A On-site Tests on HV Power Transformers

Similar documents
ABB Brasil. Power Transformers: Life Cycle and Operational Cost Optimization From Purchase to Minimum Maintenance

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

Testing of Power Transformers. Routine tests, Type tests and Special tests

GUIDE FOR TESTING POWER TRANSFORMERS

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID

THE VALUE OF POWER FACTOR TESTING

MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD

Presentation of the France Transfo factories

D Session 2004 CIGRÉ. 50 kv. 150 kv. Condition Assessment of High Voltage Power Cables. The Netherlands. E. Gulski * F.J.

Power transformers. Special transformers Railway

How To Test For Safety On A Power Cable

F05D Meeting on Damped AC Voltage Testing

Intelligent maintenance decisions with ABB TrafoAssetManagement TM proactive services

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Incipient Failure Detection in Power Transformers through Frequency Sweep Response

World Leader in HV Testing Technology

On-line PD Monitoring Makes Good Business Sense

INTERNATIONAL STANDARD

Transformer Fleet Management with e-terraassetcare

2. INDUCTIVE VOLTAGE TRANSFORMERS Oil-paper insulation Gas insulation

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

Instrument Transformers Application Guide

WIRE AND CABLE ENGINEERING GUIDE

EVALUATION OF ON-SITE DIELECTRIC RESPONSE METHODS FOR NON- DESTRUCTIVE TESTING OF WATER TREED MV XLPE CABLES

2013 RESIBLOC transformers Product presentation. ABB Group October 2, 2013 Slide 1

Certification Awarded to ABB LTDA. AV. DOS AUTONOMISTAS, 1496, VILA CAMPESINA, OSASCO/SP BRAZIL

TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS. What Is Tan δ, Or Tan Delta?

A Practical Guide to Dielectric Testing

Enhance Power Equipment Reliability with Predictive Maintenance Technologies

GE Energy Transformer Monitoring: How Moving forward from Monitoring to Diagnostics can Positively Impact Indian Business and Industry

Online Transformer Insulation Monitoring System BushingGard Product Focus. Maximizing Transformer Uptime and Reliability

OMICRON Monitoring Solutions

On-line Condition Monitoring and Diagnosis for Power Transformers their Bushings, Tap Changer and Insulation System

MCT TRANSFORMADORES LTDA. August/2015 Revr. 01


A Step-Up Transformer Online Monitoring Experience at Euzébio Rocha UTE [Thermal Power Plant]

On-line monitoring of substation condition a Romanian experience. V. ZAHARESCU, Vl. ROSCA Nova Industrial SA. CN Transelectrica SA Romania

Automated test systems for distribution transformers Part II. Detailed analysis of the test system features EVENTS ABSTRACT KEYWORDS

Hydro Plant Risk Assessment Guide

7. Reactive energy compensation

Transformer Design & Design Parameters

Alstom Grid Services. Transformer lifecycle management GRID

Power Technology Issue 104. Modeling of Two-Winding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E

THE PER-UNIT SYSTEM. (2) The per-unit values for various components lie within a narrow range regardless of the equipment rating.

PC software icos Advanced

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION

Transformers. Special transformers Reactors products

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ESCOM BY G.KALINDE SUBSTATIONS ENGINEER

High-Voltage GIS yesterday - today - tomorrow

Condition Monitoring of equipment to improve quality of supply to customers by averting failures

TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer

DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES

Power transformers. Phase shifting transformers Reliable and efficient power flow control

A Guide to Transformer Winding Resistance Measurements

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy.

Application of On-line Monitoring Systems in the view of Maintenance Engineering of Eletrobras Furnas

Voltage Regulator SPAU 341 C. Product Guide

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System

CAPACITOR BANK TESTING SWP

Power Technology Issue 106. Modeling of Three-Winding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E

Circulating Current Relay. Type IRXm

Offshore Platform Powered With New Electrical Motor Drive System

HVDC Light, a tool for electric power transmission to distant loads

Why Buy HVI VLF Products?

Preliminary Results from Present Cigre Survey

INTERNATIONAL STANDARD

The Impact of Transmission Cable System Construction and Design on Commissioning Test Options & Results

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

HV Submarine Cable Systems Design, Testing and Installation

Electrical Predictive and Preventative Maintenance

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

Capacitor Voltage Transformer. Answers for energy.

Hyperlinks are Inactive

Powerformer chosen for Swedish combined heat and power plant

Understanding Insulation Resistance Testing

Unified requirements for systems with voltages above 1 kv up to 15 kv

Charged cable event. 1 Goal of the ongoing investigation. 2 Energy sources for the CDE. Content

Power over Ethernet plus Isolation requirements. David Law 3Com

Modular Systems wind portfolio overview Power Collection and Grid Connection products

DDX 7000 & Digital Partial Discharge Detectors FEATURES APPLICATIONS

High Voltage Electrical Equipment Failure Diagnosis. Presented by: Spencer Tang & Terence Ng T&T Inspection & Engineering Sdn Bhd

OFFSHORE WIND FARM ELECTRICAL CONNECTION OPTIONS. W.Grainger 1 and N.Jenkins 2 SYNOPSIS

DDX 7000 & Digital Partial Discharge Detectors FEATURES APPLICATIONS

IEEE802.3poep Study Group Revision of isolation requirements in IEEE802.3 clause 33.

ekorrp PROTECTION, METERING AND CONTROL UNITS

DS1 Diode-based transient-free capacitor switch

AC-Synchronous Generator

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Test & Data Management Software

THE USE OF AFTER-INSTALLATION COMMISSIONING TESTS TO ASSURE MV POWER CABLE SYSTEMS MEET MANUFACTURERS STANDARDS

MiCAFIL. 1 RIP Technology. Bushings. Z. Zic 09/2003

Together we create reliable products, thus ensuring development of power industry of continents.

Transcription:

21, rue d'artois, F-75008 Paris http://www.cigre.org A2-211 Session 2004 CIGRÉ On-site Tests on HV Power Transformers Dr. J.C. Mendes * R.A.Marcondes J.Nakamura ABB - Divisão de Transformadores São Paulo, Brazil ABSTRACT This paper presents a general view and description of the test setup, test equipment as well as tests performed on site, including HV withstand tests. A description of high voltage tests, including partial discharge monitoring and measurement, is also included. A short discussion on non-performed lightning and switching impulse tests is also presented. Since 1992, on-site HV tests have been performed in more than 110 power transformers in South America ranging from 30MVA to 440MVA, 115kV to 765kV (AC) and 600kV (DC), helping large electric power utilities and industrial plants increase their business performance. The results show that on-site tests, including high voltage tests, on high voltage power transformers is fully possible and reliable. It can be selected as a proven method for diagnosis and final acceptance of new and repaired or even refurbished power transformers. KEYWORDS: Transformer, Power Transformer, Tests, Electrical Tests, On-site Tests, HV Tests. 1. INTRODUCTION On-site tests on high voltage power transformers is of increasing interest as part of transformer commissioning, as a diagnostic tool for condition assessment and as an acceptance test just after transformer repair or refurbishment. A power transformer is one of the most important and expensive pieces of equipment in electric power systems. Economic operation of electrical energy generation, transmission and distribution is closely related to power transformers reliability and availability. In the actual context of power system operation, on-site tests on power transformers is adding value to electrical systems operation, enabling electrical utilities and users efficient diagnosis or reliable acceptance of a transformer, supporting business optimization and adding quality to transformers submitted to on-site repair or refurbishment. (*) Dr. José Carlos Mendes, ABB Asea Brown Boveri Ltda, Div de Transformadores, Dept PTPT/D jose-carlos.mendes@br.abb.com, Av Monteiro Lobato 3285, tel +55 11 6464 8410 07190-904 Guarulhos, SP, Brasil

2. ON-SITE TEST APPLICATION As regards complex electrical equipment such as high voltage power transformers, internal insulation is subject to defects due to several reasons associated to bad material, design, manufacturing processes or resulting from shipment. On-site electrical tests are for the test voltage to simulate on the transformer under testing the equivalent stresses which may be established during service condition. Basically, electrical tests on power transformers are grouped in type and routine tests. The goal of a routine test is to check correct manufacture of HV insulation while the goal of a type test is to confirm correct design of HV insulation. In addition, the application of on-site tests may be able to be separated in: commissioning tests: as part of the on-site equipment commissioning procedure in order to demonstrate that shipment and erection have not caused any new defects to HV insulation; on-site repair or refurbishment: as part of the repair or refurbishment procedure in order to demonstrate that repair or refurbishment have been successfully completed and HV insulation is free of dangerous defect; and diagnosis: as part of a diagnostic procedure in order to provide reference values to further tests or to confirm results obtained from other types of test. Up to date, on-site high voltage withstand tests including partial discharge monitoring and measurements are the most significant tests in order to quantify HV insulation quality. The use of a separate HV source is more informative than measurement at normal operation voltage, as it allows investigation of the HV insulation performance with voltage. Alternating voltages are most important for on-site tests [3]. Other voltage shapes for simulation of overvoltages have been used; however, they are strongly dependent on availability of on-site testing systems. The application of HV on-site tests has been a good practice in South America. Since 1992, on-site HV tests have been performed in more than 110 power transformers ranging from 30MVA to 550MVA, 115kV to 765kV (AC) and 600kV (DC). Large electric power utilities and industrial plants are the main customers to this technology. 3. LV ON-SITE TESTS Low voltage routine tests on power transformers have been carried out on site for many years as part of commissioning, repair, refurbishment and diagnostic processes. The following LV tests are normally performed: insulation resistance (core and structure-core); polarity, phase angle displacement and phase sequence; voltage ratio; winding ohmic resistance; windings and core insulation resistance measurements (Megger test); windings insulation power factor and capacitances; condensing bushings capacitances and power factors; no-load losses and excitation current at 90%, 100% and 110% of rated voltage (AC separate source); load losses with reduced current (separate AC source); and 2

short-circuit impedances. In some cases, special on-site tests are also performed, namely: frequency response (FRA); infrared-scan; and acoustic emission and partial discharge location; and insulation characterization through RVM or dielectric spectrography. 4. HV ON-SITE TESTS In recent years, several successful high voltage on-site tests have been reported as acceptance test of large EHV power transformers repaired on site [1]. As a natural extension, the same on-site testing technology has also been applied in many cases as an efficient diagnostic tool for large transformers where a fault has been detected by another means. More recently, the same technology has also been used as an acceptance test for new transformers after problematic factory-station shipment. The following HV tests have been performed on site: AC applied voltage; longtime induced voltage (1 hour) with electrical and acoustic monitoring and measurement of Partial Discharges and voltage level up to 150% of rated voltage feed by a separate controllable source; and no-load energization with rated voltage during 24 hours with electrical and acoustic monitoring and measurement of Partial Discharges and voltage level up to 115% of rated voltage feed by a separate controllable source. Electric tests are also normally monitored by means of oil sampling and corresponding analysis of dissolved gases. Figure 1 shows de number of HV on-site tests performed in South America, mainly in Brazil, since 1992. Number of HV Tests 55 50 45 40 35 30 25 20 15 10 5 0 51 35 12 10 1 1 < 150 kv 230 kv 345 kv 550 kv 800 kv 600 kv DC Figure 1 HV On-site Tests (South America and Brazil since 1992) From the above, one may note that more than 110 units have undergone HV tests on site for several purposes. In the EHV range of 550kV and above more than 37 units have been already tested. 3

The numbers above reflect the confidence power utilities and industrial plants have in the application of on-site tests on their transformers whenever necessary. These numbers can also be used to complete the survey performed by CIGRE in 1994-1995, where the importance of on-site tests has been reduced [2]. 5. HV ON-SITE TEST SETUP To perform HV on-site tests, a complete set of mobile testing equipment is made available at field, including: variable frequency 60-240Hz motor-generator group. There are three motor-generator groups available: 300kVA, 850kVA and 2MVA. The proper group is selected according to transformer power and voltage; step-up and regulating transformers; reactive power compensating capacitors and reactors; no-load and load measuring system; and partial discharges measuring and monitoring system as per IEC60076-3 and IEC60270. Figure 2 shows a general single-line diagram of the test setup connection normally used for HV power transformer on-site testing. MV Feeding System MG StepUp Regulating Transformer Under Test Auxiliary Network Motor-Generator Group Figure 2 Test Setup Single-Line Diagram Compensating Reactor Figure 3 shows a large 400MVA, 500/345/13.8kV and transformer under dielectric testing in a substation yard, with detail of the motor-generator mobile group used to perform high voltage electric AC tests. Figure 3 Transformer (400MVA, 500kV) under HV On-site Testing and Motor-Generator Group (2MVA) 6. HV ON-SITE TESTS APPLIED FOR DIAGNOSIS In many cases, HV on-site tests have been used for diagnostic purposes on large power transformers. The process of this application typically starts based on previous events such as: 4

detected event of in oil dissolved gas generation increase given up partial discharge as a possible diagnosis using dissolved gas analysis methods; or detected mechanical event such as overacceleration during a shipment operation. In several cases, HV induced voltage with partial discharge electrical and acoustic monitoring has been successfully used to detect and locate partial discharge in large power transformers. As an example, figure 4 shows a 4-year old 300MVA, 550/138/13.8kV on-load regulating transformer under on-site testing at a substation yard. Figure 4 Transformer (300MVA, 550kV) under HV On-site Testing and PD Location During the test, partial discharge activities were measured (up to 7500pC at 130%Un) and located in the HV winding exit areas. Figure 5 shows the results of PD location through the application of 3 acoustic sensors. Figure 5 PD Location Acoustic Sensors and Triangulation Method The transformer has been visually inspected internally and partial discharges evidences have been located in the area indicated by the previous test induced test. After that, the transformer has been shipped back to factory and disassembled for complete repair. 5

7. HV ON-SITE IMPULSE TESTS Figure 6 PD Location: Acoustic and Visual Due to high costs and limited availability of testing equipment, lightning and switching impulse tests are not performed. Nowadays, however, these limitations must not be considered as restrictions to the execution of a transformer on-site complete repair when performed with the use of technology and processes qualified to this application. The non-performance of these impulse tests must be based on manufacturer's proven ability to design windings, internal insulation and main insulation systems in a reliable way according to specified transient voltage specific required conditions and also on its experience with this kind of repair work. Thus, the corresponding winding performance can be adequately certified by means of a qualified combination of design review, application of adequate method and manufacturing processes as well as tests performed in factory. Results of on-site repairs performed since 1992 and the reliable operating performance of transformers after repair certify the established repair processes, even when impulse standardized tests cannot be performed. 8. CONCLUSIONS The results show that on-site tests, including high voltage tests, on high voltage power transformers is fully possible and reliable. The results and experience accumulated over more than 12 years have shown that, in completion to GIS equipment and HV-cable systems, large HV power transformers can be also tested on site. HV tests can be selected as a proven method for commissioning, diagnosis and final acceptance of new and repaired or even refurbished power transformers. Through right high-quality application of on-site testing technology, it has been possible to optimize the whole on-site process associated to erection, diagnosis and repair of large HV power transformers. Cost and time have been reduced dramatically without reduction of expected reliability. 9. ACKNOWLEDGEMENTS The authors would like to thank several members of the repair and on-site testing team of ABB Brazil, Power Transformer Division, whose dedication and competence have contributed to the development of technology and made high-quality on-site testing of large HV power transformers possible. 6

Special thanks to customers of ABB Brazil, including Albrás, Alumar-Alcoa, Cesp, Cemig, Edelca, Furnas, Chesf, Gerasul, Nucleo-Electrica Argentina and many others, who incorporated On-site Tests as a common and reliable repair practice in their business. 10. REFERENCES 1. Mendes, J.C. et alii. On Site Repair of HV Power Transformers. Cigré Session 2002. Paper 12-114. Paris, Aug 2002. 2. KACHLER, A.J. et alii. Pro and Contras of On-Site Tests on Power Transformers and Reactors. Cigre Session 1998. Paper 12-201. Paris, Aug 1998. 3. HAUSCHILD, W. et alii. Proposed Requirements for High Voltage Withstand Tests on Site. Cigré Electra. Paris, n. 193, p.13-21, December 2000. 4. PETIT, A. Use of a Mobile Unit for On-Site PD Measurement and Fault Location. CIGRÉ Colloquium. Merida, Mexico, June, 2003. 7