Broad International Project Experience

Similar documents
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD)

Main areas of services are:

Engineering g Procurement. 02-Feb-2015

Electrical Engineering

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

CAD/CAE systems and cost engineering

Main Automation Contractor (MAC) Targets Long-Term Control System Access

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

A Leading Provider of Engineering Information Management Solutions and Services. Facilitating multi-office, multi-contractor execution strategies

Industry Solutions Oil and Gas Engineering Document Control and Project Collaboration Solutions for Oil and Gas

ITS specification Handover and commissioning process (ITS-10-01)

Training for Operations and Maintenance

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer

WELLHEAD FLOWLINE PRESSURE PROTECTION USING HIGH INTEGRITY PROTECTIVE SYSTEMS (HIPS)

Automation. Main Automation Contractor (MAC) solutions Helping the process industries to reduce risks and project delays

Solutions for Onshore Oil and Gas. Creating value through integrated solutions. Oil & Gas. Upstream and Midstream

Main Automation Contractor (MAC) Targets Long-Term Control System Success

Front End Engineering Design Capabilities

TABLE OF CONTENT

Rockwell Automation in Oil & Gas

ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM

RISK MANAGEMENT IS YOUR CAPITAL PROJECT READY TO DELIVER BUSINESS VALUE?

PISTEP WHYSTEP? The Background. What information are we talking about?

How To Manage A Project

VENDOR PREQUALIFICATION QUESTIONNAIRE

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

JOIN THE TEAM!

Reducing Risk in Large-scale Process Automation Projects

AUTOMATION AND PROCESS CONTROL

Oil and Gas Mission Dubai - Abu Dhabi - Bahrain (13-22 September 2015):

Offshore Oil and Gas. Experience and Capabilities

UNLOCKING MAJOR COST SAVINGS ON OIL & GAS PROJECTS

Engineering Capability Presentation 02-Feb-2015

Recently Completed Projects - Storage Projects

Our Structure. Our People

Up-to-Date with Electrical Equipment

B.2.2. Project Management Principles

Technology based Project Management Consulting (T-PMC): Innovate to Reduce Costs

Guidelines for FEASIBILITY STUDY

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

ENGINEERING COMPETENCY CLAIMS

SELECTING SOFTWARE FOR AIM: ASSET INFORMATION MANAGEMENT

Experience and Qualifications of PROCESS PLANTS CORPORATION

Revision: 3. Author: J McGuire Department: Company. Category: Contract Management. Appr. Signature: CONTENTS 1.0 PURPOSE SCOPE...

System 800xA Fully automated ESD System for major gas plant increases safety

Materials Management:

Power Recovery Turbines

Engineering Data Lifecycle Management Overview

Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities

Fire and Gas Solutions. Improving Safety and Business Performance

GEOil&Gas. Liquefied Natural Gas. Reliable innovation for the entire LNG value chain

Company Presentation

PROCUREMENT, FABRICATION & CONSTRUCTION

The Group CYTEK CYTEK PROJECTS CONSULTING

IAG EFFECTIVE SCOPE MANAGEMENT THROUGH MULTI-LEVEL CLIENT ENGAGEMENT

TABLE OF CONTENT

Bringing Safe and Cost Effective Products to Market

Reliability Modeling Software Defined

The CEN ORCHID Roadmap. Standardising Information in the Plant Engineering Supply Chain. Direction & Framework

NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER

BONATTI: COMPANY OVERVIEW

JOURNAL OF INFORMATION, KNOWLEDGE AND RESEARCH IN MECHANICAL ENGINEERING

Total Subsea Solutions

Project Systems Management Providing Value-Added Solutions

Alain Nifenecker - General Electric Manager Controls Engineering

Consolidation of Control Rooms for Achieving Safe, Stable and Efficient Operation by Refinery Operation Modernization Service

Industry Solutions Process Manufacturing Flexible and Agile Engineering Document Control for Efficient, Safe and Compliant Plants

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

Complete SCADA solution for Remote Monitoring and Control

ABSTRACT This paper discusses the need, issues, and solutions for automated monitoring of centrifugal process pumps. Reducing energy and improving

Position Description

The CEN ORCHID Roadmap. Standardising Information in the Plant Engineering Supply Chain. Implementation Guide

Safety Integrity Level (SIL) Assessment as key element within the plant design

INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION LIFE+ MHYBUS LIFE 07-ENV/IT/000434

AVEVA NET Accesses and Manages the Digital Asset. Executive Overview Project Risk: Inaccessible, Unreliable Information... 4

Offshore Forum. How can we optimise off/onshore cost and operation? 28 May 2014

Online Vibration Monitoring

Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd.

ABB PSPS Erich Steinmann; Generator control-2013

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

Fire Prevention and Control in Compressor Buildings

Brochure. Projects and engineering Engineering expertise to enhance your operations

UOP Gas Processing. Realizing the Value of Your Natural Gas and Synthesis Gas Resources

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

CONTRACT MANAGEMENT FRAMEWORK

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

Solution. SmartPlant. Procurement, Fabrication & Construction

Our Aim. Our Vision. NIGT works towards ameliorating its vision to be amongst the leading innovative and proactive suppliers in the Oil & Gas sector.

Transcription:

About Us Capability History Profiles Vision Principles Our Services Project Management Engineering Procurement Construction Maintenance Training Projects Oil & Gas Water Automotive Diversity Abalto News Contact Us Broad International Project Experience You will benefit from our broad international project experience with flexibility and quality engineering. We conduct every project we engineer in an alliance, an extension to your company and pride ourselves in delivering to your expectations. We PLAN what we DO We DO what we PLAN We MONITOR what we DO Abalto are able to offer engineering service encompassing one or more of the following which can either be negotiated as packages or provided as demanded by your requirements. Preparation of initial design schemes Technical Specification Preparation of Feasibility with Concept Design Contract and site management Detailed Design and Engineering Build, Integration and Testing Site Commissioning Site Support Each service is structured to be coordinated with the related phases of the process including development, design, construction, testing, and operations. The complete package of our services includes all of the necessary elements that are important to both the owner/operator and the EPC groups for successful project planning and execution. Abalto offers turnkey packages to industry including Instrumentation and Control Systems, Mechanical and Electrical Design, Build, Supply, Installation, Commissioning, Start-up, Plant Optimisation and post project Maintenance and Support.

Saudi Kayan Phenolics Delivery of MAC Project for a Phenolics Plant Scope included the delivery of the DCS, Safety system, Instrumentation, Remote Instrument Buildings, Analyser houses, UPS system and Central control room equipment. Support site installation teams for installation, loop checking and commissioning. Deliver of Project Management for $15M MAC contract from initiation to closeout with full P&L responsibility. Sponsor assignment to assure maximum scope delivery without deferral to site phase and adhere to accelerated schedule with fixed delivery date. Manage scope and quality to ensure deliverables including DCS and Safety Systems integrated into Remote Instrument Buildings and Control Room. Sole authority for every aspect of project and sole delegated authority towards Owner and EPC. Management of and communication with Owner, EPC and stakeholders. Authorise procurement and manage performance and delivery of five subcontracts valued $5M. Manage performance and deliverables of Invensys as downstream partner with contract value $5M. Responsible for resource management including remote virtual and home office engineering teams. Ensure integration and inter-operability with 8 other projects executed in UK, Netherlands, Singapore and Korea. Construct plans for and manage Risks, Issues, communications, Resources, Quality, Integration, Schedule, Costs following PMI processes for Project Management.

Harweel Phase 1 EDF Harweel Early Development Facility for Petroleum Development in Oman USD 100 Million project for PDO aimed at assessing the viability of miscible gas flooding and have early production. We were responsible to MAC from construction supervision through integration to successful commissioning and handover. Harweel Early Development Facility (EDF) project was a USD 100Million project for Petroleum Development Oman aimed at assessing the viability of miscible gas flooding which would yield highest oil recovery from high pressure sour Oil & Gas reservoirs. The 4 reservoirs had 15 producing wells with flowing pressures from 260Bar to 700Bar and average H2S concentrations of 50,000ppm with 15% Co2. This challenging Enhanced Oil Recovery project demanded cutting edge technology to deliver using prototype compressors and state of the art control and safeguarding system due not only to the process parameters but the fact that the wells were located 80Km from the production station Birba hence the base of design was remote operations. The MAC scope dimension was USD 10Million provided by Yokogawa System Centre Europe who invited Abalto to provide the system integration, design and commissioning of Foundation Fieldbus instruments, valves, wellhead hydraulic control panels, Fibre Optic Converters and repeaters. The production station Birba under the project scope had new separation train, 3 new reciprocating compressors, flare package and utility Air and Nitrogen generation packages. The oil production capacity added was 20,000 barrels of oil per day and 1.8 million meter cubes of natural gas. Abalto engineers had supervised construction and liaise with EPC to ensure quality completion which does not adversely introduce flaws that hinder commissioning. Following structured pre-commissioning procedure and extensive testing helped mitigate hidden flaws in hardware and software. We successfully integrated the MAC deliverables such as Yokogawa ProSafe IPS, Stardom FCS and FastTools to following third party system: Nuevo Pignone Compressors LP, MP and HP compressors Frames Wellhead Hydraulic Control Panels Honeywell TDC 3000 Pepperl & Fuchs relay based shutdown system Prognost Condition Monitoring system Dymac VM600 vibration protection system Haimo Multiphase Flow Metering units Alan Bradley Utility UCP ABB Variable Speed drives

Technical Details Abalto engineers have: Managed design deliverables and facilitated meetings between individual vendors on behalf of the client. Monitored actual project progress to ensure timely delivery through visits to suppliers that were incorporated in compliance to ITPs. Ensured compliant design completed in time and within allocated budget. Conduct with assistance form Shell Global Solution Fire and Gas Mapping study which outlines the numbers, type and locations of F&G devices. Carried out and implement IPF classification for the project facility and compressor packages. Review FAT procedure and manage Factory Acceptance Testing and witnessing with help from Mechanical, Safety and Material Engineers where applicable. Developed pre-commissioning procedures and provide input to vendor site check lists. Reviewed and Approve for Construction Cause & Effect diagrams, FLD, Cable schedules and JB layout design, Termination Details, Instrument selection and data sheets. Confirmed pre-commissioning tests are complete and relevant documents are signed. Safely brought online one well and monitored effects of 1st Oil to the pipeline and production facility. Commission remaining Wells, MPFMs, Manifolds, separators and pumps. Commission the Yokogawa Fieldbus Control System (FCS) which was the first Stardom based FCS in industry with an EPC company with no prior Foundation Fieldbus experience. Systems taken to site for commissioning, construction and installation supervised, Loop Checking and Calibration, Functional Tested and handed over. Solved Wide Area Fibre Optic SIL 3 classified network (MNET) design and configuration problems resolution for remote well locations working at 600 Bar pressure, 15% CO2 and 50,000ppm H2S. Solved process control problems resolution by modifying control strategies based upon commissioning experience and industry knowledge. Commissioned three high pressure reciprocating compressors with online condition monitoring system from Prognost. Integrated with existing Honeywell TDC3000 to Yokogawa FasTools, Stardom and ProSafe to form a single operator interface. Safety instruments were Hart and non-safety instruments Foundation Fieldbus.

Houdini MEG FEED DCS and Safety Systems FEED for MEG Plant in Singapore Contributed to a FEED study for the DCS and Instrumented Protective System for the Mono Ethylene Glycol plant in Singapore at Foster Wheeler UK. Delivered Systems Architecture, System Sizing, Spares Philosophy, Software Specification, Developing, Testing and Approving Software and Hardware Typicals and Safety Validation Plans working to Shell MAC Toolkit. During the Front End Engineering & Design (FEED) phase the assumptions and conclusions of the pre-feed were checked and updated. The basis for the FEED was the Basic Engineering Design Data and met the following objectives: Review the scope of work, basis of design and other design input data to determine if there are changes in the assumptions and conclusions. Provide a system design with sufficient detail to move to the EPC phase of the project. Development of the project design specifications and technical details in accordance with the engineering requirements, standards and specifications. Support the project team in completion of the required phase gate review and deliverables to enable project sanction. Support the procurement process through RFQ preparation to determine industry market costs and schedules for equipment for Long Lead Items. Perform capital cost estimates for the project, adequate to meet project sanction requirements. Contribute to the Project Execution Plans for the implementation phase of the project, including an organization chart showing resources, engineering description, procurement, fabrication, installation, commissioning and hand-over activities. Contribute to the Master Project Schedule. Preparation of documents needed for the implementation phase of work; requirements for the design, fabrication, installation, commissioning and start-up of the facility.

Perdido Regional Host GOM FEED for DCS and Safety System for Shell Offshore Platform Contributed to the FEED study for Perdido a Greenfield Offshore Platform working with Alliance Engineering Wood Group EPC and Shell E&P Offshore in Houston, USA. Establish specifications for Basis of Design and Operating Philosophy to Shell DEPs and SEPCO Design & Engineering Standards. Specifications for Process Automation Systems including DCS and Safety Systems, subsystems interfaces, Execution Plan and budget price. Develop a full Functional Design Specification for an Offshore Greenfield Project. The specific scope of the FEED was to produce specifications to the Basis of Design for this new 3000m deep Regional Host Platform in the Gulf of Mexico. The specifications included the system sizing, Software and Hardware Typicals, Systems Architecture with DACA considerations, Interfacing specifications to third party vendor systems. During the Front End Engineering & Design (FEED) phase the assumptions and conclusions of the pre-feed were checked and updated. The basis for the FEED was the Basic Engineering Design Data and met the following objectives: Review the scope of work, basis of design and other design input data to determine if there are changes in the assumptions and conclusions. Provide a system design with sufficient detail to proceed to the EPC phase of the project. Development of the project design specifications and technical details in accordance with the engineering requirements, standards and specifications. Support the project team in completion of the required phase gate review and deliverables to enable project sanction. Support the procurement process through RFQ preparation to determine industry market costs and schedules for equipment for Long Lead Items. Perform capital cost estimates for the project, adequate to meet project sanction requirements. Contribute to the Project Execution Plans for the implementation phase of the project, including an organization chart showing resources, engineering description, procurement, fabrication, installation, commissioning and hand-over activities. Contribute to the Master Project Schedule. Preparation of documents needed for the implementation phase of work; requirements for the design, fabrication, installation, commissioning and start-up of the facility. Operations Department Design Review.

QP Dukhan Flare & Seperators Dukhan field commissioning of Separators and Flare package Abalto were awarded the commissioning scope through the EPIC contractor Panorama Contracting & Engineering Services working for Qatar Petroleum contract number GTC 189/ED/03 entitled EPIC of an independent Flare for QJA-1 & 2 and Replacement Separators at Dukhan Fields. The contract scope was to replace the existing separators at both Khatia Main Degasing Station (KMDS) and Fahahil Main Degassing Station (FMDS) of Qatar Petroleum Dukhan Oil Filed in addition to the provision of new flare package at Khatia Main Pumping Station (KMPS) with all associated piping, instrumentation and commissioning. The change over from old to new separators was scheduled during planned shutdown where as the Flare package start-up was on live plant. Abalto safely and successfully delivered commissioning procedures, conducted process commissioning and managed the instrumentation and logic update in three Oil & Gas facilities for Qatar Petroleum at Dukhan filed. We were able to have a problem free commissioning through following structured methodology, drawing on lessens learnt, identifying what could go wrong and preparing for mitigation of flaws. Other success factors were management of interfaces, managing risks to successful delivery, agreeing to the handover and acceptance criteria prior to commencement and rigours testing during pre-commissioning.

AGIP Kashaghan Pipeline Electrical & Instrumentation Project Engineering AGIP Kashaghan Pipeline Project Project management of PMSC team located in Saipem s SPa office in Milan to ensure Electrical and Control compliance with company specifications for SCADA, F&G, Safety, Telecoms and Electrical, Control & Instrumentation design activities. Coordination of review of Electrical and Control generated documents, monitoring discipline teams, review schedules and monitor change control submissions.