Bulletin 1102C Vacuum Contactor Maintenance and Installation Instructions (Current Ratings 200A V-1500V)

Similar documents
ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Uninterruptible Power Supply. 500 kva kva

TraceTek TTDM Series Leak Detection and Location Modules Replacement Parts Installation Instructions

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual

12-Volt Negative Ground Installation Instructions

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST

Armature Actuated Brakes

ALLDATA Online Dodge Truck RAM 2500 Truck 2WD L6-5.9L DSL Turbo VI... Service and Repair

RAY-MAX Integrated Solar Power Strip

3.0 CHARACTERISTICS. AR Auxiliary Relay High Speed, High Threshold C

PRODUCT GUIDE. SL Medium Voltage IEC Vacuum Contactors

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5

Single Station Remote Alarm

Co-location Interconnect Power Panel (CIPP) Installation Guide

SureSite Magnetic Liquid Level Indicator

Magnetic and Hydraulic-Magnetic Circuit Breaker 8340-G2...

Owner s Manual Gantry Cranes

Owner s Guide and Installation Manual. Vancouver Model Name , Model No. English Español

Advantium 2 Plus Alarm

Toroidal Conductivity Sensor

PowerFlex 700S and 700H Frame 12 DC Bus Connector Kit

INSTALLATION INSTRUCTIONS

TOYOTA Tundra BACK-UP CAMERA SYSTEM Preparation

Service and Maintenance. SEW-EURODRIVE Driving the world

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

Installation. Smart-UPS VT MGE Galaxy Maintenance Bypass Panel kva 400 V

E-PDD Duct Smoke Detector Installation Sheet

Global Water Instrumentation, Inc.

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

Packaged Terminal Air Conditioner Wall Sleeve Installation

BUGGY SETUP GUIDE. Volume GOKARTSUSA GY6 150, CN250. Buggy Setup Guide

Owner s Manual. For Automatic Transfer Switch Amp, Service Entrance/Non-Service Entrance

ATS Overhead Table Shelf System INSTRUCTION MANUAL

HYDRAULIC LIFT TABLE CART 2200-LB.

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

MCR1900 Media Converter 19-Slot Chassis

Part I - Installation

SELF-STEERING AXLE TABLE OF CONTENTS

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) J. Instruction Leaflet

Single Phase Soft Starter

SCION tc COIL OVER SUSPENSION Preparation

Table of Contents WARNING SYMBOLS AND DEFINITIONS

Express5800/120Ed. Rack Mount Kit Installation Procedures PN:

Solid Core and Split Core Adjustable Current Status Switches CSS-O, CSS-C; CSP-O, CSP-C

Circuit Breakers. Next Generation of Protection Capabilities

Type MG-6 Multi-Contact Auxiliary Relay

Service Guide. Gateway M275

Owner's/Installation Manual

About this Manual. Support for Your Product

MTE SERIES RLW. World REACTORS USER MANUAL PART NO. INSTR 030 REL MTE Corporation

PANCAKE CAPACITOR GENERATOR Installation, Operation and Maintenance Manual

IMPORTANT DOCUMENTATION DO NOT DISCARD!

Rebuild Instructions for and Transmission

Bimetallic Overload Relay Specifications

»Product» Safety Warning

10 TON HYDRAULIC PRESS

Installation Instructions for EHD, EDB, EDS, ED, EDH, EDC, FDB, FD, HFD, FDC, HFDDC Circuit Breakers and Molded Case Switches

1. SAFETY RULES. 8. Avoid placing objects in the path of the blades.

Rating when used as a weight carrying hitch without spring bars:

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

1000-LB. TRAILER JACK OWNER S MANUAL

PowlVac Vacuum Integrity Tester

HP UPS R1500 Generation 3

F250 6 RADIUS ARM KIT

Parallel Redundant Uninterruptible Power Supply

Installation Guide of Sunrise Solartech PV Modules. Term Contents. Purpose of this guide. General. Safety precaution for installing a solar

AMPSEAL* Automotive Plug Connector and Header Assembly

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points

VC Series Zone Valves BALANCED 2-WAY AND 3-WAY HYDRONIC VALVES

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

Reliance DuraStar ORDINARY LOCATION INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

DLP-PU/E Instruction Manual

Installation. Smart-UPS VT and MGE Galaxy Maintenance Bypass Panel with Power Distribution (wall-mount) kva 208 V

Bulletin 1489 Circuit Breakers. Selection Guide

Installation Instructions

I nstallation. M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications. Tools Needed.

STC 3S A Series Solenoid Valves

JANUS INTERNATIONAL CORPORATION INSTALLATION INSTRUCTIONS Pantheon Mini Operator

430 Power/Electronics Replacement

LIEBERT VNSA Installation Sheet

8-Ohm Ceiling Speakers For Music and Home Theater

Ford F-250 / /2 Coil Kit. Ford F-250, F Part#:

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

MP8000 Series Pneumatic Valve Actuators

Oil and Coolant Circulating Heating System. Model - OCSM

MODEL T10023 ACCESSORY KIT #1 FOR T10010/T10097 WET GRINDER

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

7 Watt Solar Charger Solar Panel

6 inch A-Arm Lift Kit WARNING: / installation instructions. will fit CLUB CAR DS. included:

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide

Instruction Bulletin. MCS025 Sync-Check Module Installation Sheet

Transcription:

Bulletin 1102C Vacuum Contactor aintenance and Installation Instructions (Current Ratings 200A -- 200V-1500V) (Cat 1102-BO_93 -- 200A, 3 Pole Contactor - 1500V ax) ATTENTION: To prevent electrical shock, disconnect from power source before installing or servicing. Inspection page 1 Installation page 2 Coil Replacement page 2, 3 Control Pak Replacement page 4 Aux. Contact Assembly Installation page 4 Vacuum Interrupter Phase Assembly Replacement page 4, 5 Contact Life Over-Travel easurement page 5 Cleaning and aintenance page 6 Vacuum Interrupter Integrity Test page 6 Wiring page 6 Dimensions page 7 Replacement Parts page 8 VACUU CONTACTOR Vacuum Contactor - 200A Inspection - Unpacking Before the contactor is placed in service, check carefully for shipping damage. Any damage should be reported to the carrier within (3) three days of receipt. For overseas deliveries, it is important to obtain a certificate of examination from the nearest insurance inspector and photographs of the damage. This and other evidence should accompany any communication to the insurance company or shippers. In the event equipment is to be returned to the factory, contact Allen-Bradley Customer Service Department or our local A-B Distributor for return authorization. A returned material authorization (RA) number will be issued which should appear on all correspondence and the returned container. The Bulletin 1102C Vacuum Contactor is shipped in a shock resistant filled cardboard box. The following steps should be taken when unpacking the contactor: 1. Check the packing list against the order to make sure the shipment is complete and components are received. 2. Examine the shipping box before unpacking the contactor to make sure it has not been damaged in shipment. If the shipping box is damaged, pay particular attention when unpacking to see if the contents are also damaged. Notify the carrier if damage is found and notify your local Allen-Bradley order field sales office of damage.

Installation Instructions The vacuum contactor may be used in any mounting plane. In any non-horizontal mounting plane, the top of the contactor should point up (so that the label appears right-side up). Care should be taken to insure that the mounting hardware does not warp the mechanism frame. If the surface of the contactor to which the contactor is mounted is twisted, shims should be used to correct the condition. Any appreciable degree of end to end twist will result in phase to phase discrepancies and timing of the main contact could cause increased pickup in control voltage values. 1. Figure 1 illustrates the field terminals for line and load terminations. ount the contactor with the hardware specified in Figure 2. Loosely install the (4) mounting bolts into the intended mounting surface. Torque the mounting bolts to 50-75 lb-inches. 2. Connect control wires to the vacuum contactor control terminals A1 and A2 located on the Control-Pak using #18 to #12 gauge 75 C stranded copper or tin stranded copper wire tightening screw terminals to 7 lb-inches torque. 3. Using 75 C wire copper cable, connect the line and load conductors to the main terminals (Figure 1) and proper phase rotation, tighten the main terminal bolts to 132 lb-inches torque. 1/4 Lock Washer 4. Check all connections for accuracy and mechanical connection before energizing. 1/4 Flat Washer Line Terminals Control Pak VACUU CONTACTOR A1 Coil Terminals A2 1/4" or 7mm Bolt VACUU CONTACTOR Load Terminals Figure 1 Figure 2 ATTENTION: If coil failure is suspected, check that secondary damage has not occurred that will render the contactor non-repairable. Coil Replacement Instructions 1. Disconnect all power cables (or bus work) and all control wiring to the contactor. 2. Remove the contactor from its mounted location. The contactor is best serviced in the benchtop position as shown. 3. Remove the cover attachment screws from the contactor and remove the Cover and Retainer (Figure 3A). 4. Disconnect the two wire leads from the Coil to the Control-Pak. Remove the Control-Pak from the contactor and set on benchtop (Figure 3B). 5. Remove the (6) screws that secure the Upper Housing to the Lower Housing by first removing the (4) outer screws and then (2) center screws. NOTE- Removing the center screws will release the Return Springs. Carefully remove the Upper Housing leaving the Return Springs in the Lower Housing (Figure 3B)). Cover Center Screws Control-Pak Retainer VACUU CONTACTOR Upper Housing Return Springs Contact Operator Figure 3A (2) Figure 3B Lower Housing

1 2 3 4 5 6 7 8 A Coil Replacement Instructions (Cont'd) 6. Remove and replace the coil. Ensure that the Shim Plate remains in the proper position between the magnet core and coil (Figure 3C). 7. Carefully replace the Upper Housing, ensuring that it is orientated correctly and that the Return Springs are seated on the outer two bumps on the bottom of the Contact Operator (Figure 3D). Replace the (6) screws that secure the Upper Housing. Tighten the screws equally in a diagonal pattern approximately two turns at a time until tightened to 12 lb-inches in the same diagonal pattern (Figure 3A). 8. Reinstall the Control-Pak (Figures 3E & 3F). First, insert the lower tab into the recess on the side of the contactor base. With proper installation, the Control-Pak Actuator will fit into the hole in the slot in the side of the contactor housing. Using a thin rod or flat blade, lift the Control-Pak Actuator up as necessary to insert it into the slot mentioned. 9. Reinstall the cover with Retainer and secure it with the original mounting hardware. Tighten the four screws in a diagonal pattern to 5 lbinches (Figure 3A). B 10. Reattach the coil wire leads to the Control-Pak (tighten to 7 lb-inches). 11. Reinstall the device and reconnect any auxiliary control wires. Reconnect the line and load conductors and tighten the main terminal hardware and bolts to 132 lb-inches. Coil Bumps C Shim Plate Figure 3C Figure 3D Thin rod or flat blade D Control-Pak Actuator Actuator must fit into slot shown E Figure 3E Figure 3F F (3) G INSTRUCTION SHEET BULLETIN 1102C VACUU CONTACTOR CURRENT RATINGS 200A 200V-1500V REFERENCE REVISION AUTHORIZATION 1 1006490 H 42052 DIENSIONS APPLY BEFORE SURFACE TREATENT (DIENSIONS IN INCHES) TOLERANCES UNLESS OTHERWISE SPECIFIED.XX:.XXX: ANGLES: E - DOC THIS DRAWING IS THE PROPERTY OF THE ALLEN-BRADLEY CO. INC. AND AY NOT BE COPIED, USED OR DISCLOSED FOR ANY PURPOSE EXCEPT AS AUTHORIZED IN WRITING BY THE ALLEN-BRADLEY CO. INC. LOCATION : DR. G. Ushakow DWG. SIZE CHKD. ark Jutz APPD. D. Josef B ILWAUKEE, SHEET 3 WISCONSIN OF U.S.A. 9 42052-087

Control-Pak Replacement Instructions 1. Disconnect all control wiring to the Control-Pak. 2. Remove the cover attachment screws from the contactor and remove the cover (Figure 3A) page 2. 3. Remove the Control-Pak from the contactor (Figure 3A) page 2. 4. Reinstall the Control-Pak (Figures 3E & 3F). First, insert the lower tab into the recess on the side of the contactor base. With proper installation, the Control-Pak Actuator will fit into the hole in the slot in the side of the contactor housing. Using a thin rod or flat blade, lift the Control-Pak Actuator up as necessary to insert it into the slot mentioned. 5. Reinstall the cover and secure it with the original mounting hardware. Tighten the four screws in a diagonal pattern to 5 lb-inches. (Figure 3A). 6. Reconnect all control wiring removed per Step 1. Tighten to 7-9 lb-inches. (Auxiliary Contact Assembly) Installation Instructions (Cat 1195C-N3 -- 2-N.O./2-N.C. - 600V @ 10A-A600) (Cat 1195C-N4 -- 2-N.O./2-N.C. - 5V @ 10mA, DC) (Positioned left hand side of contactor when facing front) 1. If replacing the existing 1195C Auxiliary Contact, disconnect all control wires from the auxiliary terminals. 2. Remove the cover attachment screws from the contactor and remove the cover (Figure 3A) page 2. 3. Install the new 1195C Auxiliary Contact (Figures 5 and 6). First, insert the lower tab into the recess on the side of the contactor base. With proper installation, the 1195C Auxiliary Actuator will fit into the hole in the slot in the side of the contactor housing. Using a thin rod or flat blade, lift the 1195C Auxiliary Actuator up as necessary to insert it into the slot mentioned. 4. Reinstall any Control-Pak previously removed per instructions stated above. 5. Reinstall the cover and secure it with the original mounting hardware. Tighten the four screws in a diagonal pattern to 5 lb-inches. 6. Connect all control wiring. Tighten to 7-9 lb-inches. Thin rod or flat blade Auxiliary Actuator Actuator must fit into slot shown Figure 5 Figure 6 Vacuum Interrupter Phase Assembly Replacement Instructions 1. Disconnect all power cables (or bus work) and all control wiring to the contactor. 2. Remove the contactor from its mounted location. The contactor is best serviced in the tabletop position. 3. Remove the cover attachment screws from the contactor and remove the cover (Figure 3A) page 2. 4. Disconnect the two wire leads from the coil to the Control-Pak. Remove the Control-Pak from the contactor and set on benchtop (Figure 3B) page 2. 5. Locate the replacement vacuum interrupter phase assembly that needs to be replaced. 6. Remove the hardware that secures the shunt to the load side terminal (Figure 7A). This will free the shunt. 7. For the outer interrupters, remove the Retainer. Then remove the hardware securing the Cam Cover before removing the hardware securing the Interrupter Phase Assembly. Take care to note the position of the shunt prior to removing the Interrupter Phase Assembly. (Figure 7B). (4)

1 2 4 5 6 7 8 A Vacuum Interrupter Phase Assembly Replacement Instructions (Cont'd) 8. Place the new Interrupter Phase Assembly into the upper housing. Be sure that the Cams are properly seated around the Contact Operator. Thread the Shunt through the housing and Contact Operator, following the Shunt path (Figure 7C). Replace the hardware securing the Interrupter Phase Assembly (Figure 7B). Tighten screws to 60-80 lb-inches. The replacement interrupter is factory set for contact gap and does not require adjustment in the field. Attach the Shunt to the load terminal by placing the Shunt against the terminal with the flat washer and lock washer between the Shunt and the head of the bolt (Figure 7A) and tighten until the lock washer is fully compressed (or up to 60 lbinches). Replace the Cam Cover and hardware (tighten to 60-80 lb-inches). Reinstall the Cover and secure it with the original mounting hardware. Tighten the four screws in a diagonal pattern to 5 lb- inches (Figure 3A). Reattach the coil wire leads to the Control-Pak (tighten to 7-9 lb-inches). Reinstall the device and reconnect any auxiliary control wires. Reconnect the line and load conductors and tighten the main terminal hardware and bolts to 132 lb-inches. Shunt B Interrupter Phase Assembly Cam Cover Contact Operator Shunt Path C Cam Orientation Figure 7A Figure 7B Figure 7C Contact Life Over Travel easurement The purpose of this measurement is to determine how much vacuum interrupter electrical life remains on the contact and is performed using a standard wire gauge in a "go, no go" check. 1. De-energize the contactor and isolate from all power sources. The control source can be maintained if coming from a separate supply or if taken from a line to line connection by application then an additional control source needs to be connected to terminals A1 and A2. Reenergize the contactor insuring that the main power circuits are open and isolated. D 2. Remove Phase Cover as described (Figure 3A) page 2, earlier to access inspection area (Figure 8). 3. When the contactor is closed, a gap occurs, and this gap should accept a standard wire (.010") gauge. If the gauge can be inserted in the space then sufficient life remains for an additional 100,000 operations. Check all phases. 4. If the.010" wire gauge cannot be inserted into this gap with the contactor energized, then over travel has been exhausted and thus contact life used up. The contactor should be replaced. E F Figure 8 (5) G INSTRUCTION SHEET BULLETIN 1102C VACUU CONTACTOR CURRENT RATINGS 200A 200V-1500V REFERENCE REVISION AUTHORIZATION 1 1006490 H 42052 DIENSIONS APPLY BEFORE SURFACE TREATENT (DIENSIONS IN INCHES) TOLERANCES UNLESS OTHERWISE SPECIFIED.XX:.XXX: ANGLES: E - DOC THIS DRAWING IS THE PROPERTY OF THE ALLEN-BRADLEY CO. INC. AND AY NOT BE COPIED, USED OR DISCLOSED FOR ANY PURPOSE EXCEPT AS AUTHORIZED IN WRITING BY THE ALLEN-BRADLEY CO. INC. LOCATION : DR. G. Ushakow DWG. SIZE CHKD. ark Jutz APPD. D. Josef B ILWAUKEE, SHEET 5 WISCONSIN OF U.S.A. 9 42052-087

Cleaning and aintenance 1. The vacuum contactor requires no adjustment. Preventative maintenance is recommended on a routine basis, once every twelve months, dependent upon the environment that the contactor is exposed to. In general, maintenance consists of keeping the device free of dirt and dust and ensuring the power and control terminals are tight. 2. aintenance should verify the mechanical operation of the device for freedom of movement. Clean dirt from the surfaces. Pay particular attention to molded parts and tracking surfaces. Foreign materials on these surfaces should be removed by vacuum or wiping. Do not use compressed air to remove foreign materials. Vacuum Interrupter Integrity Test ATTENTION: Excercise caution while performing high voltage potential tests. 1. A high potential test will determine the di-electric strength and condition of the vacuum interrupter. A high potential test should be performed on each vacuum interrupter phase in sequence and should be performed approximately once every twelve months. 2. The vacuum interrupter integrity test should be performed if the contactor has been known to be exposed to fault conditions - either phase to phase or phase to ground. 3. When doing this check, make visual inspection for physical evidence of stress, distorted, discolored or cracked interrupters. 4. A contact resistance test can be done as defined below or if preferred a high potential test; di-electric test should be performed as follows. Contact Resistance A contact resistance test can be performed using a micro-ohmeter. This test determines the condition of contact surfaces. With the contactor closed, the resistance across the terminals should be less than 400 micro-ohms. If higher contact resistance values are measured then a high potential test should be performed, as follows: ATTENTION: The following test should be performed using a 50/60 Hz test set. Where the voltage is continuously variable up to at least 20 kv. X-radiation at this level is negligible. However, personnel should not be closer than ten feet to the interrupter and the test cables to avoid high voltage shock hazards. The contactor should be free of dust and other contaminants before conducting this test. 1. Disconnect the line and load conductors from the contactor. 2. Connect the leads of the test set across the interrupter terminals with the contactor in the open position. 3. Slowly raise the voltage to 10 KV and hold for 15 seconds. 4. The leakage current should not exceed 5 A during the test and any tripping of the test set circuit protector during the test should be repeated two to three times. If it becomes impossible to reach the 10 KV level, then the interrupter needs to be replaced, and should be replaced by utilizing an Allen-Bradley replacement phase assembly kit. Wiring STOP SCHEATIC SEPARATE AC SOURCE (13) START (14) (A1) (A2) STOP SCHEATIC SEPARATE 125V DC SOURCE (33) START (34) (B1) (B2) (45) (46) STOP SCHEATIC SEPARATE 250V DC SOURCE START (B1) (B2) (33) (34) (25) (26) (46) (45) OPTIONAL (1195C-N3 OR 1195C-N4) (54) (61) (62) (22) (73) (74) (81) (82) WIRING DIAGRA WIRING DIAGRA WIRING DIAGRA L1 L2 L3 (53) (13) T1 T2 T3 (A1) (A2) (14) (21) CONTROL PAK OPTIONAL (1195C-N3 OR 1195C-N4) L1 L2 L3 (53) (13) (54) (61) (62) (73) (74) (81) (82) (B2) (B1) (14) (21) (22) (33) (34) (45) (46) 1195C-N5 OPTIONAL (1195C-N3 OR 1195C-N4) (53) (54) (61) (62) (73) (74) (81) (82) L1 L2 L3 (45) (B2) (B1) (13) (14) (25) (26) (33) (34) (46) 1195C-N6 T1 T2 (6) T3 T1 T2 T3

Dimensions.9 [22.7 mm].68 [17.1 mm] 6.44 [163.5 mm] 5.3 [134.5 mm] 3.5 [89.0 mm] (4) ounting for 1/4 Screws.34.32 [8.5 mm] [8.1 mm] 5.93 [150.6 mm] 1 L1 3 L2 5 L3 VACUU CONTACTOR 13 NO 14 21 NC 22 A600 P300 7.5 [190.6 mm] 8.32 [211.3 mm] NO NC FOR X 14 13 A600 P300 FOR Y 22 21 8.66 [219.9 mm] Optional Aux. Contact Kit A1 COIL 2 T1 4 T2 6 T3 A2 1.0 [25.1 mm] 3.3 [84.3 mm] (7)

Replacement Parts Control Pak ---- side mounted module for DC coil power Bulletin Number Voltage (input) Contactor Size (Amp. Rating) 1102C-CP2D 110/120 VAC 1102C-BOD93 (200 Amp.) 1102C-CP2A 220/240 VAC 1102C-BOA93 (200 Amp.) 1102C-CP2N 380/415 VAC 1102C-BON93 (200 Amp.) 1102C-CP2B 440/480 VAC 1102D-BOB93 (200 Amp.) Coil Kit ---- This kit contains the DC coil mounted in the sheet metal frame assembly which attaches to the contactor mounting plate. NOTE: When changing the coil voltage, verify that the Control-Pak voltage for the coil kits listed below is in agreement with the Control-Pak nameplate input voltage. Bulletin Number Voltage (input) Control Pak Volts (Amp. Rating) 1102C-PK2D 108 VDC 110/120 VAC 1102C-PK2A 108 VDC 220/240 VAC 1102C-PK2N 108 VDC 380/415 VAC 1102C-PK2B 108 VDC 440/480 VAC 1102C-PK2G 125 VDC NONE 1102C-PK2H 250VDC NONE (200 Amp.) (200 Amp.) Interrupter Phase Assembly Kit - Replacement for One Vacuum Interrupter Phase Bulletin Number Current Rating of Interrupter 1102C-VB2 200 A Vaccum Interrupter Phase Assembly Accessories Auxiliary Kits Bulletin Number 1195C-N3 1195C-N4 1195C-N5 1195C-N6 Type - Contact Arrangement (2) N.O. / N.C. 600 VAC 10 Amp. (A600) (2) N.O. / N.C. 5 VDC 10mA For use on DC input coils only - 125 VDC maximum (1) N.O. / N.C. & (1) N.O. /Late Break N.C. For use on DC input coils only - 250 VDC maximum (2) N.O. / Late Break N.C. Lug Kits Bulletin Number 1195C-LK1 Current Rating W/ Wire Gauge Range 200 A 2/0-250 C 42052-087-01(1) Printed in U.S.A.