Xi2 Ground System. Engineer Approval. State Approval. Xi2 Concrete System. Page 1 of 8

Similar documents
INSTALLATION INSTRUCTIONS

Chapter 3 Pre-Installation, Foundations and Piers

EZ-48-3AB Weather Station Mounting Tripod and Mast

Mounting Tripod Kit Installation Manual

Manufactured Housing Installation Instructions TIE DOWN ENGINEERING

Structural Holding System

INSTRUCTIONS: LocknCharge Laptop Carts

In-Ground Basketball System Owners Manual

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES

Installation Instructions:

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Cable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

Cable Drum Installation

RAIL FREE SOLAR ROOF MOUNT

RPS - sales@rpssolar.com San Bruno Cove, San Diego, CA 92130

Pulleys and Belt. Install the Major Accessory and Pulley. Install the Motor Pulley NOTE. Align the Motor Pulley and the Tool Pulley NOTE

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Step 1. Item 6. Item 1

SWIM N DUNK CHALLENGE RESIDENTIAL BASKETBALL GAMES And COMMERCIAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

HORIZONTAL INSTALLATION

Bolting: Attachment Of The Mudsill To The Foundation

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

For the purposes of this Part, the following words shall have the following meanings:

8' W x 8' H or 10' H Peak Style Shelter Assembly Instructions

PANELIZED HOME INSTALLATION GUIDELINE

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

I BEAM TRACK INSTALLATION

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

MGB Chrome Bumper Conversion

SELF-STEERING AXLE TABLE OF CONTENTS

Residential Deck Safety, Construction, and Repair

How To Launch A Rocket From A Formica

Complete System Shelter

TONNEAU INSTALLATION GUIDE

RZ Guardrail System Installation Manual

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

Modular Locomotive System Instruction Manual for HBK8 George Body Kit

R O A D M A S T E R, I N C.

Manufactured Home Inspection Checklist

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001

MAST ARMS & POLES. Ornamental Pole Top & Bases

AZEK Rail Install Guide

Panel Track Installation Guide

R O A D M A S T E R, I N C.

Seismic Installation for Attic Storage System

RadianceRail Installation Guide

Auxiliary Rams USERS MANUAL

Installation instruction do88 Intercooler for Volvo S40 / V50 / C30

INSTALLATION MANUAL. Installation Instructions

SPIRAL STAIR KIT INSTALLATION MANUAL


Chapter 10 - Scaffolding Systems

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

DYNA RIDER FOOTBOARD KIT

FLAT ROOF BOX SPAN CARPORTS

ATLANTA MODEL SPECIFICATIONS

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR & SAFE APPROACH METAL ROOF SCREW-DOWN ANCHOR

Sports and High Mast Lighting Poles Phone: (866) Fax: (817)

MFH-5057 Ford Small-Block V-8 Fresh Water Cooling Kit Instructions

VW Caddy W INSTALLATION INSTRUCTIONS

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

EZ-Steer Assisted Steering System

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

FLOE DOCK STEPS FOR ROLL-IN AND SECTIONAL DOCKS ASSEMBLY & INSTALLATION INSTRUCTIONS KIT P/N KIT P/N KIT P/N

AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech

Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS

RAIN COLLECTOR S HELF MANUAL

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

Installing Shutters using Fasteners

Drive shaft, servicing

Saferand easierinstallation

Ceiling Mounted Folding Attic Ladders Installation Instructions

American National, Unified Screw Threads

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

Assembly Instructions for the InteliTrack 3000 Rail Tracking System

2.4M SERIES 1241 ANTENNA

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

R O A D M A S T E R, I N C.

INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

PV Mounting System For Crystalline Solar Module THE POWER OF ASTRONERGY

SECTION PIPE HANGERS AND SUPPORTS

SLACK PERFORMANCE KARTS

Front axle components, overview

INSTALLATION OF A BAY WINDOW

All-Season Sunroom Sliding Glass Door Installation Instructions

Hollow or Cinder Block Wall Mount Job Aid

IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL

F-Series Camera Mounting Accessories

INSTALLATION INSTRUCTIONS COMPETITION SERIES COILOVER SUSPENSION SYSTEM 03+ Scion xb

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

S OUNTING INSTRUCTION M M o u n t i n g k i t 2 &

ROOF DRAINS TABLE OF CONTENTS

CDGRD-10. Grounding. Solutions For Comm/Data Applications

Transcription:

Xi2 Engineered Tie Down System Installation Instructions for California for Ground & Concrete Systems HUD Wind Zone I, 15 PSF Wind Load Seismic 4 By Tie Down Engineering Xi2 Ground System Engineer Approval State Approval Xi2 Concrete System Page 1 of 8

Xi2 Engineered Tie Down System Installation Instructions for California for Ground & Concrete Systems HUD Wind Zone I, 15 PSF Wind Load Seismic 4 By Tie Down Engineering REQUIREMENTS These plans and specifications meet the requirements of Title 25 Section 1336.3 Sub Section A and 97 UBC Seismic Requirements, CBC 2001 addition. Maximum vertical projection at sidewall is 9. Higher walls may be used when the design loads are adjusted accordingly and approved by HUD. Main rail spacing must be 75.5-99.5 *Except single sections 95 minimum Additional vertical anchor ties that are unique to a home's design may be required by the home manufacturer. These locations may include shear walls, marriage line ridge beam support posts, and rim plates. The longitudinal component of the Xi2 system replaces end frame ties. Check manufacturers set-up requirements. Maximum pier height is 48 pier. *Except for single sections 36. Steel piers must be fastened to the I-beam with clamps provided with steel pier. Systems must be placed as evenly as possible, no more than 10 from end of home. Designed for 7:12 roof slope.*except single sections, (20-4.37 in. 12 pitch). Additional Requirements for Concrete Systems Poured concrete must be 2,500 PSI minimum at 28 days. Square concrete pads minimum is 18 wide by 12 deep. Round concrete pads minimum is 18 wide by 14 deep. Strip footings minimum is 18 wide by 14 long by 6 deep. * Xi2 components exceed HUD code 3280.306g "Anchoring equipment exposed to weathering shall have a resistance to weather deterioration at least equivalent to that provided by a coating of zinc on steel of not less than 0.30 ounces per square foot of surface coating..." Page 2 of 8

Installation of Xi2 Ground Systems 1. Identify the number of systems to be used on the home using the chart provided. 2. Identify the location where the systems will be installed. 3. Clear all organic matter and debris from the pad site. 4. Place U-bolts through holes in pan provided. 5. Place pad centered under beam with the lateral strut bracket towards the inside of the home. 6. Press or drive pan into ground until level and flush with prepared surface. 7. Build pier according to State, Local or Home Manufacturers guidelines.(figure 1) 8. Attach the end of the smaller tube to the inside of pan using U-bolt & nuts provided 9. Attach the flag end of the larger tube to the opposite I-beam using the J bolt over the top of the I-beam with the nut & washer provided. (Figure 2) 10. Install a minimum of four (#12 x 1 tek screws) self-tapping screws into the holes provided in the lateral strut so that the two tubes are connected together. (Figure 1) 4 - #12 x 1 Tek Screws Figure 2 Figure 1 11. Install frame bracket clamps to I-beam on in side of block/pier. Do not tighten nuts at this time. 12. Attach longitudinal strut to U-bolt in pan using nuts provided. 13. Insert strut in the frame bracket clamp, attach with nut and bolt. Do not tighten at this time. 14. Pull the frame bracket clamp with the fastened strut outward to remove any slack. 15. Tighten all nuts and bolts on the struts and beam clamps. Page 3 of 8

Xi2 Ground Parts Detail Xi2 Ground Lateral System Part Number 59306 Includes: 5 Strut, pad & hardware kit (#59329-1 includes all nuts and bolts). Xi2 Ground System Longitudinal Hardware Kit Part Number 59331 Includes: 2 I-beam brackets & 2 U-bolts with all nuts and bolts. Lateral and Longitudinal Combination Part Number 59333 Includes: 5 Strut, Pad, Longitudinal Strut (#59329), Lateral and Longitudinal Hardware Kit with all nuts and bolts. Struts for Longitudinal Systems Part Strut Pier Height No. Length Up To: 59330-44 44 4 Blocks or 32" 59330-65 65 6 Blocks or 48" Ground Longitudinal Hardware Kit Xi2 Stabilization Pier Placement for Ground or Concrete Longitudinal Strut & Hardware Kit Ground Longitudinal Strut Xi2 Pier Placement Single Section Home 0-80 (76 Box) 4 Xi2 Systems Double Section Home 0-62 3 Xi2 Systems* 63-80 4 Xi2 Systems Triple Section Home 0-62 4 Xi2 Systems 63-80 5 Xi2 Systems *2 Xi2 systems can be placed at either end of the home. Page 4 of 8

Installation of Xi2 Concrete Systems Xi2 Concrete System 1. Identify the number of systems to be used on the home using the chart provided. 2. Identify the location where the systems will be installed. 3. Build pier according to State, Local or Home Manufacturers guidelines. 4. Drill two 3/8 x 3 deep holes in the concrete using holes in galvanized bracket as a guide. Attach bracket to concrete pad using 3/8 x3-1/2 wedge anchors provided. Place nut & washer on anchor, leave enough room for 1 to 2 threads showing on top of bolt. Using a hammer, tap the wedge bolts into hole through bracket, leaving nut & washer flush with bracket. Using a 9/16 socket wrench, tighten wedge/anchor bolt, securing bracket to the concrete. 5. Attach the end of the smaller tube to the bracket mounted on the pad, using the grade 5, 1/2 x 2-1/2 bolt/nut provided. 6. Attach the flag end of the larger tube to the opposite I-beam using the J bolt over the top of the I-beam with the nut & washer provided. (Figure 1 next page) 7. Install a minimum of four (#12 x 1 tek screws) self-tapping screws into the holes provided in the lateral strut so that the two tubes are connected together 8. Install frame bracket clamps on I-beam on the inside of block/pier. 9. Insert strut in frame bracket clamp and attach with nut & bolt. Attach opposite end to concrete bracket. 10. Pull the frame bracket clamp with fastened strut outward to remove any slack. 11. Tighten all nuts and bolts on system. Page 5 of 8

Xi2 Lateral Concrete Systems Part #59307 Includes: 5 Strut, Bracket, & Hardware Kit #59315-1 with all nuts and bolt. Xi2 Concrete System Longitudinal Struts for Concrete Systems Part No. Length Pier Height #59013 44 up to 4 Blocks #59015 65 up to 6 Blocks Longitudinal Hardware Kit Part #59263 (Includes 2 sets per kit: I-beam bracket, nuts, bolts and washers) Lateral and Longitudinal Combination Part #59332 Includes: 5 Strut, Longitudinal Strut (#59364), Lateral and Longitudinal Hardware Kit with all nuts and bolts. Longitudinal Strut Concrete Longitudinal Hardware Kit Figure 1 J-Bolt Nut & Washer Beam Clamp Bracket Lateral Longitudinal 1 I-Beam Xi2 Installation Placement Page 6 of 8

Offset Placement Diagrams represent examples of double and triple section offsets. Total size is determined by the length of unit plus offset. Xi2 Stabilization Pier Placement for Ground or Concrete Xi2 Pier Placement Single Section Home 0-80 (76 Box) 4 Xi2 Systems Double Section Home 0-62 3 Xi2 Systems* 63-80 4 Xi2 Systems Triple Section Home 0-62 4 Xi2 Systems 63-80 5 Xi2 Systems *2 Xi2 systems can be placed at either end of the home. Page 7 of 8

Hardware Breakdown #59329-1 Hardware for 59306 Lateral System 1 84533Z U-Bolt 1/2-13 x 2.63 x 2.19 thread 1-3/4 zinc 4 10556 Tek Screw #12 x 1 1 10631Z J Bolt 1/2 x 5-1/2 grade 5 zinc 2 10640 Push Nut 1/2 1 12107 Flat Washer 1x2 SS 1 10646Y Hex Nut 1/2-13 grade 5 zinc 2 10519 Hex Nut 1/2 w/ Serr flange #59331 Longitudinal Hardware for 59306 2 59272-1 Beam Clamp Base 4 59272-2 Beam Clamp Top Flange 8 10926 Carriage Bolt 1/2-12 x 1-1/4 Full Thread 10 10646Y Hex Nut 1/2-13 grade 5 zinc 2 10801 Carriage Bolt 1/2-12 x 2-1/2 Grade 5 2 84533Z U-Bolt 1/2-13 x 2.63 x 2.19 thread 1-3/4 zinc 4 10640 Push Nut 1/2 4 10519 Hex Nut 1/2 w/ Serr flange # 59329 Hardware for 59333 Lateral and Longitudinal combination 1 59329-1 Hardware Kit 1 59272-1 Beam Clamp Base 2 59272-2 Beam Clamp Top Flange 4 10926 Carriage Bolt 1/2-12 x 1-1/4 full thread 5 10646Y Hex Nut 1/2-13 Grade 5 zinc 1 10801 Carriage Bolt 1/2-12 x 2-1/2 Grade 5 zinc 1 84533Z U-Bolt 1/2-13 x 2.63 x 2.19 Thread 1-3/4 zinc 2 10640 Push Nut 1/2 2 10519 Hex Nut 1/2 w/serr Flange #59315-1 Hardware for Lateral System 1 10631Z J Bolt 1/2 x 5-1/2 Grade 5 zinc 1 12107 Flat Washer 1/2 SS 4 10556 Tek Screw #12 x 1 2 10646Y Hex Nut 1/2x-13 Grade 5 zinc 1 10826 Carriage Bolt 1/2-12 x 3 Grade 5 zinc #59027 Hardware Kit for 59307 Lateral System 2 59264 3 Way Concrete Bracket 4 10530 Wedge Anchor 3/8 x 3.50 1 59315-1 Hardware Kit #59263 Longitudinal Hardware for 59307 2 59272-1 Beam Clamp Base 4 59272-2 Beam Clamp Top Flange 8 10926 Carriage Bolt 1/2-13 x 1-1/4 Full Thread zinc 12 10646Y Hex Nut 1/2-13 Grade 5 zinc 4 10801 Carriage Bolt 1/2-13 x 2-1/2 Grade 5 zinc #59364 Hardware for 59332 Lateral and Longitudinal combination 1 59264 3 Way Concrete Bracket 2 10530 Wedge Anchor 3/8 x 3.50 1 59315-1 Lateral Hardware Kit 1 59272-1 Beam Clamp Base 2 59272-2 Beam Clamp Top Flange 4 10926 Carriage Bolt 1/2-13 x 1-1/4 Full Thread zinc 2 10801 Carriage Bolt 1/2-13 x 2-1/2 Grade 5 zinc 6 10646Y Hex Nut 1/2-13 Grade 5 zinc Page 8 of 8