Build your own. Treated Pine DIY RETAINING WALL

Similar documents
YEAR TRANSFERRABLE TANALISED 25 YEAR TERMITE RESISTANT* STRUCTURAL TIMBER AND WOOD PRODUCTS GUARANTEE

Clayton South Report Prepared: 1 February 2015 TIMBER PEST REPORT. Portfolio Includes: Timber Pest Report

How To Retaining Wall Guide

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL

TERMIDOR DRY TERMITICIDE & INSECTICIDE

White rust on galvanized and galvanized pre-painted steel. Technical Information

MicroPro /LifeWood Construction Product Specification Guide

PERGOLAS AND CARPORTS

Specifying Treated Wood Paul I Morris, Group Leader Durability and Protection

Visual Timber Pest Inspection

Timber Pest Inspection Agreement. Ph: Fax: Mobile: Purchaser: Vendor (If Known): Re Property to be Inspection at:

TIMBER PEST INSPECTION AGREEMENT

Timber Decks. Technical Note. March 2007

INFORMATION SHEET ON TERMITES & TERMITE MANAGEMENT PROCEDURES

Termite Inspection Agreement

Tried, Tested and Proven Timber Protection

Leaky Homes Financial Assistance Package (FAP) Repair plan example

Sun Windows General Information Sun New Construction Window Installation Instructions

LASERframe. Strong, straight and environmentally sound; LASERframe, the natural choice for framing. The natural solution for you.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Joseph Laquatra Cornell University

Rehab Inspection Report Page 1

PRE-PURCHASE INSPECTION REPORT

MOSQUITO AND INSECT REPELLENT PRODUCTS

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

3. A copy of these Australian Standards may be obtained from RAPID Solutions at Your cost by phoning (02) or from Standards Australia.

LITHIUM CARBONATE, 1% AQUEOUS

Common Problems with Walls

Architectural Inspection Site Structures

Water Management & Damage Prevention:

Asbestos. from the Home. Removing. Read this booklet for:

VACUUM EXCAVATION WHAT WE CAN DO THE VACIT DIFFERENCE

LAYING BLOCK AND BRICK

Termite Management Systems

THE USE OF STEEL BUILDING PANELS FOR ANIMAL CONFINEMENT

How to Reduce Your Exposure to Chemicals at Home, Work, and Play

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 19 th Jan 2011)

RockSolid Deck Restoration Application

Assessing Curtain Walls

TIMBER PEST INSPECTION AGREEMENT

Biflex Termiticide & Insecticide

Safety Data Sheet. according to Regulation (EU) No. 1907/ Sulfuric Acid 1.0 N

H.O.W (Home Owners Warranty) / Defect Inspection Agreement Terms & Conditions

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

A. Work on this project shall consist of, but is not limited to, the following:

Preparing a maintenance plan

Sash or Balancer Replacement Guide

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

City of San Diego, CWP Guidelines

Basement Window Installation Guide Hopper and Sliding

BiO-STiX Drain Cleaner & Deodorizer

Visual Termite Inspection Report in accordance with AS Important Information

A Guideline for Cleaning Up After Flood or Sewer Back-up

A home owner s guide to rebuilding after a flood

Prime Building and Pest Consultants Pty. Ltd.

University of Vermont

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

MAC-ENC-PRG-004 EDINGLASSIE AND ROUS LENCH HERITAGE MANAGEMENT PROGRAM

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 2 nd Feb 2013)

MATERIAL SAFETY DATA SHEET TOILET BOWL SANITIZER

Exterior Elevated Elements Inspection Guidelines

TERMITE RESISTANT* TERMIFLOR AND R-FLOR PARTICLEBOARD FLOORING

Housing Services Guidance for tackling condensation, damp and mould in your home

COMMONLY USED RESIDENTIAL BUILDING CODES

UNILIC ACRYLIC EMULSION

Technical Data Sheet

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Painting, Estimating. Hourly Rate Guide

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses

JOB READY ASSESSMENT BLUEPRINT PAINTING AND DECORATING. Test Code: 2060 Version: 01

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

SAFETY DATA SHEET Revised edition no : 0 SDS/MSDS Date : 12 / 7 / 2012

BLACK JACK ALL WEATHER ROOF COATING

Residential Inspection Guidelines

Visual Termite Inspection Report in accordance with AS

Flooding After the Flood Buildings

The Timber Pest Inspection

SECTION 1 Building Inspection Agreement

Bathroom Installation Guide

Working safely with metalworking fluids

10 Year Guarantee. 15 Year Guarantee LAMINATE FLOORING

Material Safety Data Sheet

Visual Termite Inspection Report in accord with AS TERMS & CONDITIONS - READ THIS FIRST

Visual Termite Inspection Report in accordance with AS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Instructions For Use

MATERIAL SAFETY DATA SHEET

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

OFF! DEEP WOODS SPORTSMEN INSECT REPELLENT I (PUMP SPRAY)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

What you need to know about. Termite management

SECTION GUARDA SECURITY WINDOW SCREENS

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin

Colonnade Security Pipe

Reference: BRM A0 July 18 th, Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Barewood Octagon and Elongated Windows Installation Instructions

MOBILE: PO BOX A322 ARNCLIFFE

Transcription:

Build your own Treated Pine DIY RETAINING WALL

Construction 1 Setting Out Start by setting out twin headers and stretchers for the full length of the lowest line of the terrace along the natural contour. 4 Fixing Method Use 200-250mm long galvanised bridge spikes to fix logs. Headers & stretchers must be level throughout. Partly trench the base stretchers and the heels of all headers into original ground. 2 Stretcher Lengths Lay a second stretcher course in between the first row headers. 5 Drainage 3 Section Continue to terrace until the required level is reached, using the twin header/stretcher system. Backfill with appropriate soil as you progress. To ensure proper drainage at the base of the wall, install a perforated polythene pipe along the back of the wall. The fall of the pipe along the wall should allow drainage at a suitable disposal point. Be sure to install a granular drainage layer behind the wall and around the pipe. A surface drain should be installed where the ground slopes towards the wall and the water catchment area behind the wall extend more than 6 metres. 1.

Slope Analysis and Calculations Slope 2 in 7 2 x 1200 Headers Slope 2 in 6 2 x 90 Headers Slope 2 in 4 2 x 600 Headers Slope 2 in 3 2 x 600 Headers Slope 2 in 2 2 x 600 Headers Max 2100 Max 1500 Max 1200 2.

Curving Contours Headers and stretchers can be shown to accommodate individual curving contours. Timber care Cutting, notching or boring may expose untreated heartwood. A liberal coating of PROTIM RESEAL is recommended to restore the protective envelope. For more details refer to the PROTIM Timber care product literature. Raincoat UV Plus should be used to reduce the effects of weathering & maintain the appearance of your timber project. Osmose Australia. makes no warranties expressed or implied or as to the fitness for a particular purpose of this plan. Check with an architect, building expert or soil engineer to make sure that this plan is appropriate for your situation and meets local building codes. A permit may be required. Read carefully the important timber information on www.osmose.com.au <http://www. osmose.com.au> regarding pressure treated wood before starting construction. 3.

Important Information 1. Do not burn preserved wood. 2. Wear dust mask & goggles when cutting or sanding wood. 3. Wear gloves when working with wood. 4. Some preservative may migrate from the treated wood into soil/water or may dislodge from the treated wood surface upon contact with skin. Wash exposed skin areas thoroughly. 5. All sawdust and construction debris should be cleaned up and disposed of after construction. 6. Wash work clothes separately from other household clothing before re-use. 7. Preserved wood should not be used where it may come into direct or indirect contact with drinking water, except for uses involving incidental contact such as fresh water docks and bridges. 8. Do not use preserved wood under circumstances where the preservative may become a component of food, animal feed or beehives. 9. Do not use preserved wood as mulch. 10. Only preserved wood that is visibly clean and free of surface residue should be used. 11. Do not use preserved wood in direct contact with aluminum. 12. If the wood is to be used in an interior application and becomes wet during construction, it should be allowed to dry before being covered or enclosed. 13. Disposal Recommendations: Preserved wood may be disposed of in landfills or burned in commercial or industrial incinerators or boilers in accordance with federal, state and local regulations. 14. If you desire to apply a paint, stain, clear water repellent or other finish to your preservative treated wood, we recommend following the manufacturer s instructions and label of the finishing product. Before you start, we recommend you apply the finishing product to a small exposed test area before finishing the entire project to insure it provides the intended result before proceeding. 15. Certain metal products (including fasteners, hardware and flashing) may corrode when in direct contact with wood treated with copper-based preservatives. To prevent premature corrosion and failure it is important to follow the recommendations of the manufacturers for all metal products. 16. Mould growth can and does occur on the surface of many products, including untreated and treated wood, during prolonged surface exposure to excessive moisture conditions. To remove mould from the treated wood surface, wood should be allowed to dry. Typically, mild soap and water can be used to remove remaining surface mould. For more information visit www.epa.gov. 17. For more information visit www.osmose.com.au / www.osmose.co.nz. 4.

HAZARD CLASS H1 H2 CONDITIONS Completely protected from the weather and wellventilated Protected from wetting guide to the HAZARD CLASSES HAZARD Lyctid borers Borers including termites H2F - Conditions and biological hazard as for H2 although approved for use Souther of the Tropic of Capricorn only. Example: Envelope Treatement EXAMPLES Susceptible framing, flooring, furniture and interior joinery Framing, flooring and similar, used in dry conditions H2S - Conditions and biological hazard as for H2 although approved for use Souther of the Tropic of Capricorn only. Example: LVL/Plywood (glue-line treatment) H3 Subject to periodic moderate wetting Moderate decay fungi, Weatherboard, fascia, pergolas (above ground), joinery, decking & laminated verandah posts H3 ** H4 H5 H6 Products predominantly in vertical exposed situations and intended to have the supplementary paint coat system that is regularly maintained. Subject to severe wetting Subject to extreme wetting and/or where the critical use requires a higher degree of protection Subject to prolonged immersion in sea water Moderate decay fungi, Severe decay fungi, Very severe decay fungi, Marine wood borers and decay fungi Fascia, barge boards, exterior cladding, window joinery, door joinery and non laminated verandah posts Fence posts, garden walls less than 1m high Retaining walls, piling, house stumps, building poles and cooling tower fill Boat hulls, marine piles, jetty cross bracing and landing steps etc Note: Please refer to the complete standards for more detailed information. ** as per AS1604 and NSW TMA *For further information see separate brochure, consumer information and handling guide and guarantee documents. PROTIM, RESEAL and MoistureGuard are trademarks of Osmose, Inc. or its subsidiaries. 2009 Osmose Australia. 442 Binstead Way, GAVEN, QLD 4210 Ph: 07 5573 1244 Fax: 07 5573 2337 E: info@pinewoodproducts.com.au These plans have been checked and approved (at the time of printing) by Roy B.Hoskins & Associates of Qld 4006 (Structural & Civil Engineers), to be technically accurate and designed in accordance with the appropriate Australian Building standards, as local & National laws are subject to change, please ensure you check with your local authorities prior to starting construction. 5.