Categorisation of Active Material from PPCS Model Power Plants



Similar documents
DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I

Hazard Classification of the Remote Handled Low Level Waste Disposal Facility

Neutronics Analysis for Integration of ITER Diagnostics Port EP10

INTRODUCTION. The ANSWERS Software Service WIMS AEA Technology plc

Fusion, the Sun s power on Earth

RESULTS OF R&D ON FUTURE FUEL CYCLE AND ASSOCIATED HL WASTE DISPOSAL: THE FRENCH CASE

Master Degree in Nuclear Engineering: Academic year

THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM

Tritium Gas Processing for Magnetic Fusion

ITER - business in fusion

ADVANCED NUCLEAR ENERGY SYSTEM FOR THE TWENTY-FIRST CENTURY

10 Nuclear Power Reactors Figure 10.1

FUSION AS A FUTURE POWER SOURCE: RECENT ACHIEVEMENTS AND PROSPECTS

The Fuel Cycle R&D Program. Systems Analysis

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay

Physics Simulation and Configuration Control in support of the Operation and Ageing Management of SAFARI-1

Major Conclusions of the MFE Study

Fusion Engineering and Design

MCQ - ENERGY and CLIMATE

COMPARISON BETWEEN TWO GAS-COOLED TRU BURNER SUBCRITICAL REACTORS: FUSION-FISSION AND ADS

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT

Design Strategies for High Availability: Accommodating In-Vessel Piping Services and Auxiliary Systems

EMERGENCY RESPONSE FOR THE AREA SURROUNDING THE CATTENOM NUCLEAR POWER PLANT

Decommissioning situation of Nuclear Power Plant in Japan

Lessons learned from the radiological accident in Mayapuri, New Delhi, India

Generation IV Fast Reactors. Dr Richard Stainsby AMEC

Spent Fuel Project Office Interim Staff Guidance - 17 Interim Storage of Greater Than Class C Waste

Minor Actinide Transmutation. Position Paper

WM2012 Conference, February 26-March 1, 2012, Phoenix, Arizona, USA

Three Mile Island Unit 2 Overview and Management Issues

AN INVESTIGATION INTO THE USEFULNESS OF THE ISOCS MATHEMATICAL EFFICIENCY CALIBRATION FOR LARGE RECTANGULAR 3 x5 x16 NAI DETECTORS

Waste Volume Reduction by Studsvik Nuclear AB. Anders Stenmark and Bo Wirendal September 16th, 2010

Checking of quality on production

Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation. G.. d Amored

Physics Aspects of the Dynamic Ergodic Divertor (DED)

Developing a Safety Case for Ontario Power Generation s L&ILW Deep Geologic Repository

Magnetic Fusion Status and Outlook

Part 1 General and Administrative Information. Part 3 Applicant s Environmental Report Combined License Stage

Radiation Protection s Benefits in the Production of Iodine-131

Appendix 6.0 Molten Salt Reactor

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

ME6130 An introduction to CFD 1-1

FT/P7-13. The European Development of He-cooled Divertors for Fusion Power Plants

Physics and technology conditions for attaining tritium self-sufficiency for the DT fuel cycle


Retrieval of Damaged Components form Experimental Fast Reactor Joyo Reactor Vessel

IN REACTOR PHYSICS ANALYSIS

Evaluation of fuelling requirements and transient density behaviour in ITER reference operational scenarios

Japan s current Nuclear Energy Policy

Boiling Water Reactor Systems

E N G I N E E R I N G

7.1 General Events resulting in pressure increase 5

Fission fragments or daughters that have a substantial neutron absorption cross section and are not fissionable are called...

Fact Sheet on U.S. Nuclear Powered Warship (NPW) Safety

Published in the Official State Gazette (BOE), number 297, of the 12 th of December 2002

How To Clean Up A Reactor Water Cleanup

Express Introductory Training in ANSYS Fluent Lecture 1 Introduction to the CFD Methodology

arxiv: v1 [physics.ins-det] 14 Jan 2014

Do-Now. 1.) Get out notebook.

MONTE CARLO SIMULATION OF THE FULL MULTIPLICITY DISTRIBUTIONS MEASURED WITH A PASSIVE COUNTER

Construction Safety Forecast For ITER

DEVELOPMENT OF PROCESS TEMPLATES AS A PROJECT MANAGEMENT TOOL FOR THE PLUTONIUM FINISHING PLANT

A Combined Nuclear Technology and Nuclear Chemistry Master A Unique Initiative at Chalmers University of Technology, Sweden

Training in Emergency Preparedness and Response

Radioactive Waste Management at Paks NPP

Basic principles of radioactive waste management

Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Conservative approach for PWR MOX Burnup Credit implementation

Determination of the Comsumption Rate in the Core of the Nigeria Research Reactor-1 (NIRR-1) Fuelled with 19.75% UO 2 Material

Piotr Tofiło a,*, Marek Konecki b, Jerzy Gałaj c, Waldemar Jaskółowski d, Norbert Tuśnio e, Marcin Cisek f

SECTION TWO PACKAGING, TRANSPORTATION AND STORAGE OF RADIOACTIVE MATERIALS

Euratom. Work Programme

ENRICHMENT AND URANIUM MASS FROM NMIS FOR HEU METAL

Cyber Security Design Methodology for Nuclear Power Control & Protection Systems. By Majed Al Breiki Senior Instrumentation & Control Manager (ENEC)

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission

DOE Policy- Reporting of. Update

. Space-time Analysis code for AHWR

Decommissioning of Nuclear Facilities

SCDAP/RELAP5-3D : A State-of-the-Art Tool for Severe Accident Analyses

D&D of the French High Enrichment Gaseous Diffusion Plant

ADS (Accelerator Driven Systems) e LFR (Lead Fast Reactor)

Automated ultrasonic immersion testing of fusion reactor components: implementation and evaluation with high accuracy.

Decommissioning of CANDU Nuclear Power Stations. by G.N. Unsworth

Transcription:

SESE-IV Categorisation of Active Material from PPCS Model Power Plants Robin Forrest, Neill Taylor and Raul Pampin Euratom/UKAEA Fusion Association Culham Science Centre This work was funded jointly by the United Kingdom Engineering and Physical Sciences Research Council and by EURATOM

Outline Active material from fusion power plants PPCS models Neutronics and activation modelling Categorisation of active material Results: Materials from five PPCS plant models Comparison of radiotoxicity of materials from fusion power plants with those from fission reactors and coal-fired power stations Conclusions

Introduction Rather large volume of material in a fusion power plant will be exposed to some level of neutron flux Most of it at very low level Materials that are activated decay relatively quickly Strong motivation for clearance and recycling of material European studies since SEAFP have categorised material according to radiological criteria related to ability to handle material for recycling procedures Earlier studies (SEAFP, SEAL, etc.) concluded that there is very little material, if any, requiring permanent disposal after 100 years The Power Plant Conceptual Study (PPCS) re-examined this conclusion For the updated power plant designs Using improved computational models

Power Plant Conceptual Study (PPCS) European study of four concepts (Plant Models A, B, C, D) for 1.5 GWe (nominal) fusion power plant designs Ranging from near-term, with little assumed advances in physics or technology to advanced, with optimistic assumptions throughout. Fifth power plant concept added in follow-on study, Plant Model AB All five models assessed for safety, environmental and economic performance.

PPCS Plant Models Model A Model AB Model B Model C Model D Fusion Power (GW) 5.00 4.24 3.60 3.41 2.53 Net electrical output (GWe) 1.55 1.5 1.33 1.45 1.53 Average neutron wall load 2.2 1.84 2.0 2.2 2.4 Major Radius (m) 9.55 9.56 8.6 7.5 6.1 Blanket structure Eurofer Eurofer Eurofer Eurofer (ODS) SiC/SiC Blanket coolant Water He He LiPb + He LiPb Blanket LiPb LiPb Li 4 SiO 4 + Be pebbles LiPb LiPb Divertor CuCrZr W alloy W alloy W alloy SiC/SiC Coolant water He He He LiPb

Neutronics and activation modelling 3-D models with multiple layers in poloidal sectors MCNP4C3 Monte Carlo calculations of neutron fluxes In every cell of the models out to the cryostat 175-group energy spectra obtained FISPACT activation calculations (EASY-2003) For every material (with assumed impurities) In every cell of the model Computed inventories, activation and derived quantities (dose rates, decay heat, clearance indices ) Results at decay times from 1 s to 10,000 years Simplified, homogeneous representation of divertor regions HERCULES in-house code system sets up geometric model, materials specifications, etc., and links MCNP and FISPACT codes

HERCULES Geometry: Plant Model B 187 o 165 o 143 o 209 o 121 o 231 o 253 o 99 o 275 o 77 o 297 o 319 o 55 o 341 o 33 0 0 o 11 o

Categorisation of active material at end of life Activation properties of materials of each component depends on: Position in the device: level and energy spectrum of neutron flux Irradiation history: duration of exposure to flux (e.g. vacuum vessel for full life of plant, divertors for 2.5 years) Materials composition, including impurities Disposition of active material will depend on Radiological properties (activation, dose rates, decay heat, etc.) Regulations Viability of recycling, including social and economic factors Currently we categorise based only on radiological parameters

Waste Categories adopted since SEAFP Non-active Waste (NAW) Material whose activity has fallen below Clearance Level Clearance Levels defined on nuclide-by-nuclide basis In this work, IAEA 1996 proposals used (New guidelines were issued by IAEA, 2004) Clearance Index computed for mixtures of nuclides, must be <1 Simple Recycle Material (SRM) Material that could be recycled by hands-on or simple remote handling techniques Complex Recycle Material (CRM) Material that could be recycled using more advanced remote handling, probably at higher cost Permanent Disposal Waste (PDW) Material that would need long-term disposal, probably in deep geological repository

Categorisation of active material Active material classifications Contact gamma dose rate (msv.hr -1 ) Decay heat per unit volume (W.m -3 ) Clearance index Permanent Disposal Waste (PDW) > 20 >10 Complex Recycle Material (CRM)* 2-20 1-10 Simple Recycle Material (SRM) < 2 < 1 Hands-on if contact dose < 10 µsv.hr -1 Non Active Waste (NAW) < 1 * The CRM limits are probably too conservative, and are to be reviewed.

Calculation method Series of Excel spreadsheets detailing: Masses and volumes of material in each cell Activation quantities (dose rates, decay heat, clearance index) in each cell at a series of decay times Assignment of material in each cell to one of the categories at 50 and 100 years following shutdown Component replacement: TF coil, vacuum vessel and LT shield not replaced during 25 full power years Divertors, replaced every 2.5 full power years First wall and blanket, replaced every 5 full power years Proper account taken of decay time for each divertor and blanket since time of removal from the plant

Irradiation history based on PPCS maintenance scheme (1) 2.5 years at full power operation (2) Two months for divertor replacement (3) Further 2.5 years at full power (4) Ten months for divertor + blanket replacement Repeat five times results in planned availability of 85.7%.

Results for Model A 100,000 90,000 80,000 70,000 87,857 Total NAW Total SRM Total CRM Total PDW Mass (tonnes) 60,000 50,000 40,000 30,000 27,597 42,161 36,853 26,723 30,070 20,000 10,000 0 50 100 Decay time (y) 15,408 0

Results for Model AB Mass (tonnes) 100000 90000 80000 70000 60000 50000 40000 30000 20000 10000 0 15438 21384 54444 32530 24294 84023 50 100 Decay time (y) 15480 total NAW total SRM total CRM total PDW 0

Results for Model B 40,000 35,000 30,000 30,417 Total NAW Total SRM Total CRM Total PDW Mass (tonnes) 25,000 20,000 15,000 10,000 9,640 14,265 11,303 13,753 10,801 7,743 5,000 0 50 100 Decay time (y) 0

Results for Model C 60,000 50,000 52,277 Total NAW Total SRM Total CRM Mass (tonnes) 40,000 30,000 20,000 10,000 29,168 25,352 12,780 9,862 9,862 15,023 Total PDW 0 50 100 Decay time (y) 0

Results for Model D 40,000 35,000 30,000 36,595 Total NAW Total SRM Total CRM Total PDW Mass (tonnes) 25,000 20,000 15,000 22,135 17,384 11,981 10,000 9,057 5,000 0 3,740 3,740 50 100 Decay time (y) 0

Origin of material as categorised at 100 years Plant Models A and AB A AB CRM SRM SRM - hands on NAW

Origin of material as categorised at 100 years Plant Models B and C B C CRM SRM SRM - hands on NAW

Origin of material as categorised at 100 years Plant Model D D CRM SRM SRM - hands on NAW

Comparison of biological hazard potential with other power sources Comparison of the total potential radiotoxicity index of all active materials from entire power plant Five PPCS plant models Fission power plants (typical PWR and two fast reactor variants) Coal-fired power plant (Radiotoxicity from naturally-occurring actinides in ash) Normalised to 1 GWe Index: ingestion dose (relative units) Values for fission and coal from environmental impact study (1990) These results update those previously obtained in SEAFP and SEAFP-2 (as in the SEIF report, 2001)

Potential Radiotoxicity Index (ingestion dose) 1.0E+01 1.0E+00 Radiotoxicity Index (Ingestion) 1.0E-01 1.0E-02 1.0E-03 Coal PWR 1.0E-04 EFR A EFR B Model A 1.0E-05 Model B Model C 1.0E-06 Model D Model AB 1.0E-07 0.01 0.10 1.00 10.00 100.00 1000.00 Time after final shutdown (y)

Summary and Conclusions Analyses of active material from power plant concepts of PPCS has updated earlier assessments Current power plant concepts Improved 3-D models (SEAFP used 1-D) By 100 years, in all models, no material needs permanent disposal Viability of recycling to be assessed Comparison of total potential radiotoxicity shows that dose from fusion waste falls to same level as coal within a few hundred years