Selection of Wellhead & Christmas Tree Products in compliance with

Similar documents
Specification for Rotary Drill Stem Elements

VALVEWORKS USA OPERATION AND SERVICE MANUAL FOR MODEL FM 2 4-1/16 GATE VALVE

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

API Upstream Standard Development Update - Supply Chain Management. Rick Faircloth

North American Stainless

Valve Live Loading With Belleville Springs. Belleville Springs for Valve Live Loading

American Petroleum Institute Purchasing Guidelines Purchase API Spec 5CT online at

Application Guide. Compensators Hose Assemblies Expansion Joints FLEX-WELD INCORPORATED FLEX-WELD.COM. Manufactured By:

KF Needle & Gauge Valves

Best Under Pressure 2900 MPV. Pilot-Operated Safety Relief Valve MPV Oct 2008-CO

SPECIFICATIONS FOR STEEL PIPE

How To Build A Kingkong Production System

North American Stainless

Introduction to Subsea Production System

CCI 100 DPC DRAG Wellhead Production Choke Valve

Content About us 06. Accreditations 10. Wellheads and valves 12. Christmas trees 28. Surface safety valves 38. After sales services 56

Caps STANDARD WEIGHT Inches / Pounds

TECHNICAL PUBLICATION

Technical information

FLANGED END BALL VALVE

RMT RMT RMT RMT Works Area: Lifting Equipment: Machinery: Assembling:

Rigorous Qualification and Development Program

API Flanged Safety Relief Valves Series 526 CATALOG

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa

Many Products...One Source

BIW Connector Systems. BIW Connector Systems. Electrical Feedthru Systems for Oil and Gas Wells. Electrical Feedthru Systems for Oil and Gas Wells

Quick response concealed horizontal sidewall sprinkler

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

TABLE OF CONTENTS 2 Heavy-Wall Seamless & Welded Carbon Steel Pipe. 4 Alloy Pipe & Tube. 6 Chrome-Moly Pipe. 7 Low-Temp Pipe

Stainless steel grade chart

High Pressure Equipment High Pressure Valves, Fittings and Tubing

Ve-Lock manufactures Needle Valves from Solid bar stock Materials & all parts details are as below:

E-Line and Braided Line. E-Line Open Hole wireline

GENERAL PROPERTIES //////////////////////////////////////////////////////

Model 43AP Pneumatic Controller, Style B

Check Valves & Actuated Valves

6D 23 rd Edition, April 2008 Specification for Pipeline Valves

creating progress for the future

V&A PROCONTROL. Rotary Valve Actuators Pneumatic & Hydraulic On-Off / Control / ESD Double Acting Spring Return All Steel SIL 3

Compressed Gas Cylinder Program

HM Series - DBB. Single, Double Block & Bleed Valves. Continuously Improving Flow Control

Compressed Gas Cylinders Safety Policy

Munchkin Heat Exchanger Maintenance

Seamless stainless tubes for hydraulic and instrumentation systems

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Heating Cable. Construction

AIR LINE VALVES AND GAUGES

BALL VALVES TECHNICAL CATALOGUE

Roxar Electrical Resistance (ER) Probes 2 Retrievable System

SOLFRUNT Pressure Gauges and Other Products for the Process Industries

Index Page. Pumping Systems Intensifiers Gas Boosters High Pressure Generators

Valve Steel. Valve Steel

Multijacketed Tubing, Single-Jacketed Tubing, and Insulated Tubing

Subsea wellhead systems. Advanced solutions for extreme conditions

NCCER Progress Blvd., Alachua, FL Tel: (888) Task Number Item Date(s) Recorded By

Jim Harris Continuous Improvement Leader

79 GAUGE / THERMOMETER H N O

Corrosion Resistant Alloys (CRAs) in the oil and gas industry selection guidelines update

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

Compact pressure switch Flameproof enclosure Ex d Model PCA

Engineered Solutions

Your safety and the safety of others are very important.

Handbook. Purchasing Guidelines. API Monogram Equipment. Purchase API Specs online at

Vogt Valves The Connection Bulletin for Extended Body Forged Steel Valves Welded Bonnet, Bolted Bonnet, Class 800 & Class 1500 CB 22

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

Wireline Operations - Slickline Calculations

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)

Ultrasonic Reference Blocks

TABLE OF CONTENT

Econosto UK. LEICESTER Econosto UK Ltd Cambridge Road Whetstone Leicester LE8 6ZG T: +44 (0) F: +44 (0)

Mueller B-101 and A-3 Drilling and Tapping Machines

All Safe, Inc. Sherwood Master Distributor Toll Free: Fax:

STORED PRESSURE STAINLESS STEEL

Solenoid valves 2/2-way direct-operated Type EV210A

Pipe Valves, Fittings and Nipples Pressures to 15,200 psi

Wood pellet and biomass system ceramic igniter

Mustang Series PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE. M115-2 (Globe) M (Angle) Schematic. Standard Components

For over 65 years OTECO, Inc. has been providing high quality oilfield equipment to the worldwide oil and gas markets.

SPECIFICATION DIVISION 22 SECTION DESCRIPTION DIVISION 22 PLUMBING SECTION THERMOMETERS, PRESSURE GAUGES, AND ACCESSORIES

ALLOY C276 DATA SHEET

FITTINGS A series Aluminium (light weight) compression fittings Ø mm tube size, BSPP and BSPT thread

DODGE USAF 200/300 Direct Mount Pillow Block Bearings

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

ASME/ANSI B Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B Malleable Iron Threaded Fittings ASME/ANSI B16.

DOUBLE BLOCK AND BLEED VALVES

Steam System Best Practices Condensate System Piping

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-

BFE AvAilABlE CAtAloguEs. Forged valves

The Python Subsea Wellhead

Easy Tool Retracting System CMC-SR2159ER36

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

RMF Engineering

The First Line of Safety

High Pressure Equipment Pressure Vessels and Reactors Index

20 TANK CONTAINER STANDARD SPECIFICATION MODEL NUMBER: 24 FSTD 2 QUOTATION NUMBER

Scraper Passage Indicator. Electrical Indicator. Features

Transcription:

Wood Group Pressure Control Selection of Wellhead & Christmas Tree Products in compliance with API 6A 19 th Edition Mandatory February 1, 2005 08-0394-0

API specs are for CUSTOMERS to use API specifications are for the user: For selecting materials suited to well conditions For ordering equipment API specifications impact the manufacturing process: (Criteria) Temperature Class Material Class (trim) PSL (Product Specification Levels) Recommended by API to the user for various service conditions PR (Performance Requirements) Levels of testing done to qualify product designs for monogram API requires every monogrammed product to meet API specs for all 4 Criteria 08-0394-1

With or without the API monogram builds all new products to meet API requirements for Temperature Class Material Class PSL PR Companies can be API Licensed for marketing reasons, but then rarely comply with API requirements Licensed for 2 or 3 product types? Don t actually monogram parts? Buy-out equipment of someone else s design? 08-0394-2

CO2 Partial Pressure API Material Classes (Trims) w/ limits for 17-4 SS (0.5 psia) and 410 SS (1.5 psia) stems & hanger mandrels standard sour service ratings are 0,5 or NL 0 to < 7 psia 7 psia to 30 psia > 30 psia to < 200 psia 200 psia and up Corrosion resistant alloys may be needed. H2S Partial Pressure 0 to < 0.05 psia 0.05 to 0.5 psia > 0.5 and < 1.5 psia ¹ > 1.5 psia ¹ AA EE-0,5 or DD-0,5 DD-1,5 or EE-1,5 ² DD-NL or EE-NL ³ Non-Sour Sour Sour Sour Non-Corrosive Non-Corrosive Non-Corrosive Non-Corrosive BB EE-0,5 EE-1,5 ² EE-NL ³ Non-Sour Sour Sour Sour Slightly Corrosive Slightly Corrosive Slightly Corrosive Slightly Corrosive CC FF-0,5 FF-1,5 ² FF-NL ³ Non-Sour Sour Sour Sour Moderately to Highly Corrosive Moderately to Highly Corrosive Moderately to Highly Corrosive Moderately to Highly Corrosive CC or HH FF-0,5 or HH-0,5 FF-1,5 or HH-1,5 FF-NL or HH-NL Non-Sour Sour Sour Sour Highly Corrosive Highly Corrosive Highly Corrosive Highly Corrosive Wood Group Pressure Control recommends that Corrosion Resistant Alloys be considered beginning at CO2 partial pressures of 200 psia. Consult with engineering for material selection. Additional factors should be considered. ¹ Material Class ZZ may be used when materials and trims previously used for sour service will not comply with current NACE MR0175/ISO15156 standards ² 17-4 stainless steel is not allowed for stems or tubing hangers above 0.5 psia H2S. ³ 410 stainless steel is not allowed for stems or tubing hanger above 1.5 psia H2S. 08-0394-3

Temperature Classes API 6A 19 th Edition All products are built for a specific API temperature class Consider max flowing and min ambient temperature (mud temp?) K -75 to 180 F L -50 to 180 N -50 to 140 P -20 to 180 R Room Temperature S 0 to 140 T 0 to 180 U 0 to 250 V 35 to 250 X 0 to 350 (ref Annex G) Y 0 to 650 (ref Annex G) Choosing temperature ratings is the ultimate responsibility of the user 08-0394-4

NACE: limits for materials in H2S service 17-4 Stainless Steel Industry has historically used 17-4 SS for valve stems and tubing hangers for EE and FF sour service up to 3 or more psia H2S API 6A 19 th Edition 17-4 SS is not allowed in sour service for hanger mandrels and stems above 0.5 psia H2S partial pressure Inconel has NO LIMIT for H2S partial Pressure In many applications, 410 SS cannot be used as a substitute due to tensile strength requirements (re: hanger mandrels, stems) WGPC 19 th Edition products for sour service: Hanger Mandrels and Products with stems 17-4 SS up to.5 psia max H2S partial pressure Inconel for No Limit to H2S partial pressure 08-0394-5

NACE: limits for materials in H2S service 316 Stainless Steel Industry has historically used 316 SS for fittings, needle valves and pressure gauges for EE and FF Sour service with no limit to H2S partial pressure API 6A 19 th Edition 316 SS is not allowed in sour service when chlorides are present and temperatures are above 140 F Effects grease & test fittings in all products in standard temperature ranges Next NACE expected to change to max 200 F? WGPC 19 th edition products for sour service: Low alloy fittings will be used in all alloy bodies Nickel plated alloy or Inconel fittings are used in Stainless Steel bodies 08-0394-6

NACE effects API Material Classes 19 th Edition sour service Material Classes (Trims) must be labeled with the maximum allowable H2S partial pressure, depending on the materials of construction (may vary by manufacturer) WGPC 19th Edition Sour Service Material Classes (Trims) API 6A 17 th Edition & earlier API 6-A 19 th Edition DD EE FF DD-0,5 (17-4 SS stem is allowed) or DD-NL (w/ low alloy NACE stem * inconel stem is allowed) EE-0,5 (w/ 17-4 SS stem) or EE-NL (w/ inconel stem) FF-0,5 (w/ 17-4 SS stem) or FF-NL (w/ inconel stem) 08-0394-7

19 th Edition Changes NACE changes affect API materials 0,5 suffix will appear on our products with internal parts Valves Tubing Hanger Mandrels* API considers the tubing hanger mandrel an internal part of a wellhead assembly (as a stems are considered internal parts of valves) NL suffix will appear on our products with no internal parts Heads, Spools & Flanges Tubing Heads (lockscrews are not addressed by API 6A) Tubing Head Adapters, DSA s (with or without packoffs) Tees, Crosses, Tree Caps 08-0394-8

API 6A 19 th Edition Determine the required material class for sour service (EE or FF) Find the exact H2S partial pressure Your well(s) may be able to use 17-4 SS stems & tubing hangers It takes a lot of H2S to go over.5 psia @ 5,000# 100 PPM H2S =.5 psia @ 10,000# 50 PPM H2S =.5 psia @ 15,000# 33.3 PPM H2S =.5 psia If WGPC quotations dept. doesn t know the H2S partial pressure WGPC will quote Valves & Hanger Mandrels (as applicable) rated by API for.5 psia maximum H2S partial pressure. A statement will appear on the quotation. Choosing material class and specific materials for specific conditions is the ultimate responsibility of the user 08-0394-9

PSL (Product Specification Level) Quality Control & testing recommendations increase with severity of service Working Pressure H2S Concentration More quality control = more measurements during manufacture & more extensive pressure testing PSL 3G (new in 19 th edition) Replaces PSL 4 in API decision tree PSL 3 QC for manufacturing + gas testing PSL 4 is still available (if customer elects) PSL decision tree criteria Alternate questions can be used 08-0394-10

PSL (Product Specification Level) API recommendations to users Many customers don t follow these recommendations Do customers assume this is taken care of because their supplier follows API requirements? PSL s are recommended by API to the user to specify his requirements to the manufacturer Are customers unaware of the details of API recommendations? PSL recommendations apply to the 4 Primary Parts of a wellhead assembly Tubing Head Tubing Hanger Tubing Head Adapter Lower Master Valve» In some frac operations, the customer may consider the annulus valve on the side of the tubing head as a primary part as well. 08-0394-11

PSL (Product Specification Level) Decision Tree Alternate questions High H2S Concentration? Yes, if a leak will result in 70 PPM or more in air If your well has less than 70 PPM H2S, the answer is NO Alternate: Is the 100 PPM radius of exposure greater than 50 ft. from the wellhead? Depending on flow rate, it is possible for wells with 70 PPM H2S or more to have a 100 PPM ROE less than 50 ft. from the wellhead Radius of Exposure formulas are shown in API 6A, Annex A, A.4.5 08-0394-12

PSL (Product Specification Level) Decision Tree Alternate questions Gas Well? Alternate: customer may use Close Proximity and Radius of Exposure Analysis Yes, if 100 PPM ROE > 50 ft. and includes any part of a public area except a public road Yes, if 500 PPM ROE > 50 ft. and includes any part of a public area including a public road Yes, if well is located: In any environmentally sensitive area such as parks, wildlife preserve, city limits, etc. Within 150 ft. of an open flame or fired equipment Within 50 ft. of a public road (lease road excluded) In or near inland navigable waters In or near domestic water supplies Within 350 ft. of any dwelling 08-0394-13

PR (Performance Requirement) Performance Requirement Testing of product designs is required by API before a product is eligible to be monogrammed by the manufacturer PR 1 (minimum required) At room Temperature Pressure and mechanical cycles PR 2 (option of customer or manufacturer) At room temperature Additional pressure and mechanical cycles Annex F adds temperature cycles (option of customer or manufacturer) F PR 1 adds temperature max & min F PR 2 most severe testing includes added # of cycles 08-0394-14

Quality Control at different PSL s Bodies, End/Outlet Connections And Hub End Connections Requirement PSL 1 PSL 2 PSL 3/3G ¹ PSL 4 ¹ Impact Testing of Raw Material Temp K and L only Test at or below bottom of temp range Temp K, L, N and P only Test at or below bottom of temp range Temp K, L, N, P, R, S, T, U and V only Test at or below bottom of temp range Same as PSL 3/3G Same as PSL 3/3G 5M & below - sample testing Hardness Testing of Raw and Machined Parts 10M & above - test every part Test all parts for all working pressures Same as PSL 2 plus test locations on each end connection face Same as PSL 3/3G Sour service - test every part Surface NDE ² of Machined Parts Not Required Examine all accessible wetted and sealing surfaces Examine ALL accessible surfaces plus areas prepped for weld overlay Same as PSL 3/3G Volumetric NDE ² of Raw Material Not Required Not Required Examine 100% volume as practical, both After heat treating and Before machining Same as PSL 3/3G plus restricted acceptance criteria ¹ PSL 3, 3G and 4 require serialization of each part ² Non-Destructive Examination 08-0394-15

Quality Control at different PSL s Stems Requirement PSL 1 PSL 2 PSL 3/3G¹ PSL 4 ¹ Impact Testing of Raw Material Manufacturer's Material Specification Temp K, L, N and P only Test at or below bottom of temp range Temp K, L, N, P, R, S, T, U and V only Test at or below bottom of temp range Same as PSL 3/3G Same as PSL 3/3G Hardness Testing of Machined Parts 5M & below - sample testing 10M & above - test every part Sour service - test every part Test all parts for all working pressures Surface NDE² of Machined Parts Not Required Examine all accessible wetted and sealing surfaces Examine ALL accessible surfaces plus areas prepped for weld overlay Same as PSL 3/3G Volumetric NDE² of Raw Material Not Required Not Required After heat treating and Before machining Same as PSL 3/3G ¹ PSL 3, 3G and 4 require serialization of each part ² Non-Destructive Examination 08-0394-16

Quality Control at different PSL s Valve Bore Sealing Mechanisms And Choke Trim³ Requirement PSL 1 PSL 2 PSL 3/3G ¹ PSL 4¹ Tensile Testing of Raw Material Not required Not required Manufacturer's Material Specification Manufacturer's Material Specification Hardness Testing of Machined Parts Test all parts for sour service (DD, EE, FF, HH trims) Test all parts for all working pressures Surface NDE² of Machined Parts Not Required Examine all accessible wetted and sealing surfaces Examine ALL accessible surfaces plus areas prepped for weld overlay Same as PSL 3/3G ¹ PSL 3, 3G and 4 require serialization of each part ² Non-Destructive Examination ³ Choke trim: only surface NDE and serialization are required 08-0394-17

Quality Control at different PSL s Valve Testing Requirement PSL 1 PSL 2 PSL 3 PSL 3G PSL 4 Hydrostatic Body Test Two 3-minute holds Two 3-minute holds One 3-minute hold plus one 15- minute hold One 3-minute hold plus one 15- minute hold One 3-minute hold plus one 15-minute hold Hydrostatic Seat Test Two 3-minute holds Two 3-minute holds One 3-minute hold plus one 15- minute hold One 3-minute hold plus one 15- minute hold One 3-minute hold plus one 15-minute hold Gas Body Test Not required Not required Not required Gas Seat Test Not required Not required Not required Gas Back-Seat Test Not required Not required Not required One 15-minute hold @ WP One 15-minute hold @ WP plus one 15-minute hold @ 300 psi Optional One 15-minute hold @ WP One 15-minute hold @ WP One 1-hour hold @ WP fully open & close valve, one 1- hour hold at 5 to 10% WP One 1-hour hold @ WP, disengage / reengage, one 1-hour hold @ 5 to10% WP 08-0394-18

Quality Control at different PSL s Casing and Tubing Hanger Mandrels/Bodies Requirement PSL 1 PSL 2 PSL 3 ¹ PSL 4 ¹ ² Impact Testing of Raw Material Temp K & L only Test every part Same as PSL 2 Same as PSL 2 Hardness Testing after all heat treatment and machining Test every part Same as PSL 1 Same as PSL 2 plus additional test locations Same as PSL 2 plus additional test locations Surface NDE ³ of Machined Parts Not Required Examine all accessible wetted and sealing surfaces Examine ALL accessible surfaces plus areas prepped for weld overlay Same as PSL 3 Volumetric NDE³ of Raw Material Not Required Not Required Examine 100% volume as practical, both After heat treating and Before machining Same as PSL 3 plus restricted acceptance criteria ³ Non-Destructive Examination 08-0394-19

Quality Control at different PSL s Testing Of Casing & Tubing Heads, Tubing Head Adapters, Chokes, Crossover Connectors, Adapter And Spacer Spools Requirement PSL 1 PSL 2 ¹ PSL 3 ¹ PSL 3G ¹ ² PSL 4 ¹ Hydrostatic Test ³ Two 3-minute holds Two 3-minute holds One 3-minute hold plus one 15- minute hold One 3-minute hold plus one 15- minute hold One 3-minute hold plus one 15-minute hold Gas Test ³ Not required Not required Not required One 15-minute hold @ WP One 15-minute hold @ WP ¹ PSL 2 and above: Serialization of assemblies is required. ² PSL3G assemblies are built with PSL3 components. ³ Separate tests are required above & below crossover seal. 08-0394-20