Gardian W V preassembled electric heating cables for pipe freeze protection and roof & gutter de-icing Installation Instructions

Similar documents
RayClic Connection System Installation Instructions

RayClic Connection System Installation Instructions

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt.

Installation Instructions SELF-REGULATING (SR) ROOF AND GUTTER DE-ICING CABLES INDUSTRIAL AND COMMERCIAL SERIES

Wintergard wet roof & gutter De-icing

Electric Heat Tracing INSTALLATION PROCEDURES

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

INSTALLATION GUIDE HEAT TRACE WIRE SELF REGULATING HEAT CABLES

COMMERCIAL & RESIDENTIAL MARKETS U.S. PLUMBING CANADA PLUMBING AND ELECTRICAL mm mm Graphic pattern white.

Installation Instructions For Slider Casement Air Conditioners

Preventing Ice Dams on Roofs

Type FLX Freezer Floor Frost Heave Protection DESIGN GUIDE

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

Installation Instructions

Snow/Ice Melt Heating Cable System Gutters & Roof Drains Installation Manual Nexans TXLP/1 Series Resistance Cables

COLD LEAD OPTIONS FOR XMI MINERAL INSULATED (MI) HEATING CABLES

TubeTrace, ThermoTube

INSTALLATION OF A BAY WINDOW

RMM2 Heat-Tracing Remote Monitoring Module for the Raychem NGC Control System Installation Instructions

INSTALLATION GUIDE LOW VOLTAGE TRANSFORMER

Frost Heave Protection System Installation and Operation Manual for Self-Regulating Heating Cable Systems

ATS Overhead Table Shelf System INSTRUCTION MANUAL

Asphalt Shingle Application Requirements

MIQ TM Mineral Insulated Heating Cable INSTALLATION PROCEDURES. (North America)

Installation Instructions

SELF-REGULATING PIPE TRACING HEATER CABLE

Electrical Safety Plugs What are the different types of plugs? Extension Cords What are some potential hazards involving extension cords?

Ducoterra Radiant Heating Panel Installation Manual

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Series 510 Submersible Level Transmitters

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

4 Installation Requirements

Andersen Electric Window Opener for Andersen Awning and Roof Windows

Pipe Freeze Protection Design/Install Guide

Installation Manual. Self-Regulating Cables TECHNICAL HELPLINE

Installation Instructions

BATHROOM HEATER. User's Manual. Page 2...A515 Page 9...A716

OPERATING MANUAL CONTRACTOR STYLE AXIAL FANS

Chapter 9: INSTALLING ROOFING

AMERBRITE UNDERWATER WHITE LED POOL LAMP

How to Install UnderDeck The Original.

Quartzone Infrared Quartz Tube & Metal Sheathed Electric Heaters

TraceTek TTDM Series Leak Detection and Location Modules Replacement Parts Installation Instructions

Self-Regulating Low Temperature Heating Cable

SMD Rework Station TABLE OF CONTENTS

LED MOTION ACTIVATED FLOOD LIGHT

OASIS-PLUS 120V READ ALL INSTRUCTIONS BEFORE OPERATING READ ALL INSTRUCTIONS BEFORE OPERATING OZONE IS A POWERFUL OXIDIZER AND MUST BE USED WITH CARE

Name Of Occupancy Date. Yes No Describe

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

DVD-60C The Seven Sins of Wire Harness Assembly

Sun Windows General Information Sun New Construction Window Installation Instructions

Installation Instructions

PS4-24 OWNERS MANUAL 24 VAC 90 WATT WALL MOUNTED CCTV POWER SUPPLY

Portable Air Conditioner

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

VOYAGER 570G. 744A Sprayer Control

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Extension Cord Safety Policy

QT Residential Blower Metal Residential Blower

Solar Panel Installations

NOTE: Additional user information for your printer may be available in the "Manuals" section at support.dell.com.

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Mineral Insulated Heating

Wilo SP Series Submersible Sump Pumps ECS. ECS ECS ECS Installation and operating instructions

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

Installing the Sno-free Standing Seam System for Metal Roofs

WIRE, TERMINAL AND CONNECTOR REPAIR CONDUCTORS

Window Installation Instructions

IMPORTANT SAFETY RULES TO FOLLOW

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Home Inspection Report

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

SYSTEM 1850-SE SERVICE ENTRANCE CABLE SYSTEM

IMPORTANT INSTRUCTIONS & OPERATING MANUAL. Houston 50 Inch Electric Wall Mounted Fireplace Black / White

Monthly Inspection Checklists

Operating Instructions

Electrical Hazards. Power Tools. Extension Cords

Arctic Leash Instruction Manual Alaskan Products Company LLC.

GENUINE PARTS INSTALLATION INSTRUCTIONS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited

Chapter 10 - Scaffolding Systems

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Installation Guide. 5 Series 15 W. Undercounter/Freestanding Nugget Ice Machine

Ceiling Mounted Folding Attic Ladders Installation Instructions

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

Hot-Shot Operating Instructions

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL EEMAX ELECTRIC TANKLESS WATER HEATERS IMPORTANT SAFETY INFORMATION

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

About the HotWire Slot Standalone Shelf

CAER Construction and Environmental Resource

INSTRUKTIONSMANUAL INSTALLATION INSTRUCTION

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

How To Plan Out An Array Of Solar Panels

Portable Ladder Safety

Transcription:

Gardian W51 120 V preassembled electric heating cables for pipe freeze protection and roof & gutter de-icing Installation Instructions Description Gardian W51 120 V preassembled self-regulating heating cables are designed for residential and commercial metal and plastic pipe freeze protection and roof & gutter de-icing applications. Gardian W51 heating cables are available in 6, 12, 24, 50, 75 and 100 foot lengths, and each comes assembled with a 30-inch power cord and plug. Pipe Freeze Protection Roof and gutter de-icing: standard roof Kit contents 1 Gardian W51 preassembled electric heating cable 2 Roof and gutter labels 2 Pipe labels Additional items required but not supplied for pipe applications Waterproof thermal insulation (e.g. preformed foam) Ground-fault protected outlet (GFCI) Raychem H903 Application Tape and Electric Traced Labels Additional items required but not supplied for roof & gutter applications Raychem H913/H914 Roof Clips (10 clips for each 7 linear feet of roof edge) Raychem H915 Hanger Bracket (1 for each downspout, 2 if looping) UV Resistant cable ties Ground-fault protected outlet (GFCI) Approvals -WS Roof and gutter de-icing: standing seam metal roof WARNING: Fire and Shock Hazard. This product is an electrical device that must be installed correctly to ensure proper operation and to prevent shock or fire. Read these important warnings and carefully follow all the installation instructions. To minimize the danger of fire from sustained electrical arcing if the heating cable is damaged or improperly installed, and to comply with the requirements of Pentair Thermal Management agency certifications, and national electrical codes, groundfault equipment protection must be used on each heating cable branch circuit. Arcing may not be stopped by conventional circuit protection. For pipe freeze protection applications, use only fire-resistant insulation materials such as preformed foam or fiberglass. Do not damage the heating cable and power cord or plug. Remove any damaged cables from service immediately. Do not use any wire or metal clamps to attach the cable to the pipe. Use tape (1/2 inch wide to 1 inch wide) or plastic cable ties. Do not install the heating cable underneath any roof covering for roof and gutter de-icing. Leave these installation instructions with the user for future reference. 1 / 8

Pipe Freeze Protection General requirements for pipe freeze protection: Gardian heating cables may be used on metal and plastic water pipes but not on flexible vinyl tubing (such as garden hoses). Gardian heating cables are not intended for use inside any pipes, for freeze protection of liquids other than water, or for use in classified hazardous locations. Install with a minimum of 1/2 fire-resistant, waterproof thermal insulation. Never use on any pipes that may exceed 150 F (65 C). Do not use an extension cord. Electrical codes Articles 422 and 427 of the National Electrical Code (NEC), and Part 1, Section 62 of the Canadian Electrical Code (CEC), govern the installation of Gardian heating cable for pipe freeze protection and must be followed. Important: For the Pentair Thermal Management warranty to be valid, you must comply with all the requirements outlined in these guidelines. General instructions: Install only in accessible locations; do not install behind walls or where the cable would be hidden. Do not run the heating cable through walls, ceilings, or floors. Connect only to ground-fault protected outlets that have been installed in accordance with all prevailing national and local codes and standards and are protected from rain and other water. All thermal and design information provided here is based upon a standard installation with heating cable fastened to an insulated pipe. For any other application or method of installation, consult Pentair Thermal Management at (800) 545-6258 Determine which Gardian W51 heating cable you need for pipe freeze protection: Use the tables to the right to select the correct heating cable. Add 1 foot to your pipe length for each valve or spigot on your pipe system. The charts assume the lowest outside temper-ature is 0 F ( 18 C), with a minimum of 1/2 thick waterproof, fire-resistant thermal insulation (preformed foam). For protection to 20 F ( 29 C), use 1 thick insulation. Table 1 Metal Pipes Pipe diameter (in) Pipe diameter (in) 2 1 /2 2 1 1 /2 Important: All thermal and design information provided here is based upon a standard installation : heating cable fastened to a pipe and thermally insulated. For any other method of installation or application, consult Pentair Thermal Management at (800) 545-6258. 1 6P 12P 18P 24P 50P 75P 100P 1/2 0 10 20 30 40 50 60 70 80 90 100 Pipe length (ft) Table 2 Plastic Pipes 2 1 /2 2 1 1 /2 1 6P 12P 18P 24P 50P 75P 100P 1 /2 0 10 20 30 40 50 60 70 80 90 100 Pipe length (ft) Add 1 foot to the pipe length for each valve or spigot on your pipe system. If cable selected is longer than the pipe, spiral it evenly along the entire pipe. 2 / 8

12 inches End view Tape or cable ties Figure 1. Straight-traced installation W51 heating cable 1/2 in insulation Waterproof covering Pipe label 12 inches Tape or cable ties W51 heating cable 10 feet Glass tape Heating (typical) cable 1/2 in insulation Waterproof covering Pipe label Tape after spiraling heating cable on pipe Apply glass tape before spiraling heating cable on pipe Figure 2. Spiral-traced installation Pull heating cable loop length Wrap loops in opposite direction Heating cable installation 1. Prepare for installation. Store the heating cable in a clean, dry place. Complete piping pressure test. Prior to installing the cable, remove any sharp surfaces on the pipe that might damage the heating cable. Review the Gardian heating cable design and compare to materials received to verify that you have the proper Gardian heating cable. Walk the system and plan the routing of the Gardian heating cable on the pipe. 2. Position and attach heating cable to pipe. Be sure all piping to be traced is dry. Install heating cable, using straight tracing Figure 1, or spiraling Figure 2. For straight tracing, install the heating cable on a lower half of the pipe; for example, in the 4 o clock or 8 o clock position. Be sure to install the additional heating cable required for valves, flanges, etc. as shown in Figures 1 and 2. When the design calls for spiraling, begin by suspending a loop every 10 feet as shown in Figure 2. To determine the loop length, divide the Gardian length by your pipe length and multiply by 10. For example, if you are using a 50 ft Gardian on a 40 foot pipe, leave a 12-foot loop of heating cable at every 10-foot section of pipe. Grasp the loop in its center and wrap it around the pipe. Even out the distance between spirals by sliding the wraps along the pipe. Use glass tape to secure the center of the loop to the pipe. Fasten Gardian heating cable to the pipe at 1-foot intervals using H903 fiberglass application tape or nylon cable ties. Do not use vinyl electrical tape, duct tape, metal bands, or wire. If excess cable remains at the end of the pipe, double it back along the pipe. 3. Check the installation. Prior to installing thermal insulation, make sure the heating cable is free of mechanical damage (from cuts, clamps, etc.) and thermal damage (from solder, overheating, etc.). 3 / 8

Strain relief Cord label Figure 3. Insulation Figure 4. Strain relief Pipe label Note: Pipes must be fully insulated. 4. Install thermal insulation. A reliable Gardian system depends on properly installed and dry, weatherproofed thermal insulation. Ensure that at least 1/2 of preformed foam or equivalent thermal insulation is used and that all piping, including valves, joints, and wall penetrations, has been fully insulated as shown in Figure 3. For protection to -20 F (-29 C), use 1 thick insulation. Install the insulation on the piping as soon as possible to minimize the potential for mechanical damage after installation. Be sure the Gardian W51 label is visible on the outside of the thermal insulation. 5. Finishing the installation. To prevent damage to the heating cable or cord, secure the power cord (cold lead) with a plastic cable tie, glass cloth tape, or duct tape as shown in Figure 4. Two labels indicating the presence of electric pipe heating cable are included with the heating cable. Attach the two Electric Traced labels on the outer surface of the pipe insulation at suitable intervals to indicate the presence of Gardian electric heating cable. 6. Starting the system. Pentair Thermal Management recommends that the system be tested per the Cable testing and maintenance section below. Plug the heating cable into a 120 V ground-fault protected outlet. Check the circuit breaker to verify power to the cable. Standing water in the pipe should feel warm within an hour. Cable testing and maintenance Using a 2500-Vdc megohmmeter, check the insulation resistance between both of the rectangular (power) prongs on the plug and the round (ground) prong after installing the heating cable. Minimum reading should be 1000 megohms. Record the original values for each circuit, and compare subsequent readings taken during regular maintenance schedules to the original values. If the readings fall below 1000 megohms, replace the Gardian W51 cable with a new unit. Do not attempt to repair the unit. WARNING: Fire and Shock Hazard. Damaged heating cable can cause electrical shock, arcing, and fire. Do not attempt to repair or energize damaged heating cable. Remove it at once and replace with a new length. 4 / 8

Roof & Gutter De-icing Note: Route and secure the heating cable to avoid possible mechanical damage, such as from ladders, etc. General requirements for roof & gutter de-icing: Gardian is designed to remove melt water, not accumulated snow. Gardian heating cable will not keep snow or ice from falling off the roof. Snow fences or snow guards should be used to eliminate snow movement. For the names of manufacturers of snow guards or snow fences, contact Pentair Thermal Management at (800) 545-6258. Gardian heating cables may be used on: - Roofs made from all types of standard roofing materials, including shake, shingle, rubber, tar, wood, metal, and plastic. - Gutters made from standard materials, including metal and plastic. - Downspouts made from standard materials, including metal and plastic. Electrical codes Article 426 of the National Electrical Code (NEC), and Part 1, Section 62 of the Canadian Electrical Code (CEC), govern the installation of Gardian heating cables for roof and gutter de-icing and must be followed. Important: For the Pentair Thermal Management warranty to be valid, you must comply with all the requirements outlined in these guidelines. Do not use an extension cord. Do not install the heating cable underneath any roof covering for roof and gutter de-icing. Install only in accessible locations; do not install behind walls or where the cable would be hidden. Do not run the heating cable through walls, ceilings, or floors. Connect only to ground-fault protected outlets that have been installed in accordance with all prevailing national and local codes and standards and are protected from rain and other water. All design information provided here is based on a standard shake or shingle roof application. For any other application or method of installation, consult Pentair Thermal Management at (800) 545-6258. 5 / 8

Heating cable selection for roof & gutter de-icing 1. Calculate the heating cable length. Find the number of feet of heating cable needed per foot of roof edge in Table 3. Then, calculate the amount of total heating cable length you need using the following formula: Length = A + B + C + D A Roof edge: Roof edge (ft) x Feet of heating cable per foot of roof edge B Roof extension: Roof edge (ft) x 0.5* C Roof gutter: Total gutter length (ft) D Downspout: Total downspout length (ft) +1 (ft) = Total heating cable length (ft) * Roof extension: This length allows the heating cable to extend into the gutter to provide a continuous drain path, or where no gutters are present, extends beyond the roof edge to form a drip loop. Example: (shingle roof) Eave overhang: 1 ft / 12 in Roof edge: 15 ft Roof gutter: 15 ft Downspout: 15 ft Gardian heating cable required: A Roof edge: 15 ft x 2.8 = 42.0 ft B Roof extension: 15 ft x 0.5 = 7.5 ft C Roof gutter: 15 ft = 15.0 ft D Downspout: 15 ft + 1 ft = 16.0 ft Total heating required: = 80.5 ft Gardian required: W51-100P Table 3. Typical spacing and layout measurements Length of heating cable per foot of roof edge (feet) Standing seam metal roof: Eave overhang (in) Shingle roof 18 in seam 24 in seam None 2 2.5 2 12 2.8 2.8 2.4 24 3.8 3.6 2.9 36 4.8 4.3 3.6 Note: Pentair Thermal Management recommends the use of gutters and downspouts to provide a continuous path for melted water. If downspout is in the middle of the run, loop the Gardian down and back up. Double the length of the downspout for determining the length of Gardian to install. For valleys, run the heating cable two thirds of the way up and down the valley. For gutters 5-6 inches wide use 2 runs of heating cable. For gutters wider than 6 inches contact Pentair Thermal Management, (800) 545-6258 Heating cable installation UV-resistant cable tie 2' Figure 5. Standard roof UV-resistant cable tie Figure 6. Standing seam metal roof 1. Prepare for installation. Store the heating cable in a clean, dry place. Use only the following Pentair Thermal Management accessories to satisfy code and agency requirements: - H915 Hanger Bracket - H913/H914 Roof Clips Make certain gutters and downspouts are free of leaves and other debris. Carefully plan the routing of the heating cable for roof and gutter de-icing. 2. Position and attach the heating cable on roofs. Loop the heating cable on the overhang area of the roof. This is the part that extends past the building wall. Extend the bottom of each heating cable loop over the roof edge and, using a UV-resistant cable tie, connect the bottom of each loop to the cable running in the gutter to ensure a drainage channel off the roof and into the gutter and downspout. The cable running in the gutter should remain against the bottom of the gutter as shown in Figures 5 and 6. Table 4. Tracing heights for different roof styles Shake and Shingle Roof Roof of overhang (in) Feet of Gardian per Tracing width (in) Tracing heights (in) foot roof edge None* 2 18 2 12 2 18 2.8 24 2 30 3.8 36 2 42 4.8 Standing Seam Metal Roof** Eave overhang (in) Standing Seam Spacing (in) Tracing heights (in) Feet of Gardian per foot of roof edge None* 18 18 2.5 12 18 24 2.8 24 18 36 3.6 36 18 48 4.3 None* 24 18 2.0 12 24 24 2.4 24 24 36 2.9 36 24 48 3.6 * Gutter required ** No additional heating cable is required for gutters when tracing standing seam metal roofs 6 / 8

1/3 2/3 Figure 7. Standard roof clip attachmenta Figure 8. Valleys Extend the top of each heating cable loop beyond where the wall joins the roof. Trace two-thirds of the way up each valley with a double run of heating cable as shown in Figure 8. Use H913/H914 roof clips to route heating cable into and out of the gutter in such a way as to prevent abrasion to the cable. Protect all cable that protrudes past the lower opening of the downspout. One H913 kit contains ten roof clips for approximately 7 linear feet of roof edge. One H914 kit contains 50 roof clips for approximately 35 linear feet of roof edge. Accumulated ice can be removed. Figure 10. Heating cable in downspout 12 in Figure 9. Standing seam roof clip Roof clips may be attached to a shake or shingle roof with nails or screws as shown in Figure 7. Roof clips may be attached to a metal roof using screw, nail or adhesive as shown in Figure 9. (See H56723 installation instruction for more details.) Reseal the nail or screw holes if necessary before installing heating cable in the clips. A barrier (snow fence) can be placed on the roof above the heating cable. This prevents damage to the cable and keeps the installation from coming loose due to ice slides. The heating cable can be attached to the barrier with UV-resistant cable ties, instead of using roof clips, if desired. Do not use wire or other materials because they may damage the heating cable. In gutters and downspouts Run heating cable along gutters and into downspouts, ending below the freezing level. Permanent attachment of the cable to the gutter bottom is not necessary. Loop the heating cable in downspouts. Do not leave the end of the Gardian in air at the end of the downspout as shown in Figure 10. Use H915 Hanger Brackets at the gutter/downspout transition to protect the heating cable from fraying and from damage from sharp edges and to provide strain relief as shown in Figure 11. Refer to the H915 kit instructions for installation details. Route and secure cable to avoid possible mechanical damage, such as from ladders, etc. Heating cable Figure 11. Hanger brackets Hanger bracket 3. Mark the installation. Two labels indicating the presence of electric de-icing and snow-melting equipment on the premises are included with the heating cable. One label must be posted at the electrical outlet cover. The other label must be posted at the fuse or circuit breaker panel. The labels must be clearly visible. 4. Check the installation. Prior to plugging in, check to be sure the heating cable is free of mechanical damage (cuts, clamps, etc.). Using a megohmmeter, test each circuit according to the instructions in the Heating cable testing and maintenance section on next page. 5. Starting the system. Pentair Thermal Management recommends that the system be tested per the Cable testing and maintenance section below. Plug the heating cable into a 120-V ground-fault protected outlet. Check the circuit breaker to verify power to the cable. 7 / 8

Heating cable testing and maintenance Make sure that gutter and downspouts are free of leaves and other debris prior to the winter season. Using a 2500-Vdc megohmmeter (2500 Vdc minimum), unplug the Gardian and test the unit by checking the insulation resistance between the flat blade and the ground pin in the plug. Minimum reading should be 1000 megohms regardless of Gardian length. Record the original values for each circuit. Take additional readings during regularly scheduled maintenance and compare to the original value. If the readings fall below 1000 megohms, inspect heating cables and insulation for signs of damage. WARNING: Fire and Shock Hazard. Damaged heating cable can cause electrical shock, arcing, and fire. Do not attempt to repair or energize damaged heating cable. Remove it at once and replace with a new length. Product specifications W51-6P W51-12P W51-18P W51-24P W51-50P W51-75P W51-100P Cable length (feet) 6 12 18 24 50 75 100 Min. power output at 40 F (5 C) on pipe (watts) 36 72 108 144 300 450 600 Nominal power output in ice and snow (watts) 48 96 144 192 400 600 800 General specifications for all W51 products Nominal cable width (in) 0.42 Nominal cable thickness (in) 0.22 Heating cable bus wire gauge (AWG) 16 Cold lead length (in) 30 Voltage rating (V) 110 120 Plug rating (amps) 15 Circuit breaker sizing minimum (amps) 15 Max. exposure temperature 150 F (65 C) Electrical classification Nonhazardous areas only Exposure to chemicals None WWW.THERMAL.PENTAIR.COM NORTH AMERICA Europe, Middle East, Africa Asia Pacific Latin America Tel: +1.800.545.6258 Fax: +1.800.527.5703 Tel: +1.650.216.1526 Fax: +1.650.474.7711 thermal.info@pentair.com Tel: +32.16.213.511 Fax: +32.16.213.603 thermal.info@pentair.com Tel: +86.21.2412.1688 Fax: +86.21.5426.2917 cn.thermal.info@pentair.com Tel: +55.11.2588.1400 Fax: +55.11.2588.1410 thermal.info@pentair.com Pentair and Gardian are owned by Pentair or its global affiliates. All other trademarks are the property of their respective owners. Pentair reserves the right to change specifications without prior notice. 1996-2013 Pentair. PN 556229 8 / 8