Office building Laan op Zuid Rotterdam. van den Oever, Zaaijer & Partners architecten



Similar documents
Nature & Environment Learning Centre Amsterdam

redland house, bristol - public consultation exhibition

Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London

Glossop Design & Place Making Strategy

john jay college of criminal justice

Presentation: Proposed Plan Amendments

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

Hunter College school of Social Work Thesis Proposal

Commerzbank Head Office. Frankfurt am Main

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

2 CONTACT INFORMATION 4 3 ROUTE DESCRIPTION 5

Design and Access Statement Earls Court Road London SW5 9RH

Ministry of the Environment Decree. on housing design

HOUSE BUILDING DIGEST

DESIGN GUIDANCE NOTE: 11 PORCHES

Measurement Standards for Structures

Scheme 3: Rehabilitation of Heritage Building and Redevelopment

Ministry of the Environment Decree on accessible building

A Guide for Residents. Sutton Garden Suburb Conservation Area

ASYMPTOTE ARCHITECTURE / GENT SINT-PIETERS GENT SINT-PIETERS PRE-DESIGN : SITE B1 KLANKBORDGROEP JUNE 2012

Wenslauer House Amsterdam Oud-West, /44 Architects Keizersgracht CJ Amsterdam The Netherlands T / +31 (0)

PRINT POÈME NUMÉRIQUE PROJECT DESCRIPTION. Project name: LABORATORIES. A project by: Maurer United Architects ONCE UPON A TIME

Rotterdam Academy of Architecture and Urban Design

Adaptive strategies for office spaces in the UK climate

Introduction. Welcome London Road, Mitcham

Renovation and upgrading of Waterlandplein post-war housing blocks, Amsterdam

MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

New Waterloo. Transforming the Elizabeth House site

High tech indoor farming for the city

Orion Building. Project information. Siriusdreef Hoofddorp. btmakelaars.nl. BT Makelaars +31 (0) info@btmakelaars.

Department for Communities and Local Government

THE NETHERLANDS OFFICE MARKET

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

CULLINAN STUDIO FOUNDRY (CULLINAN STUDIO OFFICES)

NHR 2010: DEVELOPMENT OF RESIDENTIAL HOUSING TYPOLOGY IN THE CZECH REPUBLIC

28.0 Development Permit Area #2 (Neighbourhood District)

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 ( N, E)

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Householder Applications: Supplementary Planning Guidance GENERAL POINTS

CREATING A 3D VISUALISATION OF YOUR PLANS IN PLANSXPRESS AND CORTONA VRML CLIENT

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

Circular No : URA/PB/2004/29-CUDD Fax: Our Ref : DC/ADMIN/CIRCULAR/PB_04 Date : 6 Sep 2004

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

How To Build A Luxury Apartment Complex In London

to encourage high quality tropical vernacular Queensland architecture throughout the Shire;

Europol headquarters EisEnhowErlaan 73 nl-2517 KK den haag the netherlands

BLOCK 400 PLANNED COMMUNITY DISTRICT

La Cite des Affaires in Saint-Etienne

G R O U N D E D A R C H I T E C T U R E

Design Essentials. Stockland Residential Communities 1 st January 2014

The Oman Proton Therapy and Imaging Center AIA DC Chapter Unbuilt Awards

05 SEP MORE FROM HANS VAN HEESWIJK ARCHITECTS MORE MUSEUM. Rieteiland House / Hans van Heeswijk Architects Selected Projects

Maximum Floor Area and Maximum Development Area

South Australian Health and Medical Research Institute (SAHMRI) Adelaide, Australia

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Elegance SC. Solar Control

Miami Science Museum DoE Modelling Grant. Light Planning. 19 December 2008 Concept Design

Lincoln Townscape Assessment. Swanpool Garden Suburb Inherited Character Area Statement

Room for your success

Recycling Infrastructure Guidelines for UBC Buildings

Katharine Teats House HABS No. CA Seventh Avenue San Diego San Diego County /J/Vf# <? California /WtO

cottages design portfolio

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

Klosterenga, Oslo, Norway, page - 1

Building Condition Assessment: North Howard Street Baltimore, Maryland

21 Plumbers Row, London, E1 1EQ

ASHULIA APPARELS LTD. Client Summary Report

Architectural Condition Survey

Guidance on Householder permitted development rights

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction

Built to Last. Built for Beauty. Good. Solid. Logix. TM

Refuse and Recycling Advice note For Developers. September 2015

ACCESS AUDIT OF WESTPORT HOUSE

SUMMERSCHOOL 2009 TU Delft Rotterdam Kop van Zuid

TARRANT COUNTY FAMILY LAW CENTER Fort Worth, Texas

New technical solutions for energy efficient buildings

This policy is the guiding document for all development within that area of Cable Beach pertaining to the Cable Beach Development Plan.

HEATING, VENTILATING, AND AIR CONDITIONING EQUIPMENT. Application Guidelines

Requirements for Building Application Submission

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

Oliver House City Road, EC1. Design & Access Statement Addendum Oliver House

EGERAAT. heart of Budapest, new National Gallery and Ludwig Museum ERICK VAN. designed by. galvanizing the city: one building, two museums and more

MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP

Saint Cloud Business Center

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Product description NCC Data Center

DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD

WORKING AT A HIGHER LEVEL 400 BEETHOVENSTRAAT

Building Integrated Photovoltaic (BIPV)

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS

Priority decision. High-Frequency Rail Transport Programme

Transcription:

Office building Laan op Zuid Rotterdam van den Oever, Zaaijer & Partners architecten

Office building Laan op Zuid Rotterdam In recent years, subareas of the Kop van Zuid area of Rotterdam have been redeveloped, transforming them from industrial docklands into a lively urban centre. These subareas have been worked out from an urban development viewpoint on the basis of a Master Plan developed by Riek Bakker and Teun Koolhaas. The Ichtushof project is the latest building location to be tackled in the Zuidkade II subarea. The urban development plan for this area has been drawn up by architects Van den Oever, Zaaijer & Partners in close cooperation with EEA Architecten. The Hogeschool Inholland college, designed by EEA Architecten, makes up part of the Ichtushof. One of the office buildings to be further worked out opposite this educational building was designed by architects Van den Oever, Zaaijer & Partners. This is a multi-purpose office building on the Laan op Zuid, with a gross floor area of 27,000 m2. The building, the highest section of which is an 18-storey tower, is being developed jointly by OVG Projectontwikkeling and AM Vastgoed. The complexity of the assignment granted to architects Van den Oever, Zaaijer & Partners lies in the extremely narrow building plot, which permits only a very limited footprint. The reason for the plot being so narrow is the space to be reserved for the existing and planned metro route. Without specific interventions in the design, this footprint would be too small for the realisation of the required volume within the boundary conditions set. Allowing sections of the building to protrude extensively from the first floor outside of the footprint, made it possible to achieve the desired volume. Inclined trestles lift the highest section of the building from the footprint, high above ground level. From the fifth floor, the structural bays project 9 m over the metro route, in relation to the column base. client OVG Projectontwikkeling BV Rotterdam AM Vastgoed BV Gouda architect van den Oever, Zaaijer & Partners architecten Amsterdam Zuidoost contractor Aanneming Maatschappij J.P. van Eesteren B.V. Rotterdam structural consultants Van der Vorm Engineering B.V. Den Bosch engineering consultants Ilex Installatiemanagement bv Nieuwegein building physics consultants DGMR Raadgevende Ingenieurs B.V. Arnhem gross floor area 5.575 m2 completion September 2008

1 9 5 6 7 1 4 8 4 2 2 9 Standard floor 1. Consulting room 2. Office. Workplace 4. Work - lounge place 5. Copy room 6. Pantry 7. Lift hall 8. Toilets 9. Stairwell Unique character of each section Thanks to its mass form, divided into sections with three volumes, its dimensions and the possibilities for linkage, the building is suitable to accommodate several users. Building depths of 14.40m and 22m make a wide variety possible, from smaller office types to large, open-plan offices with an efficient, modern office layout. Although the building, with its robust brick look, comes over as a single entity, each volume within it has its own, recognisable details. In spite of the large, flexible lettable floor area, the building does not make an anonymous impression, but rather each section has its own character, allowing different users to present themselves with their own section of the building. The highest section, for example, literally towers above the other sections. The tower is characterised by vertical brick ribs that pass in front of the glass exterior wall. Above the roof, these ribs terminate in a white crown, which lights up brightly in the sunlight. The next highest building section has vertical window openings, which are linked every two storeys and are deeply recessed in the exterior wall. The openings are interrupted horizontally by a brickwork area made from special toothed bricks, known as bishop s caps. This creates a sophisticated ornamental breast that is an integral part of the facade. Vertically, the window frame openings are divided into two panels by a clear white rib. The low building section has window frames that are contrastingly placed as far forward in the surface of the exterior wall that these protrude from the facade. Although the design of the exterior walls differs between the various building sections, the use of materials and ornamentation are visibly related. The bonds and ribs in red hand-formed bricks were inspired by the ornamentation used in traditional Dutch brickwork, but also clearly have a contemporary look. Together with the composition and varied contours of the mass, the high degree of plasticity of the exterior walls gives the building as a whole an unmistakeably urban character. To give a sense of human scale from ground level, a second contour has been introduced alongside the overhang, placing the large scale of the building in context. This contour is formed by the shadow effect of profiled ribs in front of the brickwork of the lower sections of the exterior walls. On the ground floor of the central section, a doubleheight, transparent space that can be laid out as required is planned, making use of the entire building plot. This gives the building a public, transparent plinth course and corbelling on the street side. This large space will act as a market square for main lessee UWV, which is using some three-quarters of the building (17,000 m2). The remainder (10,000 m2) is leased by the Tax and Customs Authorities. The plinth course is clearly distinct from the superstructure and is built in glass and natural stone. There is a split-level underground car park with five levels and space for 287 cars.

Sustainable office building Sustainability was one of the major preconditions for the design as specified by the client. With all of the measures included in the design, the office building with an environmental index of 206 points is one of the most sustainable buildings in the Netherlands at this moment. This classification is based on the GreenCalc rule applied by the Government Buildings Agency. Firstly, the building design is extremely compact, which leads to energy savings. Passive energy saving arises through the use of narrow, high window frames, which allow daylight to penetrate far into the space. Automatic daylight regulation and presence detection systems ensure further saving of electricity for artificial light. For energy efficient climate control, use is made of underground heat/cold storage. Sustainable, maintenance-friendly materials have been used as a matter of course, and future sustainability has also been taken into account. The exterior walls consist of loadbearing prefab elements which, at the end of the building s life, can be disassembled and re-used. 2009 / van den Oever, Zaaijer & Partners architecten