CCC Certification Process. G&M Compliance, Inc. By Victor Ratinoff and Thomas Ha

Similar documents
China Compulsory Certification

Component acceptability for CE product Safety

Check-list for auditors. Audit visit at candidate registered laboratories

Guidance for upgrading to GB (IEC : 2005, MOD)

Guide to the China Compulsory Certification System December 2009 OMRON Corporation Industrial Automation Company

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

For more information please contact your local UL field representative

Implementation Rules of AC Contactor Energy Efficiency Label

November 03, Via Electronic Mail to

NEC Class 2 Power Circuits and Power Supplies

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

Electrical Safety Tester Verification

Electrical & electronics. product certification. for electrical & electronics

Argentina. Certification Guidelines. For. Electric and Electronic Products

Presentation by BSI on the main changes to the IATF ISO/TS certification scheme

IT Security Evaluation in China

Agilent 87421A/87422A Power Supply

Regulations for Compulsory Product Certification Mark

Quality Assurance Provisions

SECTION STANDBY GENERATOR TESTING AND COMMISSIONING

Self-Audit Checklist

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

FSSC Q. Certification module for food quality in compliance with ISO 9001:2008. Quality module REQUIREMENTS

Explosion proof enclosures

National Accreditation Board for Certification Bodies. Accreditation Criteria

IEC System for Conformity Testing and Certification of Electrical Equipment CB Scheme

ACCREDITED FIRESTOP SPECIALTY CONTRACTOR PROGRAM

IDEAL INDUSTRIES, INC. TECHNICAL MANUAL MODELS:

TEST REPORT. Report nº: LABEL Date: Laboratório de Ensaios Eléctricos Page nº: 1/11

TESTS OF 1 MHZ SIGNAL SOURCE FOR SPECTRUM ANALYZER CALIBRATION 7/8/08 Sam Wetterlin

IMQ RULES. Contents. IMQ Rules - Product certification

Dielectric Withstand Testing in a Production Environment

IEEE802.3poep Study Group Revision of isolation requirements in IEEE802.3 clause 33.

Top Microsystems Proprietary Specification P/N: W090015HK-XP RB V.A0 SPECIFICATION

Approaching the Response to Audit Observations

V. MATERIALS ACCEPTANCE PROGRAM

Certification criteria for. Food Safety Management Systems Auditor/Lead Auditor Training Course

IEC nd Edition: All you need to know about the new standard

Specification N : NPS - 63/8. Underground Power Cable Covers

Contractor Connect Scheme Electrical Contractor and Worker Handbook

Certification criteria for. Food Safety Management Systems Auditor Conversion Training Course

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

Low Voltage Transformers Sealed, General Purpose, Dry Type

ISO/TS 16949:2002 Guidance Document

ISO/IEC QUALITY MANUAL

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

Audit Report AS/NZS ISO 9001:2008. RRW and Co Pty Ltd trading as National On Site Training

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

SURGE PROTECTIVE DEVICES

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A.

PM734F - Technical Data Sheet Winding 28

TECHNICAL DATASHEET #TD1404AX PWM CONTROLLED SOLENOID DRIVER

PowerFlex 700S and 700H Frame 12 DC Bus Connector Kit

STEP-PS/1AC/12DC/1.5. Extract from the online catalog. Order No.: DIN rail power supply unit 12 V DC/1.5 A, primary switched-mode, 1- phase

帝 聞 企 業 股 份 有 限 公 司 DEE VAN ENTERPRISE CO., LTD. SP DSL-20WA Revision: A Date: FOR AC-DC LED DRIVER MODEL NO.

Exhibit C Design Review Guidelines

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

TOTAL QUALITY MANAGEMENT II QUALITY AUDIT

Auditing a Printed Circuit Board Fabrication Facility Greg Caswell

User s Guide. for LCB Certification

Section 10.9 STRUCTURAL STEEL AND MISCELLANEOUS METAL COMPONENTS

Powerline 1200 User Manual

Air damper actuators

Med-Info Regular Information Bulletins for the Medical Device Industry

UNCONTROLLED COPY FOR REFERENCE ONLY

Power Capacitor Units for improved power quality

LightingEurope EU Compliant Requirements Products Sheets for LIGHTING COMPONENTS

Measuring instruments in industry.

Digital input modules

Medical Device Approvals in Brazil: A Review and Update

Application for Renewal or Extension of Certification

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

PV module safety qualification according to IEC 61730:2004 EN 61730:2007

LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

SC Series: MIS Chip Capacitors

Insulation resistance

MLCC Voltage Strength

Customs -Trade Partnership Against Terrorism (C-TPAT) Vendor Participation Overview

SAMPLE EXAMINATION. If you have any questions regarding this sample examination, please

Safety & Performance in the Wire and Cable Industry

Technical Specification for 5VDC/2A +12VDC/2A Adapter

The easy way to build switchgear and controlgear assemblies in compliance with the regulations

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Scout 1U Rackmount Computer

MIT510/2, MIT520/2 and MIT1020/2

Physical Specifications (Custom design available.)

CQM1-SF200/CS1W-SF200

New SACE Emax 2 for UL 1066 From Circuit Breaker to Power Manager

Standard the the Raising

Thailand visas and Work Permit Guide

Machinery Directive EMC Directive Low Voltage Directive /EN/1096/B

Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) elindsay@blueyonder.co.

AC SERIES DUAL 1/4 (6.35mm) / XLR

08. SEK IDC CONNECTORS

VEHICLE DIAGNOSTICS THE AUTOCOM WAY

PRCP CE. Version 5.0 of 16 June Date of entry into force: 1 July 2013

Q24.1 The two conductors a and b are insulated from each other, forming a capacitor. You increase the charge on a to +2Q and increase the charge on b

Transcription:

CCC Certification Process G&M Compliance, Inc. By Victor Ratinoff and Thomas Ha

Quick Overview of CCC Mark Currently, there are 22 groups of products divided into 132 product categories that require mandatory CCC Mark Component parts of finished products, spare parts and replacement t parts, may in some cases require CCC certification Products applied for CCC certification must conform to Chinese standards s and/or other additional technical requirements The CCC system is based on the Chinese GB Standards, GB stands for "Guo" Biao" in Chinese which means literally "National Standards. Most t are harmonized with International Standards First step is to determine if your product falls under CCC Mark category Using Tariff Code or HS Code is the most efficient way to find out if a product falls under CCC Mark

Sample Case Study Target Country: China CCC Mark Basic Computer 1U Chassis with single internal power supply Pizza za Box

Case Sample CCC Submittal Process In order to determine the scope of work, equipment specification/data sheet and photos will have to be provided Need to know if equipment has a CB report (w/chinese deviations) Need to know if power supply is CCC certified. If not, does the power supply has a CB report (minimum) Need to know manufacturing facility information such as where it is located, if it has been CCC approved (has gone through CCC Initial Factory Inspection). Need to know if the manufacturing facility has a CCC Factory Inspection report. Need to know detailed information regarding various models within n a family, if any

Case Sample CCC Submittal Process All documents MUST match Applications, labels & associated documents (Company name, product description, model number(s). If any item m does not match, the document will be required to be revised Typically, the CB report will require some type of revision and therefore may greatly delay the project

4 Basic Steps for CCC Certification I. DOCUMENTION II. SUBMITTING SAMPLES & TESTING III. IV. INITIAL FACTORY INSPECTION (if applicable) CCC MARK and LABELING

CCC Documentations CCC Application and Factory Questionnaire forms must be completed d correctly Production flow chart for the product Quality manual (title of contents pages, if the document is too big) List of documented procedures associated with the product (title of contents pages, if the document is too big) Quick Start Guide (must reference exact product name and model numbers n to the Application and CB report) Copy of CB report (w/chinese deviations) for the overall product(s) Copy of CB report of the power supply (if not CCC approved) Applicant and manufacturing facility s business license Name plate or label in Chinese (Simplified Chinese) Factory s organization chart

CCC Documentations For the Quick Start guide, basic items that are needed are: Products name, model number, product content, basic installation, and operating instructions, equipment rating (voltage/current), company information, any warning and cautionary statements The quick start guide can be a summary of the manual which generally is one to a two-page document. It should contain basic instruction, rating, and any safety warning information (in Simplified Chinese) If a series of equipment is being certified, a formal letter describing the differences needs to be provided Power Cable (input) - for China the power cable used (shipped with the product) must be CCC approved, specification for the CCC approved cable is required. The company will need to obtain the CCC certificate from the power supply manufacturer which will be submitted to CQC

CCC Documentations A list of Key components for Safety & EMC must be provided. For the Safety, the critical component list from the CB report will suffice A list of EMC components such as CPU s, oscillators, filters, ferrites, foam gaskets, capacitors used for filtering will need to be provided Once all of the documentations are received, specifically the signed Application & Factory Questionnaire, then everything will be submitted to CQC C for review. An application number will be generated by CQC for the Applicant t and then samples can be sent to China for evaluation and testing

Submitting Samples and Testing Once CQC issues a formal Application number to the Applicant, samples can now be sent to China for evaluation and testing CQC has the option to send or assign testing of your product to various laboratories in China based on the category of the equipment as well as other factors (*discuss in further details) Currently, there are between 18 20 various testing laboratories in China that are designated by CNCA (China National Certification and Accreditation Agency) to perform CCC Mark testing Generally, 2 samples are required to be sent to China. However, depending on the product, the actual test samples to be provided may vary Preparing test samples as well as having all of the proper information when shipping products to China for testing may be a bit confusing Generally, a Custom Agent is required to pick up test sample and deliver to testing laboratory

Submitting Samples and Testing The designated laboratory will perform Safety (if no CB) and EMC evaluation and testing based on IEC 60950 (GB 4943), EN 55022/55024 (GB 9254) and EN 61000-3-2/ 2/-3-33 (GB 17625) Once the Safety of EMC/EMI evaluation and testing is completed by the laboratory, a test report will be generated by the test laboratory ry and then provided to CQC for review and approval Once the test report has been approved by CQC, then Initial Factory Inspection can be scheduled (IFI)

CCC Factory Inspection Initial Factory Inspection (IFI) is required for a manufacturer that does not have a valid CCC Factory Inspection report or it is the first time going through the CCC certification process CQC typically assigns CEMC in Hong Kong or UL (in some rare cases) s) to carry out Initial Factory inspections One of the biggest unknown or challenge for scheduling a CCC IFI is obtaining U.S. Visas for the inspectors CQC sends 2 auditors for a period of 2 days to audit each factory. However, the time frame may vary based on the number of products to be certified ied If UL is assigned to perform the IFI, it cannot be coordinated with other regular UL visits During the Factory Inspection, the auditors will be primarily looking oking at the company s existing quality system Auditors will request to witness the Dielectric Strength and Ground Resistance tests to be performed on the product(s) during the audit

Test item Requirements for certification standards Test results Judgment Remarks 1.Dielectric strength When 184V(Peak or DC value)<rated power voltage 354V(Peak or DC value), 1500VAC for basic insulation, 3000VAC for reinforced insulation, and no breakdown in 60s; The equipment with other working voltage shall be in accordance with GB4943-2001Table 5H. No breakdown Eligible Between either power pole and the accessible part 2. Ground resistance 1 If current rating of the circuit to be tested is less than or equal to 16A, test current is 1.5 times current rating of the circuit to be tested; test voltage shouldn t exceed 12V; test time is 60s; and resistance 0.1Ω. 2If current rating of the circuit to be tested is more than 16A, test current is 2 times current rating of the circuit to be tested; test time 2min, or comply with the specification specified by DC equipment manufacturer; voltage drop of protective connection conductor shouldn t exceed 2.5V. 0.07Ω Eligible Between input ground and grounding point

CCC Factory Inspection Manufacturers often dispute the soak time required for 100% testing of products (Dielectric Strength and Ground Resistance) Auditors follow CNCA-01C 01C-020:2001020:2001 Implementation Rules for Compulsory Certification of Electrical and Electronic Products for Information Technology Equipment For other product categories, there are other Implementation rules, however the process is generally the same If discrepancies are found, manufacturer has 30 days to address non- compliances Factory will be assigned an ID if the audit is successful. The ID number can be placed under the CCC logo but not mandatory Once CQC has obtained test reports from the test laboratory and IFI auditor (w/no major non-compliances), then the CCC certificate can be issued for the product Last component is the approval of the CCC Mark and Labeling procedure

CCC Factory Inspection Typical discrepancies found during audits are: Daily functional check on the equipment used for the routine and verification tests is not being performed as required. A functional check is to be performed on a daily basis and record rd maintained. The manufacturer does not have the capability to perform the ground resistance check at 25A, 12V. This check is required as a routine production test as well as the check of consistency of the product. A documented procedure has not been established for conducting the t ground resistance test at 25A, 10V. This test is required as both routine and verification ion testing. The manufacturer has not established the documented procedure which ensure the appropriate keeping and using of the Certification Mark. A documented quality plan or equivalent documents relevant to certified (CCC marked) products has not been established.

CCC Factory Inspection Typical audit agenda: Day 1 8:00AM 8:30AM 10:00AM 11:00AM 1:00PM 2:00PM 3:00PM 4:00PM 5:00PM Arrive/Opening Meeting Responsibility and Authority and Documentation Control of the CCC mark Internal Audits Purchasing Changes to Certified Product Receiving Inspection Calibration Open issues and daily wrap up Depart Day 2 8:00AM Arrive/Review Outstanding Issues from Day 1 8:30AM Process Control and Inspection Routine and Verification Tests Packing Handling and Storage 1:00PM Consistency of Product Appendix 4 Testing Completion of Product Description Form 3:00PM 4:30PM 5:00PM Report Writing Closing Meeting Depart

CCC MARK & LABELING Manufacturer has the option to purchase A sticker from CNCA or they may submit a drawing to CNCA for approval in order to print their own n CCC label The manufacturer cannot apply for CCC Mark and labeling until the e CCC certificate for the product has been issued. The certificate number for the product is included in the application for printing the CCC Mark The CCC label artwork must be submitted along with the CCC application. The artwork needs to display the dimensions of the CCC Mark and location on the main product label The manufacturer has the option, in some cases, to print the CCC Mark on the outside packaging, manual, etc. however they must provide a design scheme The CCC Mark must be linear proportional to the size of the standard CCC Mark The background and color of the CCC Mark can be chosen reasonably according to the appearance of the product and/or nameplate Generally, it takes about 1 2 weeks to obtain the CCC Mark approval from CNCA

Summary Generally, the entire CCC Certification process of an ITE product t may take between 2 4 months (if the manufacturing location has not been CCC approved) In order to label and ship your product, these conditions need to be met: 1. All documentations, including applications, need to be submitted 2. Samples must be evaluated and found to be in compliance 3. Initial Factory inspection must be performed and approved 4. CQC must review and approved the test and IFI reports 5. CCC Mark authorization to label certificate Annual follow-up inspection will be required which is similar to IFI GOOD LUCK TO ALL OF YOU!

Questions & Answers