EROSION CONTROL WHAT IS AVAILABLE & HOW TO PROPERLY INSTALL IT

Similar documents
Storm Drain Inlet Protection

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Storm Drain Inlet Protection

SE-10 STORM DRAIN INLET PROTECTION. Objectives

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Temporary Erosion-Control Measures

City of Shelbyville Site Inspection Checklist

Storm Drain Inlet Protection - IP

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Outlet stabilization structure

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

City of Beaumont, Texas Grading Permit Information

CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides

Table 4.9 Storm Drain Inlet Protetion Applicable for

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Concrete Waste Management

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

State of California Department of Transportation Construction Site Best Management Practice (BMP) Field Manual and Troubleshooting Guide

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Preventing Storm Water Pollution: What We Can Do

SECTION 5. Sediment Control Measures

Erosion Control and Stormwater Quality Field Guide

STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES

Activity Yes No N/A Notes

Temporary Batch Plants

Storm Drain Inlet Protection

Erosion and Storm Water Management Unit Mail Stop John Ireland Blvd. St. Paul, MN 55155

Erosion and Storm Water Management Unit Mail Stop John Ireland Blvd. St. Paul, MN 55155

PART 2 BEST MANAGEMENT PRACTICES

Stormwater/Wetland Pond Construction Inspection Checklist

SC-07 STORM DRAIN INLET PROTECTION

Homeowner s Guide for Flood, Debris, and Erosion Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN

Construction Site Inspection. Inspecting to Keep You in Compliance

Chapter 11 Site Rehabilitation and Stabilization

Stormwater Construction Inspection Guide August 2008

Erosion Control Blanket (ECB)

Installation PowerPoint for Grasscrete Formers

Block and Gravel Inlet Protection (BIP)

Beseck Switching Station Inspection

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Vehicle Tracking Control (VTC)

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

Storm Water Management Requirements for Construction Projects Less than One Acre

Erosion and Sediment Control Guidelines for. Small Sites

Storm Drain Inlet Protection for Construction Sites (1060)

MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Storm Drain Inlet Protection for Construction Sites (1060)

Stormwater Best Management Practice (BMP) Selection and Implementation

Permeable Pavement Construction Guide

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Homeowner s Guide to Drainage

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information

Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation

Watershed Works Manual

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Annual Standards and Specifications. Erosion and Sediment Control

Environmental Issues In Your Backyard

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

D R A F T. Best Management Practices Plan (Surface Water, Sediment & Erosion Control) West Carleton Environmental Centre. May 2014

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

CITY UTILITIES DESIGN STANDARDS MANUAL

STORMWATER MANAGEMENT CHECKLIST

Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5

Understanding Erosion. Revised Universal Soil Loss Equation

Standard Site Drainage and Erosion Control Details (August 15, 2006)

Integrated Pest Management, Erosion and Sedimentation Control, and Landscape Management Plan

WATER CONSERVATION TECHNICAL BRIEFS

Waste Handling & Disposal

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Underground Injection Control Storm Water Information

Scheduling Maintenance for Infiltration Basins and Trenches

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Vehicle Tracking Pad

A. Structures Quantity Item Price $3,500 EA

Emergency Spillways (Sediment basins)

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Complying with the Edwards Aquifer Rules Technical Guidance on Best Management Practices

Low Impact Development Checklist

INDEX TO SECTION CHAIN LINK FENCES AND GATES. Paragraph Title Page

NJ Interception Drainage

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods


STATEMENT OF ACKNOWLEDGMENT

piles of debris that accumulate after a rain such as leaves, trash, twigs, etc., water stains on fences and buildings, or salts extruded on bricks,

Transcription:

EROSION CONTROL WHAT IS AVAILABLE & HOW TO PROPERLY INSTALL IT Presented by : Patricia A. Daniel, CPESC Red River Hydro-Seeding, Inc. August 4, 2010 redriverhydro@winstream.net

EROSION CONTROL WHAT IS IT? Erosion Control is any practice that protects the soil surface and prevents the soil particles from being detached by rainfall or wind. John McCullah 2002

SEDIMENT CONTROL WHAT IS IT? Sediment control is the practice used to keep sediment, (soil particles left unprotected from wind and rain), from leaving the site.

RUNOFF Runoff is the stormwater increased in volume and velocity during a rain event because vegetation has been removed. Examples: Channels Ditches Slopes

BEST MANAGEMENT PRACTICES (BMP S) Methods that have been determined to be the most effective, practical means of preventing or reducing pollution from a non-point source. (EPA 2010)

SWPPP Stormwater Preventive Pollution Plan: A plan for storm water discharge that includes erosion control and sediment control prevention measures and controls.

EROSION CONTROL BMP S The most effective, efficient, and economical method of controlling erosion is to use: Established vegetation buffers Vegetation can reduce erosion by 90% Schedule dirt work for the driest parts of the year Stage dirt operations.

EROSION CONTROL BMP S SURFACE ROUGHENING PERMANENT SEEDING TEMPORARY SEEDING MULCH COVER SOLID SOD EROSION CONTROL BLANKETS TRM S (TURF REINFORCEMENT MATS)

SEDIMENT CONTROL BMP S Silt Fence Sand Bag Ditch Checks Hay Bale Ditch Checks Drop Inlet Protection Sediment Logs

RUNOFF CONTROL BMP S Grass Lined Channels Turf reinforcement mats and blankets Slope drains Waddles Sediment Logs

INSTALLING EROSION CONTROL BMP S

SURFACE ROUGHENING: Properly track a slope. Tracking with machinery such as a dozer up and down the slope places grooves on the slope that allows a place for seed, fertilizer, and water to be trapped and also serves as a runoff control as it slow water going down the slope.

RE-ESTABLISHMENT OF VEGETATION: Ph Soil testing is needed to apply lime at the correct rate. Always measure the area for correct application of seed, fertilizer, and lime.

METHODS OF SEEDING Hydro-Seeding - Seed, fertilizer, lime can be applied in a slurry Broadcast Seeding- Seed, fertilizer, lime is spread with mechanical spreaders Hand Broadcast Seeding Seed and fertilizer spread by hand

CHOOSE THE RIGHT SEEDS Temporary Seeds Examples: Warm Season: Brown Top Millet 50# per Ac Cool Season: Annual Rye Grass or Wheat or other Cereal Grass 100# per Ac AHTD Standard Spec

PERMANENT SEEDS Examples: WARM SEASON BERMUDA GRASS COMMON - HULLED SEEED 5# Acre Bermuda Grass Common Unhulled Seed 10# Acre Wildflower Mix 2.5# Acre Examples: COOL SEASON Annual Rye Grass or Cereals 10# Acre (Wheat, Oats, ) Crimson Clover (Dixie) 10# Acre Bermuda Grass Common unhulled 20# Acre Wildflower Mix 2.5# Acre - AHTD Standard Spec

MULCH COVER FLAT AREAS TO 3:1 SLOPES HAY 4,000# per Acre STRAW 4,000# per Acre Hydro-Mulch Paper ( As recommended by Mfr.) Hydro-Mulch Wood Fiber (As recommended by Mfr.) STEEPER THAN 3:1 Slopes Hydro-Mulch Wood Fiber Mulch Erosion Control Blankets 2:1 SLOPES AND STEEPER EROSION CONTROL BLANKETS/TRM s Bonded Fiber Matrix

SOLID SOD Install year around Prepare dirt as for seed bed Fertilize the area with approx. l# per l9sy Roll with a lawn roller or tamper Water thoroughly

EROSION CONTROL BLANKETS SLOPES Erosion Control blankets can be used on 2H:1V slopes - 1.5H:1V slopes. Always install according to manufacturers recommendation. Prepare the soil just as you would for seeding, grading and shaping the area. Be sure all clots, rocks, and other vegetation is removed. Lime, fertilize, seed and add all other amendments to the soil before the blanket is installed. Blankets need to fit snug to the ground. Trench in and staple according to manufacturers recommendations.

TURF REINFORCEMENT MATS TRM S Designed for Channels - Large flows of water Most of the TRM s can replace concrete ( about 25% of the cost for concrete ) Can be used on slopes than exceed blanket capabilities Seed and Fertilizer is installed before TRM is installed (unless recommended after installation by Manufacturer)

INSTALLING SEDIMENT CONTROL BMP S Silt Fence Concentrated runoff can cause failure of the silt fence. Install silt fence with J-hooks which are smaller segments of silt fence that can hold and retain smaller quantities of run off.

J HOOKS Up hill turn should be in the Direction of water flow. Sediment Should Pond Behind Silt fence McCullah (2002)

It is not a filter fabric SILT FENCE WHAT IT IS NOT It is not for direct flow of water. Do not put it across the stream. Do not put is across a channel.

SILT FENCE WHAT IT IS AND WHAT IT DOES It is designed for sheet flow Should be on the contour of a slope Toe of the slope Around stockpiles Any where it can hold and pond water It allows sediment to fall out of suspension be fore it leaves the area.

INSTALLING SILT FENCE Be sure and install the fence with the stakes away from the flow of water. On the back side. When you finish installing silt fence turn the end uphill. Post should be driven into the ground 2 min. The fabric must be keyed in at least 6 at the beginning and the end with the fabric trenched, sliced, or dug in at least 6. Compact the dirt on both sides of the fence to prevent erosion.

SLICING TOMMY SILT MACHINE No compacting Needed after installation

HOW TO ATTACH TWO ROLLS TOGETHER When attaching two rolls place the end of Second roll inside the end post of the first roll. Rotate both post l80 degrees in a clockwise direction to create a tight seal. Drive both post in the ground 2. Key fabric in 6. Go behind the first roll of fabric installed about 3 LF and start the second roll of fabric.

FAILURE OF SILT FENCE Improper use of the silt fence Improper installation Improper maintenance Not enough silt fence used for the area of runoff.

MAINTENANCE OF SILT FENCE Silt fence should be maintained when sediment is l/3 the height of the fence Silt fence is torn or sagging Silt fence has been damaged by equipment Remove silt fence when vegetation has been established.

HAY BALE DITCH CHECKS Hay bales should weight at least 50# each Should measure 30, or longer Should be bound with wire, or poly string Install 2 stakes per bale 36 1l/2 x l l/2 wood stakes

HOW TO INSTALL A HAY BALE DITCH CHECK Each hay bale should be keyed into the ground at least 4. Drive in wooden stakes through each bale, one at an angle, so that it goes into the bale laid before it to ensure a tight fit. The stakes should be driven into the ground at least 18. Maintenance should be done regularly to keep sediment removed from hay bales. Binding should be around the sides rather around the top and bottom to maintain the integrity of the hay bale.

SAND BAG DITCH CHECKS Can be used in ditches with a more direct flow They can be stacked to meet the needs of the flow Sand bags can be filled with gravel for a filter bag. Bags should be filled to within 6 of top for proper tying. One Sand Bag should be removed from the middle and top to form a dam for water to flow over.

DROP INLET SEDIMENT BARRIERS It is a barrier put around a drop inlet to prevent sediment from going into a storm drain. They can be build of gravel and stone, sandbags filled with gravel, cinder blocks, or silt fence structures sediment logs

SEDIMENT LOGS Sediment logs can filter water Can be used as a continuous berm Can be used in ditch bottoms Perimeter controls In place of rock ditch checks Replace silt fence Replace hay bale Replace sand bags Used in areas where water leaves and enters a project

SEDIMENT LOGS AS INLET PROTECTION

TRIANGULAR SILT FENCE DIKE This product can replace rock filter dams, silt fence, hay bale ditch checks, and sandbag ditch checks. Can be used as a continuous berm They are reusable The have a protective apron on both sides

TRIANGULAR SILT FENCE

CONTINUOUS BERMS The purpose of a continuous berm is to divert and capture sheet runoff. They can be used at the perimeter of property to pond water until the sediment in suspension has had time to fall out of the water. They can be used as a filter if they are filled with aggregate and permeable filter fabric. Continuous Berms can replace straw ditch checks and silt fence. Some do require a machine to install.

Grass Lines Channels. RUNOFF BMP S Reduce erosion by slowing the water Best used in wide shallow drainage areas Used to look like a natural setting Must be installed after sediment traps are installed to insure sediment is not deposited on sod.

WATTLES Primary use is on hillslopes to break up slope lengths and slow runoff. May be placed across channels

CONSTRUCTION EXIT/ENTRANCE??

CONSTRUCTION EXITS Construction exits must be used by all entering and exiting the project site. They must be maintained regularly They may require a wash out area

INSTALLING A CONSTRUCTION EXIT The exit should be long enough for at least 4-5 wheel rotations of the largest vehicle or equipment on site. A min of 50. The pad should be at least 3-4 deep. Fabric installed under riprap 4-5 Landscape Riprap placed on top of fabric.

CONCLUSION:

RESOURCES McCullah, J (2002). How to Put the Best Back into your Erosion Control BMP s.(2002) Manual Environmental Protection Agency Epa.gov/OCEPAterms/bterms.html Arkansass Highways and Transportation Standard Specifications for Roadway and Bridges (2003) Little Rock, Ar Arkansas Highways and Transporations Construction Plans (2009),Little Rock, Ar American Excelsior Company Americanexclesior company.com/erosion control products/sediment logs. php Americanexcelsior company.com/erosion control products/waddles.php Acfenvironmental.com/PDFs/TriangularSiltDike/Bro-Triangular20%silt%20Dike.pdf International Erosion Control Association. Practical Approaches for Effective Erosion and Sediment Control Manual

RESOURCES Caltran storm water quality handbooks section 6. (2003). Construction Site Best Management Practices Manual Stabilizied Construction Entrances/Exit Tc-1, TC-3 Texas Department of Transportation www.dot.state.us/business/specifications.htm Hildebrand, J (2010). ELG s and Construction Industry: What does this new rule mean to my project (2010) Webinar