What is SmartPlant Materials? SmartPlant Material optimizes management and control of all relevant business processes associated with materials management and controls for any project in the process, power, marine industries. Modular, open, and fully Web-enabled, SPMat responds to all of the abovementioned challenges with the following modules: Engineering & SmartPlant Procurement Reference Data Integration Corporate SPRD SPRD SITE SITE E&PI E&PI & Project Data MSCM MSCM Material Supply Chain Management Site Control 3
SPRD SmartPlant Reference Data SmartPlant Reference Data Major Capabilities Rule-based material libraries on project or enterprise level Define group,parts & configure part numbers Define specs Define corporate and/or project rules Revision & change management on down-to-the-attribute level Single point of data entry for design systems (e.g., PDS, SP3D) 4
MARIAN E&PI Overview Major Capabilities Tight and format-neutral integration with all design sources Provides rule-based control of Bills of material : Project breakdown structures Historical change and revision management Intelligent and rule-based requisitioning methods Set part surplus, re-order requirements Engineering & Procurement Integration 5
MARIAN MSCM Overview Major Capabilities Supplier database, does search and enables supplier restrictions Converts Requisitions into Inquiries, POs, change orders Expediting, shipping, inspection & prefabrication management can be updated by supplier Configurable security for third-party access Material Supply Chain Management 6
MARIAN SITE Overview Site Control Major Capabilities Various material receiving methods Inventory management: Physical warehouses Virtual warehouses Rule-based forecasts, reservations, and simulations Material Issuing OSD management Small tool control 7
SP Materials Clients July 2008 Americas 35 EMEA 41 Asia-Pac 34 8 8
New Clients 2007/8 Americas CIA PETROQUIMICA DO Brazil Skanska Brasil Brazil INVENSYS SYSTEMS, INC. USA Nexen Inc. Canada SNC Lavalin Nuclear Canada Empresas Y&V Venezuela SNC Lavalin Inc. Canada IMV Projects Canada Procter and Gamble Company USA S&B Engineers and Constructors USA AsiaPac BP REFINERY Australia TCC China HITACHI LTD POWER Japan Thai Nippon Steel Thailand GS Engineering & Construction Korea SK Engineering and Construction Korea China Petroleum Pipeline Engineering China Rolta India Essar Construction OLAJTERV Group OMV Solutions KPO ERG Nuove EMEA India India Hungary Austria UK Italy 9
SP Materials 08 Business Update Strong Growth 2007/2008 last 12months demand on a global scale Software Sales increased by 50% 2007 growth 35% 2008 Q1-Result growth 45% growth 110 Customers Product Development Proven and robust solution Development focus on performance, integration and.net Consulting Group New hires in Norway, UK, Japan, Australia, USA, Brazil Clients 120 100 80 60 40 20 # Clients 2000 2001 2002 2003 2004 2005 2006 2007 2008 0 10
SmartPlant Reference Data 11
Product Update SmartPlant Reference Data = MARIAN MLCL 12
New User Interface 13
We now deliver content 14
Standard Database for SmartPlant Reference Data Initial Standards Licenses obtained from ASME, ASTM & API Currently >10,000 Commodity Codes Currently > 1 million Idents (parts) Initial delivery includes US Piping & US Structure Expansion to other disciplines E&I and standards (JIS,DIN,..) being worked Interface to SmartPlant 3D & PDS 15
Integration Specs Material Classes Catalogue PDS SP Isometrics SDB Pre-defined Content, Catalog Weights, Dimensions, 16
Smart Plant Reference Data Features One-Time-Catalogue Import from SP3D The tool imports SP3D Excel sheets into an empty product group of SPRD. It will create catalog and specification data and configure the SP3D interface for exporting the data back to SP3D. Potential Users Customers having an existing catalogue with specifications in SP3D and want to import this into an empty Product Group in order to continue maintaining this data in SPRD 17
SmartPlant Materials 18
SmartPlant Materials Features Subcontract Management MSCM Subcontract Features Requisition Planning Statement of Work Schedule of Values Pricing Breakdown Labor hours Labor rates & markups Equipment Allowances Alternates and Options Workload Daily Work Journal Requests for Information Notices to Comply Progress Measurement Payment Application Management Punch Lists Deliverables/Submittals Bonds Insurance Field Work Directives Change Order Request Turnover Packages Closeout Actions Site Administration Safety Incidents & Notices Daily Site Reporting and Conditions Conversation Logs Inspection and Tests Request for Information Turnover Packages Notice to Comply Change Management Potential Change Order Change Order Request Field Work Directive CO Requisition Workload Backcharges 19
SmartPlant Materials Features Company Management New E-Supplier functions This is for the companies to self register as a potential supplier/subcontractor for evaluation and acceptance by the client. Login Request Company Profile Company Type List of Qualification Questions Material Groups 20
SmartPlant Materials Features Integration with Smart Plant License Manager New handling and Advantages Customers can split their purchased seats among their database as they want They can generate the new key required after migration/installation by themselves 21
Prism Project Estimator Prism Project Manager Cost Management 22
PRISM Project Estimator PRISM Project Estimator allows you to: Develop conceptual estimates for a feasibility study. Create a bankable document to obtain financing. Develop a detailed basis for the project budget. Standardize estimates on Joint Venture projects. Estimate change orders. Estimate Detail Build estimates using a structured "building-block" methodology to maximize consistency and minimize repetitive data-entry. Assembly Work Element Materials Subcontract Work Crew Process Equipment Crafts Construction Equipment 23
PRISM Project Manager - Cost Management Key Capabilities Earned Value Performance Measurement with 20+ Physical Progress Methods. Distribution curves for time-phasing budgets. User-defined Cost Elements/Types. Generate Control Accounts from the baseline estimate or project schedule. Seamless interface with Primavera, SureTrak, MS Project, and most estimating software. Ability to store multiple estimates (Original and Current). DATA MANAGED Baseline / Approved Budgets Budget Changes Period / To-Date Costs Open / Total Commitments Estimate-to-Complete (ETC) Estimate-at-Completion (EAC) Period and EAC Variances Resource database with rates by period. Change Control for tracking budget changes. 24