GEOTECHNICAL SITE INVESTIGATION REPORT

Similar documents
Geotechnical Investigation Test Report

FINAL REPORT ON SOIL INVESTIGATION

CIVL451. Soil Exploration and Characterization

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

ENCE 4610 Foundation Analysis and Design

KWANG SING ENGINEERING PTE LTD

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

How To Design A Foundation

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

BEARING CAPACITY AND SETTLEMENT RESPONSE OF RAFT FOUNDATION ON SAND USING STANDARD PENETRATION TEST METHOD

Specification Guidelines: Allan Block Modular Retaining Wall Systems

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design

APPENDIX F GEOTECHNICAL REPORT

GUIDELINE FOR HAND HELD SHEAR VANE TEST

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

Method Statement FOR. Soil Investigation

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Geotechnical Characteristics of Two Different Soils and their Mixture and Relationships between Parameters

PILE FOUNDATIONS FM 5-134

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

SECTION EARTH MOVING

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No M (Supersedes Report No.

King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

1.0 INTRODUCTION SCOPE OF WORK EXECUTION OF FIELD WORK LABORATORY TESTS FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS Vol. IV - Testing of Materials and Soils - F. Druyts

Work Type Definition and Submittal Requirements

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Work Type Definition and Submittal Requirements

Module 7 (Lecture 24 to 28) RETAINING WALLS

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

JOHNSON STREET BRIDGE REPLACEMENT PROJECT

REPORT OF GEOTECHNICAL EXPLORATION BRIDGE STRUCTURE REPORT

patersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group

Abstract. Keywords. Pouya Salari 1, Gholam Reza Lashkaripour 2*, Mohammad Ghafoori 2. * lashkaripour@um.ac.ir

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Testing Procedures. Note: Please refer to Table 2 for a list of completed borings.

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For Ontario Inc.

SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report. October 2011

COSMOS 2012: Earthquakes in Action COSMOS 2012

Table of Contents 10.1 GENERAL

Module 5 (Lectures 17 to 19) MAT FOUNDATIONS

20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS. Architects Engineers Program and Construction Managers

C. Section TESTING LABORATORY SERVICE.

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 5 : Geophysical Exploration [ Section 5.1 : Methods of Geophysical Exploration ]

DIRECT SHEAR TEST SOIL MECHANICS SOIL MECHANICS LABORATORY DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF MORATUWA SRI LANKA

INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1

DESIGNING STRUCTURES IN EXPANSIVE CLAY

FACTUAL GROUND INVESTIGATION

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

Determination of Thermal Conductivity of Coarse and Fine Sand Soils

Soil Mechanics. Soil Mechanics

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Standard penetration test (SPT)

ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS

Improvement in physical properties for ground treated with rapid impact compaction

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Standard Test Procedures Manual

Effects of Inadequate Geotechnical Investigation on Civil Engineering Projects

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Soil behaviour type from the CPT: an update

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

GUJARAT NARMADA VALLEY FERTILIZER CO. LTD. (GNFC Ltd) TECHNICAL REPORT GEOTECHNICAL INVESTIGATION FOR PROPOSED TDI PLANT AT VILLAGE RAHIYAD, DAHEJ

Transcription:

GEOTECHNICAL SITE INVESTIGATION REPORT RAMALLAH SPORT HALL (Ein Sama an Street - Ramallah) Prepared for: First Option for Construction Management Co. Prepared by: Hijjawi Construction Labs May - 2009

M-s/ 1 st Option for Construction Management Co. Ramallah Ref : SI/361 Date : 6/5/2009 Project Ramallah Sport Hall Ein Sama an Street Subject - Site Investigation Report Dear Sirs, With reference to your request (SI/361 on 29/4/2009, Hijjawi Construction Labs (HCL) is pleased to submit this report of the site investigation carried out for the proposed construction site of the above mentioned project. The investigation ended up with conclusions and recommendations relevant to the findings. Those, in addition to the laboratory test results and engineering recommendations are herewith attached. We look forward for further cooperation and would like to take this opportunity to highly considerate your confidence in our laboratories. For any clarification concerning this report, please contact us at your convenience. Yours sincerely, Dr. Sami A. Hijjawi General Manager

CONTENTS 1. INTRODUCTION 1.1 GENERAL 1.2 PURPOSE AND SCOPE 2. SITE CONDITIONS 2.1 DESCRIPTION 2.2 SUBSURFACE CONDITIONS 2.3 GROUND WATER 3. FIELD EXPLORATION AND SAMPLING 3.1 DRILLING 3.2 SAMPLING 4. LABORATORY TESTING 4.1 TESTS CARRIED OUT 4.2 SUMMARY OF LABORATORY TEST RESULTS 5. BEARING CAPACITY ANALYSIS 6. SELECTION OF FOUNDATION TYPE 7. SETTLEMENT ANALYSIS 8. ENGINEERING RECOMMENDATIONS 9. REFERENCES 10. APPENDICES

1. INTRODUCTION 1.1 GENERAL This report presents the outcome of the site investigation carried out for the proposed construction site of Ramallah Sport Hall building in Ramallah (Ein Sama an Street). 1.2 PROJECT DESCRIPTION The project consists of the construction of about 1000 m 2 steel structure building (sport hall). 1.3 PURPOSE AND SCOPE Investigation of the underground conditions at a site is prerequisite to the economical design of the substructure elements. It is also necessary to obtain sufficient information for feasibility and economic studies for any project. In general, the purpose of this site investigation was to provide the following: 1- Information to determine the type of foundation required (shallow or deep). 2- Information to allow the geotechnical consultant to make a recommendation on the allowable bearing capacity of the soil. 3- Sufficient data/ laboratory tests to make settlement and swelling predictions. 4- Location of the groundwater level. 5- Information so that the identification and solution of excavation problems can be made. 6- Information regarding permeability and compaction properties of the encountered materials.

7- Information regarding cavitations and other kinds of geological weaknesses within the construction site. This was accomplished through the close cooperation of HCL's geotechnical engineer and the technical staff of its Geotechnical Department. 2. SITE CONDITIONS 2.1 DESCRIPTION The site is located in Ramallah (Ein Sama an street) at the location of the recently demolished slaughterhouse. It is bordered by roads from north, south and east as shown on the attached Figure.1 No high voltage, electrical or telephone poles, sewer or water pipes were observed within the depth of the drilled boreholes. 2.2 SUBSURFACE CONDITIONS The study area on the date of field investigation consisted of different elevations with approximate difference between the higher and lower elevations of about 7-8m. However, the formation within the depths of the drilled boreholes consists mostly of creamy, hard to medium hard formation of marlstone to the full depth of exploration covered by different depth fills. The drilled boreholes for this study reflect the described above general conditions. They are discussed in more detail in the subsequent sections of this report. Borehole logs with description of soil and rock formations are attached in the Appendix. 2.3 GROUNDWATER AND CAVITIES Ground water was not encountered within the depths of the drilled boreholes and no ground water table was observed. No cavities or other kind of weaknesses were noticed within the drilled depths of boreholes.

3. FIELD EXPLORATION AND TESTING 3.1 DRILLING Upon the Client s request, the site investigation program included the exploration of site subsurface conditions at the construction area through the drilling of four boreholes: two to a depth of 8.0 m each and two to a depth of 5.0 m each below the existing ground level. Drilling has been carried out utilizing a truck-mounted drilling rig (Mobile Drill B-31) with the possibility of continuous sampling at different depths and at each lithological change of the strata. 3.2 SAMPLING Two types of samples were collected: a- disturbed samples suitable for identification and index property testing purposes at various depths. b- undisturbed rock samples for strength tests. Representative samples were placed in sealed plastic bags and transported to the laboratory for further testing. In our opinion the obtained samples were of good quality.

4. LABORATORY TESTING Representative soil and rock samples were collected from the drilled boreholes, tightly sealed and transported to HCL's Laboratories in Nablus. 4.1 TESTS CARRIED OUT The following tests were performed to evaluate the engineering properties of the soils and rocks influencing the performance of the proposed structure: 1- Natural moisture contents were determined in accordance with ASTM D- 2216. 2- Atterberg limits (Liquid and Plastic) in accordance with ASTM D-4318. Liquid and plastic limit tests were conducted on the powder of the obtained samples and the plasticity index (PI) was determined. 3- Specific gravity and absorption in accordance with ASTM C-127. 4- Test for Unconfined Compressive Strength of Intact Rock Core Specimens in accordance with ASTM D-2938. 5- Direct shear test in accordance with ASTM D-3080, where three identical specimens were sheared under three vertical load conditions and the maximum shear stress in each case was measured. The strength parameters, namely cohesion (c) and angle of internal friction (Ø) were determined from the maximum shear-vs- normal stress plot. The results of the mentioned above tests are summarized in tables below.

Moisture Liquid Plasticity Borehole Depth content limit Index No. (m) (%) (%) (PI) 793.0-792.0 7.8 32.5 13.2 1 792.0-790.0 10.9 Non plastic (NP) 790.0-785.0 7.5 NP NP 792.0-791.0 - - - 2 791.0-790.0 8.0 NP NP 790.0-789.0 8.5 NP NP 789.0-787.0 7.8 NP NP 789.0-787.5 7.4 42.0 14.9 3 787.5-786.0 7.7 NP NP 786.0-781.0 7.1 NP NP 787.0-786.0 5.5 - - 4 786.0-784.5 9.9 NP NP 784.5-782.0 7.3 NP NP Note : tests were carried out on cuttings resulted from the DTH drilling. Table (1) Summary of Test Results Borehole No. Depth (m) Specific gravity Water absorption (%) Compressive strength (Kg/cm²) 1 791.5 2.333 11.5 76 2 791.0 2.344 10.5 85 3 787.5 2.338 10.8 82 4 784.5 2.353 9.7 105 Table (2) Summary of rock properties

Borehole No. Elevation (m) Cohesion (Kg/cm²) Angle of internal friction φ ( ) 1 792.0-790.0 10 23 2 791.0-790.0 11 24 3 787.5-786.0 11 23 4 784.5-782.0 8 27 *Samples were collected from the cuttings resulted from drilling. Table (3) Summary of Shear Test Result 5. BEARING CAPACITY ANALYSIS Two approaches were utilized to calculate the bearing capacity of the shallow bedrocks: 5.1 Utilizing the bearing capacity Equations: The bearing capacity was calculated using the shear test parameters of cohesion and angle of internal friction and the soil density of the specimens extracted from the boreholes. The following well known Terzaghi equation with correction terms suggested by Schultze can be used to calculate the bearing capacity of rectangular foundation of any sides ratio B:L q ult = (1+ 0.3 B/L) CN c + γ o DN q + (1-0.2 B/L) (γ 1 B/2) N γ where: γ o - Unit weight of soil above foundation level in KN/m³. γ 1 - Unit weight of soil below foundation level in KN/m³. C,Ø - Strength parameters of the soil below foundation level in KN/m² and degrees respectively. B - Width of foundation in (m). L - Length of foundation in (m). N c, N q, N γ - Bearing capacity coefficients dependent on the angle of internal friction

D of the soil below foundation level (dimensionless). - Depth of foundation (m). Calculations for an assumed isolated footing : Considering: B = 2.5m L = 2.5m D = 2.0m γ o = 22 KN/m³ γ 1 = 22 KN/m³ C = 10 KN/m² Ø = 23 º The bearing capacity was computed using a special computer program following Terzaghi method. The sheet with computations is attached. Based on the calculations, a bearing capacity of 363 KPa is given at a depth of not less than 2.0m from the original ground assuming isolated footings will be utilized. 5.2 Utilizing the Code Instructions: According to the known codes of engineering practice, the bearing capacity of rocks is taken as a percentage of the unconfined compressive strength of rock core samples tested in accordance with ASTM D-2938. Following the Jordanian Code for Foundations and Retaining Walls (Amman- 1992) [ 3/7/1-2], the mentioned percentage is 5% for rocks with RQD 25 % and the bearing capacity should not exceed 10 Kg/cm². Taking the lowest compressive strength value of rock core specimens from the table (2) with test results above and applying the percentage of 5%, the strength will be: Q all = 5 % x 76 = 3.8 Kg/cm²

BEARING CAPACITY OF SHALLOW FOUNDATIONS Terzaghi Method Date May 6, 2009 Identification Ramallah Sport Hall BEARING CAPACITY OF SHALLOW FOUNDATIONS Terzaghi and Vesic Methods Date May 6, 2009 Identification Ramallah Sport Hall Input Results Units of Measurement Terzaghi SI SI or E Bearing Capacity Foundation Information q a = 363 kpa Shape SQ SQ, CI, CO, or RE B = 2.5 m Allowable Column Load L = 2.5 m P = 2,268 kn D = 2 m Soil Information c = 10 kpa phi = 25 deg gamma = 22 kn/m^3 Dw = 20 m Factor of Safety F = 3 6. SELECTION OF FOUNDATION TYPE According to the nature and characteristics of the materials encountered in the drilled boreholes as described in 2.2 (hard to medium hard marlstone), we recommend to consider isolated footings with tie beams at any depth after cleaning all debris and loose fill materials. 7. SETTLEMENT ANALYSIS With footings designed and constructed on the described above rocky formation, the settlement is negligible.

8. ENGINEERING RECOMMENDATIONS As a result of field and laboratory activities carried out and the analysis of the available data and test results, the following engineering recommendations can be made: 8.1 ALLOWABLE BEARING CAPACITY According to the analysis of the materials encountered (hard to medium hard marlstone) and the laboratory test results, the recommended allowable bearing capacity is 3.5 Kg/cm² for shallow foundations assuming that foundations will rest on the described marlstone formation after cleaning of all loose inclusions. 8.2 DRAINAGE OF THE SITE It is recommended to design an effective rainwater drainage system to get rid of the consequences of the rainwater percolation into the layers. The site should be graded so as to direct rainwater and water away from all planned structures. 8.3 MATERIALS FOR BACKFILL COMPACTION CRITERIA Materials encountered in the drilled boreholes are satisfactory for using for backfilling purposes. In general, materials for the backfilling should be granular, not containing rocks or lumps over 15 cm in greatest dimension, free from organic matter, with plasticity index (PI) not more than 10. The backfill material should be laid in lifts not exceeding 25 cm in loose thickness and compacted to at least 95 percent of the maximum dry density at optimum moisture content as determined by modified compaction test (Proctor) (ASTM D-1557). 8.4 SEISMIC CONSIDERATIONS As far as the seismic activity in the region has not witnessed any serious earthquakes in the last 70 years, the last earthquake in February 2004 in Palestine and

neighboring Middle East countries and their serious consequences made it necessary to consider a seismic precautive factor in the design of the project structures. Referring to the Unified Building Code Research in Jordan, the area can be considered within Zone B, which corresponds to an intensity of VI to VIII according to the Mercalli Scale (4-6 Richter Scale respectively). According to the seismic zoning chart prepared by An-Najah National University for Palestine (see appendix), the seismic gravity acceleration factor for area (Zone II) z = 0.12-0.15 g, where g gravity acceleration. Finally, it should be noted that the results and recommendations of this report are solely based on the collected samples from the drilled boreholes on May 2 nd, 2009 and assuming that the subsurface conditions do not significantly deviate from those encountered.

9. REFERENCES ١- آودة استطلاع الموقع. وزارة الا شغال العامة والاسكان عمان الطبعة الا ولى ١٩٩٠. آودة القواعد والا ساسات والجدران الساندة. وزارة الا شغال العامة والاسكان عمان الطبعة الا ولى ١٩٩٢. -٢ 3- Code of practice for Site Investigations. BS 5930: 1981. British Standards Institution. 4- Methods of Test for Soils for Civil Engineering Purposes. BS 1377: 1975. British Standards Institution. 5- K.H. Head. Manual of Soil Laboratory Testing. Vol. 1 & 2. ELE International Ltd. London, 1984. 6- J.E. Bowles. Foundation Analysis and Design. Third edition. McGraw - Hill International, 1982. 7- M.J. Tomlinson. Foundation Design and Construction. Fourth edition, ELBS, London, 1983. 8- R.Peck, W.Hanson, T.Thornburn. Foundation Engineering. 2nd edition, Willey, 1980. 9- N. Tsytovich. Soil Mechanics. Mir Publishers. Moscow, 1987. 10- N. Maslov. Basic Engineering Geology and Soil Mechanics. Mir Publishers. Moscow, 1987.

10. APPENDICES

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only. BH.2 BH.1 BH.4 BH.3 Fig.1 Approximate locations of boreholes

BOREHOLE LOG Project Ramallah Sport Hall Location Ramallah Borehole No. 1 Page No. 1/1 Drilling Date 2/5/2009 Ground level 793.0 Weather Sunny Drill Rig Mobile B-31 Operator Adnan 793.0 792.0 791.0 Scale (m) Sampler Type Symbol Description of soil strata Fill material of brown silty clay and boulders Soft to medium hard formation of creamy and slightly damp marlstone with occasional boulders USCS CL - SPT (No. of blows) 15 15 15 N R 790.0 R 789.0 788.0 787.0 Hard formation of creamy marlstone - 786.0 785.0 End of boring @ 785.00 Water Record Level, at which water was encountered None Color of water - Water level 24hrs. after completion Remarks : USCS- Unified Soil Classification System R- Refusal (more than 50 blows) None Approved : Dr. Sami A. Hijjawi E:\HCL\Site Invest E\ - رام االله\الصالة الرياضية Borehole \مباني Log.doc

BOREHOLE LOG Project Ramallah Sport Hall Location Ramallah Borehole No. 2 Page No. 1/1 Drilling Date 2/5/2009 Ground level 792.0 Weather Sunny Drill Rig Mobile B-31 Operator Adnan 792.0 Scale (m) Sampler Type Symbol Description of soil strata USCS Asphalt and base course - SPT (No. of blows) 15 15 15 N 791.0 Hard creamy formation of marlstone - R 790.0 789.0 Medium hard formation of creamy marlstone - R R 788.0 Hard formation of creamy marlstone - 787.0 End of boring @ 787.0 Water Record Level, at which water was encountered None Color of water - Water level 24hrs. after completion Remarks : USCS- Unified Soil Classification System R- Refusal (more than 50 blows) None Approved : Dr. Sami A. Hijjawi E:\HCL\Site Invest E\ - رام االله\الصالة الرياضية Borehole \مباني Log.doc

BOREHOLE LOG Project Ramallah Sport Hall Location Ramallah Borehole No. 3 Page No. 1/1 Drilling Date 2/5/2009 Ground level 789.0 Weather Sunny Drill Rig Mobile B-31 Operator Adnan 789.0 788.0 787.0 786.0 Scale (m) Sampler Type Symbol Description of soil strata Fill materials of silty clay and boulders Medium hard formation of creamy marlstone USCS CL - SPT (No. of blows) 15 15 15 N R 785.0 R 784.0 783.0 Hard to very hard formation of creamy marlstone - 782.0 781.0 End of boring @ 781.00 Water Record Level, at which water was encountered None Color of water - Water level 24hrs. after completion Remarks : USCS- Unified Soil Classification System R- Refusal (more than 50 blows) None Approved : Dr. Sami A. Hijjawi E:\HCL\Site Invest E\ - رام االله\الصالة الرياضية Borehole \مباني Log.doc

BOREHOLE LOG Project Ramallah Sport Hall Location Ramallah Borehole No. 4 Page No. 1/1 Drilling Date 2/5/2009 Ground level 787.0 Weather Sunny Drill Rig Mobile B-31 Operator Adnan 787.0 786.0 785.0 784.0 783.0 Scale (m) Sampler Type Symbol Description of soil strata Debris of concrete, base course and silty clay Soft to medium hard, slightly damp formation of creamy marlstone with occasional boulders Hard to very hard creamy formation of creamy marlstone USCS - - - SPT (No. of blows) 15 15 15 N R R 782.0 End of boring @ 782.00 Water Record Level, at which water was encountered None Color of water - Water level 24hrs. after completion Remarks : USCS- Unified Soil Classification System R- Refusal (more than 50 blows) None Approved : Dr. Sami A. Hijjawi E:\HCL\Site Invest E\ - رام االله\الصالة الرياضية Borehole \مباني Log.doc

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only. 793.0 BH.1 (793.0) Loose fill BH.2 (792.0) 791.0 789.0 Medium hard marlstone Loose fill BH.3 (789.0) Loose fill 787.0 787.0 Medium hard marlstone 785.0 Medium hard marlstone 785.0 783.0 781.0 781.0 Cross section through boreholes 1,2,3