1. About This Report (G4-30) (G4-32) (G4-24) (G4-26). Office of the President, Management Group (G4-31) Bangkok Metro Public Company Limited (G4-3)

Qatar Railway Company

1,045 m length of the Deh Cho Bridge

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

J. David Rogers Natural Hazards Mitigation Center University of Missouri-Rolla

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4

Buildings Construction Procurement Strategy

Masahiko Kunishima, Takehumi Sato (note of 1)

Value Engineering vs. Alternate Designs in Bridge Bidding

Flood Management in Japan

Virginia Approach Spans

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

Available online at I-SEEC Proceeding - Science and Engineering (2013)

Technical Assistance Consultant s Report. Thailand: Bangkok Mass Rapid Transit Integrated Ticketing Project (Financed by the Japan Special Fund)

ASHULIA APPARELS LTD. Client Summary Report

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005

WORK SCOPE. Domains in which we work:

1. Senior / Executive Project Engineer (Civil)

Thailand focus 2014 Competencies & Growth potentials. Arkhom Termpittayapaisith

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Block C Borthwick Street, London, SE8 3JY

Flood Mitigation and Management in Bangkok Metropolitan Area

Elevated Roads for Sri Lanka

Bridge Structural Rehabilitation Using FRP Laminates

The future is already here

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Requirements for Building Application Submission

APPLICATION OF ALOS DATA FOR LAND USE CHANGE IN GREEN AREA OF BANG KA CHAO, SAMUT PRAKAN PROVINCE

Quality and the Bridge Engineer

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

New flood-proof housing designs

DYNAMIC SOLUTIONS AND ADVANCED TECHNOLOGIES

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

QATAR RAIL DOHA METRO PROJECT BUSINESS OPPORTUNITIES FOR LOCAL MARKET Daniel Leckel Chief Program Officer. 7 May, 2015

Granger Bay Boulevard and Green Point Roundabout

Patio Covers / Carports

Norfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May Bloc Hotels. Vantage Planning Ltd.

Enterprise Asset Management

ARCHITECTS AND ENGINEERS PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

Director's BIO-DATA Thai Rubber Latex Corporation (Thailand) Public Company Limited

Residential Deck Safety, Construction, and Repair

1. Guidance notes for completion - Please complete in block capitals using black ink

How To Write An Analysis System For Bridge Test

ACTIVITY REPORT - JUNE 2012

College of Computing, Engineering & Construction Building Construction Management Course Descriptions

BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA)

URBAN INFRASTRUCTURE METRO

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 ( N, E)

City of Jakarta (Tanggerang) Total Greater Jakarta (Jabotabek) Area width

Residential Building Permits

INTRODUCTION TO BEAMS

Introduction to Minimal Excavation Foundations

Uncovered Decks & Porches

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

RHEDA MRT The ballastless track for underground and surface commuter transit

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

DB Guidelines on Integrated Plant Protection Management 2 nd UIC International Workshop on Vegetation Management Paris, May 24 and 25, 2016

Bangkok - Analysis of Damage Costs

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

Spatially Enabling an Asset Management Database

Macetti Ing. Alessandro Via Marconi 12H Palosco (BG) Tel:

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Corrosion protection linings. Issue 1

Rail Contractors Liability Insurance

Operating Results year Asian Insulators Public Company Limited

Leading 21 st Century Retailing, as Logistics Partners

LVT System for. AlpTransit Gotthard AG

Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment

Alternative Options to Large Scales of Domestic Wastewater Treatment Facilities Management in Thailand

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

Certification: Building Plans Examiner. Exam ID: B3

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

The unit costs are based on the trend line of the 3 low bids for the average quantity.

. ABB Thailand is also responsible for Cambodia, Laos & Myanmar

E-SPLICE TM Reinforcing Bar Couplers through Friction-Weld Technology

WSDOT Bridge Elements

US 51 Ohio River Bridge Engineering and Environmental Study

Hartsfield-Jackson Atlanta International Airport s

Nationwide Fixed Guideway

Transit Oriented Development and Value Capture Hong Kong

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Scope of EN Clarification Document

MINISTERIAL REGULATION ON THE PRESCRIBING OF STANDARD FOR ADMINISTRATION AND MANAGEMENT OF OCCUPATIONAL SAFETY, HEALTH AND ENVIRONMENT B.E.

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Geotechnical Building Works (GBW) Submission Requirements

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

REBUILDING THE CTA FORREST CLAYPOOL, PRESIDENT CHRIS BUSHELL, SVP, INFRASTRUCTURE

CALL IN PROGRAMS, CATEGORIES, AND TERMS *

ANNEX A. Page 4 of 30

Transcription:

1

2

Name of Agency Administrative Division MRTA Mass Rapid Transit Authority of Thailand Ministry of Transport BTS Bangkok Mass Transit System Public Company Limited Bangkok Metropolitan Administration SRT State Railway of Thailand Ministry of Transport 3

Agency Name of Route Length of Route SRT Airport Rail Link 28.6 km (8 stations) MRTA Blue Line 21.7 km (18 stations) BTS Green Line (Sukhumvit Line) Green Line ( Silom Line) Total 22.3 km (22 stations) 9.3 km (10 stations) 82 km (58 stations) 4

5

Agency Name of Route Length of Route SRT SRT MRTA MRTA MRTA BTS Red Line Bang Sue - Rangsit Light Red Line Bang Sue - Taling Chan Purple Line Blue Line Ext. Green Line Ext. Bearing - Kheha Samut Prakan Light Green Line Talat Phlu - Bangwa 26 km 6 stations 15 km 4 stations 25.6 km 16 stations 26.9 km 19 stations 13 km 9 stations ~2.7km 2 stations 6

Contract 1 Underground Civil Works MRT Blue Line Design and Construction Distance 2.8 km. 2 Underground Stations: Existing Blue Line Contract 2 Underground Civil Works Design and Construction Distance 2.6 km. 2 Underground Stations: Contract 3 Elevated Civil Works Construction Blue Line Extension Contract 5 Trackwork Contract 4 Elevated Civil Works Construction Distance 10.5 km. 7 Elevated Stations Depot Park & Ride Distance 11 km. 8 Elevated Stations Contract 5 Trackwork Design and Construction Distance 27 km. Including Track in Depot 7

8

Contractors Project Management Consultant Contract 1 : Design and Build Underground Civil Works Italian-Thai Development PCL Index International Group Co., Ltd Dorsch Consult Asia Co.,Ltd Project Planning Services Co., Ltd Contract 2 : Design and Build Underground Civil Works Lanna Engineering Consultant Co.,Ltd PPSN Co., Ltd CH. Karnchang PCL Arun Chaiseri Consulting Engineers Co.,Ltd Merlin s Solutions International Co., Ltd Contract 3 : Build Elevated Civil Works SH-UN Joint Venture Construction Supervision Consultant SH-UN Joint Venture MAA Consultants Co., Ltd. Utility Design Consultants Co., Ltd. Contract 4 : Build Elevated Civil Works SINO-THAI Engineering & Construction PCL Tesco Co., Ltd. Epsilon Co., Ltd. MAA D2 Consult Asia Co., Ltd. Moh and Associates Inc. Contract 5 : Design and Construction of Trackwork NorCiv Engineering Co., Ltd. Nippon Koei Co., Ltd. CH. Karnchang PCL 9

Project Details : Underground Structures Tunnel 10

11

12

Project Details : Elevated Structures 13

Stations and Buildings 14

Depot & Park and Ride Buildings 15

16

Current Progress : Contract 1 Existing Blue Line Blue Line Extension 17

Hua Lamphong, Cut & Cover 18

Hua Lamphong, Cut & Cover 19

Klong Pradung Krungkasem Construction 20

BS10 Wat Mangkon Station 21

BS10 Wat Mangkon Station 22

BS10 Wat Mangkon Station 23

IVS1 24

BS11 Wang Burapha Station 25

BS11 Wang Burapha Station : Bridge Underpinning 26

IVS2 27

Current Progress : Contract 2 Existing Blue Line Blue Line Extension 28

BS12 Sanam Chai Station 29

BS12 Sanam Chai Station 30

BS12 Sanam Chai Station Pipe Roofing 31

BS12 Sanam Chai Station 32

BS13 Itsaraphap Station 33

BS13 Itsaraphap Station 34

BS13 Itsaraphap Station 35

Cut & Cover 36

Cut & Cover, Tunnelling 37

IVS3 38

Current Progress : Contract 3 Existing Blue Line Blue Line Extension 39

Construction of Pier-head at P-BN10-05 Zone 1 Construction of Pier-head at P-BN10-06 Zone 1 Construction of DSRS Structure at Pier at P-BN10-18 Zone 1 40

Bored Piling Ø 0.35m (Dry Process) for Land Bridge at BN11/5 Bang Pho Station - Zone 1 41

Balance cantilevering construction at P3 (P-BN11-05) Chao Phraya River Crossing Balance cantilevering construction at P4 (P-BN11-06) Chao Phraya River Crossing 42

Construction of Pile Cap at P-BN11-12 Zone 2 Construction of Pier-head at P-BN11-13 Zone 2 43

Installation Segment BN12/4 to BN12/5 Bang Or Station Zone 2 44

Installation Cross Beam concourse Level Grid Line 4 Bang Phlat Station Zone 2 45

Construction of Pier-head at P-BN13-13 Zone 2 46

Construction of Barrette Pile (0.80x2.70m) at BN14/2 (L:F) Sirindhorn Station Zone 3 Construction of Barrette Pile (0.80x2.70m) at BN14/4 (L:E) Sirindhorn Station Zone 3 47

Construction of Pile Cap at P-BN15-16 BCL at Boromratchonni Zone 3 48

Installation of Crossbeam Interface Segment (IF) at BN16/3 (Concourse Level) Bang Khun Non Station Zone 5 Installation of Crossbeam Interface Segment (IF) at BN16/4 (Concourse Level) Bang Khun Non Station Zone 5 49

LG2: Erection of Main Truss (Right) at P-BN16-10/P-BN16-09 Zone 5 LG2: Assembly Main Truss (Left) at P-BN16-10/P-BN16-09 Zone 5 50

LG1: Segments Erection at Span P-BN17-46 / P-BN18/1 Zone 5 51

Installation of Crossbeam Segment at BN18/3 (Platform Level) Charn Sanit Wong Station Zone 5 Installation of Crossbeam Segment at BN18/4 (Platform Level) Charn Sanit Wong Station Zone 5 52

53

Current Progress : Contract 4 Existing Blue Line Blue Line Extension 54

Installation of Launcher Support at P-BN18-05 to P-BS15-06 Charan Sanitwong Rd. 55

Column Work at P-BS13-09 Near Transition Area 56

Column Work at P-BS14-20 Phet Kasem Rd. Column Work at P-BS14-28 Phet Kasem Rd. 57

BS-15/5 Bang Phai Station 58

BS-16/3 Bang Wa Station 59

BS-17/5 Phet Kasem 48 Station 60

BS-18/6 Phasi Charoen Station 61

BS-19/6 Bang Khae Station 62

BS-20/5 Lak Song Station 63

Depot 64

Fixing Reinforcing Bars for Ground Floor Slab at Park & Ride Building No.1 65

66

Current Progress : Contract 5 Existing Blue Line Contract 5 Trackwork Blue Line Extension 67

Incoming Material (3 rd Rail Component). Stock Yard No.2. Bang Kean, Ayutthaya 68

Warehouse No.1 Warehouse No.2 Warehouse No.3 Warehouse No.4 69

Concrete Sleeper Factory Inspection 70

Site Office/Yard and Site Shop-Fabrication for Trackworks Installation. 71

72