#27541 Mobile Laptop Charging Station

Similar documents
OWNER S MANUAL Table Tennis Table Patent Pending

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

OAK WORKBENCH WITH 2 DRAWERS

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

INSTRUCTION BOOK FOR. Single Monitor Video Conference Cart

Installation Instructions HighRock 4x4 TM

Pulleys and Belt. Install the Major Accessory and Pulley. Install the Motor Pulley NOTE. Align the Motor Pulley and the Tool Pulley NOTE

INSTRUCTION BOOK FOR. Dual Monitor Video Conferencing Cart

CK548000TX. Amherst Cocktail Table Trunk. Assembly Instructions PO#: Page 1

AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech

HermanMiller Aeron Posturefit Installation AE905A AE905B AE905C

Expanding a 40-Type Cabinet

Anthro Tablet Charging Cabinets

Assembly and Usage Instructions

ATS Overhead Table Shelf System INSTRUCTION MANUAL

INSTALLATION GUIDE. APPLICATION LENGTH MODEL YR PART # Bestop PART #

Retractable Screen. Replacement Screen Instructions

GreenWay Solar LED Path and Trail Lighting System. Installation and Owner s Manual

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

All-Season Sunroom Sliding Glass Door Installation Instructions

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

Assembly Instructions Model 1544 Heart-Of-The-Kitchen Island

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL.

Beadboard Wall Bookcase

INSTALLATION INSTRUCTIONS

Premier & Deluxe 3-Season Room Sliding Glass Door

Circo Kids. >> assembly instructions F. 3 Drawer Dresser. DPCI # (White) DPCI # (Chocolate)

TracRac G2. Overhead Rack Installation Instructions. TracRac Inc. 994 Jefferson St. FallRiver MA IN-42000_B

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

MODEL# SLA001-3 "SLIDE & LOCK" A-FRAME POOL LADDER

Whalen Furniture Mfg. Inc. Factory No Page # 1

Unpacking, Installation, and Customization

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Contractors Guide Central Inverter System Installation

TS93 EMR T/PT/TDE. Surface applied door closer

Application Instructions

4-in-1 SWIVEL TABLE. 54in (1.37m) CONTACT INFO Hours. Technical Support Monday to Friday (9:00am to 5pm EST) WARNING:

Chelsea Loft Bed WARNING:

Rollator Cane and Brake Replacement SAFETY SUMMARY (CONTINUED)

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

TABLE OF CONTENTS CABINET SAFETY

PARTS & SERVICE MANUAL for CONTEMPO SERIES WARMER LAMPS

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

Micro Cart User's Guide

INSTALLATION INSTRUCTIONS FOR MODEL 1560 AND 1570 ELECTRIC TRIM CONTROL FOR USE WITH CORBIN 955 AND YALE 626F HEAVY DUTY TRIM

INSTRUCTIONS: LocknCharge Laptop Carts

OPERATORS MANUAL MG22 MEAT GRINDER MG22/0209 ED

PRODUCT: 3/8 RIVET NUT INSTALL INSTRUCTIONS READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 8:00 AM 5:00 PM PST

Wanda Technology Inc. Side Post Aluminum Umbrella OWNER S MANUAL

42U/45U 28" Wide Rack Installation & Service Guide

1.8 CRANKSHAFT OIL SEALS

SIMPLEX UNICAN LOCKS CHANGING THE CODE / COMBINATION 900 Series 1000 Series L1000 Series LP1000 Series EE1000 Series 2000 Series 2015 Series

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

Post Mount Light Installation*

INSTALLATION INSTRUCTIONS

Assembly Instructions & User s Manual Triton Classic Gas & Charcoal Grill Model #: FSOGBG3005

LED MOTION ACTIVATED FLOOD LIGHT

In-Ground Basketball System Owners Manual

SKILL ATTACK PITCHING MACHINE PATENTS APPLIED FOR INSTRUCTION MANUAL. Includes: OPERATION SETUP USE & CARE SERVICE

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual.

ECM-D70T / ECM-D70T1.5

MIRAGE. Set-Up Instructions.

CETAC Z-Drive Assembly

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

VW GOLF Mk4 TDI FRONT MOUNTING INTERCOOLER INSTALLATION INSTRUCTIONS

RAIN COLLECTOR S HELF MANUAL

12-Volt Negative Ground Installation Instructions

Installation Instructions

Please Do Not Return This Product to the Store!

Deluxe Welding Tool Chest

EXPLORE 4-Leg Teaming Table with Screen Share Assembly Instructions

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

Please Do Not Return This Product To The Store!

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

MODEL G300 BRAKE BLEEDER

Make yourself comfortable with Staples brand furniture.

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

OWNER'S MANUAL SIGNAL COMMANDER

10 ft x 20 ft / 3 m x 6 m STEEL FRAME CAR CANOPY

ELECTRIC KNIFE SHARPENER

How To Make A Thomas Bunk Bed

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A

RadianceRail Installation Guide

Mounting Tripod Kit Installation Manual

FPU SYSTEMS OPERATION MANUAL BOH OFFICE MODULE (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack/up Units CHAPTER 5

Beautifully Traditional

MTV-FS1 / FS1T / FSB375

MALONER. Installation & Loading Instructions - Please Read Before Beginning. Step 1: Installing Carriers to Cross Bars

2013 MESA SAFE COMPANY

ALUMINUM UNIVERSAL VAN / CAP RACK INSTRUCTIONS ROOF MOUNT APPLICATION P/N ULRHDGV-1 / ULRHDGC-1

Digital Fingerprint safe

Retail Reception kiosk

INSTALLATION INSTRUCTIONS

2014+ Mazda 3/6 Shift Knob Installation Instructions

UPLIFT Height Adjustable Standing Desk (T-Frame) DIRECTIONS FOR ASSEMBLY AND USE - - ALSO - - Watch our assembly video

COMPACT ELITE MAT CUTTER

CELLAR nuvo ASSEMBLY & OPERATION MANUAL

Transcription:

1 #27541 Mobile Laptop Charging Station Assembly Instructions

#27541 Mobile Laptop Charging Station Part Drawing Description Qty Part Drawing Description Qty Hardware List P-1 Left Leg Welded 1 EA A Phil Screw M6X15mm 20 EA CS Phil Screw M6X50mm 18 EA P-2 Right Leg Welded 1 EA A2 Wood Screw M7x50mm 7 EA A3 CS Wd Screw M3x12mm 12 EA P-3 Slotted End Panel 2 EA P-4 Middle Panel 1 EA A4 Phil Pan Screw M4x12mm 4 EA (Door Knobs) Pan Wd Screw M4x18mm 10 EA A6 Socket Screw M6x65mm 4 EA P-5 Top Panel 1 EA B Threaded Post M6x16 4 EA P-6 Bottom Panel 1 EA C1 Cam Lock 2 EA C2 Cam Post 2 EA P-7 Back Panel 1 EA D 5 Locking Caster 2 EA P-8 Shelf 9 EA E 5 Inline Caster 2 EA P-9 Left Door 1 EA F Door Handle 2 EA P-10 Right Door 1 EA G Wood Dowel 1 EA P-11 Caster Base 1 EA 2

Part Drawing Description Qty Part Drawing Description Qty P-12 Electrical Mount Cap 4 EA Hardware List J Lock Catch 1 EA P-13 Cord Wrap 2 EA K1 Lock Cylinder 2 EA K2 Lock Washer 2 EA (2) #58188-12 Outlet Electrical Strips K3 Lock Hex 2 EA K4 Lock Retainer 2 EA These parts are not used. K5 ¼ Phil Head Lock Screw 2 EA L Key 4 EA M1 Grommet Sleeve 4 EA WARNING In order to charge all 20 laptops simultaneously, two separate 110-120 volt, 15-20 amp circuits are required. M2 Grommet Cap 4 EA N Allen Wrench 1 EA Missing Parts or UPS Damaged Parts For Your Convenience you can EMAIL us at support@moorecoinc.com 24HOURS 7 DAYS A WEEK Do not use unless all screws are tight. At least every six months, check all screws to be sure they are tight. If parts are missing, broken, damaged, or worn, stop use of the product until repairs are made by your dealer using factory authorized parts. 3

To Assemble: #27541 Mobile Laptop Charging Station Assembly Diagram 1. Identify and Separate all the Parts and Hardware. Illustration # 1 2. Install 2 each Cam Posts (C2) in the 2 threaded insert nuts in the Top Panel (P5) as shown in illustration #1. P-5 G C2 3. Install 1 Wood Dowel (G) in the hole in the middle of the Top Panel (P5) 4. Install 2 Cam Locks (C1) into the 2 large holes in the Middle Panel (P4) as shown in illustration #2 Illustration # 2 C1 Be sure that arrow on top of Camlock (C1) aligns with centerline of Edge Drilled hole. Phillips Screwdriver Arrow P-4 Important Centerline of Edge Drilled hole. The Balt product you have purchased is guaranteed against material and workmanship defects. This guarantee extends 1 year from date of purchase. Should this product fail to function satisfactorily under normal use due to defect or imperfection, the defective part or product will be replaced. Damage caused by common carriers during shipment is not included in this guarantee. This guarantee sets forth all applicable guarantees and remedies. No other warranty, expressed or implied shall apply. Failure to follow instructions found in Important Information Section of Owner Sheet shall void the guarantee. Consequential or incidental damages and or costs are not refundable. 4

5. Attach Middle Panel (P4) to the Top Panel (P5) as shown in illustration #3. Secure by turning the Cam Locks (C1) 1/4 Turn until they lock. G C2 Illustration # 3 P5 6. Attach Bottom Panel (P6) to the Middle Panel (P-4) using 2 Wood Screws (A2). P4 P6 C1 A2 7. Place a Slotted End Panel (P3), large space at top, in the recess inside the Right Leg Welded (P2).. Attach Right Leg Welded (P2) to the Top and Bottom Panels (P5 & P6) using 6 CS Phil Screws () as shown in illustration #4. Just start the CS Phil Screws () at this point and do not tighten. P2 To Secure Cam Locks, Insert Large Phillips Head Screwdriver and turn Cam Lock 1/4 turn (90 degrees) clockwise. P5 8. Press 2 Grommet Sleeves (M1) in round openings in the Bottom Panel (P6) as shown in illustration #4. 9. Snap Grommet Cap (M2) over top of Grommet Sleeves (M1). P3 M2 5 P6 M1 Illustration # 4

10. Slide 9 Shelves (P8) over Middle Panel (P4) and into slots in Slotted End Panel (P3) as shown in illustration #5. P8 P5 P8 Illustration # 5 P6 Should you require assistance during assembly, please call our Customer Service Department Monday - Friday 8 a.m. - 5 p.m. Central Standard Time Toll-Free Customer Service 1-800-749-2258 P4 P3 P3 P1 P5 P8 11. Place Slotted End Panel (P3) over the end of 9 Shelves (P8) as shown in illustration #6. 12. Attach Left Leg Welded (P1) to the Top and bottom Panels (P5 & P6) using 6 CS Phil Screws (). Illustration # 6 P6 P2 6

13. Place the Left Door (P9) with the Predrilled (for Hinges) holes facing up and Insert 1 each Lock Cylinder (K1) through the hole in the Left Door (P9) as shown in illustration # 7. Secure Lock Cylinder (K1) using the Lock Washer (K2) and the Lock Hex (K3). (FINGER TIGHTEN ONLY.) 14. Slide Lock Retainer (K4) over the square end of Lock Cylinder (K1). Secure using the ¼ Phil Head Lock Screw (K5). Illustration # 7 K5 P9 K4 A4 K3 K2 F 15. Attach 1 Door Handle (F) to the Left Door (P9) using 2 Wood Screws (A4). K1 16. Place the Right Door (P10) with the Predrilled holes facing up and Insert 1 each Lock Cylinder (K1) through the hole in the Right Door (P10). Secure Lock Cylinder (K1) using the Lock Washer (K2) and the Lock Hex (K3). (FINGER TIGHTEN ONLY.) P10 17. Slide Lock Retainer (K4) over the square end of Lock Cylinder (K1). Secure using the ¼ Phil Head Lock Screw (K5). K3 K5 K4 A4 K2 K1 18. Attach 1 Door Handle (F) to the Right Door (P10) using 2 Wood Screws (A4). F Illustration # 8 7

19. Press Grommet Sleeves (M1) in round openings in the Back Panel (P7) as shown in illustration #9. P7 Illustration # 9 A M1 P13 20. Attach 2 Cord Wraps (P13) to the Back Panel (P7) using 4 screws (A) and 4 Threaded Posts (B) as shown in illustration #9. B A2 A2 P7 21. Attach Back Panel (P7) to the Left Leg Welded (P1), and the Right Leg Welded (P2) using 6 screws () as shown in illustration #10. P1 22. Secure Back Panel (P7) to the Middle Panel (P4) and the Bottom Panel (P6) using 4 Screws (A2). P4 P2 A2 P5 Illustration # 10 8

P2 P11 A6 D Illustration # 11 A 23. Attach Caster Base (P11) to the Welded Legs (P1 & P2) using 4 each screws (A6) as shown in illustration #11. Tighten these 4 Screws using Allen Wrench (R). D 24. Attach 2 locking Casters (D) and 2 Inline Casters (E) to metal base (P-1)using 16 screws (A). Tighten Screws Allen Wrench (N) as shown in illustration #11. A P1 A6 25. Attach 1 Electrical-12 Outlet (#58188) to the Slotted Panel (P-3) on the Left Side using 4 each screws () through an Electrical Mount Cap (P12) on each end as shown in illustration #12. P12 58188 P3 P12 Illustration # 12 9

P3 P12 26. Attach 1 Electrical-12 Outlet (#58188) to the Slotted Panel (P-3) on the Right Side using 4 each screws () through an Electrical Mount Cap (P12) on each end as shown in illustration #13. 58188 P12 27. Route both electric cords acrooss the top shelf and through the 2 Grommet Sleeves (M1) in the Back Panel (P7) and out the back of the unit as shown in illustration #14. Illustration # 13 28. Snap Grommet Cap (M2) over top of Grommet Sleeve (M1). P2 M1 WARNING In order to charge all 20 laptops simultaneously, two separate 110-120 volt, 15-20 amp circuits are required. P7 M1 M2 Illustration # 14 10

29. Attach Left Door (P9) to Left Leg welded (P1) using 6 screw (A3) as shown in illustration #15 and Detail #16A. P9 P1 Illustration # 15 30. Attach Lock Catch (J) to Middle Panel (P4) using 2 screw (). See Detail #15A. Detail # 15A 31. 32. Attach Right Door (P10) to Right Leg Welded (P2) using 6 screw (A3) as shown in illustration #16 &16A. Before tightening the Lock Hex (K3) on either door, insert the Key (L) and turn lock. Be sure that Lock Retainer (K4) turns 90 degrees and rotates behind Door Stop (J). TIGHTEN LOCK HEX (K3). SEE ILLUSTRATION # 7. J P2 P10 Detail # 16A A3 27541_03-07-13 11