A DUAL LAUNCH FOR INTERNET AND WEATHER SATELLITES
|
|
|
- Ernest May
- 10 years ago
- Views:
Transcription
1 A DUAL LAUNCH FOR INTERNET AND WEATHER SATELLITES Arianespace will orbit two satellites on its third Ariane 5 launch of the year: the dedicated Internet satellite EchoStar XVII for the American operator and service provider Hughes, and the MSG-3 weather satellite for EUMETSAT, the European Organization for the Exploitation of Meteorological Satellites. The choice of Arianespace by leading space communications operators and manufacturers is clear international recognition of the company s excellence in launch services. Based on its proven reliability and availability, Arianespace continues to confirm its position as the world s benchmark launch system. Ariane 5 is the only commercial satellite launcher now on the market capable of handling a complete range of missions, from launches of commercial satellites into geostationary orbit, to dedicated launches into special orbits. EchoStar XVII will be the second satellite launched by Arianespace for the American operator Hughes Network Systems, LLC, a wholly owned subsidiary of EchoStar Corporation. Weighing 6,100 kg at launch, EchoStar XVII will be injected into geostationary transfer orbit, then moved to its orbital position at degrees West. Built by Space Systems/Loral using a 1300 platform, EchoStar XVII is a next-generation broadband Ka-band satellite. It will round out the HughesNet services offering in North America, bolstering the orbital capacity offered by the Spaceway 3 satellite. The payload on this new satellite offers a total capacity of well over 100 Gbps. MSG-3 is part of Europe s Meteosat Second Generation series of four geostationary meteorological satellites. It is the tenth EUMETSAT satellite to be launched by Arianespace. The first two MSG satellites were launched by Arianespace in August 2002 and December Built by Thales Alenia Space as prime contractor, MSG-3 will weigh approximately 2,000 kg at liftoff. The MSG satellites carry two instruments: the Spinning Enhanced Visible and Infrared Imager (SEVIRI), which is the main operational instrument, and the Geostationary Earth Radiation Budget (GERB) instrument. SEVIRI observes the Earth in 12 spectral channels covering the visible, near-infrared and thermal impact infrared part of spectrum. MSG-3 will ensure service continuity for EUMETSAT, providing meteorologists with a powerful tool for the detection and prediction of weather-related events in Europe and surrounding regions. EUMETSAT is an intergovernmental organization, grouping 26 Member States and 5 Cooperating States. 1 - The ARIANESPACE mission - EchoStar XVII & MSG Range operations campaign: EchoStar XVII & MSG Launch countdown and flight events - EchoStar XVII & MSG Flight Trajectory 5 - The ARIANE 5 launch vehicle 6 - The EchoStar XVII satellite 7 - The MSG-3 satellite Appendix 1. Flight key personnel 2. Launch environment conditions 3. Synchronized sequence 4. ARIANESPACE, its relations with ESA and CNES Follow the launch live on internet broadband at (starting 20 minutes before lift-off) 1
2 1. Mission profile The 207th Ariane mission will place two satellites into geostationary transfer orbit: the dedicated Internet satellite EchoStar XVII with Jupiter high-throughput technology for broadband service provider Hughes, and the MSG-3 weather satellite for EUMETSAT, the European Organization for the Exploitation of Meteorological Satellites. This will be the 63rd Ariane 5 launch. The launcher will be carrying a total payload of 9,647 kg, including 7,563 kg for the EchoStar XVII and MSG-3 satellites, which will be released into their targeted orbits. The launch will be from Ariane Launch Complex No. 3 (ELA 3) in Kourou, French Guiana. Targeted orbit Perigee altitude Apogee altitude Inclination km 35,944 km at injection 6 degrees The lift-off is scheduled on the night of July 5 to the morning of July 6, 2012 as soon as possible within the following launch window: Launch opportunity Universal time (GMT) Paris time Kourou time Washington time Tokyo time Between 9:36 pm 11:36 pm 6:36 pm 5:36 pm 6:36 am and 10:05 pm 0:05 am 7:05 pm 6:05 pm 7:05 am on July 5, 2012 July 5-6, 2012 July 5, 2012 July 5, 2012 July Payload configuration The EchoStar XVII satellite was built by Space Systems/Loral for Hughes Network Systems, LLC. Orbital position: West The MSG-3 satellite was built by Thales Alenia Space for EUMETSAT. Orbital position: 0 Longitude 2
3 2. Range operations campaign: ARIANE 5 - EchoStar XVII & MSG-3 Satellites and launch vehicle campaign calendar Ariane activities Dates Satellites activities April 13, 2012 Arrival in Kourou of MSG-3 and beginning of preparation campaign in building S5 C Campaign start review April 19, 2012 EPC Erection April 19, 2012 EAP transfer and positioning April 20, 2012 Integration EPC/EAP April 21, 2012 ESC-A and VEB Erection April 25, 2012 May 10, 2012 Arrival in Kourou of EchoStar XVII and beginning of preparation campaign in building S5 C Roll-out from BIL to BAF May 30, 2012 May 14-17, 2012 May 15-27, 2012 EchoStar XVII filling operations MSG-3 filling operations Satellites and launch vehicle campaign final calendar J-11 Tuesday June 19, 2012 EchoStar XVII integration on adaptor (ACU) J-10 Wednesday June 20, 2012 EchoStar XVII transfer to Final Assembly Building (BAF) J-9 Thursday June 21, 2012 EchoStar XVII integration on Sylda J-8 Friday June 22, 2012 MSG-3 integration on adaptor (ACU) and Fairing integration on Sylda J-8 bis Monday June 25, 2012 MSG-3 transfer to Final Assembly Building (BAF) J-7 Tuesday June 26, 2012 MSG-3 integration on launcher J-6 Wednesday June 27, 2012 ESC-A final preparations and payloads control Upper composite integration with EchoStar XVII on launcher J-5 Thursday June 28, 2012 Satellite functional tests on launcher J-4 Friday June 29, 2012 Launch rehearsal J-3 Monday July 2, 2012 Arming of launch vehicle J-2 Tuesday July 3, 2012 Launch readiness review (RAL) and final preparation of launcher J-1 Wednesday July 4, 2012 Roll-out from BAF to Launch Area (ZL), launch vehicle connections and filling of the EPC liquid helium sphere J-0 Thursday July 5, 2012 Launch countdown including EPC and ESC-A filling with liquid 3
4 3. Launch countdown and flight events The countdown comprises all final preparation steps for the launcher, the satellites and the launch site. If it proceeds as planned, the countdown leads to the ignition of the main stage engine, then the two boosters, for a liftoff at the targeted time, as early as possible in the satellites launch window. The countdown culminates in a synchronized sequence (see appendix 3), which is managed by the control station and onboard computers starting at T-7 minutes. If an interruption in the countdown means that T-0 falls outside the launch window, then the launch will be delayed by one, two or more days, depending on the problem involved, and the solution developed. Time Events - 11 h 30 mn Start of final countdown - 7 h 30 mn Check of electrical systems - 4 h 50 mn Start of filling of main cryogenic stage with liquid oxygen and hydrogen - 3 h 20 mn Chilldown of Vulcain main stage engine - 1 h 10 mn Check of connections between launcher and telemetry, tracking and command systems - 7 mn 00 s All systems go report, allowing start of synchronized sequence - 4 mn 00 s Tanks pressurized for flight - 1 mn 00 s Switch to onboard power mode - 04 s Onboard systems take over - 03 s Unlocking of guidance systems to flight mode HO Ignition of the cryogenic main stage engine (EPC) ALT (km) V. rel. (m/s) s Ignition of solid boosters s Liftoff s End of vertical climb and beginning of pitch rotation (10 seconds duration) s Beginning of roll manoeuvre mn 22 s Jettisoning of solid boosters mn 17 s Jettisoning of fairing mn 07 s Acquisition by Natal tracking station mn 59 s Shut-down of main cryogenic stage mn 05 s Separation of main cryogenic stage mn 09 s Ignition of upper cryogenic stage (ESC-A) mn 39 s Acquisition by Ascension tracking station mn 25 s Acquisition by Libreville tracking station mn 09 s Acquisition by Malindi tracking station mn 59 s Injection mn 34 s Separation of EchoStar XVII satellite mn 17 s Separation of Sylda mn 11 s Separation of MSG-3 satellite mn 59 s End of Arianespace Flight mission
5 4. Flight trajectory of EchoStar XVII & MSG-3 The launcher s attitude and trajectory are totally controlled by the two onboard computers, located in the Ariane 5 vehicle equipment bay (VEB) seconds after ignition of the main stage cryogenic engine at T-0, the two solid-propellant boosters are ignited, enabling liftoff. The launcher first climbs vertically for 6 seconds, then rotates towards the East. It maintains an attitude that ensures the axis of the launcher remains parallel to its velocity vector, in order to minimize aerodynamic loads throughout the entire atmospheric phase, until the solid boosters are jettisoned. Once this first part of the flight is completed, the onboard computers optimize the trajectory in real time, minimizing propellant consumption to bring the launcher first to the intermediate orbit targeted at the end of the main stage propulsion phase, and then the final orbit at the end of the flight of the cryogenic upper stage. The main stage falls back off the coast of Africa in the Atlantic Ocean (in the Gulf of Guinea). On orbital injection, the launcher will have attained a velocity of approximately 9361 meters/second, and will be at an altitude of about 648 kilometers. The fairing protecting the EchoStar XVII and MSG-3 spacecraft is jettisoned shortly after the boosters are jettisoned at about T+197 seconds. Standard Ariane 5 trajectory for geostationary transfer orbit 5
6 5. The Ariane 5-ECA (Industrial prime contractor: ASTRIUM Space Transportation) 50.5 m Fairings (RUAG Space) 17 m Mass: 2.6 t SYLDA - Internal structure (ASTRIUM Space Transportation) 7 versions (height: 4.9 to 6.4 m 400 to 530 kg ACU - Payload adapters (2) (RUAG Space ou EADS Casa) 160 kg each approx. H14,6 Vehicule equipment bay (ASTRIUM Space Transportation) Height: 1.13 m Mass: 950 kg Flight control system, safety, etc ESC-A - Cryogenic upper stage (ASTRIUM Space Transportation) Height: 4.71 m Mass: 19 t HM-7B (Snecma) Thrust: 67 kn max (in the vacuum) 945 sec of propulsion EPC - Main Cryogenic Stage (ASTRIUM Space Transportation) 31 m long Mass: t H173 EAP - Solid Rocket boosters (ASTRIUM Space Transportation) Height: 31.6 m Mass: 278 t approx... MPS - Solid Rocket motor (Europropulsion) Average thrust: 5060 kn Maximum thrust: 7080 kn (in the vacuum) 130 sec of propulsion P240 Vulcain 2 Engine (Snecma) Thrust 1390 kn 540 sec of propulsion Propellants (in ton) at H0 H: Cryogenic P: Solid 780 tons total mass at lift-off kn at Lift-off (at H0 + 7 to 8 sec) 6
7 6. The EchoStar XVII satellite Customer Prime contractor Mission Mass Hughes Network Systems, LLC of EchoStar Corporation Space Systems / Loral Satellite Internet Services Total mass at lift-off 6,100 kg Stabilization 3 axis stabilized Dimensions Span in orbit 8.0 x 3.2 x 3.1 m at launch m Platform 1300 Payload On-board power Life time Orbital position Coverage area 60 Ka-band users beams 16.1 kw (end of life) 15 years West North America Press Contact Judy D. BLAKE Communications - Hughes Network Systems Phone: [email protected] 7
8 7. The MSG-3 satellite Customer Prime contractor Mission Mass Stabilization Dimensions EUMETSAT Thales Alenia Space Meteorology Total mass at lift-off: 2,037 kg Spin stabilized Platform MSG FM 3 Payload On-board power Life time Orbital position Coverage area Press Contact Media Relations EUMETSAT Phone: Fax: [email protected] ø 3.2 x 2.3 m at launch 12 channel radiometer 0.7 kw (end of life) 7 years 0 North, 0 East Europe, Africa, Atlantic Ocean, East of South America 8
9 Appendix 1. Arianespace - EchoStar XVII & MSG-3 launch key personnel In charge of the launch campaign Mission Director (CM) Didier SAÏD ARIANESPACE In charge of the launch service contract Program Director EchoStar XVII (CP) Jérôme RIVES ARIANESPACE Program Director MSG-3 (CP) Beatriz ROMERO ARIANESPACE In charge of EchoStar XVII satellite Satellite Mission Director (DMS) Bob BUSCHMAN HUGHES Satellite Program Manager (CPS) Eric ELLER SS/L Satellite Preparation Manager (RPS) Doug EASTMAN SS/L In charge of MSG-3 satellite Satellite Mission Director (DMS) Sergio ROTA EUMETSAT Satellite Program Manager (CPS) François CAVE ESA Satellite Preparation Manager (RPS) Jean-Claude MICHEL TAS In charge of the launch vehicle Launch Site Operations Manager (COEL) Raphaël BREDA ARIANESPACE Ariane Production Project Manager (CPAP) Didier AUBIN ARIANESPACE Launcher Production Quality Manager (RQLP) Maël MATTOX ARIANESPACE Launch Campaign Quality Manager (CQCL) Geneviève DÉDÉ ARIANESPACE In charge of the Guiana Space Center (CSG) Range Operations Manager (DDO) Damien SIMON CNES/CSG Range Operations Deputy (DDO/A) Aimée CIPPE CNES/CSG Appendix 2. Launch environment conditions Acceptable wind speed limits at lift-off range from between 7.5 m/s to 9.5 m/s according to the wind direction. The most critical is a northerly wind. For safety reasons, the wind s speed on the ground (Kourou), and at a high altitude (between 10,000 and 20,000 m) is also taken into account. Appendix 3. The synchronized sequence The synchronized sequence starts 7 mn before ignition (T-0), it is primarily designed to perform the final operations on the launcher prior to launch, along with the ultimate checks needed following switchover to flight configuration. As its name indicates, it is fully automatic, and is performed concurrently by the onboard computer and by two redundant computers at the ELA 3 launch complex until T-4 seconds. The computers command the final electrical operations (startup of the flight program, servocontrols, switching from ground power supply to onboard batteries, etc.) and associated checks. They also place the propellant and fluid systems in flight configuration and perform associated checks. In addition, they handle the final ground system configurations, namely: Startup of water injection in the flame trenches and jet guide (T-30 sec). Hydrogen aspiration for chilldown of the Vulcain engine in the jet guide (T-18 sec). Burnoff of hydrogen used for chilldown (T-5.5 sec). At T-4 seconds, the onboard computer takes over control of final engine startup and lift-off operations: It starts the ignition sequence for the Vulcain main stage engine (T-0). It checks engine operation (from T+4.5 to T+7.3 sec). It commands ignition of the solid boosters for immediate lift-off at T+7.3 seconds. Any shutdown of the synchronized sequence after T-7 mn automatically places the launcher back in its T-7 min configuration. 9
10 Appendix 4. Arianespace and the Guiana Space Center Arianespace was founded in 1980 as the world s first launch Service & Solutions company. Today, Arianespace has 21 shareholders from ten European countries (including French space agency CNES with 34%, Astrium with 30%, and all European companies participating in the construction of Ariane launchers). Since the outset, Arianespace has signed more than 350 launch contracts and launched 301 satellites. More than two-thirds of the commercial satellites now in service worldwide were launched by Arianespace. The company posted sales of 1013 million euros in At January 1, 2012, Arianespace had 330 employees, working at the company s headquarters in Evry (near Paris), the Guiana Space Center in French Guiana, where the Ariane, Soyuz and Vega launch pads are located, and offices in Washington, D.C., Tokyo and Singapore. Arianespace offers launch Service & Solutions to satellite operators from around the world, including private companies and government agencies. These Service & Solutions call on three launch vehicles: The Ariane 5 heavy launcher, operated from the Guiana Space Center in Kourou, French Guiana. The Soyuz medium launcher, currently in operation at the Baikonur Cosmodrome in Kazakhstan and the Guiana Space Center. The Vega light launcher, launched also from the Guiana Space Center. With its family of launchers, Arianespace won over half of the commercial launch contracts up for bid worldwide in the last two years. Arianespace now has a backlog of more than 40 satellites to be launched. The Guiana Space Center: Europe s Spaceport For over 30 years, the Guiana Space Center (CSG), Europe s Spaceport in French Guiana, has offered a complete array of facilities for rocket launches. It mainly comprises the following: CNES/CSG technical center, including various resources and facilities that are critical to launch base operations, such as radars, telecom network, weather station, receiving sites for launcher telemetry, etc. Payload processing facilities (ECPU), in particular the S5 facility. Ariane, Soyuz and Vega launch complexes, comprising the launch zones and launcher integration buildings. Various industrial facilities, including those operated by Regulus, Europropulsion, Air Liquide Spacial Guyane and Astrium, which contribute to the production of Ariane 5 elements. A total of 40 European manufacturers and local companies are involved in operations. Europe s commitment to independent access to space is based on actions by three key players: the European Space Agency (ESA), French space agency CNES and Arianespace. ESA is responsible for the development of the Ariane, Soyuz and Vega programs at the Guiana Space Center. Once these launch systems are qualified, ESA will transfer responsibility to the operator Arianespace. ESA has helped change the role of the Guiana Space Center, in particular by funding the construction of the launch complexes, payload processing buildings and associated facilities. Initially used for the French space program, the Guiana Space Center has gradually become Europe s own spaceport, according to the terms of an agreement between ESA and the French government. To ensure that the Spaceport is available for its programs, ESA takes charge of the lion s share of CNES/CSG fixed expenses, and also helps finance the fixed costs for the ELA launch complexes. French space agency CNES plays several roles at the Space Center. It designs all infrastructures and, on behalf of the French government, is responsible for safety and security. It provides the resources needed to prepare the satellites and launcher for missions. Whether during tests or actual launches, CNES is also responsible for overall coordination of operations. It collects and processes all data transmitted from the launcher via a network of receiving stations, to track Ariane, Soyuz and Vega rockets throughout their trajectories. In French Guiana, Arianespace is the contracting authority in charge of operating the family of three launchers, Ariane, Soyuz and Vega. Arianespace supervises the integration and functional checks of the Ariane launcher, built by Astrium as production prime contractor, in the Launcher Integration Building (BIL). It then carries out acceptance tests of the launcher at the same time as satellite preparations in the Payload Preparation Complex (EPCU), operated by the Guiana Space Center (CSG). Arianespace next oversees final assembly of the launcher and integration of satellites in the Final Assembly Building (BAF), followed by transfer of the launcher to Launch Zone No. 3 (ZL3), and then final countdown and liftoff from Launch Complex No. 3 (CDL3). Arianespace has created a top-flight team and array of technical resources to get launchers and satellites ready for their missions. Building on this unrivalled expertise and outstanding local facilities, Arianespace is now the undisputed benchmark in the global launch services market. 10
TWO TELECOMMUNICATIONS SATELLITES READY FOR LAUNCH
TWO TELECOMMUNICATIONS SATELLITES READY FOR LAUNCH Arianespace will orbit two telecommunications satellites on its sixth Ariane 5 launch of the year: Eutelsat 21B for the European operator Eutelsat, and
SATELLITE LAUNCHES FOR ASIA AND INDIA
SATELLITE LAUNCHES FOR ASIA AND INDIA Arianespace will orbit two communications satellites on its third launch of the year: ST-2 for the operator ST-2 Satellite Ventures Pte Ltd., a joint venture of Singapore
A DUAL LAUNCH FOR MOBILE COMMUNICATIONS AND METEOROLOGY SATELLITES
A DUAL LAUNCH FOR MOBILE COMMUNICATIONS AND METEOROLOGY SATELLITES Arianespace will orbit two satellites on its third Ariane 5 launch of the year: the Alphasat mobile communications satellite for operator
ARIANESPACE LAUNCHES TWO TELECOM SATELLITES
ARIANESPACE LAUNCHES TWO TELECOM SATELLITES On the first Ariane 5 launch of the year, Arianespace will orbit two telecommunications satellites: ABS-2 for the Bermuda-based operator ABS and Athena Fidus
Satellite launches for Japan and Australia
Satellite launches for Japan and Australia For its fourth launch of the year, Arianespace will orbit two communications satellites: JCSAT-12, built by Lockheed Martin Commercial Space Systems for the Japanese
A launch for science. Follow the launch live on the internet broadband at www.arianespace.com (starting 20 minutes before lift-off)
A launch for science For its second launch of the year, Arianespace will orbit two scientific satellites for the European Space Agency: the Herschel space telescope and the Planck scientific observatory.
A DUAL LAUNCH FOR COMMUNICATIONS AND BROADCASTING SERVICES
A DUAL LAUNCH FOR COMMUNICATIONS AND BROADCASTING SERVICES Arianespace will orbit two communications and broadcast satellites on its fifth launch of the year: Arabsat 5C for the operator Arabsat and SES-2
June VV 05. Sentinel-2A LOGOTYPE COMPLET (SYMBOLE ET TYPOGRAPHIE) 294C
LOGOTYPE TONS MONOCHROME 294C June 2015 VV 05 LOGOTYPE COMPLET (SYMBOLE ET TYPOGRAPHIE) FIFTH VEGA LAUNCH FROM THE GUIANA SPACE CENTER, AT THE SERVICE OF EUROPE'S COPERNICUS PROGRAM On the fifth Vega mission
KOUROU. August 2015 ARIANE 5. Data relating to Flight 225. EUTELSAT 8 West B. Intelsat 34
KOUROU August 2015 ARIANE 5 Data relating to Flight 225 EUTELSAT 8 West B Intelsat 34 Flight 225 Ariane 5 Satellites: EUTELSAT 8 WEST B INTELSAT 34 Content 1. Introduction... 3 2. Launcher L579... 4 3.
KOUROU. December 2014 ARIANE 5. Data relating to Flight 221 DIRECTV 14 GSAT 16
KOUROU December 2014 ARIANE 5 Data relating to Flight 221 DIRECTV 14 GSAT 16 Flight 221 Ariane 5 Satellites: DIRECTV 14 GSAT 16 Content 1. Introduction... 3 2. Launcher L575... 4 3. Mission V221... 12
KOUROU. July 2013 ARIANE 5. Data relating to Flight 214 ALPHASAT INSAT-3D
KOUROU July 2013 ARIANE 5 Data relating to Flight 214 ALPHASAT INSAT-3D Flight 214 Ariane 5 Satellites: ALPHASAT INSAT-3D Content 1. Introduction... 3 2. Launcher L569... 4 3. Mission V214... 10 4. Payloads...
KOUROU. June 2013 ARIANE 5. Data relating to Flight VA213 by Florence Hauss
KOUROU June 2013 ARIANE 5 Data relating to Flight VA213 by Florence Hauss Flight VA213 Ariane 5 ES/ATV Payload: ATV Content 1. Introduction...3 2. Launcher L592...5 3. Mission VA213...10 4. Albert Einstein...Erreur!
SpaceLoft XL Sub-Orbital Launch Vehicle
SpaceLoft XL Sub-Orbital Launch Vehicle The SpaceLoft XL is UP Aerospace s workhorse space launch vehicle -- ideal for significant-size payloads and multiple, simultaneous-customer operations. SpaceLoft
The National Strategy, Current Activities for Space Technology Development and Application
14-18 November 2011, Putrajaya, Malaysia The National Strategy, Current Activities for Space Technology Development and Application Lai Anh Khoi Space Technology Institute, VAST, Vietnam Bief History Space
LAUNCH KIT APRIL 2016 VS14. Sentinel-1B. Microscope Fly Your Satellite!
LAUNCH KIT APRIL 2016 VS14 ARIANESPACE S FIRST SOYUZ LAUNCH IN 2016: SUPPORTING EUROPEAN SPACE APPLICATIONS For its third launch of the year, which will be the initial mission in 2016 utilizing a Soyuz
Space Launchers. Mastering technologies of cryogenic tanks and associated equipment. www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES
ADVANCED TECHNOLOGIES Space Launchers Mastering technologies of cryogenic tanks and associated equipment www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES Air Liquide and Space Since the beginning
Space Launchers. Mastering technologies of cryogenic tanks and associated equipment. www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES
Space Launchers Mastering technologies of cryogenic tanks and associated equipment www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES Air Liquide and Space Since the beginning of cryogenic launchers
The European Satellite Navigation Programmes EGNOS and Galileo
The European Satellite Navigation Programmes EGNOS and Galileo Olivier Crop European GNSS Agency (GSA) Paris, 17 March 2014 20 March, 2014 The European GNSS Programmes 2 Basics of Satellite Navigation
APOPHIS 2029 A UNIQUE MISSION OPPORTUNITY
APOPHIS 2029 A UNIQUE MISSION OPPORTUNITY Jean-Yves Prado CNES Toulouse - France Presentation Outline APOPHIS reminder The April 2029 flyby Mission objectives Sequence of events Launch Orbit transfer Relative
2. Typology of space value chain actors
Toulouse Space Show 2012 : IISL/IAA Space Law and Policy Symposium Session 1a : Towards effective sustainability for outer space activities ECONOMICAL SUSTAINABILITY OF THE SPACE VALUE CHAIN : ROLE OF
Space Shuttle Mission SPACE SHUTTLE SYSTEM. Operation. Luca d Agostino, Dipartimento di Ingegneria Aerospaziale, Università di Pisa, 2010/11.
Space Shuttle Mission SPACE SHUTTLE SYSTEM Operation SPACE SHUTTLE SYSTEM Operation The flight plan and operation of the Space Shuttle differs markedly from that of the now-familiar launch procedures and
Information furnished in conformity with the Convention on Registration of Objects Launched into Outer Space
United Nations ST/SG/SER.E/510 Secretariat Distr.: General 11 April 2007 Original: English Committee on the Peaceful Uses of Outer Space Information furnished in conformity with the Convention on Registration
Satellite technology
Satellite technology Overview What is a satellite? The key elements of orbital position Satellite manufacturers and design The components of a satellite: payload and bus Digital versus analogue How do
SCADE Suite in Space Applications
SCADE Suite in Space Applications at EADS David Lesens 09/10/2008 Overview Introduction Historical use of SCADE at EADS Astrium ST Why using SCADE? The Automatic Transfer Vehicle (ATV) M51 and Vega R&T
Precision on earth. Reliability in space. RUAG Space.
Precision on earth. Reliability in space. RUAG Space. Image: ESA Precision on earth. Reliability in space. RUAG Space is the leading supplier of products for the space industry in Europe. Experience, outstanding
SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, 2010. SpaceX
SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, 2010 SpaceX Vehicles Falcon 1 Falcon 9 Dragon Spacecraft 2 SpaceX Overview Founded in mid-2002 with the singular goal
PRESENTATION SPACE MISSIONS
GENERAL PRESENTATION SPACE MISSIONS CONTENTS 1. Who we are 2. What we do 3. Space main areas 4. Space missions Page 2 WHO WE ARE GENERAL Multinational conglomerate founded in 1984 Private capital Offices
Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS
Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS 10 September 2008 Prague, Czech Republic Agenda Short company introduction Turksat s satellite design and R&D goals Outline Turksat s satellite design
What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance. www.hostedpayloadalliance.
Hosted Payloads: What, Why and How A guide to commercially hosted government payloads from the Hosted Payload Alliance The Hosted Payload Alliance (HPA) is a satellite industry alliance formed in 2011
Technologies for Re-entry Vehicles. SHEFEX and REX FreeFlyer, DLR s Re-Entry Program. Hendrik Weihs. Folie 1. Vortrag > Autor > Dokumentname > Datum
Technologies for Re-entry Vehicles SHEFEX and REX FreeFlyer, DLR s Re-Entry Program Hendrik Weihs Folie 1 DLR`s Re-Entry Program, Why? Re-entry or return technology respectively, is a strategic key competence
CONTENTS. Satellite Fleet. Türksat 2A. Türksat 3A. Türksat 4A. Türksat 4B. Türksat VSAT
www.turksat.com TURKSAT A.S. Turksat, one of the leading operators in the satellite communication business, offers flexible solutions by providing its customers with cable and wireless broadcasting, high-speed
The Elwing Company THE ELWING COMPANY. EPIC Workshop 2014. Products and Systems 2015 2020
The Elwing Company THE ELWING COMPANY EPIC Workshop 2014 Products and Systems 2015 2020 Elwing E IMPAcT technology key features Erosion free Contamination free Short circuit free Multiple modes Thurst/
Overview of the Orbiting Carbon Observatory (OCO) Mishap Investigation Results For Public Release
Overview of the Orbiting Carbon Observatory (OCO) Mishap Investigation Results For Public Release SUMMARY The Orbiting Carbon Observatory was a National Aeronautics and Space Administration satellite mission
NASA ISS Research Academy and Pre-Application Meeting. Erin Beck Mission Integrator [email protected] August 4, 2010
NASA ISS Research Academy and Pre-Application Meeting Erin Beck Mission Integrator [email protected] SpaceX Overview Founded in mid-2002 with the singular goal of providing highly reliable, low cost
www.turksat.com TURKSAT A.S. Turksat, one of the leading operators in the satellite communication business, offers flexible solutions by providing its customers with cable and wireless broadcasting,
Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014
Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014 Francesca Esposito INAF Osservatorio Astronomico di Capodimonte (Napoli) ExoMars Mission The ExoMars Program is carried
The Sentinel-4/UVN instrument on-board MTG-S
The Sentinel-4/UVN instrument on-board MTG-S Grégory Bazalgette Courrèges-Lacoste; Berit Ahlers; Benedikt Guldimann; Alex Short; Ben Veihelmann, Hendrik Stark ESA ESTEC European Space Technology & Research
Revision history. Version Date Action. 1.0 Oct 1, 2015 Initial release. Moonspike - Feasibility Study - October 2015 - Page 1 of 35
Revision history Version Date Action 1.0 Oct 1, 2015 Initial release Moonspike - Feasibility Study - October 2015 - Page 1 of 35 1 Table of Contents 1 Table of Contents... 2 2 Acronyms & Terms... 3 3 Document
BR-257. The European Small Launcher VEGA
BR-257 The European Small Launcher VEGA Preface The European small launcher, called Vega, will make its inaugural flight from Europe s Spaceport in French Guiana before the end of 2008. This will be an
OUTLINES. Earth Observation Satellite Program of Vietnam and applications for disaster management
UNESCAP ICC & HLDM Meetings, Bangkok 26 28/11/2013 Earth Observation Satellite Program of Vietnam and applications for disaster management OUTLINES 1. VNREDSat-1 (VAST*) - Optical 2. VNREDSat-1B (VAST)
Overview of the IR channels and their applications
Ján Kaňák Slovak Hydrometeorological Institute [email protected] Overview of the IR channels and their applications EUMeTrain, 14 June 2011 Ján Kaňák, SHMÚ 1 Basics in satellite Infrared image interpretation
History of the Titan Centaur Launch Vehicle
History of the Titan Centaur Launch Vehicle The Centaur program began in 1958 with its first successful flight on 27 November 1963. The unique Centaur design is the first liquid oxygen and liquid hydrogen
STERN - A ROCKET PROGRAMME FOR GERMAN STUDENTS
STERN - A ROCKET PROGRAMME FOR GERMAN STUDENTS Andreas Stamminger (1), Helmut Ciezki (2), Wolfgang Kitsche (3), Mario Kobald (4), Karsten Lappöhn (5), Alexander Schmidt (6) (1) Deutsches Zentrum für Luft-
RS platforms. Fabio Dell Acqua - Gruppo di Telerilevamento
RS platforms Platform vs. instrument Sensor Platform Instrument The remote sensor can be ideally represented as an instrument carried by a platform Platforms Remote Sensing: Ground-based air-borne space-borne
2. Orbits. FER-Zagreb, Satellite communication systems 2011/12
2. Orbits Topics Orbit types Kepler and Newton laws Coverage area Influence of Earth 1 Orbit types According to inclination angle Equatorial Polar Inclinational orbit According to shape Circular orbit
EUCASS 2009-299 3 EUROPEAN CONFERENCE FOR AEROSPACE SCIENCES (EUCASS) Study Trade-Offs on Future European Expendable Launchers
RD EUCASS 29-299 3 EUROPEAN CONFERENCE FOR AEROSPACE SCIENCES (EUCASS) Study Trade-Offs on Future European Expendable Launchers Martin Sippel, Arnold van Foreest Space Launcher Systems Analysis (SART),
An Introduction to the MTG-IRS Mission
An Introduction to the MTG-IRS Mission Stefano Gigli, EUMETSAT IRS-NWC Workshop, Eumetsat HQ, 25-0713 Summary 1. Products and Performance 2. Design Overview 3. L1 Data Organisation 2 Part 1 1. Products
O3b Press Kit. From Vision to Reality
O3b Press Kit From Vision to Reality Contents 2 3 Contents 4 Message to all Media 5 O3b Satellites Fast Facts We believe in a world where 6 7 The O3b Story affordable, high-speed connectivity is always
Section 4: The Basics of Satellite Orbits
Section 4: The Basics of Satellite Orbits MOTION IN SPACE VS. MOTION IN THE ATMOSPHERE The motion of objects in the atmosphere differs in three important ways from the motion of objects in space. First,
Indian Diplomacy At Work
Indian Diplomacy At Work 50 YEARS OF INDO-FRENCH SPACE CO-OPERATION BRINGING BENEFITS TO MANKIND 50 YEARS OF INDO-FRENCH SPACE CO-OPERATION Bringing Benefits to Mankind A time-tested partnership India
Emerging commercial space technologies, along with complex and substantial
VOLUME II: Chapter 8/Technical Afterword THE COMMERCIAL SPACE INSURANCE INDUSTRY Introduction: The Market Emerging commercial space technologies, along with complex and substantial financial investments,
AIDA: Asteroid Impact & Deflection Assessment A Joint ESA-NASA Mission. Joint ESA NASA AIDA Team
AIDA: Asteroid Impact & Deflection Assessment A Joint ESA-NASA Mission Joint ESA NASA AIDA Team Chelyabinsk Meteor on 15 February 2013 AIDA Asteroid Deflection Test AIDA international cooperation First
Description of the AAU satellite Project. CubeSat Concept. Financing. Organization
Projects Catalogue for AAU satellite /DRAFT by Rafael Wisniewski (I8), Ole Thybo (15), Stig Munk Nielsen (I14), Brian Nielsen (I16), Thomas Bak (I8), Lasse Rosendahl (I14) Description of the AAU satellite
The Space Shuttle: Teacher s Guide
The Space Shuttle: Teacher s Guide Grade Level: 6-8 Curriculum Focus: Astronomy/Space Lesson Duration: Two class periods Program Description This video, divided into four segments, explores scientists'
ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL TWO INSTRUCTIONAL GUIDE SECTION 6 EO C240.03 IDENTIFY PARTS OF A ROCKET PREPARATION
ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL TWO INSTRUCTIONAL GUIDE SECTION 6 EO C240.03 IDENTIFY PARTS OF A ROCKET Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery
29.01.2015. Industry and Business Applications. Industry and Business Applications
Industry and Business Applications ETH Zürich 30 January 2015 Dr. Jürg Wildi Vice President Technology RUAG Aviation 1 Industry and Business Applications Where is the business for the industry? A Swiss
Lecture L14 - Variable Mass Systems: The Rocket Equation
J. Peraire, S. Widnall 16.07 Dynamics Fall 2008 Version 2.0 Lecture L14 - Variable Mass Systems: The Rocket Equation In this lecture, we consider the problem in which the mass of the body changes during
Korean Space Law 2014. 11. Dr. Joon Lee Korea Aerospace Research Institute. www.kari.re.kr
Korean Space Law 2014. 11 Dr. Joon Lee Korea Aerospace Research Institute Contents 1. Introduction to Korean Space Law 2. Space Object Registration 3. Launcher Regulations 4. Space Accident Inquiry 5.
Motion & The Global Positioning System (GPS)
Grade Level: K - 8 Subject: Motion Prep Time: < 10 minutes Duration: 30 minutes Objective: To learn how to analyze GPS data in order to track an object and derive its velocity from positions and times.
Thomas Fiolleau Rémy Roca Frederico Carlos Angelis Nicolas Viltard. www.satmos.meteo.fr
Comparison of tropical convective systems life cycle characteristics from geostationary and TRMM observations for the West African, Indian and South American regions Thomas Fiolleau Rémy Roca Frederico
Visualizing Wireless Transfer of Power: Proposal for A Five-Nation Demonstration by 2020. ISDC2012: Washington DC, May 26, 2012
Visualizing Wireless Transfer of Power: Proposal for A Five-Nation Demonstration by 2020 Don Flournoy Ohio University Brendan Dessanti & Narayanan Komerath Georgia Institute of Technology ISDC2012: Washington
VIETNAM ACADEMY OF SCIENCE AND TECHNOLOGY VIETNAM NATIONAL SATELLITE CENTER CUBESAT PICO DRAGON. Presenter Name: Do Xuan Phong
VIETNAM ACADEMY OF SCIENCE AND TECHNOLOGY VIETNAM NATIONAL SATELLITE CENTER CUBESAT PICO DRAGON Presenter Name: Do Xuan Phong Co-authors: Vu Viet Phuong, Truong Xuan Hung, Le Xuan Huy, Bui Nam Duong, Do
CONTROL, IOT AND OBSERVATION STATIONS
CONTROL, IOT AND OBSERVATION STATIONS Satellite communications, earth observation, navigation and positioning and control stations indracompany.com ENGINEERING SERVICES CONTROL, IOT AND OBSERVATION STATIONS
Plasma Propulsion on STENTOR Satellite: In Flight Acceptance Operations and Experimental Program *
Plasma Propulsion on STENTOR Satellite: In Flight Acceptance Operations and Experimental Program * Franck Darnon, Luc Petitjean, Jean-Pierre Diris, Jacques Hoarau, Louis Torres Centre National d'etudes
GALILEO System Status ESA Galileo Project Office Workshop Satellietnavigatie Haarlem HSB / NIN / VPN / GIN 12 December 2014
GALILEO System Status ESA Galileo Project Office Workshop Satellietnavigatie Haarlem HSB / NIN / VPN / GIN 12 December 2014 Navigation solutions powered by Europe Galileo Constellation Walker 24/3/1 constellation
General aviation & Business System Level Applications and Requirements Electrical Technologies for the Aviation of the Future Europe-Japan Symposium
General aviation & Business System Level Applications and Requirements Electrical Technologies for the Aviation of the Future Europe-Japan Symposium 26 March 2015 2015 MITSUBISHI HEAVY INDUSTRIES, LTD.
Evolution of Satellite Communication Systems
Mathieu DERVIN Brussels, 6th May 2015 Brussels, May 2015 Agenda I. From Sputnik to wideband satellite services: The key technological evolutions II. Increase the satellite system capacity: A global system
Launch / Tracking and Control Plan of Advanced Land Observing Satellite (ALOS) / H-IIA Launch Vehicle No. 8 (H-IIA F8)
Launch / Tracking and Control Plan of Advanced Land Observing Satellite (ALOS) / H-IIA Launch Vehicle No. 8 (H-IIA F8) November 2005 Japan Aerospace Exploration Agency (JAXA) (Independent Administrative
Trajectory design for the Solar Orbiter mission
Monografías de la Real Academia de Ciencias de Zaragoza. 25: 177 218, (2004). Trajectory design for the Solar Orbiter mission G. Janin European Space Operations Centre. European Space Agency. 64293 Darmstadt,
PHANTOM 2 Product Release Notes
Date : March 3, 2015 PHANTOM 2 Flight Controller Firmware Version : 3.12 March 3, 2015 PHANTOM 2 Flight Controller Firmware V3.12 released Major New Features 1. No-Fly Zones have been updated to include
16 th IOCCG Committee annual meeting. Plymouth, UK 15 17 February 2011. mission: Present status and near future
16 th IOCCG Committee annual meeting Plymouth, UK 15 17 February 2011 The Meteor 3M Mt satellite mission: Present status and near future plans MISSION AIMS Satellites of the series METEOR M M are purposed
Use the following information to deduce that the gravitational field strength at the surface of the Earth is approximately 10 N kg 1.
IB PHYSICS: Gravitational Forces Review 1. This question is about gravitation and ocean tides. (b) State Newton s law of universal gravitation. Use the following information to deduce that the gravitational
Lecture L17 - Orbit Transfers and Interplanetary Trajectories
S. Widnall, J. Peraire 16.07 Dynamics Fall 008 Version.0 Lecture L17 - Orbit Transfers and Interplanetary Trajectories In this lecture, we will consider how to transfer from one orbit, to another or to
Core technology activity for future launchers
future launchers A TOUCHSTONE FOR SUCCESS Core technology activity for future launchers Guy Ramusat Future Launchers Preparatory Programme (FLPP), Directorate of Launchers, ESA HQ, Paris, France Whether
FUNcube-1 Satellite. Wouter Weggelaar 1 AMSAT-NL. NVR CubeSat Cluster Launch mini-symposium
FUNcube-1 Satellite NVR CubeSat Cluster Launch mini-symposium Wouter Weggelaar 1 AMSAT-NL Wouter Weggelaar Worked on Delfi-C3 The first dutch Nanosatellite Now RF engineer at Delfi-spinoff ISIS Radio Amateur
USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES
USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES Thierry Martin CNES Scilabtec 09 Use of Scilab for space mission analysis Page 1 Use of Scilab in CNES Scilab is now widely used
SARAL ACCESS TO OFF-LINE DATA
SARAL AltiKa introduction Plot of the SARAL/AltiKa ground track over Africa (Credits: Google). S ARAL/AltiKa is a new mission in cooperation between CNES and ISRO (Indian Space Research Organization),
Dawn - Overview, Science Objectives, Mission Progress. Hap McSween For PI Chris Russell
Dawn - Overview, Science Objectives, Mission Progress Hap McSween For PI Chris Russell Presentation to Decadal Survey Primitive Bodies Panel, Washington, DC, Sep 2009 Spacecraft configuration, assembly
Herschel, Planck and GAIA Orbit Design. Martin Hechler, Jordi Cobos
Herschel, Planck and GAIA Orbit Design Martin Hechler, Jordi Cobos Mission Analysis Section, ESA/ESOC, D-64293 Darmstadt, Germany TERMA, Flight Dynamics Division, ESA/ESOC, Darmstadt, Germany 7th International
Electric Propulsion for Station Keeping and Electric Orbit Raising on Eutelsat Platforms
Electric Propulsion for Station Keeping and Electric Orbit Raising on Eutelsat Platforms 2015-b/IEPC-97 Presented at Joint Conference of 30th International Symposium on Space Technology and Science 34th
The 2013 MAVEN Mission To Mars. Bruce Jakosky MAVEN Principal Investigator University of Colorado
The 2013 MAVEN Mission To Mars Bruce Jakosky MAVEN Principal Investigator University of Colorado Summary of MAVEN Status We ve been developing MAVEN since 2003; now under 3 months to launch! All science
Physics 2A, Sec B00: Mechanics -- Winter 2011 Instructor: B. Grinstein Final Exam
Physics 2A, Sec B00: Mechanics -- Winter 2011 Instructor: B. Grinstein Final Exam INSTRUCTIONS: Use a pencil #2 to fill your scantron. Write your code number and bubble it in under "EXAM NUMBER;" an entry
The Spacewire interface for HERSCHEL/SCORE suborbital mission
The Spacewire interface for HERSCHEL/SCORE suborbital mission International Spacewire Conference, Dundee, 19 Sept. 2007 Session: SpaceWire missions and applications Pancrazzi Maurizio e Scienza dello Spazio
ADS-B over Satellite Global Air Traffic Surveillance from Space
www.dlr.de Chart 1 ADS-B over Satellite Global Air Traffic Surveillance from Space ATM World Congress, March 11 th 2015 in Madrid K. Werner, German Aerospace Center (DLR) Institute of Flight Guidance T.
METEOSAT. Europe s geostationary
METEOSAT Europe s geostationary Meteorological satellites MONITORING WEATHER AND CLIMATE FROM SPACE Observations from geostationary orbit save lives on Earth Changes in weather and climate significantly
From Single to Formation Flying CubeSats: An Update of the Delfi Programme
From Single to Formation Flying CubeSats: An Update of the Delfi Programme Jian Guo, Jasper Bouwmeester & Eberhard Gill 1 Outline Introduction Delfi-C 3 Mission Delfi-n3Xt Mission Lessons Learned DelFFi
State of the Satellite Industry Report June 2013
State of the Satellite Industry Report June 2013 Sponsored by the Prepared by The Satellite Industry Association: 18 Years as the Voice of the U.S. Satellite Industry SIA MEMBER COMPANIES 2 Study Overview
How To Connect The World To The Internet With Satellite Communication
O3b Networks Corporate Brochure Contents 05 Developed to meet a business need 09 Who we are 10 What we do 12 The technology 16 The O3b advantage 20 Our Investors 21 Our Partners Fiber Performance. Satellite
Space Weather Research and Forecasting in CRL, Japan
Space Weather Research and Forecasting in CRL, Japan Maki Akioka Hiraiso Solar Observatory Communications Research Laboratory Contact [email protected] 1 Contents of Presentation 1.Space Weather Observation
Mobile Communications: Satellite Systems
Mobile Communications: Satellite Systems Mobile Communication: Satellite Systems - Jochen Schiller http://www.jochenschiller.de 1 History of satellite communication 1945 Arthur C. Clarke publishes an essay
A MONTE CARLO DISPERSION ANALYSIS OF A ROCKET FLIGHT SIMULATION SOFTWARE
A MONTE CARLO DISPERSION ANALYSIS OF A ROCKET FLIGHT SIMULATION SOFTWARE F. SAGHAFI, M. KHALILIDELSHAD Department of Aerospace Engineering Sharif University of Technology E-mail: [email protected] Tel/Fax:
AEROSPACE ENGINEERING SERIES, GS-0861
TS-124 May 1993 General Schedule Position Classification Flysheet AEROSPACE ENGINEERING SERIES, GS-0861 Theodore Roosevelt Building 1900 E Street, NW Washington, DC 20415-8330 Classification Programs Division
Status, Development and Application
Federal Space Agency GLONASS GLONASS Status, Development and Application Sergey G. Revnivykh International Committee on Global Navigation Satellite Systems (ICG) Second Meeting, September 4-7, 2007, Bangalore,
Forces on the Rocket. Rocket Dynamics. Equation of Motion: F = Ma
Rocket Dynamics orces on the Rockets - Drag Rocket Stability Rocket Equation Specific Impulse Rocket otors Thrust orces on the Rocket Equation of otion: = a orces at through the Center of ass Center of
GPS Precise Point Positioning as a Method to Evaluate Global TanDEM-X Digital Elevation Model
GPS Precise Point Positioning as a Method to Evaluate Global TanDEM-X Digital Elevation Model 7 th FIG Regional Conference TS 1C Advances in GNSS Positioning and Applications I Volker Schwieger 1, Jürgen
