Pipeline bridge crossing for mining trucks A geotechnical engineering design.

Similar documents
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL

Safe & Sound Bridge Terminology

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Module 7 (Lecture 24 to 28) RETAINING WALLS

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

How To Design A Foundation

Emergency repair of Bridge B421

Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

METHODS FOR ACHIEVEMENT UNIFORM STRESSES DISTRIBUTION UNDER THE FOUNDATION

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

How To Retaining Wall Guide

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

and the design of construction working platforms

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Designed and Engineered to Perform

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

PILE FOUNDATIONS FM 5-134

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

GUIDELINE FOR HAND HELD SHEAR VANE TEST

vulcanhammer.net This document downloaded from

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Geotechnical Building Works (GBW) Submission Requirements

High Strain Dynamic Load Testing of Drilled Shafts

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

PDHonline Course S151A (1 PDH) Steel Sheet Piling. Instructor: Matthew Stuart, PE, SE. PDH Online PDH Center

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

VERTICAL STRESS INCREASES IN SOIL TYPES OF LOADING. Point Loads (P) Line Loads (q/unit length) Examples: - Posts. Examples: - Railroad track

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

Liner system design for tailings impoundments and heap leach pads

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Residential Foundations and Basements

DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

Pipeline Replacement using Relining

SECTION STORM DRAINAGE TABLE OF CONTENTS

CEEN Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

GLOSSARY OF TERMINOLOGY

Embankment Consolidation

HOUSE BUILDING DIGEST

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

How to Design and Build a Fence/G traverse Bridge or Graffiti Project

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

A study on the causes of troubles in shield tunneling site with numerical analysis

Design and Construction of Cantilevered Reinforced Concrete Structures

ATLAS RESISTANCE Pier Foundation Systems

Aluminium systems profile selection

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Module 5 (Lectures 17 to 19) MAT FOUNDATIONS

Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05

Types of Mining - Expert Table

Section Installation of pipe and casing for sanitary sewer by methods of augering.

Chaudière Crossing Bridge Rehabilitation

BUTE Department of Construction Management and Technology

CHAPTER 9 FEM MODELING OF SOIL-SHEET PILE WALL INTERACTION

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Drained and Undrained Conditions. Undrained and Drained Shear Strength

EN Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland

COSMOS 2012: Earthquakes in Action COSMOS 2012

vulcanhammer.net This document downloaded from

A N Beal EARTH RETAINING STRUCTURES - worked examples 1

Trenching and Excavation Safety

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

DESIGNING STRUCTURES IN EXPANSIVE CLAY

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

Elevating Your House. Introduction CHAPTER 5

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level.

Underpinning Systems 14.1 FOUNDATION REPAIR. Helical Piles

Numerical Simulation of CPT Tip Resistance in Layered Soil

Soils, Foundations & Moisture Control

Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

HOW TO DESIGN CONCRETE STRUCTURES Foundations

Access chambers and maintenance shafts. Issue 1

ITS specification Jointing chambers and pull pits (ITS-02-02)

Wang, L., Gong, C. "Abutments and Retaining Structures." Bridge Engineering Handbook. Ed. Wai-Fah Chen and Lian Duan Boca Raton: CRC Press, 2000

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

Installation Instructions

System. Stability. Security. Integrity. 150 Helical Anchor

Transcription:

Pipeline bridge crossing for mining trucks A geotechnical engineering design. Bernard Shen Pells Sullivan Meynink, Sydney, Australia ABSTRACT The Donaldson open pit coal mine is located in Blackhill, New South Wales. Three water pipelines, supplying water to approximately 100,000 people in the Cessnock and Maitland areas, traverse the mine site. A design for a bridge crossing over the pipelines was required in a short time frame to allow access to the western part of the site for mining purposes. The crossing had to accommodate 300 t hydraulic mining shovels and 250 t mining trucks and be able to be removed at 24 hours notice to allow maintenance of the pipelines. The paper presents the design approach and construction methods used to achieve the 5 year design life while also satisfying requirements imposed by Hunter Water Corporation (HWC). 1 INTRODUCTION The Donaldson open pit coal mine is located in Blackhill, New South Wales. Three Hunter Water Corporation (HWC) water pipelines, supplying water to approximately 100,000 people in the Cessnock and Maitland areas, traverse the mine site (Figure 1). A design for a crossing over the pipelines was required in a short time frame to allow access to the western part of the site for mining purposes. The options considered include a crossing structure spanning over the existing pipes or relocating the above grade 900 mm diameter pipe underground. Building the crossing structure was assessed as the more economical solution. The paper presents the design approach and construction methods used to achieve the 5 year design life while also satisfying requirements imposed by Hunter Water Corporation (HWC). Figure 1: Pipeline location plan

2 DESIGN The design criteria for the crossing required it to carry loads from 300 t hydraulic mining shovels and 250 t mining trucks with a 5 year design life. Some of the main design considerations include the following: A requirement imposed by HWC to include a 2 m high by 5 m wide access space around the pipes to have access to the pipes for minor works if required. The crossing is to be designed such that it could be dismantled within 24 hours should emergency access to the pipes be required. The design of the crossing comprised cast in situ reinforced concrete vertical walls on either side of the pipes and precast reinforced concrete top slabs supported by the walls, as shown in Figure 2. Footings for the structure comprised piles founded on bedrock spaced at 1.0 m centres. The walls were backfilled with engineered fill to provide a ramp approach for the mine vehicles. The design was undertaken using hand calculations and a two-dimensional finite element software, Phase 2 by Rocscience Inc. 3 LOADS Figure 2: Pipeline crossing design The loads considered during design were that due to two fully loaded CAT785B mining trucks and a CAT5230 mining excavator. The plant imposes a lateral load onto the structure as the plant approaches the structure and a vertical load on the top slab as it crosses the pipes. Shen (2008) provides details of loads considered during design and methods used in assessing the lateral earth pressure imposed on the structure. The service load calculated was a semiinfinite UDL at the surface of 130 kpa. That lateral load models considered are summarised in Figure 3.

The main lateral resisting element is the engineered fill placed against the side walls, this was specified as a well compacted cohesive and frictional fill. A cohesion of 5 kpa, angle of friction of 35 degrees and elastic modulus of 15 MPa were adopted and considered that the adopted strength parameters are conservative for such a material. The adopted modulus is equivalent to a stiff clay or medium dense sand. The piles were designed to mainly resist the high lateral loads imposed on the structure but also the vertical loads. For passive resistance, Coulomb passive earth pressure coefficients (given in Das, 1984) of Kp = 5.3, for a wall friction angle ( ) of 10 degrees and Kp = 8.3 for a wall friction angle ( ) of 20 degrees. The square root of Kp has been adopted as Kpc which is consistent with the Rankine Solution. The passive earth pressure distributions on the resisting side of the structure is given 0.5 as K c'( K ) and shown in Figure 4. hp p v 2 p Figure 3: Summary of lateral load models Figure 4: Coulomb passive earth pressure distribution In addition, the Phase 2 analysis was interrogated to assess the earth pressures on the resisting side of the structure. These are shown for increasing vertical loads on Figure 5 together with the Coulomb passive earth pressures. It can be seen that at the service load of 130 kpa (broken blue line) the soil is not stressed significantly with respect to the available passive pressures. As the applied load increases, more of the soil approaches the limiting passive state. The Coulomb assumptions are considered to reasonably bracket the ultimate state.

4 ANALYSIS Figure 5: Passive earth pressure with increasing vertical loads Stability analysis was undertaken by 2 methods, a simple hand calculation for a 4 pinned frame and two-dimensional elasto-plastic finite element analysis. The hand calculation was based on calculated service lateral loads from methods 3 and 4 shown in Figure 3 and Coulomb passive earth pressures and analysed per Figure 6. Figure 6: Pipeline crossing design The resulting factors of safety (resisting moment / overturning moment) are given in the table below. Lateral load models Coulomb Passive Resistance = 10 = 20 Surcharge 2.6 4.0 Surcharge and elastic theory 2.0 3.0 As can be seen, the minimum factor of safety of 2.0 is obtained for the combination of the more conservative load and resistance. The actual loading is more likely a surcharge load with a wall friction angle ( ) of 20 degrees resulting in a factor of safety of 4.0. It is noted that the actual resistance is spread over greater than twice the length of the loaded area and thus the factors of safety would be at least double those presented above.

A two dimensional elasto-plastic finite element analysis of the structure was undertaken by increasing the applied load (semi-infinite UDL from 100 kpa to 800 kpa) until failure occurred. The overall arrangement of the analysis is shown on Figure 7. The piles have been modelled as a two dimensional wall and thus the top of the piles deform less in the model than is likely in service. Figure 7: Finite element analysis model From the analysis, values of horizontal displacement were calculated for each load. An analysis for a poor fill material in passive resistance under the service load was also undertaken. The following horizontal displacements were calculated at the top of the passive side wall under the service load: Less than 10 mm with passive resistance from engineered fill constructed in accordance with the design as shown in Figure 8(a). Less than 20 mm with passive resistance from poor fill (ie fill not achieving soil properties presented in Section 3) as shown in Figure 8(b). The analysis indicated that provided the structure was constructed in accordance with the design, it would be stable under loads several times the service load and for the ultimate case of poor fill under service load.

Figure 8(a): Horizontal displacement of passive side wall under service load Figure 8(b): Horizontal displacement of passive side wall under service load where passive resistance provided by poor fill.

5 CONSTRUCTION The construction of the crossing is described in the following section. 5.1 Bored piles The piles comprised approximately 3.5 m long, 450 mm diameter reinforced concrete bored piles drilled with a 5 t excavator fitted with a pendulum auger. The piles were drilled at 1 m centres through residual soils and socketed 1 m into low strength weathered shale bedrock. Reinforcement cages that formed part of the reinforcement for the side walls were lowered and concrete poured to the top of the bored piles. Some difficulty was encountered in getting the cages central to the pile holes and vertical. This was overcome by construction of timber forms at the top of the pile holes to centralise the cages and adjusting the base of the cages manually. 5.2 Side walls The side walls comprised cast insitu reinforced concrete walls (34 m length x 2 m height x 0.4 m thick) constructed on either side of the design envelope. The side walls were formed and reinforcement constructed as shown in Photo 1. 5.3 Top slabs Photo 1: Construction of side walls The top slabs comprised precast reinforced concrete slabs (5.8 m length x 0.4 m thick x 2 m width) with corbels at both ends. Upon delivery to site, the top slabs were lifted into place as shown in Photo 2. Photo 3 shows the crossing with the structural components constructed.

Photo 2: Top slabs Photo 3: Crossing with structural components completed 5.4 Engineered fill, rockfall protection and safety bund Following construction of the crossing structure, engineered fill comprising of approved mine overburden material was placed adjacent to the side walls extending at least 5 m from the side walls which forms part of a ramp for the mining trucks. The engineered fill was placed in layers and compacted with a 10 tonne non-vibratory roller. Finally, a rockfall protection barrier and safety bunds along the edges were constructed. Photo 4 shows the crossing in operation.

6 MONITORING Photo 4: Crossing in operation Four survey prisms were installed at the top of the side wall at each corner of the crossing. A baseline reading was taken immediately upon completion of construction. Surveys were conducted on a weekly basis for the first 3 months of operation reducing to monthly surveys for the following 18 months. Based on the design analyses, under service loads, less than 10 mm of lateral displacement was expected at the top of the side walls. The survey monitoring indicated lateral displacements varied between 0 mm to 20 mm between each survey undertaken. However, the data appeared noisy and did not indicate a clear movement trend. Given that the loads are dynamic and the crossing allows 2 way traffic, it is unlikely lateral displacement in one direction can be expected. The crossing has been in operation for over 7 years and thus has achieved the intended design life. REFERENCES Shen, B. (2008), Comparison of lateral loads due to surcharge with particular reference to the Australian Standard AS4678 (2002), Proc 8 th Young Geotechnical Professionals Conference, Wellington, New Zealand, November, 2008, pp205-210.