PLANNING STUDY. Transport planning beyond the next decade

Similar documents
Why build the Silvertown Tunnel?

Energy and. Resources

21.08 ECONOMIC DEVELOPMENT. Retail

The Corporation of the TOWN OF MILTON

Review of Punt Road. Public Acquisition Overlay. Background Report

Cathkin Relief Road Planning Statement

MELBOURNE METRO RAIL NEWSLETTER

(3) Coordination of, and strategic investment in, the timely delivery of infrastructure headworks capacity to serve future development needs

GTA Cordon Count Program

Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia

Professional transport planning, traffic engineering, transport economics and program management solutions

Location # OP 64. W Lake St. N Wolf Rd. (* Numbers in thousands)

HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW

ATTACHMENT A: ARTC 2015 INLAND RAIL PROGRAMME BUSINESS CASE

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Miami/Ft. Lauderdale

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Vulnerability Analysis of Road Networks

This document is part of a series of Building a Stronger South Australia policy initiatives from the Government of South Australia.

Chapter 5. Transportation. Decatur County Comprehensive Plan. Introduction. Goals and Objectives. Goal. Objectives. Goal.

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

Making Rail the Smart Solution. Commercial Capacity Community. capability statement

An airport for Western Sydney. Building Western Sydney s future

Evergreen Line Rapid Transit Project Business Case Executive Summary. February Reviewed by

Melbourne Airport Rail Link Study. Study overview and findings

Section ALTERNATIVES. 3. Alternatives

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study

Wilmington to Newark Commuter Rail Improvement Project

We would be pleased to discuss these issues with you at your convenience.

Engagement with the community will be in accordance with Council s Community Participation Policy.

Journey to Work Patterns in the Auckland Region

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

DESIGN ASSISTANCE APPLICATION

AIR QUALITY TECHNICAL MEMORANDUM

TRANSPORT INFRASTRUCTURES TO APPROXIMATE THE YEREVAN INTERNATIONAL AIRPORT ZVARTNOTS

13.4 REPORT TITLE: TRANSPORT MASTER PLAN PROPOSED PROCESS DATE OF MEETING: 15 DECEMBER 2008 TECHNICAL SERVICES INFRASTRUCTURE AND PROJECTS

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Southern California International Gateway Project Description

RICHARD REID & ASSOCIATES LTD CITYMAKERS

IPENZ TRANSPORTATION GROUP CONFERENCE 2013 KEEP CHRISTCHURCH MOVING FORWARD CHRISTCHURCH TRANSPORT STRATEGIC PLAN

Goals & Objectives. Chapter 9. Transportation

Connecticut s Bold Vision for a Transportation Future

2. Project Rationale

Technical note. 1. Background. 2. Document Purpose. Project: A350 Chippenham Dualling

Introduction of the Project

Amex Site Residential Development, Tarneit

Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

Chapter 9: Transportation

Downtown Tampa Transportation Vision

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

Nearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months.

Speed Limit Policy Isle of Wight Council

The Follo Line Project

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

Capturing Value Uplift Benefiting from the Private Sector

10 Aviation Element Introduction Purpose of Chapter

Stouffville Corridor Rail Service Expansion

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama

Phases 2 & 3, & Addendum Urban Structure Plan Options for West Whitby

The Norwegian Point of View

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

Policies and progress on transport access, including access for the rural population and low-income households

Moving Together Corporate Plan

August Planning SA METROPOLITIAN ADELAIDE RESIDENTIAL DEVELOPMENT CRITERIA STUDY. Technical Report. visions, plans, people, places

TfL and Network Rail s consultation on Crossrail 2 Response from London First

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

DEPARTMENT OF TRANSPORT AND MAIN ROADS BRIEF FOR DECISION

The Heartland Corridor: Crossing Mountains, Crossing Sectors

Growth of Addis Ababa

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Adelaide Industrial Market

14.0 AVIATION. I. Introduction 6/142010

Major and Minor Schemes

Planning Railway Safety in Canada

M8 M73 M74 Motorway Improvements Project

SUMMARY REPORT FORECAST SOCIAL RETURN ON INVESTMENT ANALYSIS

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

CONSTRUCTION SEQUENCE & PROGRAMME

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

ROSTHERNE TO MANCHESTER PICCADILLY

Demand for Long Distance Travel

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

STOP CONSOLIDATION TRANSIT STRATEGIES

The Danish Transport System. Facts and Figures

SECTION 2 CORRIDOR A

Major & State Significant Projects Committee. East West Link Consolidated Business Case SUBMISSION PROPOSAL

Taylor Wimpey UK Ltd. December 2007

26 Connecting SEQ 2031

Florida s Future Corridors Initial Study Areas

6. Social & Community Facilities

Midlands Connect. Economic Impacts Study

6.0 Market Research Implications for Policy Plan

APPENDIX A FIVE YEAR GROUND TRANSPORT PLAN

Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

Transcription:

STRATEGIC Road/rail LINK PLANNING STUDY Transport planning beyond the next decade www.dtei.sa.gov.au 1300 793 458

STRATEGIC Road/rail LINK PLANNING STUDY The Northern Connector would be a completely new multiple use transport corridor that consolidates road and rail developments in a far-reaching project that will be a first for our State. The proposed new corridor has the capability to bring all traffic from the north s industrial and residential growth into Adelaide and the Port of Adelaide. It is a big picture view that will facilitate the dynamic new growth in the north. Transport Planning Beyond the Next Decade A comprehensive planning study will soon be undertaken to investigate a vital part of South Australia s transport needs into the next decade and beyond. It will determine the options for a proposed road and rail Northern Connector travelling from the Port Wakefield Road interchange with the Northern Expressway to the Port River Expressway and South Road via Salisbury Highway. This proposed route would be a strategic investment joining these major transport routes in a way that creates maximum economic and social value for the State. The road would eventually allow a largely unimpeded journey from Port Wakefield, the Mid North, the Barossa Valley and the Riverland to the Port of Adelaide, and the future North-South Corridor. A New Road and Rail Connector in the North The new Northern Connector would run to the west of the existing Port Wakefield Road. This innovative combination of road and rail services within one corridor would deliver clear benefits to the community, to industry, everyday commuters and the national transport network. It would improve the safety and efficiency of the state and national transport network. This new road/rail corridor would reduce congestion on the existing Port Wakefield Road by providing an expressway standard road from the Port of Adelaide to regional destinations east and north of Adelaide. For example, a 70 kilometre trip from the Barossa Valley to the Port of Adelaide would include 47 kilometres of expressway standard road with very few interruptions created by traffic lights. Local communities living alongside the existing Port Wakefield Road would benefit from better management of traffic volumes. This would assist the development of business precincts in this growing region, while still maintaining direct links to high quality transport infrastructure and services. It also offers increased road safety and better quality of life for communities living adjacent to the national east-west freight rail line. A critical step in investigating the feasibility of the Northern Connector is the completion of a planning study. The planning study would reveal how the Northern Connector contributes to the objectives of the Australian Government s AusLink program. Artist impression of potential interchange with Salisbury Highway

STRATEGIC Road/rail LINK PLANNING STUDY The Northern Connector Planning Study Process WE ARE HERE ENLARGED PROPOSED ROUTE INSIDE Ñ Ñ Ñ Announcement of project Collection of data Ground survey, traffic investigations, Project Information Line MARCH 2008 TO AUG 2008 Ñ Planning study Ñ Define and consult on the proposed route, identify issues and define road/rail corridor PROPOSED TIMELINE SEPT 2008 TO SEPT 2009 Ñ Environmental Impact Assessment DEC 2009 Ñ South Australian and Australian Government approval of project, funding and proposed route IF PROJECT IS APPROVED NEW NORTHERN CONNECTOR Road/rail LINK POTENTIAL TIMELINE 2010 2011 Ñ Land acquisition 2016 2017 Ñ Construction to be completed Northbound Carriageway Southbound Carriageway TYPICAL X-SECTION

STRATEGIC Road/rail LINK PLANNING STUDY A New Road and Rail Connector in the North (continued) In the broader context, this planning study should be seen as part of an overall review of a north to south Adelaide transport strategy moving closer to achieving smoother and faster connections for people travelling via the upgraded Sturt Highway to South Road and ultimately along a future North-South corridor towards Darlington and the Southern Expressway. The area to the west of Port Wakefield Road was, for the purposes of the planning study, identified as a preferred study area, primarily due to significant development and residential areas located on the eastern side. On the western side development is generally less dense, comprising a mix of agricultural, horticultural, recreational, residential and industrial land uses. A Project of National and State Importance The Australian Government, under its AusLink Program, provides funding for transport links of national importance. These initiatives will contribute to AusLink s key objective of assisting local and national economic and social development through improvements to the safety, efficiency and reliability of the national transport network. Importantly, the Northern Connector will assist in achieving these objectives from both a rail and road perspective. AusLink is based on the concepts of better long-term planning and encouragement of the best ideas and solutions. It aims to target investment to achieve the best outcomes for people, the national economy, regions and communities. The South Australian Government is committed to a long term approach to planning our transport infrastructure. The Northern Connector is a prime example as it is high on the priorities of the State Infrastructure Plan, the Adelaide Urban Corridor Strategy and will also contribute towards the following targets in South Australia s Strategic Plan: promoting economic growth expanding export potential for the State providing strategic infrastructure providing infrastructure to support communities in regions. The 2008 Port Wakefield Road Upgrade The current upgrade of Port Wakefield Road is designed to cater for the increased traffic volumes that are occurring as a result of rapid developments in the north of Adelaide. Traffic modelling has shown that increased traffic volumes on Port Wakefield Road after 2016 could: significantly increase the noise levels for residents and businesses impact on the surrounding traffic network affect accessibility for communities on the western and eastern side of Port Wakefield Road. The upgraded Port Wakefield Road will continue to provide the arterial link to the city from the adjacent suburbs while traffic from further field could be redirected onto the new Northern Connector. This is a very sensible decision for the future of the State. It not only finishes the world class access from the north to the Port of Adelaide via the, recently completed, Port River Expressway but also connects to the developing South Road corridor. The combination will eventually provide Adelaide with an efficient north south transport spine ensuring the needs of both freight and the public are met into the future. Vincent Tremaine, Chair South Australia Freight Council

SALISBU NEW NORTHERN CONNECTOR Proposed route WOMMA RD SUBURBAN PASSENGER RAIL LINE TO GAWLER ANDREWS RD EDINBURGH X X X TO SYDNEY NORTHERN EXPRESSWAY HEASLIP RD PROPOSED INTERMODAL TERMINAL NATIONAL NETWORK RAIL LINE X Adelaide Darwin Railway Line WATERLOO CORNER RD BAGSTER ROAD, COMMERCIAL ROAD & PARK TERRACE CROSSINGS BOLIVAR RD HEASLIP ROAD CROSSING TAYLORS ROAD CROSSING TAYLORS RD ALIGNMENT TO BE INVESTIGATED Interchange TO PERTH/DARWIN PORT WAKEFIELD RD Interchange ST KILDA ROAD POSSIBLE Interchan N LEGEND PROPOSED NEW NORTHERN ACCESS ROAD/RAIL LINK NORTHERN EXPRESSWAY PROPOSED INTERCHANGE NATIONAL NETWORK ROAD SUBURBAN PASSE PROPOSED NATIO NETWORK RAIL

PORT WAKEFIELD ROAD N GAWLER MAIN NORTH ROAD KINGS ROAD CROSSING RY KINGS RD X SALISBURY HWY MAIN NORTH RD PORT RIVER EXPRESSWAY SALISBURY HIGHWAY NORTHERN CONNECTOR NORTHERN EXPRESSWAY FUTURE NORTH SOUTH CORRIDOR ADELAIDE MARTINS RD SUBURBAN PASSENGER RAIL LINE RYANS RD MAWSON LAKES PORT WAKEFIELD RD PORT WAKEFIELD RD TO ADELAIDE CBD GRAND JUNCTION RD Interchange BOLIVAR POSSIBLE UPGRADE X SOUTH ROAD TO ADELAIDE AIRPORT ge PORT RIVER EXPRESSWAY POSSIBLE Interchange TO PORT ADELAIDE NGER RAIL NATIONAL NETWORK RAIL EXISTING LEVEL CROSSING 0 500 1,000 2,000 Metres Meters NAL POSSIBLE CONNECTOR ROADS EXISTING UNDERPASS/ OVERPASS 1:50,000 1:50,000

STRATEGIC Road/rail LINK PLANNING STUDY About the Project The Northern Connector would involve: the construction of an expressway standard road in a new corridor between the interchange connection of Port Wakefield Road and the Northern Expressway and Salisbury Highway (a distance of approximately 14 kilometres) an upgrade of Salisbury Highway between Port Wakefield Road and South Road (approximately 3 kilometres) a double track freight rail link from the Adelaide to Darwin/Perth rail line near Pellew Road, east of Port Wakefield Road, to Dry Creek, within the central corridor of the proposed new link road. The key features of the rail link would include: a double track freight rail from the main north-south rail line (Adelaide to Darwin/ Perth) near Pellew Road on the Northern Expressway through to Dry Creek rail tracks located centrally between road carriageways with no level crossings a rail connection to the main line north of the proposed intermodal terminal at Penfield. Benefits Initial investigations reveal that the Northern Connector would: reduce truck movements and traffic congestion on Port Wakefield Road and the Salisbury Highway improve access to Adelaide for road freight transport travelling via the Sturt Highway and Port Wakefield Road make other roads safer by diverting freight traffic away from the local road network and residential communities provide a new rail link that would remove often disruptive heavy freight trains and the interstate passenger trains from northern suburban areas such as Salisbury, Parafield and Mawson Lakes. These long trains can cause major delays and traffic problems in peak hours, particularly in the vicinity of Park Terrace, Salisbury. Port Wakefield Road would revert to an arterial road serving the industrial and commercial industries in the City of Salisbury. The adjacent industrial precinct would continue to operate as normal, with Port Wakefield Road providing easy movement and access to the connections for road and rail freight. The road would: provide the final link in a free flowing strategic northern corridor between the Port of Adelaide and the Riverland and Barossa Valley improve safety for road users by reducing freight traffic, particularly from Port Wakefield Road improve traffic conditions along Port Wakefield Road and Main North Road improve freight efficiency and export opportunities provide a safer, faster connection to suburban destinations such as Adelaide Airport, sporting venues, beaches and businesses in the southern and western suburbs reduce travel times for commuters travelling to and from the Northern Suburbs reduce overall vehicle emissions due to smoother traffic flow. The freight rail link would: improve safety and enhance quality of life for nearby residents, through the reduction of freight rail traffic through the suburban area to the east of Port Wakefield Road reduce the environmental impact of heavy rail freight transport through suburban communities improve rail freight transport efficiencies through a higher speed and shorter connection to port and intermodal facilities (estimated 13 minute travel time saving) improve access to Adelaide and the Port of Adelaide for rail freight transport travelling from the north and west of country South Australia. RAA supports this investment as it will provide relief to those residents subjected to the growing road and rail freight movements through their community north of Adelaide. This project will also complement the current major infrastructure priorities of South Road and the Port Adelaide and Outer Harbor precincts. Sharon Hanlon, General Manager Public Affairs RAA

STRATEGIC Road/rail LINK PLANNING STUDY Following the determination of a preferred route, an environmental impact assessment will be undertaken to assess the social, environmental and economic effects of the Northern Connector. Next Steps A formal planning study will now commence, as the department s initial assessment of the feasibility and options for the new road is now complete. The planning process will begin in 2008 and a broad range of community and stakeholder issues will be examined prior to determining the preferred route. It will include a full economic analysis, establish an environmental assessment process and outline an approach for design and construction. To assist the planning process, an illustrated concept has been developed and can be found in the centre of this brochure. The completion of the planning study enables the South Australian Government to make a submission to the Australian Government for funding under AusLink 2 and 3, the next two funding rounds under this important cost sharing grants program. Stakeholder and Community Engagement Key stakeholders will be involved in the planning study to assist in determining the preferred corridor and will consider factors such as: freight efficiency safety impacts on local traffic networks community needs land use and planning land productivity Aboriginal and non-aboriginal heritage environmental impacts visual impacts cost Important key stakeholders already identified are the Councils of Salisbury, Playford and Port Adelaide Enfield as well as relevant government agencies, industry bodies, business representatives and resident groups. A community engagement process will be undertaken to ensure the local community receives information about the project and is able to provide input and feedback. Environmental Issues Following the determination of a preferred route, an environmental impact assessment will be undertaken to assess the social, environmental and economic effects of the Northern Connector. The extent and process for this assessment will be determined as part of the planning process but will include an assessment of: social and economic impacts noise air and water quality cultural heritage flora and fauna visual effects and landscaping Property Acquisition Once the planning study determines the properties that are likely to be affected by the new road/rail link, representatives from the department will contact the property owners at the earliest opportunity to discuss any required property acquisitions. For Further Information As further information becomes available it will be released on our website www.dtei.sa.gov.au (Follow the links to the New Northern Connector.) Email dtei.northernconnector@saugov.sa.gov.au Information line 1300 793 458 Interpreter Service 1300 793 458 www.dtei.sa.gov.au