Tool 4.4: Individual house flood mitigation measures Costs and benefits



Similar documents
Elevating Your House. Introduction CHAPTER 5

1. GENERAL ADVISORY BASE FLOOD ELEVATION (ABFE) QUESTIONS

Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Appendix F Benefit-Cost Analysis of Flood Protection Measures

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and


APPENDIX B Understanding the FEMA Benefit-Cost Analysis Process

FLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses

Openings in Foundation Walls for Buildings Located in Special Flood Hazard Areas

Reducing Flood Risk to Residential Buildings That Cannot Be Elevated

Making sustainable, flood proof houses - issues and opportunities by: John Alexander

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

FEMA P-936 Floodproofing Non-Residential Buildings ASFPM 2013

Appendix C Asset Risk Model Data

Mitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin

Sports Buildings: budget costs for the Flood Relief Fund

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

6 RETROFITTING POST & PIER HOUSES

Lighthouse Engineering, L.L.C.

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Table of Contents. Comments on the Technical Bulletins should be directed to:

Elevations Certificates: Update 2009 Presented by Wendy Lathrop, PLS, CFM

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Hazard Mitigation Grant Program (HMGP) Elevation Grant

Melbourne balcony Assessments

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

HOME INSURANCE ASSESSMENT

Repair and Renew Grant. Croydon RRG Scheme

Appendix A Flood Damages Assessment

Excerpts from the Canadian National Building Code (NBC)

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Georgia State University. Urban Life Building Roof Replacement

Repair and Renew Grant Scheme Leeds - Guidance to Applicants Purpose of the Fund

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

RISKSCAPE TUTORIAL 4: 200 YEAR ANNUAL RETURN INTERVAL (ARI) HEATHCOTE RIVER FLOOD EVENT: MITIGATING IMPACTS ON CHRISTCHURCH BUILDINGS

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

CHAPTER 2 QUANTITY TAKE-OFF

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Chapter 3 Pre-Installation, Foundations and Piers

Repairing your business or home after a flood how to limit damage and disruption in the future.

Disaster Recovery Managing and Leveraging Multiple Funding Sources

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

Page & Turnbull imagining change in historic environments through design, research, and technology

APPENDIX H7: POOL SPREAD AREAS FOR INSTANTANEOUS TANK FAILURE

School Construction Authority Architecture & Engineering

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

Development of Guidance Information for the Repair and Rebuilding of Houses Following the Canterbury Earthquake Series

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

CHAPTER 7 DRY FLOODPROOFING

Managing the risk of falls while working on roofs in housing construction

VULNERABILITY FLOOD STANDARDS. VF-1 Derivation of Residential Structure and Contents Flood Vulnerability Functions

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: Purpose

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

How To Install An Overhead Sewer

Emergency Spillways (Sediment basins)

BRIDGES ARE relatively expensive but often are

ARTICLE 12 FLOOD DAMAGE PREVENTION

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION

Q&A: Tenancy law changes

Department for Communities and Local Government

FLOOD DAMAGE PREVENTION ORDINANCE

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

How To Get A Flood Risk Reduction Rebate

Breakaway Walls

ADEQUACY OF EXISTING HOUSE FOUNDATIONS FOR RESISTING EARTHQUAKES: THE COST-BENEFIT OF UPGRADING

research highlight Economic Assessment of Residential Basement System Insulation Options introduction Objectives Methodology

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

Objective 4: Enhanced community education, flood awareness and preparedness

Leaky Homes Financial Assistance Package (FAP) Repair plan example

ADD WATERPROOF VENEER TO EXTERIOR WALLS

Tool 2.3.1: General information on the causes of rainfall-induced landslides

Sample Flood Damage Prevention Ordinance

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

19.1 Overview Repair or replace Relevelling

Project Evaluation Guidelines

Kanawha County Floodplain Regulations Quick Guide & Overview

How To Retaining Wall Guide

Keeping Overland Flood Water Out of Your Basement: Dry Floodproofing

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses

Presenters. The Ups and Downs of Home Elevations 4/29/2016. Hazard Mitigation Grant (HMA) Programs

Floodplain Development Land Use Review

Indiana Department of Homeland Security. Preliminary Damage Assessment FIELD GUIDE

When considering Roof drainage design the following should be taken into account:

are you under insured?

Basement Flooding: Preventing Future Damage

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Sutton Harbour Holdings PLC. March 2007

Transcription:

Impacts of Climate Change on Urban Infrastructure & the Built Environment A Toolbox Tool 4.4: Individual house flood mitigation measures Costs and benefits Author Ian Page Affiliation BRANZ, Private Bag 50 908, Porirua

Contents 1. Introduction 1 1.1 Background 1 1.2 Purpose of Tool 1 1.3 Obtaining this Tool 1 2. Overview of the Tool 1 2.1 Theoretical Basis of Decision Tool 1 2.2 Data Needs 1 2.3 Decision Outputs 2 2.4 Assumptions and Limitations 2 3. How to Apply the Tool 2 3.1 Application Framework 2 3.2 Tool Structure and Content 3 4. Example Inputs and Outputs 3 4.1 Illustrative Examples 3 4.2 The Next Steps 5 5. References 5 Appendix A: Illustrative Inputs and Outputs 6 6. Contact Details 9 All rights reserved. The copyright and all other intellectual property rights in this report remain vested solely in the organisation(s) listed in the author affiliation list. The organisation(s) listed in the author affiliation list make no representations or warranties regarding the accuracy of the information in this report, the use to which this report may be put or the results to be obtained from the use of this report. Accordingly the organisation(s) listed in the author affiliation list accept no liability for any loss or damage (whether direct or indirect) incurred by any person through the use of or reliance on this report, and the user shall bear and shall indemnify and hold the organisation(s) listed in the author affiliation list harmless from and against all losses, claims, demands, liabilities, suits or actions (including reasonable legal fees) in connection with access and use of this report to whomever or howsoever caused.

1. Introduction 1.1 Background This document gives details of one of a number of tools developed to assist councils and others to take account of long-term climate change effects in their ongoing asset management. The broad aim of this work is to make urban infrastructure more resilient to climate change effects. This tool is to aid in the screening and short-listing of flood damage reduction measures for existing housing at the small-scale level. It is equally applicable to current flood scenarios as to future climate change effects on flooding scenarios. 1.2 Purpose of Tool The Individual House Mitigation Tool [Tool 4.4] is specifically designed to assist in the identification of plausible damage reduction measures, and the short-listing of these prior to a more formal assessment of options. It gives approximate costs and benefits, and provides a starting point for a more detailed investigation of particular cases. It was developed for existing housing but some of the options in the tool are also applicable to new housing. 1.3 Obtaining this Tool Contact the author of this report for information about obtaining and using this tool. 2. Overview of the Tool This tool provides approximate costs for various mitigation options for individual houses. The net benefits are also provided when users enter data on flood heights, floor heights and annual expected occurrence of floods. The results apply for both timber and concrete floor housing and all types of cladding. 2.1 Theoretical Basis of Decision Tool The basic concept of the tool is to compare initial costs of flood mitigation measures with the expected future benefits. Future benefits are discounted using a discount factor which users can change along with many other variables appropriate to their flood situation. 2.2 Data Needs The following are the minimum data needs for assessing individual houses: Tool 4.4: Individual house flood mitigation measures costs and benefits. 1

Floor area Design flood height above floor level Annual Exceedance Probability (AEP) of design flood Height of floor above ground Flood heights, AEPs for one or two lesser floods. Users can also enter unit costs for various measures shown in the tool if they have local data. Otherwise the default values will be sufficiently accurate for preliminary analysis. 2.3 Decision Outputs The tool output is the initial costs of various mitigation measures, and the net benefits of each measure expressed as a Net Present Value (NPV) per house. Positive NPVs indicate the measure is worthwhile over the analysis period. 2.4 Assumptions and Limitations The model benefits are based on flood damage avoided. Flood damage is calculated as the replacement cost for the house multiplied by the damage ratio for the flood height. The damage ratios are based on RiskScape data [see Tools 3.2 and 3.3] and are averages for the house types (i.e. timber framed or masonry construction). In fact, there is a wide variation in damage to similar houses with the same flooding depth. Actual damage depends on house materials, flooding duration and velocities, and other factors. The estimated flood depths at year 2040 should be used for the analysis. The modelling ignores the change in flood depths over time with climate change, so taking the depths at 2040 will provide an approximate average value for an analysis period of 50 plus years ahead. For short analysis periods, i.e. less than 15 years, the user could use current year flood data. Single-storey houses only are considered and personal injury costs are not included. Damage to contents is not included and will vary widely depending on the household and warning time. Consideration of contents damage and personal injury would have improved the net benefits and hence the tool results are conservative. 3. How to Apply the Tool 3.1 Application Framework The tool can be used from various perspectives. Individual owners can use it for mitigation measures funded by them. Generally their time horizon is quite short in Tool 4.4: Individual house flood mitigation measures costs and benefits. 2

terms of payback, so they would use an analysis period of say 10 years or less and see what measures are expected to be cost-effective over that period. Government (local or central) will often have longer timeframes and may consider mandating mitigation measures for individual houses (possibly with subsidies). The tool provides the net benefits for the total initial expenditure and can be compared with other mitigation measures such as area-wide schemes. 3.2 Tool Structure and Content The tool calculates the trade-off between the up-front costs of the mitigation measure against the expected savings in flood damage to the house. The expected savings are a continuous series into the future where the saving in any single year is the house replacement cost x damage ratio (for flood depth) x AEP. The AEP is the likelihood of the design flood in any single year. The Uniform Series Present Worth Factor (USPWF) is the discounting factor used to bring future benefits back to present values using well-established financial analysis methods (Fraser et al., 2008). If the present value of expected benefits is greater than the initial cost of the mitigation then the measures are worthwhile. 4. Example Inputs and Outputs 4.1 Illustrative Examples The tool provides a quick analysis of the net benefits of mitigation measures, and the output for a typical house and flood regime is shown in Figure 4.1. A brief description of the measures are: 1. Do nothing no mitigation measures. Repair the houses after each flood. 2. Dry flood-proofing install a flexible membrane barrier up to 1.2 m above floor level. The membrane sheet normally sits in a concrete trench with a cover and runs around the house perimeter. It is manually extended and fixed in place to the walls of the house. This assumes adequate flood warning. 3. Earth bund around section perimeter. The bund is assumed to have side slopes of 2:1 (horizontal to vertical). Note that bund height is restricted to 1.5 m, otherwise it covers most of the section and there may be insufficient room between the house and the boundary. The costs include a small pump to discharge water within the bund perimeter. 4. Earth bund around groups of houses. As above, but the bund is more economically constructed around a group of at least four adjacent houses. Tool 4.4: Individual house flood mitigation measures costs and benefits. 3

NPV $ 5. Raise house. The house remains with same footprint but is raised above the expected flood height plus freeboard. It includes the cost of sub-floor bracing, new foundations for chimneys, reconnecting services and providing steps to the entrances. The cost increases with flood height due to longer pile lengths and the need for stronger bracing as the lateral load on the piles increase. The costs assume minimal debris load on the sub-floor and low water velocities (<1.5 m/sec). If the debris load and/or water velocities are high then the costs will be larger than shown. 6. Relocate house. The house is relocated to a new site above the expected flood level. The costs allow for transport up to 7 km, land section and services at the new site at a minimum of $170,000 per house. 7. Demolish and rebuild. Abandon the existing house and rebuild anew on a site above the flood level. The costs include demolition, land, services and a new house. 100000 Mitigation measures - typical house 50000 0-50000 -100000 Max flood ht above floor= 1 m, AEP= 0.02-150000 Floor area 140 sqm, DisRate= 5%, Analysis period 50 years Figure 4.1: Net Present Values for various mitigation measures Figure 4.1 indicates that if nothing is done the net outcome is an expected cost of about $60,000 in damage in present value terms for the particular house and flood regime shown. Relocation to a new site (above the flood level), and demolition and rebuild on a new site, are not cost-effective options due to their large initial costs, i.e. it is better to periodically repair the flood damage to this particular house than move to a new site. The other four measures shown are cost-effective, the best being to build a bund surrounding several adjacent houses. Raising individual houses by 1.3 m (1.0 m plus 0.3 m freeboard), is also cost-effective. Tool 4.4: Individual house flood mitigation measures costs and benefits. 4

Further details of mitigation measures for existing houses can be found in a number of publications (FEMA 2009, 2008, 2001). A BRANZ publication (BRANZ, 2004) describes measures to reinstate a home after a flood and is particularly applicable to the New Zealand situation. 4.2 The Next Steps The spreadsheet model applies to individual houses and indicates which options are better from a cost viewpoint. The results for all houses in a particular area could be added together and compared to area-wide mitigation schemes e.g. stop-banks, diversion channels etc [see Tools 4.2 and 4.3]. 5. References BRANZ Ltd. (2004). Restoring a house after flood damage. Bulletin 455. BRANZ Ltd, Judgeford, New Zealand. NIWA/GNS. (2009). RiskScape A tool for analysing risks from multiple hazards. RiskScape Manual. Available online at www.riscscape.org.nz Fraser N, Jewkes E, Bernhardt I and Tajima M. (2008). Global Engineering Economics: Financial Decision Making for Engineers (4 th Ed.). Pearson Education, Canada. FEMA. (2009). Homeowner s guide to retrofitting Six ways to protect your home from flooding. FEMA (2 nd Ed.) P-312 (2009). FEMA. (2008). Flood damage-resistant materials requirements for buildings located in special flood hazard areas in accordance with the National Flood Insurance Program. Technical Bulletin 2 (2008). FEMA. (2001). Engineering principles and practices of retrofitting flood-prone structures. FEMA (2 nd Ed.) P-259 (2001). Tool 4.4: Individual house flood mitigation measures costs and benefits. 5

Appendix A: Illustrative Inputs and Outputs The spreadsheet model is shown in Table A1. Users enter the individual house characteristics (floor height above ground, flood height above floor, AEP, and house floor area). Other values in the boxes can also be changed but the default values will be approximately correct for most locations. The bottom line in the first panel gives the result as an NPV. There are a large number of assumptions behind the modelling and details are provided in Table A1 to Table. Table A1: Net benefit model for individual houses Indicative costs of flood resilence measures for individual houses Timber framed single story house. Initial cost of resilience measures (for largest flood, $ per house) Height floor level above ground 0.5 metres Do Dry flood Earth bund Earth bund Raise Relocate incl Demolish nothing proofing One house 3-5 houses house land cost & re-build Flood height (2) (3) (3) (4) (5) (6) above floor Damage 0 35,504 42,565 18,872 24,000 176,417 350,000 level ratio AEP m Benefits (as present value per house for each flood) Largest flood 1.0 0.45 0.02-32,347 32,347 32,347 32,347 32,347 32,347 32,347 Smaller flood 1 0.7 0.37 0.05-26,434 26,434 26,434 26,434 26,434 26,434 26,434 Smaller flood 2 0.1 0.09 0.1-6,657 6,657 6,657 6,657 6,657 6,657 6,657 Total benefits -65,437 65,437 65,437 65,437 65,437 65,437 65,437 Net present value $ per house for all floods (benefits less costs) -65,437 29,933 22,873 46,565 41,437-110,980-284,563 AEP = Annual exceedance probability na= not applicable. Bund cross section 7.4 sqm 140 sqm house One house Four houses $1,400 per sqm total reconstruct Bund volume 964 422 cum/house $196,000 house cost 5% discount rate 50 years analysis period. USPWF = 18.26 (1) Measures are raising power outlets, installing solid core doors in place of MDF, solid timber skirting and architrave in place of MDF, and using closed cell polystyrene insulation in place of fibreglass insulation, when undertaking refurbishment. (2) For timber or slab foundation. The measure is a retractable flexible membrane over the exterior of the cladding. Cost per lin m = 634 $ per lin m Not applicable for floods over 1.5m high. (3) Bunds. Compacted fill in-place $/cum 40 $/cum Waste& storm water one-way valves, small pump $ 4,000 Bund & house raising freeboard 0.3 m Double above for 4-6 house group. Bunds cost for flat site. (4) Raising house - the cost variations with flood height are due to increased pile length and bracing. Includes steps, & chimney reconstruction. Basic cost $20,000 per 130 sqm house. Cost is to raise house above largest flood plus freeboard. (5) Relocate. Assume approx 7 km shift, and land / infrastructure cost = $ 150,000 per house. (6) Land and new house cost on new site above flood plain site $ = $346,000 Demolition costs = 4,000 $/ house Costs assume minimal debris impact damage and water velocities less than 1.5 metres per sec, otherwise hydrodynamic effects on the structure need consideration. = values can be changed. Tool 4.4: Individual house flood mitigation measures costs and benefits. 6

Table A2: Cost details Cost details Dry proofing Find perimeter length 2x House perimeter = 6x Area A=2x^2 Perim/A = 6/(sqrt(2*A) x house plan A (sqm) TR (transfer ratio) 130 0.37 200 0.30 use 0.4 flexible membrane sheet, normally folded below ground in concrete box 0.6 1.0 Butyl membrane on decks is about $90/sqm, use 180$/sqm for flood membrane m 0.5m below grd +sub-floor + flood ht + freeboard = 2.3 414 $/m Treated timber cover to pit, top & bottom sheet fixing 50 $/m Concrete fdn pit 100mm thick = 0.22 cum/m 220 $/m Excavation & concrete $ 1000 per cum 634 Tool 4.4: Individual house flood mitigation measures costs and benefits. 7

Table A3: Further cost details Cost details (continued) Bunds volume z= flood height above floor + freeboard Floor to ground = s 0.5 ht bund = z + s 1:2 slope GL Cross sect area =2(z+s)(z+s) + 0.5*(z+s) Bunds length Assume 800 sqm sections 3:1 y= 16.3 m One house Four houses y 4y 3y 3y Bund construction on perimeter of section (s) perimeter perimeter 131 m 229 m per house 57 m Elevate house in place Raise m house $ 0 20,000 0.5 20,000 1 21,000 1.5 24,000 2 27,000 2.5 30,000 Tool 4.4: Individual house flood mitigation measures costs and benefits. 8

6. Contact Details This spreadsheet financial tool was developed by BRANZ. Should territorial authorities wish to make use of the tool they will need to provide data for each house they wish to assess. The data needed are the flood heights and return periods for each house. BRANZ will run the data through the model and quickly provide answers on net benefits for each house for the various options. Contact Ian Page or Johannes (Hans) Roberti at BRANZ, ph. (04) 237 1170, for further details. Tool 4.4: Individual house flood mitigation measures costs and benefits. 9