ProGuide Series SAMPLE PAGES USAR OPERATIONS. Dr DF Merchant & Darryl Ashford-Smith

Similar documents
FORM DESIGN. easy to work with, and generally available.

Residential Deck Safety, Construction, and Repair

Speed-Mat Rectangle Cutter

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Basement & Foundation Damage

Constructing Systems. A program based on the RESET General Rescue curriculum

Mark Cramer Inspection Services, Inc.

Ceiling Mounted Folding Attic Ladders Installation Instructions

Structural Failures Cost Lives and Time

Lighthouse Engineering, L.L.C.

Chapter 3 Pre-Installation, Foundations and Piers

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

How to build a Pizza Oven in 4 days

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Elevating Your House. Introduction CHAPTER 5

POST AND FRAME STRUCTURES (Pole Barns)

RZ Guardrail System Installation Manual

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

EAST LYME HIGH SCHOOL

GLOSSARY OF TERMINOLOGY

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Gear PEPSI CAN STOVE INSTRUCTIONS

Installation Instructions

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

USAR Marking System. Structure/Hazards Marking System

Building Construction. Lightweight construction. Conventional Construction

MHI. Overview of Manufactured Home Installation MANUFACTURED HOUSING INSTITUTE. This guide contains an overview. of the HUD-Code manufactured home

EMPLOYEE FALL PROTECTION

SITE SPECIFIC FALL PROTECTION PLAN

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

TRAINING AND EQUIPMENT MANUAL 307 SALVAGE EQUIPMENT EFFECTIVE: OCTOBER 2007

COMMONLY USED RESIDENTIAL BUILDING CODES

6 RETROFITTING POST & PIER HOUSES

1. Concrete: T W L / 27 = Concrete C.Y. Multiply Feet Thickness x Feet Width x Feet Length / 27 = Cubic Yards.

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin

MANUFACTURED HOUSING USED AS DWELLINGS

Chapter. Earthquake Damage: Types, Process, Categories

SUPER SHED. Indoor shelter for your outdoor tools.

King Post Wall Information

I BEAM TRACK INSTALLATION

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

CH. 2 LOADS ON BUILDINGS

Chapter. Restoration of Damaged Structures

How To Repair A House

HS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

MATHEMATICS FOR ENGINEERING BASIC ALGEBRA

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual

Guidelines for Earthquake Bracing of Residential Water Heaters

CHAPTER 29 VOLUMES AND SURFACE AREAS OF COMMON SOLIDS

March 14, Installation of Bay, Bow and Garden Windows

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

How to secure your property after a disaster

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

PANELIZED HOME INSTALLATION GUIDELINE

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Guidelines for storage and handling BlueScope Steel's products

Grand Mesa Plus LAMINATE - WIRE BRUSHED. GAGVGM81012A Prairie. GAGVGM80012NA Colorado. GAGVGM84012A Pecan Rustic. GAGVGM85012A Saddle Walnut

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

VOLUME AND SURFACE AREAS OF SOLIDS

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

STANDARD OPEN PATIO COVER

Best Barns USA Assembly Book

Cooktop Low-Profile Ventilation Hoods

FCA CARPENTRY & JOINERY THEORY. 10 SIMPLE ROOF CONSTRUCTION Part 2

Guidelines for Earthquake Bracing Residential Water Heaters

3D Drawing. Single Point Perspective with Diminishing Spaces

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.

Formwork for Concrete

Timber Decks. Technical Note. March 2007

Removable Aluminium posts

HUS-A 6 / HUS-H 6 / HUS-I 6 / HUS-P 6 Screw anchor in precast prestressed hollow core slabs

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Owner s Manual Gantry Cranes

Wall-Mounting your HP computer. User Guide

Section A Roof Truss

Shingle Installation Guide

Chapter 6 ROOF-CEILING SYSTEMS

Stilling Well Recommendations

WM002 LCD Display Wall Mounting Kit Installation Guide. Welcome

Installation Instructions

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

Portable Digitilt Tiltmeter

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels

ECM-D70T / ECM-D70T1.5

LAYING BLOCK AND BRICK

Vehicle Restraint Installation Manual

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Transcription:

X ProGuide Series SAMPLE PAGES USAR OPERATIONS Dr DF Merchant & Darryl Ashford-Smith

URBAN SEARCH AND RESCUE OPERATIONS 2008 Dr DF Merchant & Darryl Ashford-Smith all rights reserved. Selected material Fotolia/ Paratech used under licence. First edition, published in the UK 2008 by UVSAR ISBN 978-0-9560784-0-7 This book contains condensed technical information intended for use by trained rescue team members as part of urban search and rescue operations. Techniques detailed herein are unsuitable for construction or workplace uses. The authors and/or publishers make no representations or warranties as to the accuracy and completeness of the material herein nor shall they be held liable for any loss or damages caused by their application. Specifications valid at time of press only. This book does not constitute a training program if used in isolation. No part of this publication may be reproduced, transformed, broadcast or transmitted in any physical or electronic format without prior written permission of the authors and publisher except insofar as is permitted by UK law. Trademark names used herein are the property of their owner(s) and are used to their benefit in an editorial context only. For more information on this and other titles, visit www.uvsar.com/books ProGuides are printed on waterproof polymer paper that can be repeatedly washed. You can write permanently on any page using ballpoint or marker pens. Chinagraphs can be erased. 100% WATERPROOF PAPER X ProGuide Series

6 Incident Management SCENE OPERATIONAL CONSIDERATIONS Follow REPEAT Establish location for USAR Advisor/Control Establish hot/warm/cold zones Clear restricted area of public and non-necessary crews Establish booking (All crews must book in/out of restricted area) Establish communications with Control Request utilities personnel/other agencies as required Request structural/demolition engineer as required Identify RVP, holding, logistics, rest, casualty handling, decontamination and roll call areas Obtain information on structure from building owners, witnesses or on-site personnel Detail & brief logistics, mapping, safety & cordon personnel Detail and brief structure assessment team Establish internal site communications Establish and mark access/egress routes Perform surface or structure search Ensure documentation signed off and available (structure assessment; lifting and moving/shoring plans; confined space permit to work / risk assessment / safe system of work) Ensure site ID sheets are available X ProGuide Series PREVIEW COPY : NOT FOR DISTRIBUTION

VICTIM MARKING (ON STRUCTURE) Potential victim counts VL = 1 D = 1 VL = 1 D = 1 VD = 1 L = # of live victims D = # of dead Confirmed victim location Arrow points to victim(s) L = # of live victims D = # of dead Only dead victims at location Arrow points to victim(s) D = # of dead LIVE extrication complete VL = 2 L = # of live victims removed circle denotes work completed DEAD extrication complete VD = 3 D = # of dead victims removed circle denotes work completed 9 Victim Marking

Material Slab mass per square metre (kg) Domestic wood floor (boards + joists + carpet) 30 Plywood, 3/4" thickness 10 Roofing slates 50 Roofing, fibre-cement sheet 15 Roofing, steel sheet 5 Wall, ACB 100mm block, single ply 75 Wall, brick, single ply 150 Water, standing, 1 inch depth 25 Domestic building contents/furniture (typical) 50 Mass of cuboid M = D x L x W x H (D = density from previous page) L W H Mass of sphere M 0.5 x D x Ø x Ø x Ø (Ø = diameter) Ø Mass of cone M 0.25 x D x Ø x Ø x H H e.g. Conical pile of wet sand, 2m high and 4m diameter: Mass = 0.25 x 1900 x 4 x 4 x 2 = 15200kg (15.2 tonnes) Ø 17 Properties of Materials

TENSIONLESS (POST) HITCH LOAD Strength up to 100% of rope. Use at least 8 turns and make sure the anchor object is strong enough and cannot rotate. Insert padding if the object has sharp edges. Can be formed in wire rope provided object is large and round, e.g. a tree. Any method can secure the loose end - it can be tied back to the main line as shown or to a second anchor, but should not be used to carry a load. J Connect the loose end to a second anchor point if the direction of the main line tension is planned to change 23 Knots

TRAVEL towards me (hands face up) TRAVEL away from me (hands face down) SLEW this way TRAVEL this way ENTEND TELESCOPIC JIB (hand faces up) RETRACT TELESCOPIC JIB (hand faces down) DERRICK JIB UP DERRICK JIB DOWN Signals can be given with either arm if necessary. 27 Crane hand signals

COMPOUND PULLEY SYSTEMS J 0 Uses a set-reset action - slower on long lifts Larger minimum length when fully collapsed Requires rope clamps - cannot work on wire Uses less rope than B&T systems Load is free to rotate Z-RIG - 3:1 ADVANTAGE W-RIG - 5:1 ADVANTAGE 29 Pulley systems

42 Shoring : timber Raker shore gussets (3 nails) R13 = top of raker post W13 = wall/sole plate junction RB13 = bottom of raker post R13 Note that in pattern RB13 the gusset plate is shifted, compared to R13, to allow clearance for the wedge blocks. Gussets should be inset by ~10mm from wall and floor to avoid taking any direct side load. W13 RB13 X ProGuide Series PREVIEW COPY : NOT FOR DISTRIBUTION

68 Timber shore patterns LACED-POST COLUMN SHORE Rigid slab = 4 deep header. Flexible slab = 8 deep header. All lateral and diagonal laces in 2 x4 LG8 half gussets can be used with no major loss of strength Header & sole extend beyond posts by 12 X ProGuide Series PREVIEW COPY : NOT FOR DISTRIBUTION

Per 4-post shore (as above with LG13s) = 264 nails VERTICAL STRENGTH PER POST = 2500KG Used for vertical bracing of heavy ceilings, as a replacement for T spot shores, and to form a safe haven for rescuers. 0 Max post height (full strength) = 4 x width Absolute max post height = 5m Spacing between posts = 1m to 1.2m Max floor slope = 3 (150mm over 3m) Fit two mid-braces if height > 3.5m Variations: LG8 half gussets and a tall three-tier column, also with LG8s. 69 4-post laced column

88 Hollow precast slabs CUTTING HOLLOW PPC SLABS Breaching hollow precast prestressed concrete (PPC) slabs requires extreme care, as they are prone to shatter. As they are supported at each end, once cracked the integrity of the entire floor can be lost, leading to a total collapse. PPC is used for floors and walls, normally 1.2m wide and up to 9m long. Typical depths are between 150mm and 300mm. 6 0 2 0 Dirty breaching and use of impact tools (even hammers) must be avoided at all costs Check for services, electrical cables etc. routed through the core ducts Clean breach using disc cutters so that only a small part of each slab width is removed Any hole larger than 10 must be assessed by a qualified structural engineer X ProGuide Series PREVIEW COPY : NOT FOR DISTRIBUTION

HOT CUTTING: FRONT WEB HINGE CUT Allows a vertical standing I-beam to fold down endways 1: Cut fully across end web on opposite side to direction of intended fall 2: Cut inner web at a 45 downwards angle 3: Cut centre 70% of end web, leaving two safety tags to act as hinges 4: Allow beam to fold down in a controlled manner, with L&M support. Gentle heating of the tags may be necessary. 95 Hot cutting operations

Name: (FE)MALE Age: Casualty ID: Location: History & notes: Mark locations with:- A = abrasion B = burn C = contusion D = disclocation F = fracture H = haemorrhage P = pain R = rigidity S = swelling Body temp: Pupils: Equal React light Round React accom 103 Patient assessment