PART 1 GENERAL CULTURED MARBLE FABRICATIONS

Similar documents
INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Installation Guide. Bath and Wall Surrounds SERIES B

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Product Guide Specification

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

2. Division 05 Structural Steel Framing for steel framework requirements

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Acrylic Walls Installation Instructions

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

CLEAR-DIVISIONS CENTERFOLD

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

IMPROVEMENT COST ESTIMATE powered by HomeFixers

SECTION GUARDA SECURITY WINDOW SCREENS

April 25, 2014 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

SECTION FIRE-RATED WOOD JAMBS

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

Sealant. 30" Model No D: 17-7/8" TO 18-3/8" (454 to 466mm) W: 29-3/4" TO 30-1/4" (756 to 768mm) Under Countertop Installation

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

GigaCrete Specification PlasterMax

London Farm Kitchen Sinks

Fiberglas, Exterior Wall Thermal Insulation

CLEAR-DIVISIONS VARIOFOLD

SECTION METAL WALL PANELS

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

Architectural Casework Description of Work

CHALKBOARDS, MARKERBOARDS, TACKBOARDS, DISPLAY CASES, AND BULLETIN BOARD CABINETS

AUTO COLLISION REPAIR CERTIFICATE I COURSE DESCRIPTIONS. Total: 18 Credit Hours

SECTION PREFORMED METAL STANDING SEAM ROOFING

STAIR TREAD & RISER INSTALLATION GUIDELINES

SECTION STANDING SEAM METAL ROOF

Base Cabinet with Self-storing Folding Doors and Floor

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

Installing Window Trim and Door Trim

Single Family Residential Basement Finish

C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.

How to Install GoBoard:

FIRESTOPPING & SMOKE SEALS

A. Work on this project shall consist of, but is not limited to, the following:

ROXUL Board Insulation Section Master Guide Specification (CAVITYROCK ) Page 1 April 2016

CLEAR-DIVISIONS APERTO

Construction Technologies Career Field Pathways and Course Structure

Division 9. SignaFlor Pad and Pour Flooring System

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Aspect Metal Peel & Stick Tile Installation Guide

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

SECTION STANDING SEAM METAL ROOFING

Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited**

Autobody/Collision and Repair Technology/Technician CIP Task Grid

Houston ISD Deadly Middle School RR Renovations- Phase 3 VCS Architects, LLC

Tundra Series Windows January 2016

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

SCHLUTER -KERDI-BOARD

SPECIFICATION Section Insulated Precast Concrete Wall Panels

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

Bath Planning Guidelines With Access Standards

PART 1 GENERAL 1.1 SECTION INCLUDES

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

Inspection Item COMMENTS

INSTALLATION INSTRUCTIONS

RACQUETBALL, HANDBALL OR SQUASH COURTS AND GYMNASIUM WALL SURFACES

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

The replacement or modification of existing windows shall comply with the following requirements:

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Preformed Metal Roofing and Siding

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Basement Window Installation Guide Hopper and Sliding

Window Installation Instructions

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Toll Free:

Resurfacing Specialists Professional Bathtub Refinishing & Repair

PEPPER VINER HOMES WARRANTY GUIDELINES

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

SECTION PRECAST CONCRETE STRUCTURES

SECTION COMMERCIAL PLUMBING FIXTURES

ENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES. July 1, 2008 Revision 2

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

NOTE: Take extra care in handling the front surfaces of the walls. Use only non-abrasive cloths to avoid scratching.

Roof Inspection. Summary Report

Sun Windows General Information Sun New Construction Window Installation Instructions

City of San Diego, CWP Guidelines

DIY CABINET REFACING INSTALLATION GUIDE

XONYX Solid Surface Owner's Manual

COMMERCIAL BUILDING APPLICATIONS

FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?

glass & Glazing Products

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

R432. Health, Health Systems Improvement, Licensing. R Nursing Facility Construction. R Legal Authority. R Purpose.

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

Barewood Octagon and Elongated Windows Installation Instructions

Transcription:

SECTION 06 61 13 (06610) PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Cultured Marble Fabrications a. Tub and Shower Surrounds B. Related Sections 1. Section 12 36 61.13 Cultured Marble Countertops 1.2 REFERENCES A. Federal Specifications (FS) Publications: 1. FS MMM-A-130 - Adhesive, Contact B. Architectural Woodwork Institute (AWI) Publications: 1. "Architectural Woodwork Quality Standards" C. ASTM International (ASTM) Publications: (Former American Society for Testing and Materials) 1. E84 "Standard Test Method for Surface Burning Characteristics of Building Materials" 1.3 SUBMITTALS A. General: Submit the following in accordance with Conditions of Contract and Division 01 Specification Sections: 1. Submit Shop Drawings and product data. Include materials, component profiles, fastening methods, assembly methods, joint details, accessory listings, and schedule of finishes. a. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. 1.4 QUALITY ASSURANCE A. Countertops, Tub/Shower surrounds and window stools shall be supplied by one manufacturer. Where shown to be the same color, the color of the components shall match for all items. Refer to [Sleep Inn, Inn & Suites Interior Finish Specifications] for colors. B. Allowable Tolerances: 1. Variation in component size: +/- 1/8 inch. 2. Location of openings: +/- 1/8 inch from indicated location. C. Perform work to (custom) quality in accordance with "Quality Standards" of the Architectural Woodwork Institute (AWI). 06 61 13 (06610)-Page 1 of 5

D. Fire-Test-Response Characteristics: Where fire-retardant materials or products are indicated, provide materials and products with specified fire-test-response characteristics as determined by testing identical products per test method indicated by UL, ITS, or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify with appropriate markings of applicable testing and inspecting agency in the form of separable paper label or, where required by authorities having jurisdiction, imprint on surfaces of materials that will be concealed from view after installation. 1.5 DELIVERY, STORAGE, AND HANDLING A. Do not deliver Cultured Marble materials until painting and similar operations that could damage synthetic marble have been completed in installation areas. If cast polymer materials must be stored in other than installation areas, store only in areas where environmental conditions comply with requirements specified in "Project Conditions" Article. B. Handle materials to prevent damage to finished surfaces. Provide protective coverings to prevent physical damage or staining following installation for duration of project. 1.6 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install Cultured Marble materials until building is enclosed, wet work is complete, and HVAC system is operating and maintaining temperature and relative humidity at occupancy levels during the remainder of the construction period. B. Field Measurements: Where Cultured Marble materials are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication and indicate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work. 1. General Contractor to locate concealed framing, blocking, and reinforcements that support cast polymer materials work by field measurements before being enclosed and indicate measurements on Shop Drawings. 1.7 SPECIAL WARRANTY A. Cultured Marble Materials: 1. Provide one (1) year Warranty against manufacturing defects. PART 2 PRODUCTS 2.1 CULTURED MARBLE A. Qualified Manufacturers: 1. Mincey Marble Manufacturing Co. (800-533-1806) 2. Dupont Bath Surfaces (800-436-6072) B. Accepted Manufacturers: 1. Imperial Marble Corporation (888-649-5604) C. Fire Hazard Ratings: 1. Classified in accordance local codes and ordinances, ASTM E84 and the following: 06 61 13 (06610)-Page 2 of 5

a. Class C b. Flame Spread: Class C: 76-200 c. Smoke Developed: 0-450 2.2 TUB/SHOWER SURROUNDS: Note: Coordinate with Sleep Inn Signature Shower or Sleep Inn Shower Alternate design. Model shown below is Signature Shower with curved end. A. Accepted Product: 1. Signature Shower: a. Sleep Inn Shower Pan and Surrounds Model SP-02 ; Mincey Marble Manufacturing Co. (800-533-1806) B. Wall Panels: 1. Signature Shower Design: Homogeneous molded panels. Surrounds to be Cultured Marble wall panels; installed as indicated on Drawings. No horizontal seams or trim strips permitted. Provide multiple section custom configuration. Sizes as shown on Drawings. Color as shown in Sleep Inn, Inn & Suites Interior Finish Specifications. a. Provide matching one-piece Shower Pan with integral curbs. b. Provide corner mounted soap dishes in locations, configurations, and sizes as shown on Drawings. 2. Standard Bathtub and Accessible Roll-In Shower: 1/4" thick molded panels. Surrounds to be Cultured Marble wall panels; installed as indicated on Drawings. No horizontal seams or trim strips shall be permitted. Provide one piece for each wall. Joints will be permitted at corners only. Sizes as shown on Drawings. Color as shown in Sleep Inn, Inn & Suites Interior Finish Specifications. a. Provide integral soap dishes in locations, configurations, and sizes as shown on Drawings. 2.3 INSTALLATION MATERIALS A. Adhesive and Sealant (Installer to verify products are approved by Cultured Marble materials Manufacturer): 1. Qualified Manufacturers: a. "DAP 2000", DAP, Inc. (888-327-8477) 2. Accepted Manufacturers: a. "OSI SF400"; OSI Sealants, Inc. (800-999-8920) b. "PL Premium Polyurethane Adhesive"; OSI Sealants, Inc. (800-999-8920) c. "LN-602 Liquid Nails", Liquid Nails, Macco Division of ICI Paints, (800-634-0015) d. Or as recommended by Cultured Marble manufacturer. 06 61 13 (06610)-Page 3 of 5

2.4 FABRICATION A. Shop assemble Cultured Marble materials for delivery to site in units easily handled and to permit passage through building openings. B. Shop cut openings, to maximum extent possible, to receive hardware, appliances, plumbing fixtures, electrical work, and similar items. Locate openings accurately and use templates or roughing-in diagrams to produce accurately sized and shaped openings. 1. Rout and finish component edges with clean, sharp returns. Rout cutouts, radii and contours to template. Smooth edges. Repair or reject defective and inaccurate work. C. When necessary to cut and fit on site, provide materials with ample allowance for cutting. Provide trip for scribing and site cutting. D. Provide cutouts for plumbing fixtures, inserts, appliances, outlet boxes, and other fixtures and fittings. E. Coordinate mounting of soap dishes, grab rails, and other accessories, as indicated on the Drawings. PART 3 EXECUTION 3.1 INSPECTION A. Verify adequacy of backing and support framing. 3.2 PREPARATION A. Condition cast polymer materials to average prevailing humidity conditions in installation areas before installation. 3.3 INSTALLATION A. All surrounds shall be installed as shown on Drawings and as specified by manufacturer. B. Install components plumb, level and rigid, scribed to adjacent finishes, in accordance with approved shop drawings and product data. C. Adhere using manufacturer's recommended sealant, adhesive and mounting hardware. Wipe clean with to remove any contaminants prior to applying adhesives as recommended by manufacturer. D. Tub/Shower Surrounds: 1. Remove all dust and other contaminants from the back side of all panels before installation. 2. Secure soap dishes to panels with adhesive as recommended by Manufacturer. 3. Hold bottom edge of wall panel above rim of tub and shower for application of sealant as shown on Drawings. 3.4 ADJUSTING AND CLEANING A. Keep components clean during installation. Remove adhesives, sealants and other stains. Keep clean until Date of Substantial Completion. Replace stained and damaged components. B. Protect surfaces from damage until Date of Substantial Completion. Repair work or replace damaged work which cannot be repaired to Owner Representative s satisfaction. 06 61 13 (06610)-Page 4 of 5

END OF SECTION 06 61 13 (06610) 06 61 13 (06610)-Page 5 of 5