Water resources. The main problems of pollution that need to be addressed in the country are the following:

INDONESIA - LAW ON WATER RESOURCES,

Global water resources under increasing pressure from rapidly growing demands and climate change, according to new UN World Water Development Report

Importance of Forestry in China

Published in: 2012 International Conference on Materials for Renewable Energy & Environment

Water Resource. 1 Initiating and Sustaining Water Sector Reforms : A Synthesis World Bank in collaboration with the Government of India, Ministry of

A Survey of Wastewater Treatment Facility Installation in China: Opportunities for International Cooperation of Technology Transfer

Water: The Environmental Outlook to 2050

Soil Contamination Legislation in China: Progress and Prospect

FOUR RIVERS RESTORATION PROJECT

Water Environmental Management in Cambodia

Wastewater Production, Treatment, and Use in Malaysia

How To Manage Water Quality In Korea

Section 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About?

City of Jakarta (Tanggerang) Total Greater Jakarta (Jabotabek) Area width

Overview and highlights

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Status of China s regional trading programs: progress and challenge

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

China: Towards Results-Based Strategic Planning

Report on Urban Household Water Use Pilot Survey in Beijing and Tianjin

Tianjin City is located on the Huabei

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI

Utilities Privatization Success Story. Mid-west drought management Enhance water conservation Enhance environmental sustainability

Environmental Protection in China

THE 4 MAJOR RIVERS RESTORATION PROJECT

Water Security Agency. Plan for saskatchewan.ca

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

Local Water Supply, Sanitation and Sewage

HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back!

Progress of Water Environmental Governance/Management and Future Challenges in Vietnam

Water Security and Desalination in the GCC Countries. Dr. Muhammad F. Al Rashed Executive Director Water Research Center

EU China River Basin Management Programme

Coal in China: Environment Risks and It s future Qingwei Sun, Greenpeace Woodrow Wilson May 3, 2013

FRESHWATER COUNTRY PROFILE NORWAY

A Long-Range Plan: Melbourne s Drinking Water Supply

Freshwater Resources and Water Pollution

ACQWS Paper No. 20 Total Water Management Strategy in Hong Kong

Global Water Resources

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Plan for the Establishment of ASEM Water Resources Research and Development Center

Sihwa Tidal Power Plant: a success of environment and energy policy in Korea

Policy measures for the prevention and minimization of hazardous wastes

Presentation from the 2013 World Water Week in Stockholm

Aquatera 2015/16 Business Plan Highlights

GENERAL OBLIGATION BONDS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

5. Environmental Analysis

DONOR REPORT WATER PROJECTS 2015

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa

Study on Driving Force of Economic Growth in Beijing and Outlook on Prospect of Economic Growth during 11th Five-year Plan Period

How To Invest In Water Infrastructure In Canada

Environmental Protection Law of the People's Republic of China

The Development of Soil Survey and Soil Mapping in China

Agricultural Production and Research in Heilongjiang Province, China. Jiang Enchen. Professor, Department of Agricultural Engineering, Northeast

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

Basic social medical insurance in China

edms 5. THAILAND 5.1 Water Resources Management Policies and Actions

Special Regional Session: Achieving water security for Asia and the Pacific through sustainable water management

China Railways Development, Financing and Challenges

GOALS, OBJECTIVES AND POLICIES

Responding to the Challenges of Water Security: the VIII Phase of the International Hydrological Programme

Development of Public Administration in China: Since 1978 Mao Shoulong (Draft)

Meeting Urban Development Challenges

How to Become a Green Farmer in China

Chapter 2 Study on Functional Mechanism and Effectiveness of Land Ticket System in the Process of New-Type Urbanization

CHAPTER 2 HYDRAULICS OF SEWERS

Hashemite Kingdom of Jordan Ministry of Water and Irrigation. Water in Jordan: Water security and protection

EPA s Typhoon Morakot Disaster Emergency Response

EPA Trends for wastewater Treatment in California

It s easy to issue a Green Bond

National Policy on Water Resources Restoration in Thailand

PRC: Zhanghewan Pumped Storage Power Station Project

Wastewater Regulation and Designing Changes in South East Asia

SUSTAINABLE DEVELOPMENT FOR INDONESIA: NATIONAL CAPITAL INTEGRATED COASTAL DEVELOPMENT

Development of information management system of dams in China based on. WebGIS

CASE STUDY Hanjiang Dafu Shoe Company & Putian Hanjiang Shoe Company

WATER SHORTAGE MANAGEMENT PLAN

China - One Nation, Multiple Markets

Practices in China. Outline

Ecological Restoration on Barren lands, degraded arable lands, harvested sites and sloped farmland: A Market-based Approach

Pay Later: The Cost of Inaction

Water Resources Development and Management in India - An Overview

Facts on People with Disabilities in China

Hydrological and Material Cycle Simulation in Lake Biwa Basin Coupling Models about Land, Lake Flow, and Lake Ecosystem

Egypt & Climate Change

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Water Recycles poster

Roadmap toward Effective Flood hazard Mapping in China. Concluding Report For

National Environment Awareness Campaign(NEAC) Theme

Nepal Water Supply Corporation Act, 2046 (1989)

Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences

DESIGN OF STORM WATER DETENTION POND

WATER RESOURCES MANAGEMENT IN TURKEY

Transcription:

Urban Water Sanitation in China Challenges and Opportunities WANG Zhenyu China National Committee for Pacific Economic Cooperation For 2nd PECC Water Management Seminar Noumea,, New Caledonia, 2008

A general survey of fresh water quality 2006, Communique of Ministry of Environment Protection

The Problem is serious. Around 100 million urban residents do not have access to safe water. Water resource pollution serious. 3988 water pollution incidents occurred from 2001 to 2004, nearly 1000 per year in average. 693 water accidents in 2005, 49.9% of total pollution accidents. 2005 survey showed that 27% of monitoring sections of 7 rivers were w ranked V in water quality. Half of the ground waters in urban areas are polluted in various degrees Over-development of the river water in the north (53% in Huai He, 66% in Liao He and 100% in Haihe) ) drastically reduced the self-clearance capacity of the rivers. 72% of 222 drinking water resources of 113 key environmental protection cities are up to quality standards. Fast urbanization, an annual increase of over 15 million urban residents, r water demand increases sharply. Low sewage treatment ratio: in 2006, only 55.67% of sewage was treated. t By 2006, there were still 248 cities without sewage treatment plants Over 400 cities out of 667 cities suffer water shortage, 30-40 billion cubic meters of water is in short every year. Urban water systems suffers ecological damages with the increase e of water exploitation, sewage discharge, cement covered area and loss of biodiversity, hence blue b green alga booms in many water bodies.

Quoting Qiu Baoxing,, Vice Minister for Housing and Urban-Rural Development

Deep-Rooted Causes for the Problem The cost of law-abiding abiding is very high while the cost of law-violation is relatively low hence sewage discharge is hard to curb. (Tuojiang( River Pollution Incident: the inflictor: Sichuan Chemical Group of Chengdu caused an economic loss of 200 million yuan,, but only paid 12 million yuan for compensation and fine.) Mentality of treatment after pollution is yet to be changed. Pro-GDP orientation of local authorities leads to conspiracy with discharge enterprises. (Huaihe( River Pollution, Taihu Lake Pollution) Governance default: 9 dragons manage water. The water sector administration is separated. The ruling is not consistent, while vested interests is inevitable. Market default: the relevant water management bodies are public utility bodies, not enterprises. Water is not managed according to market t rules, and investment was hard to introduce. Efficiency was very low. Pricing mechanism default: sewage pricing much lower than sewage treatment cost: 67%.

National Policy law law building Water Law (Oct 2002) on water protection and use, sewage discharge is forbidden in the drinking water source area. Govs at various levels are charged to improve water drinking conditions for the urban and rural people. Water use must be permitted. Law Environment Influence Evaluation (Oct 2002) Environmental Quality Standards for Surface Water (1997) Quality Standards for Urban Water Supply (Feb 2005 Ministry of Housing H and Urban-Rural Development, 103 items) Standards for Drinking Water Quality (2006, Ministry of Public Health, H 106 items) Regulations on Levy and Use of Sewage Discharge Fees (July 2003) (specially used for discharge treatment, rules of accounting and auditing) Law on Water Pollution Prevention and Management (February 2008)(sewage discharge must be permitted, urban water pollution management, drinking water source protection, direct discharge forbidden etc. river basin permit limit introduced) (1984, 1996, 2000, 2008) Law on Urban and Rural Planning (Jan 2008) Environmental Protection Law (Dec. 1989) Rules on Urban Water Supply (Oct 1994) Regulations on Quality Management of Water Permit (Jan. 1996) Methods on Applying Water Administrative Punishment (Dec.1997) Rules on Quality Management of Urban Water Supply (May 2007) Pending: Rules on the Protection of Drinking Water Sources; Rules s on Water Discharge Permit

National Policy-- --Planning - Drinking Water Safety: 1st Priority of all the pollution control l efforts. - 11th five-year plan, enhancing the pollution control in the three rivers and a three lakes, identify drinking water source protection zone, enhancing prohibition ition of direct discharge of sewage in major rivers and lakes, resolutely banning g direct discharge outlet at the drinking water source zones, over-polluted sewage discharge in water bodies is forbidden. Enhancing sewage treatment facilities in cities, levying sewage treatment fee universally, at least 70% of urban sewage shall be treated by 2010. -2005, State Council: Circular on Enhancing Drinking Water Safety and Safeguard, covering planning compilation, rural water safety, urban water safety, s drinking water source protection and water pollution control, monitoring mechanism, reserved water resource and emergence response system, etc. -2007, five ministries, National Development and Reform Commission, Ministry of Water Resource, Ministry of Housing and Urban-Rural Development, Ministry of Public Health, Ministry of Environment Protection, Planning of National Urban Drinking Water Safety and Safeguard

Objectives: By 2020, improve drinking water safety in all cities and county-level townships, establish a complete drinking water safe-guard system. By 2010, solve drinking water safety problems identified in 205 cities and 350 county level townships with striking water safety problem. By 2010, cut COD by 10%, including reducing 3 million tons through increase urban sewage treatment capacity by 45 million tons per day; reducing 1 million tons by industrial sewage treatment.

Approaches Drinking water source protection and water pollution control in the source area Water saving efforts combined with expansion and restoration of existing water projects; Upgrading water cleaning and transferring facilities and, build water quality inspecting capacity; Improving monitoring and information system of water safety

Give market a role Starting from 2002, government opened the water market for private enterprises and foreign capital. The water market is big (1 trillion yuan market in the 11th five-year period) The water market is open Foreign investment is burgeoning (case of 2007, French Veolia, buying a series of water plants with premium price) Internal investment is coming up (case of Beijing Capital Group, help Hunan Province in developing around 200 water projects.)

A Successful Story of Beijing -- A. Basic situation Annual water demand is 3.4 billion m3, rainfall provides 2.6 billion, ground water 400 million m3, shortage 600 million. Drinking water sources (Miyun( Miyun, Huairou reservoirs) and ground water quality remains stable. City proper Surface water systems polluted in various degrees.

Quality Survey of Beijing Water Systems (2005)

A Successful Story of Beijing -- B. river-basin management 2001, river-basin and Cross-river river-basin Management: Plan for Sustainable Use of Water Resources in the Capital Area in Early 21st Century. Program Coordinating Group under direct leadership of Ministry of Water Resources, comprising Ministry of Finance, Commission of Development and Reform, Ministry of Housing and Urban-Rural Development, Ministry of Environ. Protection, Department of Forestry, Shanxi Provincial Gov. Hebei Provincial Gov, etc.

Outcome and Effects By 2006, 14.8 billion yuan investment, water saving irrigation area: 116,000 km2, soil erosion control 3829 km2, pollution spot management:68, urban sewage treatment plant: 19 Integrated urban-rural rural water management. Water price lift: Beijing from 1.5yuan/m3 to 5.04yuan/m3; sewage treatment fee: 0.9-1.5yuan/m3 Water transfer from Hebei and Shanxi to Beijing, 301 million m3 in 4 years. Water consumption per 10000 yuan GDP:104 m3 in 2001 to 50.7 m3 in 2005; industrial water re-use rate: 91%. 5 rivers rehabilitated in Beijing, urban sewage treatment capacity reached 2,480,000 tons per day, 70% of sewage was treated, deep treatment reclaimed water plants: 4, by 2005 260 million m3 of reclaimed water used, 30% of the reclaimed water. Guantin Reservoir water quality form >V upgraded to IV and V., etc

A Successful Story of Beijing -- C. Integrated water management Governance 2004, establishment of Beijing Water Bureau to integrate functions of the former water resources bureau, water supply, sewage discharge, and urban water saving functions of city administration commission, and the former tap water supply group, and sewage treatment group, receiving management from Ministry of Housing and Urban-Rural Development, Ministry of Water Resources, and Ministry of Environment Protection.

Governance Structure

Integrated water management Governance: Effects Universal and Whole-process management, including flood control, water conservation, supply, drainage, sewage treatment, use of reclaimed water, consistency is guaranteed in policy making for water conservation, development and use. Administrative efficiency is improved: external coordination became internal coordination. Example: use of reclaimed water, overcapacity of reclaimed water plant vis-à-vis inadequate user, water shortage of power plant, default of transfer pipes: the problem was solved in half a year. Establishment of Circular Water Management: sewage is resource.

A successful story of Beijing -- D. 11th Five-year Plan of water resource-- --Beijing By 2010, useable water quantity: 4.2 billion m3, including annual l rain fall of 2.6 billion m3, 1 billion of south-north transferred water from Han River, and 600 milliom m3 of reclaimed water. Accessory projects of water plants and pipes in the city will be completed. A reserved water resource in Changpin to be established (finished already) and emergent water supply projects to be improved in Huairou, Pinggu and Zhangfang; Restore the water body of Guating Reservoir, (already improved, yet to be upgrade to type III.) A series of water plant will be established or rehabilitated or expanded. Establish or expand 9 reclaimed water plant. Lay reclaimed water pipe 470 km. Extensive use of reclaimed water in thermal power plant and irrigation area. Extend use of reclaimed water to 600 million m3 by 2010, 300 million for agriculture, 150 million in industry, and 150 million in municipal maintenance. Maintain the balance of water supply and demand, taking into account population increase, urbanization, and water saving capacity. By 2010, household 660 million m3, tertiary sector, 820; industrial ial 700, with 93% reused. Agriculture 1 billion, and environmental use 400 to 600 million.

A Successful Story of Beijing E. Circular water management

(Pic Quoted Beijing Water Bureau: Circular water management)

Use of Reclaimed Water for Lawn Watering, irrigation, landscaping, and price

Gaobeidian Sewage Treatment Plant Sewage collection and treatment for the center and east part of the metropolitan, treatment capacity 1 million m3/day, 40% of sewage discharge, serving 2.4 million people. 9 such plants established in the city proper in the past 20 years, 2.54 million m3/day, 5 to be established in the 11th five year period.

Sewage treatment Since 2000, One sewage plant is established every year. Sewage treatment capacity improved form 320 million m3 in 2001, to 800 million m3 in 2007, 92% of the sewage is treated, COD reduction improved from 30% to 80%. From 2001 to 2007, 1.29 million tons of COD was reduced.

Use of reclaimed water Over 60 thermal power plant use reclaimed water 120 million m3; 500,000 mu irrigation area in Tongzhou,, use 230 million m3 reclaimed water; Olympic Games central area, parks, use 100 million m3. reclaimed water. Watering in municipal maintenance: 30 million m3. Total: 480 million m3 in 2007 2008: 600 million m3. Pricing encouragement: 1 yuan/ton for reclaimed water against the actual cost of over 2 yuan,, the gap is subsidized by the public budget.

A Successful Story of Beijing F. Treat water in an ecological way (pics of Mr. Jiao Zhizhong,, Former DG of Beijing Water Bureau)

rural areas, 27% of sewage is treated. Simultaneous treatment of sewage, garbage, toilets and river courses. (pic( of Mr. Jiao Zhizhong)

Ecological compensation policy is practiced in the up-ranges of rivers and drinking water source areas. Visible effect: water quality in Guanting Reservoir is improving. A dead lake will soon be restored to be a drinking water source.