Airbus in the UK Response to the Enterprise and Business committee s inquiry on International Connectivity through Welsh Ports and Airports

Similar documents
Malmi - Helsinki City International Airport. Malmi operators development plan

The aerospace industry: statistics and policy

years in the community

Strategic Business Plan

Reach for the skies. The Aerospace Growth Partnership. Industry and government working together to secure the future for UK aerospace

Current Challenges in the Aerospace Industry. Martin Wright, CEO, NWAA

Central Cardiff Enterprise Zone. Strategic Plan 2015

Why Study Aerospace Engineering? Deciding Your Future

3-4 June 2014 Sywell Aerodrome

The company Premium AEROTEC

Planning requirements for heliports and helicopter landing sites

AIRBUS GROUP AUSTRALIA PACIFIC

Airbus Progamme Review

COMPANY PROFILE YOUR PREFERRED PARTNER IN AEROSPACE TECHNOLOGIES SUBSIDIARIES. AERO Vodochody AEROSPACE a.s., Odolena Voda, Czech Republic

Canadian Aerospace Industry

Global Investor Forum Market Perspectives / Strategy. Marwan Lahoud, Chief Strategy and Marketing Officer London, 11th/12th December 2013

Master Plan

The UK National Aeronautics Technology Strategy

Aerospace Industry & Engineering in the UK

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

SECURING YOUR AIRCRAFT

A Look into the Future of Airport Planning, Design, and Construction by Analyzing Current Issues

study in IRELAND Bachelor of Technology in Aircraft Maintenance and Operations Partial scholarships available!

Joe Randell President and Chief Executive Officer. Rick Flynn Chief Financial Officer. Nathalie Megann Director, Investor Relations.

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

Chapter 2. Basic Airplane Anatomy Delmar, Cengage Learning

Airspace Change Communications and Consultation Protocol Protocol

The Economic Benefits of Aviation and Performance in the Travel & Tourism Competitiveness Index

GE Aviation. Aerostructures Facility Overview. GE Aviation

Radio Frequency Identification (RFID)

Case Study BOEING 787: GLOBAL SUPPLY CHAIN MANAGEMENT TAKES FLIGHT. Leveraging Global Partners to Maximize Customer Value

The Natural Laminar Flow Ground Based Demonstrator

Aerospace and Defence Insurance Overview 2013

Aviation Premises, Hangarkeepers and Products Liability Insurance Proposal

CONNECTING TALENT, IMPROVING BUSINESS

APPENDIX B - PL1 Homes that meet people s needs and aspirations

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

ADVANCED MANUFACTURING: AIR TRANSPORTATION CAREER PATHWAY

Germany s Support for Civil Aeronautical Infrastructure: Afghanistan as a successful example

Advanced Systems & Equipment

Third Runway is Key to Hong Kong s Competitiveness. Professor Anthony Cheung Bing-leung Secretary for Transport and Housing

Delcam s Aerospace Heritage

1.2 Some of the figures included in this publication may be provisional only and may be revised in later issues.

EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2014

Application For General Liability Coverage

Implications for Service Parts Management in the Rapidly Changing Aviation MRO Market

Report to the Board of Governors on Elizabeth City State University s Aviation Related Initiatives

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary

Phil Curnock Head of Supply Chain

EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2015

Economic impact of airport: the Roissy Charles de Gaulle airport example

China's Aviation Sector - Overview, Current Trends & Opportunities for European Suppliers

Backgrounder. Boeing Commercial Airplanes

EASA Part-66 Category B1.1 Licence

Aeronautics. Industry - Maintenance - Engineering - Logistics

aircraft spare part and inventory management...

Advanced MRO Solutions

Air Transport and Aerospace Education - Synergies and Differences Antonín KAZDA, Air Transport Department, University of Žilina

Case study: The Olympic Challenge

Israel s Aerospace Industry. Higher Faster Farther

The Mayor of London s Submission:

2015 Review and Outlook 13 January 2016 DG/ALB

Airbus Group Reports Improved Nine-Month (9m) Results 2014

The SESAR programme: Making air travel safer, cheaper and more efficient

Apprenticeship in Aircraft Maintenance Engineering

FAI AVIATION GROUP ONE BRAND - THREE DIVISIONS

Air Traffic Management Services Plan

The economic impact of London Luton Airport Oxford Economics

CAPABILITIES STATEMENT

You count on availability. We provide reliable solutions.

MASTER PLAN PREPARATION

50e Show report INTERNATIONAL PARIS AIR SHOW. SALON INTERNATIONAL de l Aéronautique et de l Espace. Paris Le Bourget. June

Our track record for innovation Your chance to shape the future. Engineering opportunities in France, Germany, Spain and UK:

Essex... A great location for offshore wind

28 St Thomas Court, Bristol, BS1 6JG

Training Centers for Aircraft Maintenance Engineers

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

ADACEL TECHNOLOGIES LIMITED 2005 AGM, 28 NOVEMBER 2005 ADDRESS BY CHAIRMAN, JULIAN BEALE

Competitiveness and New Development Opportunities in Aerospace

Optimum Aviation Solutions

OPENING UP OF THE AIR TRANSPORT MARKET IN GREECE UNDER LIBERALIZATION. (Submitted by Greece)

LAZIO AEROSPACE INTERNATIONAL TAKE OFF: COMPETENCE, EXCELLENCE, CREATIVITY. Company name: COMPANY PROFILE. Company details.

Realising the transformation programmes of major aeronautics players

World Fuel Services Corporation Overview

Academy teachers and Industry Partner staff jointly developed and facilitate the programme.

Airbus Group Achieves Record Revenues, EBIT* And Order Backlog In 2014

China General Aviation Promising Future

Luis Pinto, CFO, NetJets Europe. NetJets Europe - Flying the fractional flag

ITEM FOR FINANCE COMMITTEE

Recruitment of Procurement staff for the MOD Commercial Function

Airbus Group Reports Robust First Quarter 2015 Results

Perfect Partners The Versatility of the King Air Ideal for Canada s Fast Air A MAGAZINE FOR THE OWNER/PILOT OF KING AIR AIRCRAFT

Definition of a Lease

Developments and Challenges for Aluminum A Boeing Perspective

Aviation Fuelling. is our business

Capabilities at a glance

Chapter 3.2: Helping Manufacturers and Businesses Succeed in the Global Economy

Pioneering by nature: Cornwall s aerospace industry. 1

Type selection of. DenMARK S new

Transcription:

Airbus in the UK Response to the Enterprise and Business committee s inquiry on International Connectivity through Welsh Ports and Airports Introduction Airbus welcomes this opportunity to respond to the Enterprise and Business Committee s Inquiry on International Connectivity through Ports and Airports. This response opens by providing background information on Airbus and on Hawarden Airport. It then addresses some of the specific questions raised in the terms of reference. About Airbus Airbus is a global company, the world's leading aircraft manufacturer. In 2011, Airbus achieved a 64% share of the global civil airliner market. Airbus directly employs over 10,000 highly skilled people in the UK and supports 100,000 further jobs in this country through the company s supply chain and from induced employment. In total, Airbus and its UK supply chain provide supplies and services worth nearly 2 billion annually to the UK economy. Airbus has two sites in the UK located at Filton, near Bristol, and Broughton, in North Wales. Together, these sites comprise the company s global Centre of Excellence Wing and Pylon and are responsible for the design, manufacture and assembly of the wings of all Airbus aircraft, as well as landing gear and fuel systems integration. Airbus is a wholly owned subsidiary of EADS, the European Aeronautic Defence and Space company. EADS employs around 116,000 people and has over 70 production sites around the world. In addition to Airbus, the EADS group of industries includes Eurocopter, the world s largest helicopter supplier, Cassidian, a worldwide leader in security systems, and EADS Astrium, the European leader in space programmes from Ariane to Galileo.

About Airbus in Wales The Broughton airfield has a long history. In 1935, the Government unveiled the Shadow Factory Scheme, designed to move vital industries to remote areas in the North of the country. In 1937, the Broughton site was chosen to build a plant capable of producing Wellington bombers, thanks to clear, year round test flying conditions. This factory was financed by the Government, but was leased to and managed by Vickers- Armstrong. Since then, the factory has passed successively from Vickers-Armstrong to de Havilland, Hawker Siddeley, British Aerospace, and BAe systems. In 2001, Airbus was formally incorporated into a joint stock company, with BAe Systems owning a 20% share, and EADS owning the further 80%. In 2005 BAe Systems sold its 20% share to EADS and Airbus became a wholly owned subsidiary. Since 1971, over 7000 Airbus wing sets have been produced at Broughton. Broughton also manufactures wings and fuselages for Hawker Beechcraft executive jets. Today, the Broughton site employs around 6,600 people (permanent and temporary), more than half of whom live in Wales. Its annual salary bill to Welsh resident employees is around 100 million per annum. Airbus provides its employees with secure, long term employment. For example 30% of employees have 15 years or more experience and 10% with 25 years or more experience within the company. The 700 acre site has seen significant inward investment. Excluding R&D, Airbus has invested over 2 billion into the Broughton site during the last 10 years, to create a state- of- the- art, high tech, innovative and modern facility. The most recent addition to the site is the 400m North Factory that houses the production of wings for the new A350 XWB. The factory was opened in October 2011 by the Prime Minister and First Minister and is now in operation. A number of key suppliers are based in or near the Airbus site in Broughton. Businesses such as Metal Improvement Company and Hawker Beechcraft all have a manufacturing presence on site. Aerotech, Electroimpact and Gardner both have facilities based on the adjacent business park, which was established with the support of the Welsh Government. It is estimated that as a result of the supply chain impact, in addition to the 6,600 directly employed Broughton workforce, a further 2000 people are employed by suppliers to Airbus, located on, or in close proximity to the Broughton site. Thus, Flintshire is recognised by many as the engine of the North Wales economy and has established Airbus as a key component of the wider UK economy. About Hawarden Airport Hawarden Airport forms an integral part of the 700 acre Airbus site. The site is owned by BAE systems, which has a long term lease with Airbus in the UK. Hawarden is the third largest airport in Wales. Its 2043m runway length puts it in the medium category of airfields, with around 19,000 movements in 2011. The airfield has its own Air Traffic Control Tower on site providing a service for the airfield including radar service. A new primary radar was recently installed at Hawarden aerodrome to replace an older model.

Airbus primary use for the airfield is transportation of its products to its final assembly lines (FAL s) in Toulouse and Hamburg. Airbus has developed its own transportation system to airlift the large, preassembled sections of its jetliners from their production locations to the final assembly lines in Toulouse and Hamburg. This service is performed by a fleet of five A300-600ST Super Transporters, commonly called Beluga due to their resemblance to the whale of the same name. In 2011 Broughton started manufacturing the carbon- fibre composite wings for Airbus new A350 XWB aircraft. The Beluga fleet is being used to import panels for the A350 wings from Stade in Germany and Illescas in Spain. This is the first time the Beluga has been used to bring products in to Broughton, and means there will be a significant increase in Beluga movements as production of the A350 increases. As well as moving Airbus wings, the airport is also currently used to transport Airbus staff between Broughton, Filton in Bristol and Airbus headquarters in Toulouse. The service is provided by BMI Regional and flies 2-3 times daily during the working week. This arrangement will change at the end of 2012 due to the closure of the airfield at Filton, which is also owned by BAE Systems. The decision by BAE to close the airfield means Airbus is currently looking into viable alternatives for transporting its staff to and from Filton. Private jet company Hawker Beechcraft is also based at Hawarden Airport. Airbus is responsible for manufacturing the wings and fuselage of Hawker Beechcraft jets. Hawker Beechcraft provide an upgrade, maintenance and repair service at Hawarden airport employing around 300 people. The Aviation Park Group is located at Hawarden Airport and operates through Chester Handling Services and Hawarden Air Services. They provide dedicated handling, refueling and storage services for corporate and VIP passenger jets. The discreet location of the airport makes it attractive to dignitaries and provides them with a quick transport route to North Wales. The services are used by a wide variety of VIPs and businesses. Also located at Hawarden Airport are Airbus sister company Eurocopter, Raytheon Aircraft Systems ltd, Flintshire Flying School, North Wales Military Aviation Services, Cheshire Police and aquatic science consultancy APGM. Of the 19,000 aircraft movements at the airfield last year the Beluga fleet accounted for 3%, Hawker Beechcraft for 24% and the remaining services 73%. How important are major Welsh ports and airports, both to the economy of their own regions and to Wales as a whole? Hawarden Airport Hawarden Airport is integral to the economy in North Wales, with a variety of businesses relying on it for their operations. Airbus is one of the largest employers in North Wales, providing long- term highly skilled jobs. 6,600 people are employed at Airbus Broughton plant, and Airbus pays 100 million annually in salary to Welsh residents. Airbus spends almost 121 million annually through its Welsh supply chain. The airfield is essential to Airbus operations in Wales. Airbus principally uses the airport to transport completed wings to assembly lines in Toulouse and Hamburg, via a fleet of 5 specially designed Beluga aircraft, A300-600 planes that have been modified with a large cargo area so as to enable transportation of completed wings and parts of fuselage.

With the beginning of production of the A350 XWB product the Beluga fleet is for the first time being used to bring wing covers in to the site as well as flying finished products out. Composite wing covers will be flown into Broughton from Stade in Germany and Illescas in Spain. The deliveries of various wing sets from Broughton take place daily, with up to 3 Belugas taking off and landing each day. Each of the 5 Belugas in the fleet currently flies 5000 hours a year. Due to the increased production rates a new project Fly 10000 will start implementing a programme of 10000 hours of flying per aircraft per year. Broughton is planning significant investment to improve efficiency and turnaround time. To reduce the effects of weather conditions on the loading process, a new Beluga integrated line station will be built by 2014 where loading will take place inside a purpose built hangar. This will ensure a just in time programme for the deliveries of various aircraft components to the FAL. As Airbus is a global company, there is a competitive element internationally when deciding on the location of new production lines. Shipping to Final Assembly Lines is of paramount importance to Airbus, as delays in assembly and shipping will in turn delay the delivery of Airbus aircraft to customers. Delay to the manufacturing process cannot be accepted by Airbus. Products are developed along 20 to 25 year project programmes, with considerable investment made for each new product line including substantial factory refurbishment or development. Any uncertainty regarding the long term deliverability of its products would be an unnecessary detractor when Airbus takes future investment decisions. Port of Mostyn The Port of Mostyn is a privately owned port located on the Dee Estuary. The port is essential to Airbus A380 programme in Wales. Airbus began producing the A380 superjumbo airliner in 2003. Due to the size of the wings, which are over 39m in length, it is not possible to fly them to the Final Assembly Line via Beluga, so a unique system of transportation was introduced. Wings travel by road to a load out facility in the River Dee, where they are transported 26km by barge to the port of Mostyn. A purpose- built rivercraft berth has been built at the port to accommodate the specially designed ferry that transports the wings to France. Wings take between two and three hours to travel down the River Dee and around five days to travel from Mostyn to Bordeaux on the Ville de Bordeaux. What factors limit realisation of the potential offered by major Welsh ports and airports; what opportunities are available to develop this potential; and how can these be realised? Hawarden Airport is not currently operating at full capacity; there is potential for growth. Airbus is supportive of the idea of establishing new routes from the airport increasing access to North Wales and the North West of England, thereby creating opportunities for growth and strengthening the regional economy. With residential areas nearby, Airbus is ever mindful of environmental considerations and of its neighbours when considering developments.