Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Similar documents
STANDARD PRACTICE INSTRUCTION

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS

What should you check for when inspecting a crane before maintenance?

How To Ensure Safety Of Lifting Equipment

POTENTIAL HEALTH & SAFETY HAZARDS

Safety Manual For Overhead Crane Operators

CRANE & HOIST PROGRAM

RIGGING HARDWARE ASME B Addresses detachable lifting hardware for lifting purposes

SAFETY AND HEALTH PPG INDUSTRIES, INC. -- LAKE CHARLES UNIT NAME RIGGING AND LIFTING SAFETY FOR PPG LAKE CHARLES

Contents. 1. Foreword Common accidents in lifting operations Legislative requirements and code of practice of lifting operations 2

Operator Training Questionnaire

Slings, Rigging and Lifting Equipment

Owner s Manual & Safety Instructions

Boom and fly capacities for this machine are listed by the following sections:

Cable Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMCA680. Americrane & Hoist Corp.

Topics of the Presentation

EXCAVATOR SAFETY TRAINING

MATERIAL HANDLING PROGRAM (Section 10)

Owner s Manual Gantry Cranes

AHS-Series Steel Adjustable-Height Gantry Cranes Instruction Manual

LOAD TEST PROCEDURE. Bridge, Gantry and Jib Cranes & Monorail Systems B001-R05/07

WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.

Guidebook for Lifting Supervisors

02805 Printed in China

Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement

CONTRACTOR CRANE AWARENESS WEB BASED TRAINING STUDENT GUIDE NCC-CCA-01

Cranes and Lifting Equipment

CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

Mobile (Truck) Cranes

Aerial/Scissor Lift Program. Environmental Health & Safety Office

Fall Protection Guidelines

SAFETY INSPECTION AND TESTING OF LIFTING DEVICES

Savard Labor & Marine Staffing, Inc. Rigging Safety Rev3/14 Rigging Safety

SAFE USE OF LIFTING EQUIPMENT

CHAPTER 9 MOBILE CRANES

Guidance on Lifting Operations in Construction When Using Excavators

Chicago Crane Operators Examination Study Guide

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date:

CHAPTER 7 OVERHEAD AND GANTRY CRANES

The Campbell operation facilities in York, PA, and Cortland, NY, conform to Quality Standard ISO 9001.

HYDRAULIC LIFT TABLE CART 2200-LB.

PROGRAM OUTLINE. Tower Crane Operator Program Outline

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

June 22, Steve Johnson Operation Manager Best Roofing, Inc N. 288th St. Sioux City, IA Booker Elementary Safety Survey Omaha, NE

Wire rope slings, the hazards surrounding

ELEVATED WORK POLICY

APPENDIX A UNIVERSITY OF MICHIGAN TRAINING PACKAGE FOR OVERHEAD OR GANTRY CRANES

EMPLOYEE FALL PROTECTION

IMPORTANT SAFETY NOTICE

Chapter 7 Hydraulic System Troubleshooting

Apprenticeship Curriculum Standard

Basic Rigging Workbook

Working Copy WP 05-WH1401. Revision 4. 6-Ton Electric Forklifts 74-H-010B. Technical Procedure EFFECTIVE DATE: 01/04/06. John Guy APPROVED FOR USE

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE

Crane Best Practices in Tree Removal Hoisting a Qualified Arborist. By Mark Adams

CHAPTER 2 GENERAL SAFETY REQUIREMENTS

Scaffold Safety L O S S C O N T R O L A L E R T

Training Schedule Quality Service Superior Training Reliable Results.

EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT

Lifting equipment at work

M_004 Basic Rigging Safety Lecture

Health and Safety Resources Caution to Users

LiftAlloy Chain Slings

Load Testing and Lift Engineering

TABLE OF CONTENTS DT7K INSTRUCTION MANUAL TABLE OF CONTENTS E DT7K

TABLE OF CONTENTS PART 5 - CRANES, HOISTING AND LIFTING

COMPENDIUM OF TYPICAL HAZARDS ASSOCIATED WITH CNC MILLING AND THEIR CONTROL MEASURES IN THE CONSTRUCTION INDUSTRY CNC MILLING

CHAPTER 13 LOAD HOOKS

CR-SERIES CARPET POLES INSTRUCTION MANUAL

Fall Protection Program

Survey and Examination of Ships Lifting Appliances. In conjunction with:

Slings Effect of Angle of Lift on a Sling Rated Capacity

Ladder Program and Training Materials

1000-LB. TRAILER JACK OWNER S MANUAL

OVERHEAD CRANE OPERATOR SAFETY TRAINING

Table of Contents WARNING SYMBOLS AND DEFINITIONS

TABLE OF CONTENTS. COLUMBUS McKINNON CORPORATION is a leading worldwide designer and manufacturer of material handling products,

Record of Performance Inspection and Test Crawler, Locomotive, Truck, and Wheel Cranes

FALL PROTECTION PROGRAM

Safety and Analysis in Material Handling of Construction Industry

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials

Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form

10 TON HYDRAULIC PRESS

INSTALLATION INSTRUCTIONS MULTI-MOUNT KIT Part Number: Application: Warn HP PowerPlant P/N 71800

Working at Heights and Fall Protection

1 Ton Telescoping Gantry Crane

Guidelines for the Survey of Offshore Mooring Chain Cable in Use

Click here for Lessons Learned that may apply to the requirements in this LIR. Section Title Page In this

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

International Association of Drilling Contractors. Oilfield Gin Pole Truck Guidelines

OSHA Crane Operator Regulations and Recordkeeping

Fall Hazards 1/3/2014. Introduction

Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions

TLILIC3003A Licence to operate a bridge and gantry crane

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

Series 90 Portable Capstan Hoist. Owners Manual ! CAUTION

Mobile Crane Operator Certification Program

Advanced Rigging Annotated Instructor s Guide

Transcription:

Great Western Painting Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily injury or property damage. Care must be taken in all facets of crane operation. As with all items of machinery, only trained, qualified, and authorized persons may operate cranes. Qualified Crane Operator: Training: A person who has appropriate offshore experience and training may be designated by our Safety Director as a Qualified Crane Operator. Appropriate offshore experience and training would include classroom-type sessions and hands-on field training on cranes to be operated by the qualifying crane operator. Classroom-type training would included a full review of the American Petroleum Institute Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, which must be readily available for reference and use. Classroom topics will include: Types of Cranes Used Offshore: 1. Mechanical cranes. 2. Non-mechanical cranes. 3. Electric powered cranes. 4. Other crane types. Crane Components and Lifting Capacities: 1. Components of a stationary mounted crane. 2. Boom Angle and Load Radius, reading a range diagram or load rating chart. 3. Number of parts of line and relationship to rated load. 4. Limitations of the size and type of wire ropes used in boom hoist lines, pendants, and load hoist line. 5. Lifting capacity of the auxiliary hook. 1 Great Western Painting

6. Lifting capacity of load and boom hoist drums. 7. Consideration of sea state on operating conditions. Wire Rope Construction and Use: 1. Mechanics of wire rope. 2. Classes, designation and characteristics of wire rope. 3. Handling of wire rope. 4. Guidelines for replacement of wire rope. 6 Wire rope slings. Mounting features of the Revolving Superstructure: 1. Hookrollers. 2. Ball ring. 3. King post. 4. Others. Boom Structure: 1. Types of boom construction (lattices, box, etc.). 2. Wire rope guides. 3. Boom bolts. 4. Pin connections. Limit Devices: 1. Boom-hoist limit. 2. Load hoist limit. 3. Boom stops. 4. All locking devices. 5. Anti-two block devices. Additional Items: 1. Sheaves. 2. Hand signals. 3. Control markings. 4. Engine emergency stop. 5. Gauges and indicators. 2 Great Western Painting

Hands-on training will include: 1. Lubricating points. 2. Adjustments. 3. Principles of crane operations. 4. Load charts. 5. Hand signals. 6. Inspections. Refresher training is required every four (4) years. Fire extinguisher training will be included in both the hands on training as well as the classroom training and in the refresher training. Having completed the above training the operator should be qualified to operate both non-mechanical cranes and/or mechanical cranes (those with free-fall capability). Physical Qualifications: Crane operators must: 1. Have vision of at least 20/30 Snellen in one eye and 20/50 in the other with or without glasses, and have depth perception as demonstrated by record of a recognized test administered by an authorized person. 2. Be able to distinguish red, green, and yellow, regardless of the position of colors, if color differentiation is required for crane operations. 3. Have hearing, with or without a hearing aid, adequate for the specific operation. 4. Have no history of a disabling medical condition which may be sufficient reason for disqualification. Note: Follow-up qualification is required every four (4) years. Additionally, prior to authorization to operate a crane, operators of cranes with a boom length of 25 feet or more and a maximum rated load capacity of 15,000 pounds or more must: a. have a valid certificate of competency issued by an Accredited Certifying Entity for the type or cane being used. b. pass a physical examination that meets the requirements of either ASME B30.5-2000 or US DOT standard 49 CFR 392.41 through 391.49. 3 Great Western Painting

c. pass a written examination that covers, at least: 1. operational characterizes and controls for the crane type for which qualification is being sought. 2. emergency control skills such as a response to fire, power line contact, loss of stability, and control malfunction. 3. demonstration of basic arithmetic skills necessary for crane operation and the ability to read and comprehend the crane manufacturer s operation and maintenance instruction manuals, including load capacity information (load charts) for the crane for which certification is sought. 4. pass a hands-on examination to demonstrate proficiency in operating the specific crane including pre-start and post-start inspection, maneuvering skills, shutdown, and securing procedures. The above operator certificates are valid for five (5) years after which recertification is required. All crawler, truck, or locomotive cranes will meet the applicable requirements for design, inspection, construction, testing, maintenance and operations as prescribed in ANSI B30.5-1968. A crane inspection certification record will be maintained which shows the date, the items inspected, the serial number of the crane and the signature of the inspector. The operator will ensure that a 5BC (or greater) fire extinguisher is readily accessible during operation. Qualified Rigger A rigger is anyone who attaches or detaches lifting equipment to loads of lifting devices. Crane load rigging will only be performed by a qualified rigger, a qualified crane operator, and/or a qualified inspector who has completed the requirements to be a qualified crane operator. Training for Qualified Riggers: Training includes classroom-type, hands-on training, and examination. Hand-on training should include proper inspection, use. selection, and maintenance of rigging gear (slings, shackles, hooks, etc.). Rigger qualifications should be maintained at a minimum every 4 years through requalification. Additionally, the individual should have no history of a disabling medical condition which may be sufficient reason for disqualifications. 4 Great Western Painting

A training outline for riggers in found in Appendix A3 API Recommended Practice 2D, Rigger Training, which includes: a. Rigging Hardware: 1. Sheaves, blocks. 2. Hooks, latches. 3. Rings, links, swivels. 4. Shackles. 5. Turnbuckles. 6. Spreader and equalizer beams. 7. Cable clips. 8. Pad eyes, eyebolts, and other attachment points. b. Slings: 1. Sling configuration. 2. Sling angle. 3. Rated Load. 4. Sling types (synthetic, wire, chain, etc.) 5. Cargo nets, personnel baskets, and other basket types. c. Procedures and Precautions: 1. Load control/taglines. 2. Lift planning (load weight, center of gravity, etc.). 3. Sling Inspection/rejection criteria. 4. Unbinding loads. 5. Personnel transfer. 6. Sling handling and storage. d. Rigging Basics: 1. Pinch points/body position. 2. Personal Protective Equipment (PPE). 3. Signals/communications. 4. Load stability. 5 Great Western Painting

Crane Usage Categories and Inspections: Infrequent usage (10 hours or less per month based on average use over a quarter: Requires pre-use inspection performed by the operator; Annual Inspection performed by a qualified crane inspector. Moderate usage (more than 10, less that 50 hours per month): Requires pre-use inspection performed by the operator; quarterly and annual inspections performed by a qualified crane inspector. Heavy usage (50 hours or more per month) Required pre-use inspection perform by the operator; monthly, quarterly, and annual inspections performed by a qualified crane inspector., Note: While the pre-use inspection is performed by the operator, it may also be performed by a qualified inspector. Note: A pre-use inspection form is found in our project manual. Minimum crane inspection guidelines are found in Appendix C to API RP 2D, Usage, Inspection, Testing, and Maintenance. All rated load capacities, recommended operating speeds, special hazard warnings or instructions must be readily visible to the operator while operating the crane. At all times, the manufacturer s specifications and limitations will be adhered to. Attachments will not exceed the capacity, rating, or scope recommended by the manufacturer. Any modifications to crane equipment which might affect safety may only be done with written approval from the manufacturer. While cranes easily have the lifting ability to hoist employees on a personnel platform, this is absolutely prohibited except in cases when the erection, use, and dismantling of conventional means of reaching the worksite would be more hazardous or is not possible because of structural design or worksite conditions. A conventional means would include: a personnel hoist, ladder, stairway, aerial lift, elevating work platform or scaffold. Dangers associated with cranes include numerous moving parts. These dangers can be minimized or eliminated by ensuring that all guards are in place and not tampered with. Care must be taken to ensure that areas within the swing radius of the rear of the rotating superstructure of the crane are barricaded to prevent a person from being struck or crushed. All employees must keep clear of loads that are about to be lifted as well as suspended loads. 6 Great Western Painting

Slings: Minimum inspection requirements for wire rope and slings are found in Appendix G to API RP 2D, Wire Rope and Sling Inspection, Replacement and Maintenance. When using slings made from alloy steel chain, wire rope, metal mesh, natural or synthetic fiber rope (conventional three strand construction), and synthetic web (nylon, polyester, and polypropylene), the following safe operating practices will be observed: a. All slings will be inspected prior to use by the crane operator. Additionally, the frequency for documenting crane inspections will be determined by the crane owner based on: 1.) frequency of use; 2) severity of service conditions; 3) nature or type of lifts being made; and, 4) experience based on service life of slings used in similar applications. b. Slings shall not be shortened with knots or bolts or other makeshift devices. c. Sling legs shall not be kinked. d. Slings used in a basket hitch shall have the loads balanced to prevent slippage. e. Slings shall be padded or protected from the sharp edges of their loads. f. Hands or fingers shall not be placed between the sling and its load while the sling is being tightened around the load. Hand Signals: Hand signals used to guide the crane operator will be consistent with the ANSI standard for the type of crane in use and an illustration of the signals must be posted at the job site. A copy of these hand signals is in our Project Manual. Load Test Records: Load test records will be furnished showing procedures outlined in Appendix E to API RP 2D, Load Testing. Load testing should be done by a qualified inspector following the specific procedures listed on pages 1 through 3 of Appendix E to API RP 2D. 7 Great Western Painting

U.S. Department of Labor Mine Safety and Health Administration Hand Signals for Lifting Equipment. 8 Great Western Painting PROJECT MANUAL Job Site Forms

Certification of Crane Pre-Use Inspection & Checklist CRANE MODEL: DATE: CRANE SERIAL NUMBER: FREQUENT Mon. Tues. Wed. Thurs. Fri. Sat. Sun. Observation of defects as used Continual Functional Operating Mechanisms Deterioration or leakage in: Lines Tanks Valves Drain Pumps Any Part of Air or Hydraulic System Hooks Deformation Cracks Note: Repair or replace if more than 15 percent of normal throat opening or more than 10º twist from plane of unbent hook Hoists, Chains & End Connections Excessive Wear Twisted Distorted Stretched Rope reeving (See Mfg s Specifications) All operating mechanisms for excessive wear Rope reeving (See Mfg s Specifications) Operator s Initials: Code: = OK X = Deficiency NA = Not Applicable PERIODIC All THE ABOVE ITEMS Deformed, Cracked or Corroded Members Loose Bolts or rivets Cracked or worn sheaves and drums Excessive Wear on: Brake System Parts Linings Pauls Ratchets Improper indicators Chains & Sprockets excessive wear Power Plant Safety Issues Distorted, worn, cracked pins, bearing, shafts, gears, rollers, locking and clamping devices Certified Completion: All Items inspected in the Pre-Use Inspection must be certified as having been completed. I certify the items noted in the Pre-Inspection have been inspected. Robert Evans Safety Program Administrator Great Western Painting (Date) 9 Great Western Painting PROJECT MANUAL Job Site Forms