LAUNCH KIT DECEMBER 2016 VV08 GÖKTÜRK-1

Similar documents
June VV 05. Sentinel-2A LOGOTYPE COMPLET (SYMBOLE ET TYPOGRAPHIE) 294C

A DUAL LAUNCH FOR COMMUNICATIONS AND BROADCASTING SERVICES

TWO TELECOMMUNICATIONS SATELLITES READY FOR LAUNCH

ARIANESPACE LAUNCHES TWO TELECOM SATELLITES

SATELLITE LAUNCHES FOR ASIA AND INDIA

LAUNCH KIT APRIL 2016 VS14. Sentinel-1B. Microscope Fly Your Satellite!

A DUAL LAUNCH FOR MOBILE COMMUNICATIONS AND METEOROLOGY SATELLITES

A DUAL LAUNCH FOR INTERNET AND WEATHER SATELLITES

Satellite launches for Japan and Australia

A launch for science. Follow the launch live on the internet broadband at (starting 20 minutes before lift-off)

SOYUZ TO LAUNCH METOP-A

BR-257. The European Small Launcher VEGA

The National Strategy, Current Activities for Space Technology Development and Application

SpaceLoft XL Sub-Orbital Launch Vehicle

The European Satellite Navigation Programmes EGNOS and Galileo

APOPHIS 2029 A UNIQUE MISSION OPPORTUNITY

2. Typology of space value chain actors

Space Launchers. Mastering technologies of cryogenic tanks and associated equipment. ADVANCED TECHNOLOGIES

Space Launchers. Mastering technologies of cryogenic tanks and associated equipment. ADVANCED TECHNOLOGIES

Indian Diplomacy At Work

PRESENTATION SPACE MISSIONS

O3b Press Kit. From Vision to Reality

OUTLINES. Earth Observation Satellite Program of Vietnam and applications for disaster management

Technologies for Re-entry Vehicles. SHEFEX and REX FreeFlyer, DLR s Re-Entry Program. Hendrik Weihs. Folie 1. Vortrag > Autor > Dokumentname > Datum

KOUROU. August 2015 ARIANE 5. Data relating to Flight 225. EUTELSAT 8 West B. Intelsat 34

Emerging commercial space technologies, along with complex and substantial

Strategic decision with focus on Europe: Acquisition of Carlo Gavazzi Space S.p.A. Analysts and Investors Conference Call

Information furnished in conformity with the Convention on Registration of Objects Launched into Outer Space

'l'ehisat. A IfICROSATBLLI'l'E SYS'l'EH FOR AlJ'rONOHOUS ENVIRONIfElI'.rAL IfONI'l'ORING SERVICR

Conference Call May 14, 2014, Bremen. Three-month results 2014 Analysts conference call

OHB SE Marco Fuchs, CEO May 13, 2015, Bremen. Three-month results 2015 Analysts conference call

Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014

TAI Turkish Aerospace Industries, Inc.

Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS

C-S TEAM. Page 1 of 5

State of the Satellite Industry Report June 2013


The RapidEye optical satellite family for high resolution imagery

SCADE Suite in Space Applications

USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES

TEAM AMERICA ROCKETRY CHALLENGE 2016 RULES

SATELLITES TO BE BUILT & LAUNCHED BY 2024

Description of the AAU satellite Project. CubeSat Concept. Financing. Organization

The European Space Agency

KOUROU. June 2013 ARIANE 5. Data relating to Flight VA213 by Florence Hauss

Satellite technology

KOUROU. December 2014 ARIANE 5. Data relating to Flight 221 DIRECTV 14 GSAT 16

August 13, 2015 Conference Call OHB SE Six-month results. Marco Fuchs, Chief Executive Officer Kurt Melching, Director Finance& Controlling

KOUROU. July 2013 ARIANE 5. Data relating to Flight 214 ALPHASAT INSAT-3D

Space Shuttle Mission SPACE SHUTTLE SYSTEM. Operation. Luca d Agostino, Dipartimento di Ingegneria Aerospaziale, Università di Pisa, 2010/11.

Small Satellite Space Traffic Management

The Elwing Company THE ELWING COMPANY. EPIC Workshop Products and Systems

What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance.

University microsatellites: an hands-on educational tool

STERN - A ROCKET PROGRAMME FOR GERMAN STUDENTS

50e Show report INTERNATIONAL PARIS AIR SHOW. SALON INTERNATIONAL de l Aéronautique et de l Espace. Paris Le Bourget. June

CRISA speeds up document control with Athento

Precision on earth. Reliability in space. RUAG Space.

Overview of the Orbiting Carbon Observatory (OCO) Mishap Investigation Results For Public Release

Space Debris Activities at ESA in 2012

UBS Pan European Conference. Hervé Multon, SVP Strategy 1st June 2012

CONTENTS. Satellite Fleet. Türksat 2A. Türksat 3A. Türksat 4A. Türksat 4B. Türksat VSAT

Qi3 Insight: Space The New Frontier Growth Opportunities for Non-Space Companies

Israel s Aerospace Industry. Higher Faster Farther

Launch / Tracking and Control Plan of Advanced Land Observing Satellite (ALOS) / H-IIA Launch Vehicle No. 8 (H-IIA F8)

Visualizing Wireless Transfer of Power: Proposal for A Five-Nation Demonstration by ISDC2012: Washington DC, May 26, 2012

SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, SpaceX


ADS-B over Satellite Global Air Traffic Surveillance from Space

The Space Shuttle: Teacher s Guide

RS platforms. Fabio Dell Acqua - Gruppo di Telerilevamento

State of the Satellite Industry Report

The German interagency approach to SSA

EUCASS EUROPEAN CONFERENCE FOR AEROSPACE SCIENCES (EUCASS) Study Trade-Offs on Future European Expendable Launchers

THE HIGH GROWTH POTENTIAL OF AUSTRALIA S SPACE ECONOMY

Space Flight Project Work Breakdown Structure

Evolution of Satellite Communication Systems

FUNcube-1 Satellite. Wouter Weggelaar 1 AMSAT-NL. NVR CubeSat Cluster Launch mini-symposium

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL TWO INSTRUCTIONAL GUIDE SECTION 6 EO C IDENTIFY PARTS OF A ROCKET PREPARATION

Space Liability Insurance

PROJET : VEGA GROUND SEGMENT

WATCHKEEPER X UNMANNED AIRCRAFT SYSTEM (UAS)

16 th IOCCG Committee annual meeting. Plymouth, UK February mission: Present status and near future

A science class experience that is out of this world. Robert Benkoczi, PhD Optimization Research Group University of Lethbridge

November 11, 2015 Conference Call OHB SE Nine-month results. Marco Fuchs, Chief Executive Officer Kurt Melching, Director Finance& Controlling

2015 Full-Year results

ESRIN Its Development and Role

Status, Development and Application

Final Resolution for the 6 th European Interparliamentary Space Conference (EISC), held on November 10 th and 11 th 2004

Airbus Group. Marwan Lahoud Airbus Group, CSMO. London 10 December 2014

SATELLITE VULNERABILITY TO SPACE DEBRIS RISK

AIDA: Asteroid Impact & Deflection Assessment A Joint ESA-NASA Mission. Joint ESA NASA AIDA Team

M I S S I O N T O P L A N E T E A R T H TOPEX/POSEIDON NASA/CNES PRESS KIT

Fleet Ballistic Missile Eastern Range Operations Supporting Navy Testing and Deployment

VIETNAM ACADEMY OF SCIENCE AND TECHNOLOGY VIETNAM NATIONAL SATELLITE CENTER CUBESAT PICO DRAGON. Presenter Name: Do Xuan Phong

Mars Sample Return Campaign: An Overview. Dr. Firouz Naderi Associate Director NASA s JPL

DEOS. Deutsche Orbitale Servicing Mission. The In-flight Technology Demonstration of Germany s Robotics Approach to Service Satellites

Korean Space Law Dr. Joon Lee Korea Aerospace Research Institute.

From Single to Formation Flying CubeSats: An Update of the Delfi Programme

Analysis on the Long-term Orbital Evolution and Maintenance of KOMPSAT-2

Transcription:

LAUNCH KIT DECEMBER 2016 VV08

FLIGHT VV08: A NEW VEGA MISSION AT THE SERVICE OF EARTH OBSERVATION For its 10th launch of the year and the eighth to be performed by the Vega launcher since its first liftoff from the Guiana Space Center in 2012 Arianespace will orbit the satellite in the framework of a Telespazio turnkey contract with the Undersecretariat for Defence Industries of Turkey (SSM). CONTENTS > THE LAUNCH VV08 mission Page 3 satellite Page 4 > FURTHER INFORMATION Vega launch vehicle Page 5 VV08 launch campaign Page 6 Countdown and flight sequence Page 7 VV08 mission profile Page 8 Arianespace and the Guiana Space Center Page 9 As a multi-purpose launch vehicle that already has demonstrated its capabilities during the seven initial missions, Vega is now fully operational in commercial service and will be performing its fifth flight at the service of Earth observation. With Flight VV08, Turkey becomes a new export customer for this latest member of Arianespace s launcher family. is the first Turkish governmental satellite for Earth observation. It also is the sixth satellite to be launched by Arianespace for Turkey, following five Türksatseries telecommunications spacecraft from 1994 to 2008. is a very high-resolution optical Earth observation satellite. Its images are intended for civilian and military applications. The satellite will be injected in a Sun-synchronous orbit at an altitude of approximately 700 km. is capable of imaging the entire globe in 72 hours. Telespazio as prime contractor of the program under terms of a 2009 agreement signed with the Undersecretariat for Defence Industries of Turkey in Ankara (SSM) is responsible for the satellite s integration and the associated ground segment. SSM is the 55 th operator to select Arianespace for the launch of its first satellite. Thales Alenia Space and its Turkish partners including the companies TAI A.S., Aselsan A.S., Tubitak Bilgem, Roketsan A.S. and TR Tecnoloji built based on the PROTEUS spacecraft platform. will be 145th Thales Alenia Space-produced satellite launched by Arianespace. Eleven other satellites from this spacecraft manufacturer are in Arianespace s launch services order book: SENTINEL-2B, SGDC, TELKOM-3S, KOREASAT-7, COMSAT NG 1, four satellites for O3b, along with two undisclosed payloads. CONTACT PRESSE Isabelle Veillon i.veillon@arianespace.com +33 (0)1.60.87.60 04 #VV08 @arianespace @arianespaceceo arianespace.com youtube.com/arianespace arianespace For more information, visit us on arianespace.com 2 @arianespace

MISSION DESCRIPTION The eighth Arianespace Vega launch from the Guiana Space Center (CSG) will place its satellite passenger into a Sun-synchronous orbit (SSO). The launcher will be carrying a total payload of approximately 1,140 kg. The launch will be performed from the Vega Launch Complex (SLV) in Kourou, French Guiana. DATE AND TIME Liftoff is scheduled for Monday, December 5, 2016, at exactly: > 08:51:44 a.m., Washington D.C. time > 10:51:44 a.m., local time in French Guiana > 13:51:44, Universal Time (UTC) > 14:51:44 p.m., Paris time > 16:51:44 p.m., Ankara time MISSION DURATION The nominal mission duration (from liftoff to separation of the satellite) is: 57 minutes, 19 seconds. TARGETED ORBIT SSO (Sun-synchronous orbit) Altitude at separation 700 km. Semi major axis: 7,060 km. Inclination 98.11 degrees THE LAUNCH AT A GLANCE Following liftoff from the Guiana Space Center, the powered phase of Vega's first three stages will last 6 minutes, 36 seconds. After this first phase, the launcher s third stage will separate from the upper composite, which includes the AVUM upper stage, a payload adapter and the satellite. The lower three stages will fall into the sea. The AVUM upper stage will ignite its engine for the first time, operating for about six minutes, 20 seconds followed by a ballistic phase lasting approximately 40 minutes. The AVUM stage will then reignite its engine for approximately one minute, 42 seconds, prior to releasing the satellite about two minutes after the engine is shut down. The satellite will be released 57 minutes, 19 seconds after liftoff. VEGA PAYLOAD CONFIGURATION > Payload: > Mass at liftoff: 1,060 kg. > PLA - Vega Payload Adaptor For more information, visit us on arianespace.com 3 @arianespace

SATELLITE CUSTOMER Telespazio PRIME CONTRACTOR Telespazio MISSION Earth observation PLATFORM Based on the PROTEUS platform MASS Mass at launch of 1,060 kg. STABILIZATION Three-axis DIMENSIONS 4.2 m. x 2.5 m. x 1.6 m. TARGETED ORBIT Low Earth Orbit DESIGN LIFE 7 years, 3 months CONTACT PRESSE Telespazio Paolo Mazzetti Press relations www.telespazio.com Tel: +39 6 40 79 62 52 Mobile: +39 (335) 651 59 94 Email: paolo.mazzetti@telespazio.com Thales Alenia Space Sandrine Bielecki Press manager Tel: +33 4 92 92 70 94 Email: sandrine.bielecki@thalesaleniaspace.com www.thalesgroup.com For more information, visit us on arianespace.com 4 @arianespace

THE VEGA LAUNCHER ELV the production prime contractor delivers the Vega launcher to Arianespace. Payload Faring (RUAG Space) Integration & Testing (Avio) AVUM Payload adapter (Airbus Defence and Space) AVUM structure (Airbus Defence and Space) AVUM engine (KB Yuzhnoye) Production, integration & testing (Avio) ZEFIRO-9 Interstage - 2/3 (Rheinmetall) Production, integration and testing (Avio) ZEFIRO-23 Interstage - 1/2 (Airbus Defence and Space) Integration and testing (Avio) P80 P80 engine (Europropulsion) Thrust vector control system (P80, Zefiro 9, Zefiro-23 & AVUM) S.A.B.C.A LAUNCH CAMPAIGN: Igniters (P80, Zefiro-9 & Zefiro-23) VEGA APP Interstage - 0/1 (SABCA) P80 Nozzle (ASL) SATELLITE AND LAUNCH VEHICLE CAMPAIGN CALENDAR DATE Avionics Thales, IN-SNEC, Selex Avionica, SATELLITE ACTIVITIES LAUNCH VEHICLE ACTIVITIES October CRISA, RUAG 17, 2016 Space, SAFT Campaign start review - Transfer of P80 stage October 22, 2016 Interstage 1/2 integration For more information, visit us on arianespace.com 5 @arianespace

October 24, 2016 October 27, 2016 October 31, 2016 November 4, 2016 Arrival in French Guiana of ; beginning of preparation in the S1B hall transfer from S1B to S5B hall Z23 integration Z9 integration AVUM integration November 9, 2016 fueling operations in S5B hall Synthesis control test November 17, 2016 November 18, 2016 November 21, 2016 integration on payload adapter encapsulation Completion of fairing, and preparation of upper composite for transfer SATELLITE AND LAUNCH VEHICLE CAMPAIGN FINAL CALENDAR DATE SATELLITE ACTIVITIES LAUNCH VEHICLE ACTIVITIES Thursday, November 22, 2016 Wednesday, November 23, 2016 Friday, November 25, 2016 Monday, November 28, 2016 Thursday, November 29, 2016 Wednesday, November 30, 2016 Thursday, December 1, 2016 Friday, December 2, 2016 Monday, December 5, 2016 Transfer of upper composite from S5B to SLV (Vega Launch site) Composite Integration on the launcher Fueling operations AVUM (N2O4) Fueling operations AVUM (UDMH) Fueling operations for RACS (Roll and Attitude Control Subsystem) AVUM final pressurization and rehearsal Arming of launch vehicle and fairing Launch readiness review (RAL), final preparation of launcher and final inspection of the fairing Final launch countdown For more information, visit us on arianespace.com 6 @arianespace

COUNTDOWN AND FLIGHT SEQUENCE The countdown comprises all final preparation steps for the launcher, the satellite and the launch site, including the steps leading up to authorization of P80 first-stage ignition. TIME EVENT - 09 h 00 min Start of final countdown - 05 h 50 min Activation of Multi-Functional Unit (MFU) - 05 h 30 min Activation of Inertial Reference System (IRS) - 05 h 30 min Activation of telemetry - 05 h 00 min Activation of Safeguard Master Unit (SMU) - 04 h 40 min Removal of safety devices - 04 h 30 min Activation of onboard computer and loading of flight program - 04 h 20 min IRS alignment and checks - 03 h 05 min Mobile gantry withdrawal (45 min.) - 02 h 15 min IRS alignment and checks after withdrawal of gantry - 01 h 15 min Activation of the telemetry transmitter after withdrawal of gantry - 01 h 15 min Activation of transponders and receptors - 00 h 30 min Transfer to satellite internal power - 00 h 40 min Launcher system ready - 00 h 10 min Final weather report prior to launch - 00 h 04 min Start of synchronized sequence T-O 00 s LIFTOFF + 00 h 01 min 54 s 1 st stage (P80) separation + 00 h 01 min 55 s 2 nd stage (Zefiro-23) ignition + 00 h 03 min 37 s 2 nd stage (Zefiro-23) separation + 00 h 03 min 54 s 3 rd stage (Zefiro-9) ignition + 00 h 03 min 59 s Fairing separation + 00 h 06 min 36 s 3 rd stage (Zefiro-9) separation + 00 h 08 min 21 s 1 st ignition of AVUM + 00 h 14 min 40 s 1 st cut-off of AVUM + 00 h 54 min 01 s 2 nd ignition of AVUM + 00 h 55 min 43 s 2 nd cut-off of AVUM + 00 h 57 min 19 s Separation of GOKTURK-1 + 01 h 46 min 10 s 3 rd ignition of AVUM + 01 h 47 min 36 s 3 rd cut-off of AVUM + 02 h 00 min 56 s End of the Arianespace mission For more information, visit us on arianespace.com 7 @arianespace

MISSION PROFILE For more information, visit us on arianespace.com 8 @arianespace

ARIANESPACE AND THE GUIANA SPACE CENTER ARIANESPACE, THE WORLD S FIRST LAUNCH SERVICES COMPANY Arianespace was founded in 1980 as the world s first launch services & solutions company. Arianespace now has 20 shareholders from 10 European countries (including Airbus Safran Launchers, CNES and all European companies participating in the production of Ariane launchers). Since the outset, Arianespace has signed over 530 launch contracts and launched 540-plus satellites. More than half of the commercial satellites now in service around the globe were launched by Arianespace. The company posted sales of more than 1.4 billion euros in 2015. The company s activities are worldwide, with the headquarters in Evry, France (near Paris); the Guiana Space Center in French Guiana, where the Ariane, Soyuz and Vega launch pads are located; and offices in Washington, D.C., Tokyo and Singapore. Arianespace offers launch services to satellite operators from around the world, including private companies and government agencies. These services call on three launch vehicles: > The Ariane 5 heavy-lift launcher, operated from the Guiana Space Center in French Guiana. > The Soyuz medium-lift launcher, currently in operation at the Guiana Space Center and the Baikonur Cosmodrome in Kazakhstan. > The Vega light-lift launcher, also operated from the Guiana Space Center. Building on its complete family of launchers, Arianespace has won over half of the commercial launch contracts up for bid worldwide in the past two years. Arianespace now has a backlog of more than 70 satellites to be launched. THE GUIANA SPACE CENTER: EUROPE S SPACEPORT For more than 40 years, the Guiana Space Center (CSG), Europe s Spaceport in French Guiana, has offered a complete array of facilities for rocket launches. It primarily comprises the following: > The CNES/CSG technical center, including various resources and facilities that are critical to launch base operations, such as radars, telecom network, weather station, receiving sites for launcher telemetry, etc. > Payload processing facilities (ECPU), in particular the S5 facility. > Ariane, Soyuz and Vega launch complexes, comprising the launch zones and launcher integration buildings. > Various industrial facilities, including those operated by Regulus, Europropulsion, Air Liquide Spatial Guyane and Airbus Safran Launchers - all participating in the production of Ariane 5 components. A total of 40 European manufacturers and local companies are involved in the launcher operations. Europe s commitment to independent access to space is based on actions by three key players: the European Space Agency (ESA), the French CNES space agency and Arianespace. ESA is responsible for the Ariane, Soyuz and Vega development programs. Once these launch systems are qualified, ESA transfers responsibility to Arianespace as the operator. ESA has helped change the role of the Guiana Space Center, in particular by funding the construction of the launch complexes, payload processing buildings and associated facilities. Initially used for the France s space program, the Guiana Space Center has evolved into Europe s own Spaceport, according to the terms of an agreement between ESA and the French government. To ensure that the Spaceport is available for its programs, ESA takes charge of the lion s share of the CNES/CSG fixed expenses, and also helps finance the fixed costs for the ELA launch complexes. The French CNES space agency has several main responsibilities at the Guiana Space Center. It designs all infrastructure and, on behalf of the French government, is responsible for safety and security. It provides the resources needed to prepare the satellites and launchers for missions. Whether during tests or actual launches, CNES is also responsible for overall coordination of operations and it collects and processes all data transmitted from the launcher via a network of receiving stations to track Ariane, Soyuz and Vega rockets throughout their trajectories. ARIANESPACE IN FRENCH GUIANA In French Guiana, Arianespace is the contracting authority in charge of operating the family of three launchers: Ariane, Soyuz and Vega. For Vega, Arianespace supervises the integration and inspection of the launcher built by ELV, which is the production prime contractor. Before taking official delivery of the launcher, Arianespace coordinates the preparation of satellites in the payload preparation facility (EPCU) operated by CNES/CSG, handles the final assembly of the launcher and integrates satellites on the launcher, and oversees the final countdown and launch from Launch Control Center 3 (CDL3). Arianespace deploys a top-flight team and technical facilities to ensure the launchers and their satellites payloads are ready for their missions. Building on this unrivalled expertise and outstanding local facilities, Arianespace is now the undisputed benchmark in the global launch services market. For more information, visit us on arianespace.com 9 @arianespace