Victorian Hydro Power Stations

Similar documents
ALCOA OF AUSTRALIA LIMITED BUSHFIRE MITIGATION AND LINE CLEARANCE PLANS 2013/2014

ENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas

Hyperlinks are Inactive

Transmission Business Electrical Incident & Safety Performance Reporting Guide

Introduction. Electricity Reliability. Powerline Bushfire Safety Taskforce PO Box 262 Collins Street West VIC 8007

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

BUSHFIRE MITIGATION STRATEGY PLAN

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

Distribution Substation Manual (DSM) Section I - Introduction

Indicative costs for replacing SWER lines

Fact sheet 6: for farmers

ICM Project Station Infrastructure and Equipment

Trees, powerlines and your property

Pollution Incident Response Plan

Fact sheet 6: for farmers

2. OUR NETWORK POWERPOLES 2 POWERPOLES. Our distribution network comprises: For every 1 kilometre of powerlines: Essential Energy has

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

DISTRIBUTION OPERATIONS AND MAINTENANCE

Electrical switchgear and safety: A concise guide for users

This plan forms one part of a suite of Asset Management Plans that have been developed:

Planning for Bushfire Risk Mitigation General Code

Distribution Business Electrical Safety Performance Reporting Guidelines

CALDER PARK PROJECT STAGE 1. EPBC Act Approval Compliance Report (EPBC 2012/6439)

Identification of Street Hydrants for Firefighting Purposes FIRE SERVICES GUIDELINES

June 24, Notice of Proposed Construction Project Pursuant to General Order 131-D, Weymouth 66/4 kv Substation Project

Safety Performance Report on Victorian Electricity Distribution and Transmission Businesses

GroundRod AC Substation Earthing Tutorial

Asset Management Strategy

Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services.

SIEMENS Transmission and Distribution

Technical Guidance Note 287. Third-party guidance for working near National Grid Electricity Transmission equipment

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

Work in Substations - General

Living with Electricity Easements

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

STANDARD SITE LICENCE CONDITIONS FOR RESIDENTIAL PARK HOME SITES IN GUILDFORD CARAVAN SITES AND CONTROL OF DEVELOPMENT ACT 1960 (AS AMENDED)

MURPHY SHIPPING & COMMERCIAL SERVICES AZERBAIJAN

Defence College of Technical Training. Former RAF Lyneham Geo-Environmental Report Appendix D: Preliminary Qualitative Risk Assessment

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Understanding the Auckland electricity network

SAFETY PERFORMANCE REPORT ON VICTORIAN ELECTRICITY NETWORKS 2014

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

February 2014 MICKLEHAM BUSHFIRE NOTICE OF A CLASS ACTION

Certificate of Registration

VILLAS OF TRADITIONS AT GREY OAKS

Customer Installation Safety Plan. March 2015

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

EPCOR Distribution & Transmission Inc.

FIREFIGHTER SAFETY. Stay safe during substation fires

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

Electrical Safety Tips. Help us keep you safe

Sample Micro Hydro Initial Report

Contract Relationship Management DRAFT

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS

NEW ZEALAND ELECTRICAL CODE OF PRACTICE. for ELECTRICAL SAFE DISTANCES

Does your new building

Climate Change and Infrastructure Planning Ahead

Policy for the Management of Asbestos in the Workplace

Alphington sewer replacement

Electricity Safety (Electric Line Clearance) Regulations 2015 Regulatory Impact Statement

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

Application & Customer Site Management Plan to Use Recycled Water from a Standpipe

Code of Practice Electricity transmission and distribution asset management. February 2009

Manage water resources for on site hydro-electricity generation

Management of flooding downstream of dams

SECTION 5 DRAFTING STANDARDS

Concept Design Synopsis

Pollution Incident Response Management Plan

FIXED CHARGE: This is a cost that goes towards making the service available, including

Trees and powerlines. Office of the Technical Regulator. Web: sa.gov.au/energysafe Phone:

RIN Response. Part C. Operating and maintenance expenditure

SOCALGAS APROACH TO PIPELINE INTEGRITY

Trees and powerlines. Office of the Technical Regulator. sa.gov.au/energysafe

DESCRIPTION OF WORK:

BASIC NEC CODE RULES AND DESIGN PRACTICE

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015

Application for Planning Permit and Certification

HYDROMATRIX Jebel Aulia - Sudan

FLAMMABLE LIQUIDS COMPLIANCE NOTE

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety

Electricity Network Performance Report New South Wales. Transmission Annual Report Outline

Considering UNDERGROUND. tampaelectric.com

Heading FACT SHEET. Overview.

Repair of Fences Damaged by Bushfire and Fire Control Line Rehabilitation Policy

Earthing Guidance Notes

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

Protecting your private water supplies. The possible causes of contamination and their remediation to prevent this risk.

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

Protocol for vegetation management near powerlines - DRAFT

Jemalong Irrigation Limited. Pollution Incident Response Management Plan

Investigation report. Leakage testing of coal seam gas wells in the Tara rural residential estates vicinity

The Importance of Garbage Clearing and vegetation

Company Policy MANAGEMENT OF OVERHEAD PRIVATE AND SHARED MAINS. Page 1 of 11

SECTION 8 Industrial Facilities Field Investigation

GUERNSEY OIL INSTALLATION GUIDELINES

Transcription:

Victorian Hydro Power Stations Bushfire Mitigation Plan Pacific Hydro

PHA.OPS.08.007 Table of Contents 1. Overview... 3 2. Contact Information... 3 3. Description of Assets... 4 4. Preventative Strategies... 7 5. Works Program... 7 6. Operations at High Risk Times... 7 7. Investigations... 8 8. Public Awareness of the Plan... 8 9. Performance Measures... 8 10. Prescribed Times of Inspection... 8 11. Prescribed Form of Notice of Inspection... 8 12. Pacific Hydro Policy on Assistance Provided to Fire Control Authorities... 9 13. Management of this Plan... 9 14. Appendices... 9 Appendix A: Location of the Victorian Hydro Power Stations... 10 Appendix B: Maps of Glenmaggie Hydro Power Station... 11 Appendix C: Map of Eildon Hydro Power Station... 13 Appendix D: Map of Lake William Hovell Hydro Power Station... 14 Page 2 of 14

PHA.OPS.08.007 1. Overview The Victorian Hydro-Electric Power Stations Bushfire Mitigation Plan has been developed with the objective to identify possible electrical causes of fire and to reduce the likelihood and consequences of these through the implementation of various preventative measures. The Plan has been produced to fulfil the requirements of the Electricity Safety (Bushfire Mitigation) Regulations 2003 (Version 003) whereby a new plan must be prepared and submitted to Energy Safe Victoria before the1 st July of each year. The Victoria Hydro-Electric Power Stations refers to the three (3) Pacific Hydro sites known as Glen Maggie, Eildon and William Hovel. These assets are in open areas on the dam walls (refer to figures 1, 2, 3)however heavily wooded areas are, at times, in close proximity of the substations/switchyards. Pacific Hydro recognises that there are multiple at-risk electrical assets located at the Victorian Hydro Power Stations where a fire could originate from, including; The substation which also houses the generators The switch yard adjacent to the substation There is no overhead line under the control of Pacific Hydro Ltd at these sites. All cables are buried underground. Further description of these assets and there management can be found in Section 3 & 4. 2. Contact Information (a) The name, address and telephone number of the specified operator: Pacific Hydro Pty Ltd Level 11, 474 Flinders Street Melbourne, Victoria, 3000 (03) 8621 6000 (b) The person responsible the preparation of this plan is: Mr. Duncan Alexander Operations Engineer Pacific Hydro Pty Ltd Level 11, 474 Flinders Street Melbourne, Victoria, 3000 Phone: (03) 8621 6322 Mobile: 0433 124 949 (c) The person responsible for carrying out the plan is: Mrs. Caitlin Wilson Operations Engineer, Pacific Hydro Pty Ltd Level 11, 474 Flinders Street Melbourne, Victoria, 3000 Phone: (03) 8621 6000 Mobile 0434 927 340 Page 3 of 14

PHA.OPS.08.007 (d) In case of an emergency contact should be made with: Duty Controller Pacific Hydro Control Pacific Hydro Pty Ltd Level 11, 474 Flinders Street Melbourne, Victoria, 3000 Mobile: 0434 927 340 3. Description of Assets 3.1 Glenmaggie Figure 1 The Glenmaggie station is located at the foot of the dam wall, between the irrigation channel and the river. The substation is contained within a fenced enclosure, which is largely isolated from surrounding areas by the river, the dam wall, and an irrigation channel. The substation has a bluemetal base to prevent the ingress of weeds. The substation contains a 22kv/6.6kv transformer, vacuum switchgear connected to a pole top transformer owned by the Network Operator located within the switchyard. The 22kv/6.6kv transformer is fully bunded to prevent the spread of oil or fire. The generator is 10m below ground level in a concrete bunker. If a fire was to be initiated within the generator area it should remain contained within the building. The other components inside the substation buildings such as control components, batteries and battery Page 4 of 14

chargers are fully enclosed and the likelihood of fire is minimal. PHA.OPS.08.007 There are no trees in the immediate vicinity of the substation. Around the station vegetation is limited to wild grasses at the edge of roadways and around the penstocks. There are no overhead lines that are part of the Pacific Hydro Ltd infrastructure. 3.2 Eildon Figure 2 The Eildon Pondage station is contained within a fenced area, which is largely isolated from surrounding areas by the pondage, the pondage dam wall, the Goulbourn River and the Eildon Back Rd. The area behind the substation is an open grassed area that is routinely slashed. On the opposite side of the road is farm land that is lightly wooded. The generator is 5m below ground level in a concrete bunker. If a fire was to be initiated within the generator area it should remain contained within the building. The HV switchgear is vacuum insulated and located in a separate room isolated from other areas of the substation by concrete and besser brick walls. The other control components inside the substation buildings are contained in the control room, which is a concrete and besser brick walled room. The control components, batteries and battery chargers, are fully enclosed and the likelihood of fire is minimal. HV cables belonging to Pacific Hydro Ltd are buried, and the connection point to the distribution network is within the HV switch room. The transformer compound is located adjacent to the substation within a fenced enclosure, which is fully bunded to prevent the spread of oil or fire. Page 5 of 14

PHA.OPS.08.007 There are no overhead lines that are part of the Pacific Hydro Ltd infrastructure. 3.3 William Hovell Substation Figure 3 The William Hovell station is located at the foot of the Lake William Hovell dam wall at the head of the King River. The area surrounding the dam is heavily wooded although the station itself relatively open, surrounded by the dam wall, road structure, and the King River, with only one large tree adjacent to the station. The generator is 10m below ground level in a concrete bunker. If a fire was to be initiated within the generator area it should remain contained within the building. The substation contains a control room at ground level containing the 6.6 kv HV switch gear which is vacuum insulated. The other components inside the substation buildings such as control components, batteries and battery chargers are fully enclosed and the likelihood of fire is minimal. The switchyard is located near the substation within a fenced enclosure, which has a bluemetal base to prevent the ingress of weeds. The switchyard contains a 22kv/6.6kv transformer, vacuum insulated switchgear connected to a pole top transformer owned by the Network Operator. The 22kv/6.6kv transformer is fully bunded to prevent the spread of oil or fire. Page 6 of 14

PHA.OPS.08.007 There are no overhead lines that are part of the Pacific Hydro Ltd infrastructure. 4. Preventative Strategies In accordance with Regulation 5, Section (h) and in line with Pacific Hydro s plan objectives the strategies to be adopted for the prevention of fire ignition from substations are detailed in this section. 4.1 Substations/Switchyards Quarterly housekeeping inspections are performed by Pacific Hydro personnel of substations and transformers to ensure they are clear of vegetation. Weed spraying is undertaken as required to control the vegetation. In addition prior to the Declaration of the Fire Danger Period (DFDP) action shall be undertaken to ensure that: There is no vegetation growing within the switchyards, and transformer compounds, The Substation guttering will be checked and cleared of all debris, and The area around the substations shall be slashed, where required, to minimize the amount of flammable material within vicinity of the substations. As soon as practicable after the declaration of the fire danger period an audit shall be undertaken to ensure the substations are clear of any vegetation and that the surrounds of all substations remain clear of any significant vegetation for a distance of 5 metres from the structures. The substation equipment has additional routine maintenance performed in accordance with the sites Maintenance Plan which has activities such as inspection, thermal imaging, service and refurbishment that vary from monthly to 25 yearly intervals. 5. Works Program In accordance with Regulation 5, Section (i) the routine preventative strategies previously mentioned for the Substations/Switchyards are recorded as individual works in the Maintenance Plan and tracked through the use of Pacific Hydro s computerised maintenance management system WTG Service. There is no overhead line at any of these Victorian sites. 6. Operations at High Risk Times 6.1 In the event of fire In the event of fire which prevents the safe operation of one the hydro power stations, the station will be shutdown. Where the fire is in the area but presents no risk to the safe operation of one of the hydro power stations, the station s continued operation will be reviewed. The decision to isolate a station from the network during a time of fire will be made by the owner/operator of the distribution network, SP-AusNet. 6.2 During a Total Fire Ban During a time of total fire ban the hydro power stations will be operated in accordance with normal operating practices. 6.3 During the Fire Danger Period The hydro power stations will be operated in accordance with normal operating practices. Early in December or before the DBFP the bushfire mitigation actions will be audited by the Pacific Hydro Page 7 of 14

PHA.OPS.08.007 member, referred to in section 2 (c) of this document, to ensure that they have been carried out in accordance with this plan. 7. Investigations Electrical faults are recorded on Pacific Hydro s Field Incident Report. For faults or incidents requiring investigation, Pacific Hydro s Defect Reporting and Root Cause Analysis processes are utilised. These processes ensure that incidents are properly investigated and actions taken to reduce their likelihood of reoccurring. 8. Public Awareness of the Plan Pacific Hydro is responsible for processes and procedures for enhancing public awareness in relation to mitigation of bushfire danger. The approved Bushfire Mitigation Plan is available at Pacific Hydro s Website for the general public. They can also get a copy of Bushfire Mitigation Plan at the responsible person s office. 9. Performance Measures The works shall be reviewed annually as initiated by the computerised maintenance management system WTG Service. Performance is monitored by the closure of maintenance work orders related to bushfire mitigation by the 1st December each year or before the DBFP each year, whichever is earlier. The Pacific Hydro Bushfire Index is calculated as follows: Bushfire Index = Works include all routine asset maintenance and vegetation clearance scheduled and remedial works. The bushfire index for all Pacific Hydro sites is sent to Energy Safe Victoria before the 1 December each year. The current outstanding works for these stations is as follows: There are no outstanding/overdue works for this site. The works required include: Assess William Hovell site for ember attack. Review shutdown requirements for William Hovell in the instance of bushfire threat. Assess transformer CB isolation. Therefore: Bushfire Index = 0 3 = 0 10. Prescribed Times of Inspection There are no overhead lines that are part of the Pacific Hydro Ltd infrastructure. 11. Prescribed Form of Notice of Inspection There are no overhead lines that are part of the Pacific Hydro Ltd infrastructure. Page 8 of 14

All assets described within this plan are on land leased by Pacific Hydro Ltd. PHA.OPS.08.007 12. Pacific Hydro Policy on Assistance Provided to Fire Control Authorities Pacific Hydro will allow access to and assist fire control authorities in the investigation of fires at or near our electrical assets. 13. Management of this Plan In accordance with Regulation 5, Section (n) there are a number of processes and procedures used by Pacific Hydro to manage this plan including: Monitoring the implementation of the plan is performed by the computerised maintenance management system WTG Service which records the requirement for inspection and vegetation clearing listed in this plan. Auditing of this plan is performed at a maximum of 2 yearly intervals as part of Pacific Hydro s Health, Safety and Environment audit program. Identification of any deficiencies in the plan or the plan's implementation relies on the person s carrying out this plan to provide feedback to Pacific Hydro management. Monitoring and auditing the effectiveness of inspections carried out under the plan is performed by the Maintenance Quality Assurance procedure. Asset performance and condition audits are performed every 3 years by Pacific Hydro s corporate operations team as part of the company s asset management framework. Improvement to the plan and the plan's implementation if any deficiencies are identified is performed via the Change Management procedure and annual reviews of this plan. Training necessary for persons assigned to perform functions under the plan is provided internally by Pacific Hydro and under the O&M agreement between Pacific Hydro and John Horn and Sons Pty Ltd. Monitor and audit the competence of the persons assigned to carry out inspections under the plan is performed by the Maintenance Quality Assurance procedure and requirements under the contracted services. Outcomes from Defect Reporting/Root Cause Analysis investigations are reviewed as part of the annual review of this plan and any learning s are fed into this plan. 14. Appendices In accordance with Regulation 5, Section (g). Appendix A: Location of the Victorian Hydro Power Stations Appendix B: Maps of Glenmaggie Hydro Power Station Appendix C: Map of Eildon Hydro Power Station Appendix D: Map of Lake William Hovell Hydro Power Station Page 9 of 14

Appendix A: Location of the Victorian Hydro Power Stations PHA.OPS.08.007 Eildon Pondage Hydro Power Station - 1100 Back Eildon Road, Eildon 3713, VIC (Murrundindi Shire Council) William Hovell Hydro Power Station - Lake William-Hovell, Upper King River Road, Cheshunt South 3678, VIC Glenmaggie Hydro Power Station - Lake Glenmaggie Weir, Weir Road, Heyfield 3858, VIC Page 10 of 14

Appendix B: Maps of Glenmaggie Hydro Power Station Figure 1 Location of station PHA.OPS.08.007 N Lake Glenmaggie Hydro Station Access Road Southern Rural Water Office Weir Road 500m To Heyfield / Maffra Page 11 of 14

Figure 2 Switchyard location PHA.OPS.08.007 Weir Access Track Hydro Station Spill Way Channel Switchyard Access Track Page 12 of 14

Appendix C: Map of Eildon Hydro Power Station PHA.OPS.08.007 Transformer compound Hydro station Weir Wall Eildon Pondage Goulburn River Page 13 of 14

Appendix D: Map of Lake William Hovell Hydro Power Station PHA.OPS.08.007 To Upper King River King River Switchyard GMW outlet Station outlet Powerhouse and Control Room Retaining Wall E Entrance Lake Embankment GMW Valve House To Spillway N E Emergency Evacuation Point Page 14 of 14