Tower Assembly Weight: Minimum 2 degrees from Center plus 6 over swing Maximum 5 degrees from Center plus 6 over swing 16 diameter 235 lbs. Hollow cast brass, polished to mirror finish with solid brass End caps 1/8-7 x 19 stranded steel galvanized w/ welded ends 200 lbs. Overall Dimensions: Assembled Tower 18 diam. 35 h Power Requirements; Shipping Weight; Shipping Size; 120 VAC. 60hz. 2 amp. Install disconnect as required or use dedicated breaker. 640 lbs. (ships class 70 frt) 4 crates total including pallet 36 x 36 x 42H PLATFORM DIMENSIONS (platform not supplied with pendulum kit) 30 x 30 x ½ steel plate with an 8 hole in the center plus 4 threaded ½ x 13T holes at 8.5 radius from center, and 90 degrees apart. Mounted level and centered over pendulum pit. SPECIAL REQUIREMENTS 1) Minimum clearance above platform: 48 2) Adequate means of access to tower site to install equipment and for future servicing 3) Electronics temperature requirement; Max low32- high122 degree F. 6

7

8

10

11

12

Pit Diameter 1 degree 2 degrees 3 degrees 4 degrees 5 degrees 45 minutes 20 cable 42.8 47 53 61.5 70 25 cable 46.5 51.8 59.2 70 80.5 30 cable 50.2 56.58 65.5 78.3 91 35 cable 53.9 61.35 71.7 86.7 101.5 40 cable 57.6 66 78 95 112 45 cable 61.3 70.9 84 103.5 122.5 50 cable 65 75.6 90.5 112 133 Calculations include 6 over swing each side plus 16 diameter of the ball. Calculations: Diameters are determined based on tangent x length of cable = ½ swing, multiplied by 2 for Total Swing plus 6 over swing on each side plus the balls diameter. Notes 13