STAFF PAPER POWER PURCHASE COST /FUEL COST ADJUSTMENT MECHANISM

Similar documents
Analysis of state-wise RPO Regulation across India

True up of Capitalization of FY 2006 and FY 2007, RoCE, Depreciation for the MYT Control Period and True up of FY

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009

DELHI ELECTRICITY REGULATORY COMMISSION

Year A perspective

Detailed Vetting Report

TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?

PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR

Tamil Nadu Electricity Regulatory Commission

Web Edition: PROVISIONAL POPULATION TOTALS. Chapter 5. Census of India 2001 Series 1, India, Paper 1 of Chapter 5

Press Note on Poverty Estimates,

IDENTIFICATION OF DEALERS

Generation Cost Calculation for 660 MW Thermal Power Plants

Renewable Energy Certificate Mechanism

Works Contract - VAT and Service Tax Planning By CA S Ranga Swamy -ID: rangaswamy_singa@yahoo.co.in Cell Phone No.

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

Jammu & Kashmir State Electricity Regulatory Commission

GOVERNMENT OF INDIA PRESS INFORMATION BUREAU *****

Sub: States Fiscal Consolidation ( )

INDIA RENEWABLE ENERGY STATUS REPORT May 14. NOVONOUS

Tamil Nadu Electricity Regulatory Commission

Press Note on Poverty Estimates,

ESTIMATES OF MORTALITY INDICATORS

Internal Migration and Regional Disparities in India

DENSITY OF POPULATION. Figures Map Table/Statements Notes

BASEL DISCLOSURES DOCUMENT AS ON 31 st December 2014 TABLE DF-3 CAPITAL ADEQUACY

Strategy for Providing 24x7 Power Supply. Forum of Regulators

Karnataka Electricity Regulatory Commission. Discussion note on

Comments on Draft Deviation Settlement Mechanism and related matters Regulations, 2013

STATE WISE DATA As on

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

NEW CERC REGULATIONS TO ENCOURAGE INVESTMENT, EFFICIENCY IN POWER SECTOR

02 July VIPL Response to balancedata gaps 1 / Queries Set Case 36 of 2015 Data Gaps/Deficiencies on the Petition submitted by VIPL

State Data Centre. Round Table Conference 30 th July 2009

National Iodine Deficiency Disorders Control Programme

INDEX S. No. PARTICULARS Note:

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

CHAPTER-VI ECONOMIC GROWTH, POVERTY AND SOCIAL SERVICES EXPENDITURE. In this chapter, the impact of social services expenditure on economic

Name of Service Provider : Tata Teleservices Limited (Broadband Service) Customer Complaints Redressal Report for the Quarter ending - March 2015

Report On Development of Conceptual Framework For Renewable Energy Certificate Mechanism for India

IND AS 19 Impacts and Examples

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

S. No. Year Obligation expressed as percentage of energy consumption (%)

Wind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key Fver

ORISSA ELECTRICITY REGULATORY COMMISSION UNIT-VIII, BHUBANESWAR Suo motu proceeding of Case No.44 of 2011

Determination of cost of power generation for Dongamahua captive power plant of Jindal Steel & Power Ltd. from FY till FY

Report on Short-term Power Market in India:

CENTRAL ELECTRICITY REGULATORY COMMISSION

Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

Settlement Commission

Renewable Energy. and Renewal Energy Certificates in Indian Context

Report on Short-term Power Market in India:

Chapter V - Functioning of Income Tax Settlement Commission and Implementation of its orders by ITD

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR Petition No. RERC 456/14, 457/14, 458/14, 442/14, 444/14 & 447/14

MOST IMPORTANT TERMS AND CONDITIONS

The Gazette of India. EXTRAORDINARY PART I - Section 1 PUBLISHED BY AUTHORITY Ministry of Power RESOLUTION

May 30, International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Chapter 3 LITERACY AND EDUCATION

Press Release on Tariff Orders FY for PSPCL & PSTCL

Reliance Infrastructure Limited Q1 FY15 Results Conference Call July 18, 2014

Reforms in Vulnerable Power Distribution Sector in Odisha BOT Model

System. Applied Electro-Magnetics Pvt Ltd.

Existing Wind Power Policies and Incentives

Jharkhand State Electricity Regulatory Commission

Government of India Ministry of New and Renewable Energy MNRE

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

PRICE DISSEMINATION PROJECT

Sample Reports of Value Added Tax

FAQS FOR MEMBERS OF COMMODITY DERIVATIVES EXCHANGES

Chapter-5. Special Economic Zones (Sezs) and Export Oriented Units (Eous)

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill:

R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S.

IndIan Power Market. Journey so far and way forward. June Prepared by: Mercados energy Market IndIa pvt. ltd.

Role of Power Traders in enhancing market dynamics

NeGP Infrastructure Components (State Data Centre, SWAN, SSDG)

TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR

Staff Paper. April 2013

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi Tel : / Fax :

ROAD USER TAXES IN INDIA

MEDIA & ENTERTAINMENT. Indirect tax issues

Solar Power Plants FAQs

Maternal & Child Mortality and Total Fertility Rates. Sample Registration System (SRS) Office of Registrar General, India 7th July 2011

GLOBAL INDIRECT TAX. India. Country VAT/GST Essentials. kpmg.com VAT

REPORT ON DEVELOPMENT OF REC FRAMEWORK IN INDIA PRICING OF RENEWABLE ENERGY AND RENEWABLE ENERGY CERTIFICATES

Telecom Regulatory Authority of India. Engagement of Consultant for conducting a market survey of consumers of Cable and Television services

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.

ORIGIN.AL,, STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION ORDER OF THE COMMISSION

At a Glance. Constructed Over 3.0 million sq. ft. in Retail, Entertainment, Commercial, Parking & Residential Assets. Planned (next 3 years)

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

SOCIAL BACKGROUND OF OFFICERS IN THE INDIAN ADMINISTRATIVE SERVICE SANTOSH GOYAL

3.9 Interest on Working Capital (IOWC)

Transcription:

STAFF PAPER POWER PURCHASE COST /FUEL COST ADJUSTMENT MECHANISM 1. INTRODUCTION 1.1 The National Capital Territory of Delhi receives power from central generating stations, state generating stations through the long-term power purchase agreements and short term purchases. The Distribution Licensees procure power from various available sources and supply power to consumers at retail tariffs determined by the Commission. The power purchase cost accounts for about 80% of Annual Revenue Requirement of the distribution licensees and includes the cost paid for procurement of power, transmission charges, UI charges, SLDC/ RLDC charges and is netted off with revenue earned from sale of surplus power. 1.2 The cost of long term power being procured by the distribution licensees is being fixed by the Central Electricity Regulatory Commission (CERC) for plants supplying power to more than one state and by the Delhi Electricity Regulatory Commission (DERC) for plants located within the State of Delhi. The charges for unscheduled interchanges and Inter State transmission charges including RLDC charges are being fixed by the CERC. The charges for purchase / sale of intra state power and intra state transmission charges are fixed by the DERC. The short term purchase/ sale are through traders, bilateral contracts, banking, and power exchanges at market determined prices. 1.3 Thus, it can be seen that power purchase cost are uncontrollable in nature and are volatile making it difficult to accurately estimate power purchase costs at the time of annual tariff fixation. The power purchase cost is beyond the control of distribution licensees and dependent upon following factors: (a) Price of Fuel (Coal /Gas) which are highly unpredictable as has been seen from past few years. (b) Availability of Power from New Sources. (c) Weather conditions such as extreme harsh summers/ cold which have direct impact on the demand. (d) Demand Supply Gap of the power within the country. 2. LEGAL PROVISIONS 2.1 The provisions of various Acts, Regulations and Policy documents, which enable the Commission to devise, adopt and implement a power purchase/ fuel price adjustment mechanism are as follows:- (a) Delhi Electricity Reforms Act, 2000: Section 28 (8) 1

No tariff or part of any tariff required by sub-section (6) may be amended more frequently than once in any financial year except in respect of any changes expressly permitted under the terms of any fuel surcharge formula prescribed. (b) DERC 2001 Regulation (Conduct of Business Regulations, 2001) Clause 27 (15) In the event of variation in the fuel cost, the Board/utilities may make application to the Commission in terms of Section 28(8) of the Act for the amendment in the last tariff so as to adjust the same provisionally from the date of such application subject to final adjustment as per finalized accounts of the Board/Utility. (c) Indian Electricity Act, 2003 Section 62 (4) No tariff or part of any tariff may ordinarily be amended more frequently than once in any financial year, except in respect of any changes expressly permitted under the terms of any fuel surcharge formula as may be specified. (d) National Tariff Policy notified by Ministry of Power, Government of India Clause-5 (h-4): Multi Year Tariff Uncontrollable costs should be recovered speedily to ensure that future consumers are not burdened with past costs. Uncontrollable costs would include (but not limited to) fuel costs, costs on account of inflation, taxes and cess, variation in power purchase unit costs including on account of hydro-thermal mix in case of adverse natural events. Clause 8.2.1: Framework for revenue requirements and costs The following aspects would need to be considered in determining tariffs: (1).. Actual level of retail sales should be grossed up by normative level of T&D losses as indicated in MYT trajectory for allowing power purchase cost subject to justifiable power purchase mix variation (for example, more energy may be purchased from thermal generation in the event of poor rainfall) and fuel surcharge adjustment as per regulations of the SERC. 3. PETITIONS OF THE DISCOMS 3.1 In the Petition filed by DISCOMs in Dec. 2009, regarding True-up for FY 2008-09 and ARR for FY 2010-11, the DISCOMs had prayed for implementation of the Power Purchase Adjustment. The Public hearing regarding same was held in the Commission s office from 23 to 25 February 2010, wherein stakeholders put forth their comments/ suggestions before the Commission. 2

3.2 The DISCOMs have filed a Petition in June, 2010 (Additional Information submitted in October, 2010) again seeking implementation of Power Purchase Adjustment on a quarterly basis for timely true-up of variance between estimated and actual power purchase cost. The same has been admitted in the hearing on 08.10.10. 3.3 The DISCOMs have submitted that they are faced with an imminent cash-flow crunch due to unrecovered expenses primarily on account of uncontrollable increase in the power purchase cost. In the petition, they have prayed to allow a pass-through of the uncontrollable increase in the power purchase cost and sought the approval for the power purchase adjustment formula, with adjustments provided on quarterly basis. 3.4 Power purchase adjustment formulas proposed by the licenses: 3.4.1 Formula Suggested by NDPL PPPACn (Rs/Unit) = (PPPAn x10)/units Billed (MU) PPPACn =Power Purchase Price Adjustment Charge (Rs/Unit) to be levied in current quarter (nth quarter) for recovery of PPPAn to consumers in licensed area during the previous quarter, PPPAn = The total amount of Power Purchase Price Adjustment (Rs Cr) required in current quarter for the variation in actual vis a vis average net power purchase rate approved in the Tariff Order for the year. PPPAn = Cn + An (Rs. Cr) Cn = Change in cost of power purchase (Rs Cr) due to variation in the power purchase rate during the previous quarter vis-à-vis average net power purchase rate approved in the Tariff Order for the year. Cn = Qn-1 x (AAPP n-1 APPappd) / 10 Qn-1 = Quantum of Power received (MUs) at NDPL periphery for meeting requirements of NDPL licensed area (i.e. power purchased including Central / State allocation, bilateral, exchange, UI etc. and net off transmission losses & sale of power outside licensed area ) during the previous quarter. AAPP n-1 = Actual Average Power Purchase Rate (Rs. /unit) for the previous quarter 3

APPappd = Average Power Purchase Rate (Rs. /unit) approved in Tariff Order An = Adjustment factor for over-recovery / under-recovery i.e. difference between the amount actually recovered through PPPAC and amount recoverable. An = PPPA (Recovered)n PPPAn-1 PPPA (Recovered)n = PPPA recovered in current quarter for previous quarter 3.4.2 Formula Suggested by BYPL Power Surcharge Component (PSC), (Rs. /kwh) = Z - R, Z= Average Power Purchase Cost (Rs/kWh) incurred by the Distribution Licensee (excluding the UI Purchase and surplus power sales (UI/bilateral/otherwise) Note 1: Both short term as well as Long-term sources to be included. Note 2: The UI power is excluded from the computations as it takes more than 8 weeks for the distribution licensee to receive the final settlement. Hence, the distribution licensee will not be in a position to submit this set of information in the time stipulated in next section for submission of PSC. Further, the net quantum (over drawl v/s under drawl) may not aggregate to a substantial amount during the quarter to alter the PSC significantly. Note 3: The UI/ bilateral/other external sales by the distribution licensee has been excluded as there will not be any motivation for the distribution licensee to maximize the quantum and price of these surplus power sales, otherwise. Such exclusion will push the distribution licensee to manage and economize these sales to the best of consumer interest, as this may help the licensee in optimizing its own cash-flow position in the short-term. However, the ultimate benefit of these external sales and variations on account of UI over drawl/ under drawl will be passed on to the consumers at the time of truing-up of revenue gap. R = Average Power Purchase Rate (Rs. /kwh) approved in the Tariff Order for that year. Provided, the average power purchase cost and the subsequent variations shall be allowed to be computed at the distribution end (T-D Interface) and include the interstate and intra-state transmission charges and the SLDC and RLDC charges. Further, the PSC shall be allowed to be applicable only if the variation is positive i.e. the actual power purchase cost per unit is higher than the base cost estimated in the approved ARR. 4

The PSC may be capped at Rs. 0.50/kWh. Any positive variation above that may be ignored and be considered in the next quarter. 0 PSC 0.50 (in Rs./kWh) The PSC shall be allowed to be applicable on the entire sale of Distribution Licensee at the consumer end, without exemption to any consumer. and, Z = (C 1 + C 2 +. +C N-1 + C N-2 +TC+SC)*10 P 1 +P 2 + +P N-1 +P N, C N = Cost of Power Procured (Rs Crore) from Source (N) as billed to the Distribution licensee (excluding, any Procurement through Unscheduled interchange (UI) and any external sales (UI/Bilateral/otherwise)) TC = Inter-State and Intra-state Transmission Charges (Rs Crore) SC = SLDC and RLDC charges (Rs Crore) P N = Power Input (MU) to the Distribution System (T-D Interface) from source(n). or, P 1 = G 1 *(1-T 1 ) P N = G N *(1-T N ), G N = Power dispatched at Generator End (MU) from the source (N) T N = Actual Inter-state and Intra-state transmission losses (%age) as applicable for the source (N) 3.4.3 Formula suggested by BRPL PPPA = C + A The PPPA may be capped at 15% of the Average Billing Rate (ABR) approved for the year in the Tariff Order. Any variation both positive/negative, if not absorbed within the cap of 15% may be passed onto the subsequent quarter(s). 5

PPPA = Total Power Purchase Price Adjustment (Rs.Crore) C= Change in power purchase cost (including Transmission and SLDC charges) due to variation in power purchase rate during the previous quarter vis-à-vis rate approved in Tariff Order for the year [C=[Q*(Actual PPCost PPCost approved)]/10 A = Adjustment Factor for over-recovery / under recovery i.e. difference between the amount actually recovered through PPAC and amount recoverable (subject to the cap as mentioned above). Q = the Actual Energy Input (MU during the previous quarter) available at BRPL s Periphery PP Cost is the average Power Purchase rate in Rs./ unit The calculation of PPPA to be charged for the quarter will be PPPAj-2 = Cj-2+Aj-2 j and j-1 shows the current Quarter and the previous quarter respectively and j-2 shows that the PPPA would be applicable from the quarter after the quarter in which the additional costs are calculated. Thus, increase in costs during Qj-2 will be calculated by the mid of Qj-1 and would be included in the PPPA applicable for the quarter, Qj. Cj-2 = Qj-2 * (PPCj-2 PPC approved) The adjustment for over-recovery / under-recovery A, should be calculated as: Aj-2 = [(Bj-4 Rj-2)] Bj-4 = Incremental cost in Qj-4 Rj-2 = Incremental cost in Qj-4 actually recovered in Qj-2 Calculation of PPPA per unit The total PPPA recoverable, as per the allowed expenses discussed earlier should be recovered from all the metered consumers on the basis of the actual consumption in that period, on the basis of Rs./unit. PPPA/kWh = (Total PPPA in Rs. Crore)*10/ (Energy Sales), PPPA / kwh = PPPA (Rs./kWh) 6

Energy Sales = Actual energy sold in MU The PPPA shall be allowed to be applicable on the entire sale of Distribution Licensee at the consumer end, without exemption to any consumer. 4. PREVALENT PRACTICE IN OTHER STATES The Power Purchase/ Fuel Price Cost adjustment mechanism is already in place in many states. The mechanism and frequency of adjustment in some of the States is given in the following Table: 5. ISSUES: State Power Purchase Cost Adjustment Fuel Price Adjustment Frequency Adjustment Kerala Yes Yes Quarterly Bihar Yes Yes Half Yearly Chhattisgarh No Variable Cost Adjustment Time to Time Gujarat Yes Yes Quarterly Haryana Yes Yes Quarterly Jharkhand Yes Yes Quarterly Andhra Pradesh No Yes Quarterly Punjab No Yes Quarterly Madhya Pradesh Yes Yes Half Yearly Tripura Yes Yes Time to Time West Bengal Yes Yes Yearly Assam Yes Yes Quarterly Maharashtra Yes Yes Quarterly Orissa Yes Yes Quarterly Uttar Pradesh Yes Yes Quarterly of 5.1 Any fluctuation in the cost of fuel is a pass through for the generator through a fuel surcharge adjustment formula and is payable by the distribution licensees in the subsequent bills. 5.2 The power purchase cost being uncontrollable is pass-through to the consumers but the difference in actual cost of procurement of power and the estimated cost of purchase of power gets trued up only after 2 years. The time lag of two years puts additional burden on consumers by way of carrying cost. 5.3 In view of the above deliberations, the relevant issues, which emerge for consideration, are, (i) Whether the adjustment mechanism may cover adjustment on account of fuel cost for power procured on long term contract basis or it may cover adjustment on 7

account of power purchase cost for power procured under long term contract and on short-term basis? (ii) What should be periodicity of such adjustment? 8