APPENDIX 1 Detailed Breakdown for Repairs and Plant Replacement

Similar documents
Control of legionella bacteria in water systems

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

Hot water supply, distribution and use

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

HomeServices Terms and Conditions

CONTROL OF LEGIONELLA AUDIT PROFORMA

Session 2: Hot Water Supply

Select Radiators Installation Guide

Domestic Chemical Water Treatment Manufacturers Association

B-1 Buildings & Service Maintenance

Managing the Risk of Legionnaires Disease in Vehicle Wash Systems

Steam System Best Practices Condensate System Piping

ITE. Indirect calorifier ITE - 400/500/600/750/1000. Installation, User and Service Manual. Innovation has a name.

Factory owners must ensure the boiler is:

UNDERSTANDING HOT WATER SYSTEMS IN THE HOME

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2014/07) en

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

Maxi Pressurisation Units (Maxi, Maxi Plus & HP)

Legionnaires disease. Part 2: The control of legionella bacteria in hot and cold water systems

Boiler & Pressure Vessel Inspection discrepancies and failures

Tankless Water Heater

Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters

Quik Lining Systems Heater Owners Guide

FILLING AND PURGING THE SYSTEM

Mechanical Engineering Technician- Plant Technician

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

The Worcester Greenstar System Filter. An innovative solution for reducing system contaminants

Advanced_O&M_Task_List_Example_Tool_06_02_16: O&M Example

OTF Oil Fired Pool Heater

Energy Saving Fact Sheet Boilers

Vaillant s plain English guide to. simple, concise and precise

Operating instructions

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

NFPA 25 FAQs. 1. When inspecting an old system (60 years or older), when/where does NFPA 25 require a system to be upgraded to present standards?

Link-Up. Solid Fuel Association Guide to Central Heating.

How To Clean Up A Reactor Water Cleanup

LONDON BOROUGH OF CAMDEN HIGHGATE NEWTOWN: PIPEWORK CONDITION REVIEW. Revision 002

ENERGY RETROFIT PROGRAM

CHEMICAL CLEANING UNIT Product number:

Arrangements for the Maintenance and Testing of Laboratory Autoclaves

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

PELLEXIA COMFORT ENVIRONMENT COMPATIBLE

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

Housing Solutions Limited. Terms and Conditions. Fixmy Boiler Service

A Guide to Trouble-Free Cooling Towers

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

PRIVATE WATER SUPPLY - WATER SAFETY MAINTENANCE PLAN

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

Draining and filling cooling system

VACUUM REFRIGERATION SYSTEMS

Fundamentals of Hydronic Design

GAS HEATING IN COMMERCIAL PREMISES

ecomax Instructions for use Wall hung room sealed fan assisted condensing boilers For the user

Operating instructions

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

C. starting positive displacement pumps with the discharge valve closed.

Our knowledge and database of all projects and buildings we have worked on enable us to optimise productivity, service and efficiency for all our

ions T ondi Terms & C

Energy Efficiency HOSPITALITY.

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

ASTACEA4 Inspect complex/central air conditioning systems

Electric Flow Boiler

Standard Hydraulic Piping Flushing Procedure

COMMISSIONING OF HVAC SYSTEMS

Blowdown vessels Meeting the requirements of HSE PM60

UNDERSTANDING CENTRAL HEATING SYSTEMS

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

service breakdown emergency 3in1 Plan What the SGS Service Plan provides What happens if you have a breakdown Cover provided by the Plan Dear

Element D Services Plumbing

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport.

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales

Refrigeration & Air-conditioning Technician

Stove-boiler for solid fuels KW Directions for use and assembling

Emergency Showers and Eyewashes Mike Adkins Wednesday, October 31, 10:00-11:1511:15 a.m.

Elson Coral E. Open Vented Thermal Store providing mains pressure hot water heated by electricity. Installation, Servicing and User's Instructions

CODE NOTES. Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping

SunMaxx Solar Filling Station Operating Instructions

MECHANICAL, ELECTRICAL, PLUMBING ASSESSMENT

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp.

Terms and Conditions Page 2 of 20

For installation guide see reverse of book

PBX Series Quick Fit Connector Bimetallic Steam Traps

Operation & Maintenance Manual

INTEC Engineering GmbH Heating Solutions for the Marine Industry

ECOCIAT. Domestic hot water heat recovery unit

CIBSE Guide M: Maintenance engineering and management Statutory compliance legislation and guidance

Stenner Pump Chlorinator Installation & Start Up Guide

Installation and maintenance instructions. Danfoss Vent

GUERNSEY OIL INSTALLATION GUIDELINES

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

Thermostatic bar showers. Troubleshooting and maintenance

Installation, Maintenance, & Repair Series 4000B/LF4000B

BERMAD Fire Protection

What you can expect from your Solar Hot Water System

Experience Our Innovation

Transcription:

APPENDIX 1 Detailed Breakdown for Repairs and Plant Replacement 2.3 Filter Media Change at and Sand Filters Refurbish & Replace Filter Medium to 3 Vessels including shot Blast to Remove Scale and 3 New Man Access Doorways Sand Filters Refurbish & Replace Filter Medium to 3 Vessels including shot Blast to remove Scale and recoat the interior of the vessels with a 3 coat paint system. Provide 1 New Man Access Doorway Sub Total for Filter Media Change 46,798.00 23,998.00 Completed 22,800.00 Completed The filter medium was last replaced ten years ago and was due for replacement in order to ensure that the quality of the pool water is maintained. Refurbishment & Replacement of Filter Medium to 3 Vessels including Re-lining with 3 Coat Epoxy Paint system and increasing the size of the man access hatches to the three vessels as the existing 400mm opening no longer complies with current access legislation. 11,326 (Plus PC sum for nozzles 10,474 & PC sum for upper bell mouth 900 & 1298 for PAC dosing system [total discounted cost 23,998]) The filter medium was last replaced ten years ago and was due for replacement in order to ensure that the quality of the pool water is maintained. Refurbishment & replacement of filter medium to 3 vessels including Re-lining with 3 Coat Epoxy Paint system and increasing the size of the man access hatch to the teaching pool vessel as the existing 400mm opening no longer complies with current access legislation. 19,475 (Plus PC sum for nozzles 3,000 & PC sum for upper bell mouth 900) 2.9 Renewal of Plant at and Replacement of Swimming Pool Chlorine Chemical Dosing Unit Replacement & Relocation of Flow Meter Replacement of Teaching Pool circulating Pump Replacement of Swimming Pool Chlorine Chemical Dosing Unit 2,750.00 Completed 2,365.00 Ordered 2,622.00 Completed 2,915.00 Completed The dosing system was replaced as the existing system had failed parts were not available and the pool was being hand dosed (for approximately two weeks) The existing flow meter is not working. The old style gauges use mercury which is no longer permitted hence the unit must be replaced. 1,865 to install the flow meter and 500 estimated for access to be provided by DDC One of the teaching pool circulating pumps failed. The system was running on a single pump with no redundancy. In order to ensure resilience in water quality a replacement was required. This system treats the pool water by introducing Chlorine. The existing very old FlocDos Poly Aluminium Chloride dosing system had failed and parts were not available so it could not be repaired.

Replacement of a 2 PAC Dosing system to Main pool and teaching pool 2,138.00 Ordered This system doses the pool water with PAC which acts as a coagulant binding smaller particles to larger ones to increase the filters efficiency, it is introduced around 2m upstream of the filters after the pumps. The existing system had been inoperable for many years and these systems are now deemed essential in order to maintain water quality. Replacement of Section of Damaged Pipe to Teaching Pool Sub Total First Half of 2013 Plant Replacement 15,648.00 2,858.00 Completed The suction pipe from the teaching pool has a fracture in one of the stub flanges this was weeping and drawing in air. This was causing the pump to cavitate and was increasing ware. Options were to drain the pool or employ the use of divers to remove the pool outlet grill and bund and seal the outlet so that the defective pipe section could be replaced. That later option was chosen and the heavily corroded valve was changed at the same time. 2.9 Renewal of Plant at and Replacement of Primary hot water pump head number 2 1,426.00 Desirable One of the existing pump units on a twin head pump has failed. The system is still operational on a single pump but has no standby duty. Should the existing pump fail the centre will be left without hot water. Modifications to Pool Make-Up tank Ball Valve Remedial Works to the Flume 1,000.00 Desirable 15,000.00 Desirable The tank ball valve are has been bent in order for it to fit into the tank. The valve does not operate in this configuration and requires modification. One possible solution may be to install two smaller valves that fit in the tank and deliver the required flow. The Flume structure is significantly corroded and the flume slide is in need of resurfacing within the next 18 months. Such remedial work will extend the life of the flume. Alternatively, in time the flume will have to be closed however this may involve further modifications as the Flume water provides circulation in the smaller pools. Replacement Flume Pump 8,000.00 Desirable The standby duty Flume pump has failed. Leaving the Flume operating on a single pump. Should this fail the flume would be inoperable and water quality may suffer due to a lack of circulation of the pool water. In order to ensure resilience the pump should be replaced. Remedial Works to Corroded Electrical Control Panels 2,000.00 Essential Both of the electrical control panels in the lower plant room show signs of significant corrosion. In order to maintain the integrity of the enclosures required under BS7671 the panels need repairing.

Replacement pool vacuum 2,500.00 Essential The pool vacuum cleaner has failed. Currently one cleaner is being transported between centres. Environmental health have identified that should an emergency arise when debris needs urgently cleaning from the pool this practise would cause an unacceptable delay. Replacement of Boilers Module Sub Total Plant Currently in Need of Replacement 34,426.00 Sub Total Contingency for Future Plant Replacement 50,000.00 4,500.00 Desirable The boilers at Leisure Centre consist of 18 boiler modules, fitted in three banks. One of the banks of six failed and was shut down and capped several years ago and has been used for spare parts to repair the other 12 modules. Over a period of time these parts were exhausted and the leisure centre now runs of just 9 modules. During this years annual service three of these modules were found to be leaking! We are approaching a critical point where further failures will result in inadequate heat output. In order to retain resilience a spare module should be purchased and stored in the boiler room as a standby replacement. (The lead-in-time for obtaining a replacement module is one week). 2.17 Legionella Risk assesment Works at and Replacement of Defective Valves to Calorifiers 8,047.00 Completed The Calorifiers should have been internally inspected and de-scaled on a annual basis. This has not been happening and is recommend in ACOP L8 as part of effectively controlling Legoinella. In winter the calorifiers are struggling to maintain temperature to effectively control Legoinella. Your leisure are responsible for this annual inspection and descale however, the calorifiers cannot be descaled as the valves do not hold. Replacement of the defective valves enables the calorifiers to be isolated on an individual basis for future maintenance & inspection. Sub Total Legionella Risk Assesment Work Completed 8,047.00

2.17 Legionella Risk assesment Works at and Legoinella risk: Replacement Pool Slide Water Curtain & Whirlpool Pump Legoinella risk: Extra Over Cost for Descale of Calorifiers Outside Working Hours & Installation of Additional Isolation Valves Legoinella risk assessment remedial works Legoinella risk: Modifications to Cold Water main running at High level Through the main pool 3,881.00 Essential 5,000.00 Essential 5,500.00 Essential 10,000.00 Essential This pump has been out of action for sometime. However, following the refurbishment of the Sand Filters and replacement of the Filter Medium it has become evident that this circulation contributes to the mixing of the chemical dosing in the whirlpool and slide plunge pool. It is advisable to replace the pump in order to ensure consistence with the water quality. Quote for replacement pump 2,881.00 and 750 estimate for installation. The Calorifiers should have been internally inspected and descaled on a annual basis. This has not been happening and is recommend in ACOP L8 as part of effectively controlling Legoinella. Your leisure are responsible for this annual inspection and descale however, the calorifiers have no provision to isolate them on an individual basis. This means that they cannot be descaled whilst the centre is in use. Estimate of cost to be met by DDC Following the legionella risk assesment a number of remedial actions have been identified some of which are District Councils responsibility to rectify - Pipe dead legs have been identified they are deemed to present a high risk under ACOP L8 paragraph 162 and require tracing and cutting back estimate 500. Cold Water storage Tank 2 has no lid ACOP L8 paragraph 151&152 rerquires a cover and vent that complies with the water supply fittings regulations. Cold Water Storage Tank 1 is located in an enviroment that promotes heat gain. ACOP L8 paragraph 152 rerquires that tanks should be placed in a cool place to prevent heat gain estimate 4000. Cold Water Storage Tank 1has a vent pipe that may discharge into the tank. ACOP L8 paragraph 152 rerquires that vent pipe should discharge to an external drain via a tundish estimate 250 The tank feed main from the plant room to the dry side runs through the main pool hall at high level. The water delivered from this pipe at times fails to meet the minimum temperature requirement as stated in ACOP L8 guidance for effective control of Legoinella. Further investigation is required in order to identify the best solution. A possible option is to install a chemical dosing rig and this estimate is based on this approach.

Legoinella risk assessment remedial works 3,000.00 Essential Following the legionella risk assesment a number of remedial actions have been identified some of which are District Councils responsibility to rectify - Pipe dead legs have been identified they are deemed to present a high risk under ACOP L8 paragraph 162 and require tracing and cutting back estimate 500. Non insulated hotwater pipework is causing heat gain within the system. ACOP L8 appedix 1 checklist 2 requires cold water to be circulated at less than 20C. the hot water pipework requires tracing and insulating estimate 2,500. The coldwater storage tank lids have been identified as not being WRAS approved and the feed and expansion pipes to these tanks vent into the tanks not tun dishes. This does not met ACOP L8 guidelines however the risk is identified as medium and the centre life is limited Legoinella risk: Insulation of Calorifiers 4,000.00 Essential The current insulation to the calorifiers has deteriorated and is ineffective. Given the issues with achieving sufficient temperature and the potential risk of Legoinella growth by not achieving effective thermal disinfection it is necessary to replace and upgrade the insulation. This will also have significant benefit to energy consumption. Legoinella risk: Insulation of Dry Side Hot Feed 1,500.00 Desirable The plastic pipe which feeds the Dry Side hot water has no insulation its length is circa 50m and water temperature will drop rapidly over this run. The hot water is recirculated but the temperature loss reduces the stored water temperature. Causing increased demand from the boilers to ensure sufficient temperature is maintained. Sub Total Legionella Risk Assesment Work Required 32,881.00 Sub Total for Filter Media Change 46,798.00 Sub Total First Half of 2013 Plant Replacement 15,648.00 Sub Total Plant Currently in Need of Replacement 34,426.00 Sub Total Contingency for Future Plant Replacement 50,000.00 Sub Total Legionella Risk Assesment Work Completed 8,047.00 Sub Total Legionella Risk Assesment Work Required 32,881.00 Total 187,800.00