ENGINEERING CHECKLIST STORMWATER MANAGEMENT FACILITY AS-BUILT INFORMATION

Similar documents
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

STORMWATER MANAGEMENT CHECKLIST

Stormwater/Wetland Pond Construction Inspection Checklist

SECTION 5 DRAFTING STANDARDS

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

ENGINEERING & CONSTRUCTION MANAGEMENT

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

City of Shelbyville Site Inspection Checklist

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Emergency Spillways (Sediment basins)

City of West Linn Public Works Design Standards Table of Contents

URBAN DRAINAGE CRITERIA

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

ORDINANCE NO

Outlet stabilization structure

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Underground Injection Control Storm Water Information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL

Low Impact Development Checklist

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE

SITE IMPROVEMENT PLANS CHECKLIST

OAKLAND COUNTY WATER RESOURCES COMMISSIONER ENGINEERING DESIGN STANDARDS FOR STORM WATER FACILITIES

Riprap-lined Swale (RS)

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

DESIGN & TECHNICAL CRITERIA STORM DRAINAGE JEFFERSON COUNTY, COLORADO PLANNING & ZONING DIVISION

Table 4.9 Storm Drain Inlet Protetion Applicable for

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Definition of Tower from the Bradley County Zoning Resolution

PART V BEST MANAGEMENT PRACTICES

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Seattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual

STORM DRAINS CHAPTER 7

Preliminary Plan Application and Checklist

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Homeowner s Guide to Drainage

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

OHIO ENGINEERING JOB APPROVAL AUTHORITY ETHICS STATEMENT

SECTION INLETS INLET LOCATIONS

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

Design Templates Stormwater Calculation Summary

Annual Standards and Specifications. Erosion and Sediment Control

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

CHAPTER 5. Storm Sewer

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SEWER LINE EXTENSION DESIGN CHECKLIST

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Catawba County Application for a Wireless Communication New Tower or Combination New Tower/Collocation (Quasi-Judicial Hearing - Board of Adjustment)

City of Beaumont, Texas Grading Permit Information

4.3 Cisterns and Rain Barrels

Funding the Long-Term Operation and Maintenance of Stormwater Best Management Practices

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

1.7.0 Floodplain Modification Criteria

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Storm Drain Inlet Protection

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Computing Stormwater Runoff Rates and Volumes

Engineering Department

Chapter 5.0. Stormwater Credits for Innovative Site Planning

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO , Construction Permit No. CP , Callaway County

Receiving Water Body:

CHAPTER 7 DRAINAGE OF PAVEMENTS

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012

Section 2100-Trenching and Tunneling

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

Block and Gravel Inlet Protection (BIP)

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL

BMP #: Dry Wells / French Drains

Stormwater Management Functional Servicing Report

STORM DRAINAGE GENERAL INFORMATION Drainage Systems VDOT Requirements Metric Plan Preparation...

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

US Army Corps of Engineers BUILDING STRONG

720 Contour Grading. General. References. Resources. Definitions

Basic Elements of Reading Plans

Transcription:

NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST STORMWATER MANAGEMENT FACILITY AS-BUILT INFORMATION Project Name: Application Number: Date Submitted: Date Accepted: Accepted By: For Office Use Only 1. Minimum Submission Information Review fee, payable to New Castle County. (UDC Appendix 2) Two (2) copies of bound as-built package consisting of: (all originals, signed and sealed, and dated) Stormwater Management Facility As-Built Information (Form) All applicable individual Stormwater Construction Checklists (Form) (vegetative stabilization should be inspected at the time of asbuilt submission) Plans Narrative Report consisting of the following items: Identification of any discrepancies from the regulations and/or approved plans and any design changes from the original design CCR Inspection(s) during the construction and stabilization of the facility Identification of any installation issues Confirmation the drainage area to each stormwater management facility is consistent with the design Revised volume and routing computations along with an evaluation of the facility, if applicable. (If necessary 87 Reads Way, New Castle, DE 19720 www.nccdelu.org Phone: 302-395-5400 Fax: 302-395-5587

modifications to the facility or outlet structure may be required) Certification from a Delaware RLA of landscape plantings within the facility, if applicable Outfall Data Sheet(s) 2. Minimum Required Plan Information 24 x 36 Sheet Engineering firm and address, phone number and fax number Record subdivision name, Instrument number, and Subdivision Land Development Application number (SLD) Name, address, phone number and fax number of maintenance corporation representative or owner Hundred, County, State Scale (must match design plan) Date of Survey Signature, seal and date of P.E. or P.L.S. Certification as prescribed below: I, the undersigned, hereby certify that I am a Professional Engineer / Land Surveyor registered in the State of Delaware. To the best of my knowledge and belief, I certify that the stormwater management facility, as shown on the Stormwater Management Facility As-Built Plan prepared by and dated, is in general compliance with the latest approved Sediment and Stormwater Plan. Signature and Seal of Professional Date Adjoining roads with names Property lines Easements Maintenance access Sediment disposal area per Record Plan Contours at 1-2 foot intervals based on design plan datum Type, size, length of pipes Rock outlet protection with rock size Location plan North arrow

Facility Data as prescribed below (required for each facility) Facility Type Impervious Cover (ac.) DE State Plane Coordinates GPS Coordinates N: W: Latitude: N Longitude: W Drainage Area to Facility (ac.)* * If there are BMP s in a series start with the most upstream BMP and assign the appropriate drainage area to it; proceed downstream adding only the incremental increase in drainage area at each BMP. 3. The as-built drawing shall include a complete as-built survey of the facility in plan view and, at a minimum, the following: Cross-Sections and Details Through each pipe discharge into the basin (including forebays) Through outfall structure Through principal spillway including outfall treatment such as stilling basins or riprap channels. Through the emergency spillway Two cross sections of any Bioretention facility, underground detention, sand filter, or infiltration facility. Design storm water elevations Type(s), size(s), length(s), and slope(s) of pipes Weir opening size Orifice opening size Outlet structures type, material and applicable dimensions (see item 4). The cross-sections should include all relevant existing and design storm water elevations. Invert elevations of all pipes Top elevations of outlet structures and risers Type of grate and trash rack with manufacturer s information. Outlet protection length, width, depth, type, and size Embankment Height (existing grade and top of embankment as-built) Top width Side slopes Cutoff trench, if applicable per design

Anti-seep collar(s) Emergency spillway Width and side slopes Crest elevation Length Top of berm elevation Type stabilization methods Filter media depth and supplier Type of geotextile Type, length, size of underdrain Type and depth of stone Type and depth of mulch Cross sections along length of Biofiltration Swale (two minimum): Minimum three (3) spot grades across bottom (left toe of slope, centerline, and right toe of slope), top of bank elevations Bottom width Side slopes Longitudinal profile of Biofiltration Swale: Minimum spot grades at fifty feet intervals along entire length Length Slope Sand Filter: Depth of stone Depth of sand Chamber dimensions Weir dimensions Access manhole 4. Provide a detailed drawing of the outfall structure as constructed including all relevant elevations and views. 5. As required in Section 12.04.007 of the New Castle County Drainage code (June 1998), the Substantiating Data for Documentation as specified in the USDA Soil Conservation Service Pond Code 378 (September 1990 or as later revised) must also be provided. 6. The plan should include the maintenance specifications and schedule for the facility. 7. Provide details of the condition and adequacy of the vegetative stabilization of the facility.

CERTIFICATION OF ENGINEER / LAND SURVEYOR I, the undersigned, hereby certify that I am a Professional Engineer / Land Surveyor registered in the State of Delaware and it is my opinion that, to the best of my knowledge, each element of this checklist was considered and addressed in accordance with all applicable regulations, codes, standards, guidelines and policies. Signature and Seal of Professional Date Submission of this Checklist does not relieve the Applicant from the responsibility to comply with all applicable regulations, codes, standards, guidelines and policies. The Department of Land Use reserves the right to revise this checklist periodically as the need arises. Revised: 08/27/04, 01/25/05, 4/23/08, 10/11/11