Sewer/Water Utility - Trace Wire Specification

Similar documents
Utility Marking Trace Wire Guide

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

For a building with a crawl space, see Figure

SECTION 603 SANITARY SEWER FORCE MAINS

Chapter 7 Plumbing Connections

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

SECTION 3 SANITARY SEWER DESIGN

CHAPTER 8 CIVIL DESIGN

SECTION 5 DRAFTING STANDARDS

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

FIBER-OPTIC CABLE PLAN CHECK

DESCRIPTION OF WORK:

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

WATER SERVICE 2

SECTION SIGNAL WIRE AND CABLE

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

SECTION 22 LIGHTNING PROTECTION SYSTEM

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

Standard Specifications for Installation and Repairs of Water and Sewer Service Lines

SANITARY SEWER SPECIFICATIONS

Appendix B: Uniform Color Code & Marking Guidelines

Town House Center Highway North Huntingdon, PA 15642

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

Specifications for Residential Property Owners Connection to New Public Sewer

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

Gas Meter Clearances and Service Installation Requirements

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

LS 2540 SEWER LATERALS AND INSPECTION TEES

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

MOBILE HOME SERVICE REQUIREMENTS GAS

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

4 Installation Requirements

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Operating Instructions

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION DUCTILE IRON PIPE AND FITTINGS

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Installation Instructions Hustler 6-BTV Trap Vertical

Beacon Hill Sewer District Standard Specifications

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

ENGINEER S LIST OF APPROVED ITEMS POTABLE WATER SYSTEM

Mobile Home Pre-Inspection Checklist

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

SECTION GROUND WATER STORAGE TANKS

HELIPORT FUEL/WATER SEPARATOR MODEL H-200

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

CD i -STREETS- Detail #

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

CHAPTER 6 - SANITARY SEWER

Section 2100-Trenching and Tunneling

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION DUCTILE IRON PIPE AND FITTINGS

FACTORY AUTOMATION. Manual Laying loops for Loop detector LC10-1 and LC10-2

Specifications for Lightning Protection. ASAE Engineering Practice

Ontario Electrical Safety Code - Info Sheet

IRRIGATION PUMPING Table of Contents - Section 900

GreenGuard Housewrap Installation Guide

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification GRAVITY SANITARY SEWER SYSTEM

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Chapter 6 Material Specifications

Utility Distribution Systems

Cooktop Low-Profile Ventilation Hoods

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

Residential Driveway Installation Requirements. Table of Contents

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

SECTION PIPE HANGERS AND SUPPORTS

Canopy Surge. User Manual

SECTION POLYVINYL CHLORIDE (PVC) PIPE

TABLE OF CONTENT

SECTION SANITARY SEWER PIPE

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

GAS INSTALLERS MANUAL CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3", 4", 6", AND 8" IPS PLASTIC GAS SERVICE PIPING

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

NCCER Progress Blvd., Alachua, FL Tel: (888) Task Number Item Date(s) Recorded By

Transcription:

Sewer/Water Utility - Trace Wire Specification Materials General All trace wire and trace wire products shall be domestically manufactured in the U.S.A. All trace wire shall have HDPE insulation intended for direct bury, color coated per APWA standard for the specific utility being marked. Trace wire Open Trench - Trace wire shall be #12 AWG Copper Clad Steel, High Strength with minimum 450 lb. break load, with minimum 30 mil HDPE insulation thickness. Directional Drilling/Boring - Trace wire shall be #12 AWG Copper Clad Steel, Extra High Strength with minimum 1,150 lb. break load, with minimum 30 mil HDPE insulation thickness. Trace wire Pipe Bursting/Slip Lining - Trace wire shall be 7 x 7 Stranded Copper Clad Steel, Extreme Strength with 4,700 lb. break load, with minimum 50 ml HDPE insulation thickness. Connectors All mainline trace wires must be interconnected in intersections, at mainline tees and mainline crosses. At tees, the three wires shall be joined using a single 3-way lockable connector. At Crosses, the four wires shall be joined using a 4-way connector. Use of two 3-way connectors with a short jumper wire between them is an acceptable alternative. Direct bury wire connectors shall include 3-way lockable connectors and mainline to lateral lug connectors specifically manufactured for use in underground trace wire installation. Connectors shall be dielectric silicon filled to seal out moisture and corrosion, and shall be installed in a manner so as to prevent any uninsulated wire exposure. Non locking friction fit, twist on or taped connectors are prohibited. Termination/Access All trace wire termination points must utilize an approved trace wire access box (above ground access box or grade level/in-ground access box as applicable), specifically manufactured for this purpose. All grade level/in-ground access boxes shall be appropriately identified with sewer or water cast into the cap and be color coded. A minimum of 2 ft. of excess/slack wire is required in all trace wire access boxes after meeting final elevation. All trace wire access boxes must include a manually interruptible conductive/connective link between the terminal(s) for the trace wire connection and the terminal for the grounding anode wire connection. Grounding anode wire shall be connected to the identified (or bottom) terminal on all access boxes. This Standard specification was prepared by Joe Rubbelke (joe.rubbelke@gmail.com), Jeff Dale (jeff.dale@mrwa.com) and Frank Stuemke (frank.stuemke@mrwa.com), and is a work-in-progress, intended for redistribution, modification and immediate use by any municipality (March 2014). The end user must accept all liabilities and hold harmless the contributors of this information.

Sewer/Water Utility - Trace Wire Specification Service Laterals on public property - Trace wire must terminate at an approved grade level/inground trace wire access box, located at the edge of the road right-of-way, and out of the roadway. Service Laterals on private property - Trace wire must terminate at an approved above-ground trace wire access box, affixed to the building exterior directly above where the utility enters the building, at an elevation not greater than 5 vertical feet above finished grade, or terminate at an approved grade level/in-ground trace wire access box, located within 2 linear feet of the building being served by the utility. Hydrants Trace wire must terminate at an approved above-ground trace wire access box, properly affixed to the hydrant grade flange. (affixing with tape or plastic ties shall not be acceptable) Long-runs, in excess of 500 linear feet without service laterals or hydrants - Trace wire access must be provided utilizing an approved grade level/in-ground trace wire access box, located at the edge of the road right-of-way, and out of the roadway. The grade level/in-ground trace wire access box shall be delineated using a minimum 48 polyethylene marker post, color coded per APWA standard for the specific utility being marked. Grounding Trace wire must be properly grounded at all dead ends/stubs Grounding of trace wire shall be achieved by use of a drive-in magnesium grounding anode rod with a minimum of 20ft of #14 red HDPE insulated copper clad steel wire connected to anode (minimum 0.5 lb.) specifically manufactured for this purpose, and buried at the same elevation as the utility. When grounding the trace wire at dead ends/stubs, the grounding anode shall be installed in a direction 180 degrees opposite of the trace wire, at the maximum possible distance. When grounding the trace wire in areas where the trace wire is continuous and neither the mainline trace wire or the grounding anode wire will be terminated at/above grade, install grounding anode directly beneath and in-line with the trace wire. Do not coil excess wire from grounding anode. In this installation method, the grounding anode wire shall be trimmed to an appropriate length before connecting to trace wire with a mainline to lateral lug connector. Where the anode wire will be connected to a trace wire access box, a minimum of 2 ft. of excess/slack wire is required after meeting final elevation. Installation General Trace wire installation shall be performed in such a manner that allows proper access for connection of line tracing equipment, proper locating of wire without loss or deterioration of low frequency (512Hz) signal for distances in excess of 1,000 linear feet, and without distortion of signal caused by multiple wires being installed in close proximity to one another. Trace wire systems must be installed as a single continuous wire, except where using approved connectors. No looping or coiling of wire is allowed. This Standard specification was prepared by Joe Rubbelke (joe.rubbelke@gmail.com), Jeff Dale (jeff.dale@mrwa.com) and Frank Stuemke (frank.stuemke@mrwa.com), and is a work-in-progress, intended for redistribution, modification and immediate use by any municipality (March 2014). The end user must accept all liabilities and hold harmless the contributors of this information.

Sewer/Water Utility - Trace Wire Specification Any damage occurring during installation of the trace wire must be immediately repaired by removing the damaged wire, and installing a new section of wire with approved connectors. Taping and/or spray coating shall not be allowed. Trace wire shall be installed at the bottom half of the pipe and secured (taped/tied) at 5 intervals. Trace wire must be properly grounded as specified. Trace wire on all service laterals/stubs must terminate at an approved trace wire access box located directly above the utility, at the edge of the road right-of-way, but out of the roadway. (See Trace wire Termination/Access) At all mainline dead-ends, trace wire shall go to ground using an approved connection to a drive-in magnesium grounding anode rod, buried at the same depth as the trace wire. (See Grounding) Mainline trace wire shall not be connected to existing conductive pipes. Treat as a mainline deadend, ground using an approved waterproof connection to a grounding anode buried at the same depth as the trace wire. All service lateral trace wires shall be a single wire, connected to the mainline trace wire using a mainline to lateral lug connector, installed without cutting/splicing the mainline trace wire. In occurrences where an existing trace wire is encountered on an existing utility that is being extended or tied into, the new trace wire and existing trace wire shall be connected using approved splice connectors, and shall be properly grounded at the splice location as specified. Sanitary Sewer System A mainline trace wire must be installed, with all service lateral trace wires properly connected to the mainline trace wire, to ensure full tracing/locating capabilities from a single connection point. Lay mainline trace wire continuously, by-passing around the outside of manholes/structures on the North or East side. Trace wire on all sanitary service laterals must terminate at an approved trace wire access box color coded green and located directly above the service lateral at the edge of road right of way. Water System A mainline trace wire must be installed, with all service lateral trace wires properly connected to the mainline trace wire, to ensure full tracing/locating capabilities from a single connection point. Lay mainline trace wire continuously, by-passing around the outside of valves and fittings on the North or East side. Trace wire on all water service laterals must terminate at an approved trace wire access box color coded blue and located directly above the service lateral at the edge of road right of way. Above-ground tracer wire access boxes will be installed on all fire hydrants. All conductive and non-conductive service lines shall include tracer wire. This Standard specification was prepared by Joe Rubbelke (joe.rubbelke@gmail.com), Jeff Dale (jeff.dale@mrwa.com) and Frank Stuemke (frank.stuemke@mrwa.com), and is a work-in-progress, intended for redistribution, modification and immediate use by any municipality (March 2014). The end user must accept all liabilities and hold harmless the contributors of this information.

Sewer/Water Utility - Trace Wire Specification Storm Sewer System This section shall be included at the discretion of the facility owner. If the storm sewer system includes service laterals for connection of private drains and tile lines, it shall be specified the same as a sanitary sewer application. Lay mainline trace wire continuously, by-passing around the outside of manholes/structure on the North or East side. Prohibited Products and Methods The following products and methods shall not be allowed or acceptable Uninsulated trace wire Trace wire insulations other than HDPE Trace wires not domestically manufactured Non locking, friction fit, twist on or taped connectors Brass or copper ground rods Wire connections utilizing taping or spray-on waterproofing Looped wire or continuous wire installations, that has multiple wires laid side-by-side or in close proximity to one another Trace wire wrapped around the corresponding utility Brass fittings with trace wire connection lugs Wire terminations within the roadway, i.e. in valve boxes, cleanouts, manholes, etc. Connecting trace wire to existing conductive utilities Testing All new trace wire installations shall be located using typical low frequency (512Hz) line tracing equipment, witnessed by the contractor, engineer and facility owner as applicable, prior to acceptance of ownership. This verification shall be performed upon completion of rough grading and again prior to final acceptance of the project. Continuity testing in lieu of actual line tracing shall not be accepted. This Standard specification was prepared by Joe Rubbelke (joe.rubbelke@gmail.com), Jeff Dale (jeff.dale@mrwa.com) and Frank Stuemke (frank.stuemke@mrwa.com), and is a work-in-progress, intended for redistribution, modification and immediate use by any municipality (March 2014). The end user must accept all liabilities and hold harmless the contributors of this information.

Sewer/Water Utility - Trace Wire Specification Products The following products have been deemed acceptable and appropriate. These products are a guide only to help you choose the correct applications for your tracer wire project. Copper clad Steel (CCS) trace wire o Open Trench Copperhead #12 High Strength part # 1230-HS o Directional Drilling/Boring - Copperhead Extra High Strength part # 1245*EHS o Pipe Bursting/Slip Lining Copperhead SoloShot Extreme Strength 7 x 7 Stranded part # PBX-50 Connectors o Copperhead 3-way locking connector part # LSC1230* o DryConn 3- way Direct Bury Lug: Copperhead Part # 3WB-01 Termination/Access o Non-Roadway access boxes applications: Trace wire access boxes Grade level Copperhead adjustable lite duty Part # LD14*TP o Concrete / Driveway access box applications: Trace wire access boxes Grade level Copperhead Part # CD14*TP 14 o Fire hydrant trace wire access box applications: Above ground two terminal with 1 conduit. Copperhead part # T3-75-F (Cobra T3 Test Station, denoting F includes mounting flange) Grounding o Drive in Magnesium Anode: Copperhead Part # ANO-1005 (1.5 lb) Manufacture product options: The information provided by Copperhead Industries gives you product options to help you choose the correct wire termination/access points connectors and grounding products. Other manufactures provide these products; this information is only a guide. This Standard specification was prepared by Joe Rubbelke (joe.rubbelke@gmail.com), Jeff Dale (jeff.dale@mrwa.com) and Frank Stuemke (frank.stuemke@mrwa.com), and is a work-in-progress, intended for redistribution, modification and immediate use by any municipality (March 2014). The end user must accept all liabilities and hold harmless the contributors of this information.

ON EAST SIDE OF WATER MAIN PIPE N ON NORTH SIDE OF WATER MAIN PIPE 4-WAY CONNECTOR OR TWO 3-WAY CONNECTORS WITH SHORT JUMPER WIRE WATER MAIN WATER MAIN CROSS WATER SERVICE MAINLINE TO LATERAL LUG CONNECTOR GRADE LEVEL / IN-GROUND ACCESS BOX AND GROUNDING ANODE (SEE WATER SERVICE DETAIL) ABOVE GROUND ACCESS BOX SECURED TO HYDRANT FLANGE (SEE HYDRANT DETAIL) CURB STOP HYDRANT CLAD STEEL - BLUE NOTES: 1. WIRE SHOWN AWAY FROM PIPE FOR CLARITY. WIRE SHALL BE INSTALLED ON THE BOTTOM SIDE OF THE PIPE BELOW THE SPRING LINE. THE WIRE SHALL BE FASTENED TO THE PIPE WITH S AT 5' INTERVALS. GROUNDING ANODE PLAN (WATER) SAMPLE WATER PLAN

GRADE LEVEL / IN-GROUND TRACE WIRE ACCESS BOX ON NORTH OR EAST SIDE OF WATER SERVICE RIGHT-OF-WAY LINE WATER MAIN MAINLINE TO LATERAL LUG CONNECTOR CLAD STEEL - BLUE DRIVE-IN MAGNESIUM GROUNDING ANODE ROD N SERVICE SADDLE WATER SERVICE CURB STOP BOX WATER SERVICE - PLAN VIEW NOTES: 1. WIRE SHOWN AWAY FROM PIPE FOR CLARITY. WIRE SHALL BE INSTALLED IMMEDIATELY ADJACENT TO THE SERVICE PIPE. THE WIRE SHALL BE FASTENED TO THE PIPE WITH S AT 5' INTERVALS. 1.5' MAX FINISHED GRADE GRADE LEVEL / IN-GROUND ACCESS BOX TO BE INSTALLED ON NORTH OR EAST SIDE OF WATER SERVICE CURB STOP BOX COIL 2' OF EXTRA RED AND BLUE WIRE IN ACCESS BOX. RED WIRE IS FROM GROUNDING ANODE AND BLUE WIRE IS ON SERVICE PIPE THAT CONNECTS TO THE MAIN LINE WIRE. CLAD STEEL - BLUE DO NOT SECURE WIRES TO CURB STOP BOX AS TO ALLOW FOR ADJUSTMENTS WITHOUT DAMAGING WIRE #14 AWG COPPER CLAD STEEL - RED, FACTORY CONNECTED TO GROUND ROD GROUNDING ANODE ROD CURB STOP WIRE CONTINUES WITH WATER SERVICE AND CONNECTS TO MAINLINE WIRE (SEE PLAN VIEW ABOVE) WATER SERVICE - SECTION VIEW WATER SERVICE DETAIL

N CLAD STEEL - BLUE ABOVE-GROUND ACCESS BOX AROUND NORTH OR EAST SIDE OF FITTINGS ABOVE-GROUND TRACE WIRE ACCESS BOX PERMANENTLY MOUNTED TO GRADE FLANGE BOLT (SEE FRONT VIEW) NEW STAINLESS STEEL BOLT TO ALLOW FOR BRACKET INSTALLATION 3-WAY CONNECTOR AROUND NORTH OR EAST SIDE OF FITTINGS 2.0' MIN HDPE OR STAINLESS STEEL BRACKET TO PERMANENTLY SECURE ACCESS BOX TO GRADE FLANGE DRIVE-IN MAGNESIUM GROUNDING ANODE ROD CLAD STEEL - BLUE WIRE UNDERNEATH NORTH OR EAST SIDE OF HYDRANT LEAD WIRE UNDERNEATH EAST SIDE OF WATER MAIN #14 AWG COPPER CLAD STEEL - RED, FACTORY CONNECTED TO GROUND ROD WATER MAIN WIRE CONTINUES UNDER HYDRANT LEAD AND CONNECTS TO MAIN LINE WIRE (SEE PLAN VIEW) DRIVE-IN MAGNESIUM GROUNDING ANODE ROD HYDRANT - PLAN VIEW HYDRANT - SECTION VIEW HYDRANT DETAIL

N SHALL BE ROUTED AROUND MANHOLES ON THE NORTH AND/OR EAST SIDE CLAD STEEL - GREEN MAINLINE TO LATERAL LUG CONNECTOR N GRADE LEVEL / IN-GROUND ACCESS BOX AND DRIVE-IN MAGNESIUM GROUNDING ANODE (SEE SEWER SERVICE DETAIL) SEWER SERVICE GROUNDING ANODE 4-WAY CONNECTOR OR TWO 3-WAY CONNECTORS WITH SHORT JUMPER WIRE MANHOLE NOTES: 1. WIRE SHOWN AWAY FROM PIPE FOR CLARITY. WIRE SHALL BE INSTALLED ON THE BOTTOM SIDE OF THE PIPE BELOW THE SPRING LINE. THE WIRE SHALL BE FASTENED TO THE PIPE WITH S AT 5' INTERVALS. PLAN (SEWER) SAMPLE SEWER PLAN

RIGHT-OF-WAY LINE CLAD STEEL - GREEN N MAINLINE TO LATERAL LUG CONNECTOR DRIVE-IN MAGNESIUM GROUNDING ANODE ROD GRADE LEVEL / IN-GROUND TRACE WIRE ACCESS BOX DIRECTLY ABOVE SEWER SERVICE SEWER SERVICE ON PRIVATE SIDE SEWER SERVICE - PLAN VIEW NOTES: 1. WIRE SHOWN AWAY FROM PIPE FOR CLARITY. WIRE SHALL BE INSTALLED IMMEDIATELY ADJACENT TO THE SERVICE PIPE. THE WIRE SHALL BE FASTENED TO THE PIPE WITH S AT 5' INTERVALS. COIL 2' OF EXTRA RED AND GREEN WIRE IN ACCESS BOX. RED WIRE IS FROM GROUNDING ANODE AND GREEN WIRE IS ON SERVICE PIPE THAT CONNECTS TO THE MAIN LINE WIRE. GRADE LEVEL / IN-GROUND ACCESS BOX TO BE INSTALLED DIRECTLY OVER SEWER SERVICE NEAR THE RIGHT-OF-WAY LINE #14 AWG COPPER CLAD STEEL - RED, FACTORY CONNECTED TO GROUND ROD CENTERLINE SEWER SERVICE CLAD STEEL - GREEN GROUNDING ANODE ROD SEWER SERVICE WIRE CONTINUES WITH SEWER SERVICE AND CONNECTS TO MAINLINE WIRE (SEE PLAN VIEW ABOVE) SEWER SERVICE - SECTION VIEW SEWER SERVICE DETAIL

MAINLINE TO GROUNDING ANODE LUG CONNECTOR SHALL BE ROUTED AROUND MANHOLES ON THE NORTH AND/OR EAST SIDE N #14 AWG COPPER CLAD STEEL - RED, FACTORY CONNECTED TO GROUND ROD GROUNDING ANODE ROD CLAD STEEL - GREEN SEWER MANHOLE - PLAN VIEW 27" MAINLINE TO MAGNESIUM GROUNDING ANODE LUG CONNECTOR GROUNDING ANODE ROD CLAD STEEL - GREEN SEWER MANHOLE - SECTION VIEW SEWER MANHOLE DETAIL