UNC Charlotte Network Replacement Project

Similar documents
Information Services Hosting Arrangements

Nuance Healthcare Services Project Delivery Methodology

As the new environment is built, several other improvements will be made.

2008 BA Insurance Systems Pty Ltd

Help Desk Level Competencies

Systems Support - Extended

Service Level Agreement

Information Technology Department REQUEST FOR PROPOSALS

Build the cloud OpenStack Installation & Configuration Integration with existing tools and processes Cloud Migration

Digital Signage Proposal Prepared For:

Change Management Process For [Project Name]

Washington State Department of Information Services. State Data Center Migration Project Charter. August, 2011 DRAFT

OE PROJECT MANAGEMENT GLOSSARY

Enhanced Enterprise Mobility Assessment Program Description

Change Management Process

Symantec User Authentication Service Level Agreement

Security Services. Service Description Version Effective Date: 07/01/2012. Purpose. Overview

Process Improvement Center of Excellence Service Proposal Recommendation. Operational Oversight Committee Report Submission

Implementing an electronic document and records management system using SharePoint 7

Business Continuity Management Policy

General Information Project Title. Enterprise Service Management Reporting 7/3/2012 Project Manager Phone

expertise hp services valupack consulting description security review service for Linux

WUSM/TFC VoIP Migration Charter Status: Final Version: 1.00

CSU STANISLAUS INFORMATION TECHNOLOGY PLAN SUMMARY

1.2 Supporting References For information relating to the Company Hardware Request project, see the SharePoint web site.

Data Warehouse Scope Recommendations

Good Secure Collaboration Suite Quickstart Program Description ( Quickstart Program Description )

Entrepreneur Purchasing Recommendations for CRM

Corporate Profile, 2014

System Business Continuity Classification

ITIL Release Control & Validation (RCV) Certification Program - 5 Days

Systems Load Testing Appendix

Incident Management-Roles and Responsibilities

IT Help Desk Service Level Expectations Revised: 01/09/2012

Zimbra Professional Services Portfolio, Purchasing Guide & Price List

Business Plan

CARRIER COORDINATION TEAM Plan for Operations Committee

A project manager may choose to use a combination or hybrid of agile and waterfall processes on a project. Here, we describe only the agile process.

Project Startup Report Presented to the IT Committee June 26, 2012

Project Management Professional Preparation for Certification CIE 5017 Five 8-hour days (4.0 CEUs)

POLICY 1390 Information Technology Continuity of Business Planning Issued: June 4, 2009 Revised: June 12, 2014

INFRASTRUCTURE TECHNICAL LEAD

Version: Modified By: Date: Approved By: Date: 1.0 Michael Hawkins October 29, 2013 Dan Bowden November 2013

Computer Relocation Services

How to Reduce Project Lead Times Through Improved Scheduling

Helpdesk Services at the Executive Office of Energy and Environmental Affairs is defined as follows:

GUIDELINE INFORMATION MANAGEMENT (IM) PROGRAM PLAN

CDC UNIFIED PROCESS PRACTICES GUIDE

TrustED Briefing Series:

Major capital investment in councils. Good practice checklist for project managers

ITIL Service Offerings & Agreement (SOA) Certification Program - 5 Days

BES12 Jumpstart Program Description ( Jumpstart Program Description )

TESTING TIMES: HOLISTIC ENVIRONMENT MANAGEMENT IN AN AGILE WORLD

June 29, 2009 Incident Review Dallas Fort Worth Data Center Review Dated: July 8, 2009

WASHINGTON STATE UNIVERSITY EXTENSION NEW EMPLOYEE CHECKLIST

System Business Continuity Classification

Managed Firewall Service Definition. SD007v1.1

POSITION NUMBER: LOCATION: Vancouver. DATE: February 2009

IT CHANGE MANAGEMENT POLICY

Service Description Implementing Kimble Professional Services Automation

Seneca R7 School District REQUEST FOR PROPOSAL E-Rate Internal Connections / Managed Internal Broadband Services / Basic Maintenance

Service Level Agreement

The Importance Advanced Data Collection System Maintenance. Berry Drijsen Global Service Business Manager. knowledge to shape your future

Agenda. o Purpose of IT Assessment o Scope of IT Assessment o Deloitte Recommendations o IBM Discussions o Research Data Center o Open Season

Sources of Federal Government and Employee Information

REQUEST FOR PROPOSAL FOR SHAREPOINT LEGISLATIVE MANAGEMENT SERVICES

Project Charter. Course and Learning Management System Evaluation. Executive Summary. Business Need and Background. Project Description

Internal Audit Charter and operating standards

CSC IT practix Recommendations

Lumesse TalentLink pricing guide for G-Cloud 5

This report provides Members with an update on of the financial performance of the Corporation s managed IS service contract with Agilisys Ltd.

Army DCIPS Employee Self-Report of Accomplishments Overview Revised July 2012

1)What hardware is available for installing/configuring MOSS 2010?

CHANGE MANAGEMENT STANDARD

Manager Checklists for Hiring New Employees

UCISA-Infrastructure Group Case Study

Database Services - Extended

PURPOSE The purpose of this Position Description (PD) is to assist the employee in the following areas:

Mobile Workforce. Improving Productivity, Improving Profitability

FY-2006 Networking and Security Engineering and Operations NASA Task TM: Richard Kurak

Request for Resume (RFR) CATS II Master Contract. All Master Contract Provisions Apply

Electronic and Information Resources Accessibility Compliance Plan

In addition to assisting with the disaster planning process, it is hoped this document will also::

OR 2) Implement and customize an off the shelf product that would suit the requirements

Professional Leaders/Specialists

CASSOWARY COAST REGIONAL COUNCIL POLICY ENTERPRISE RISK MANAGEMENT

G-CLOUD FRAMEWORK SERVICE DEFINITION. Solution Architecture for Cloud Service. Copyright: point6 Ltd

Vulnerability Management:

Oakland County Department of Information Technology Project Scope and Approach

ITIL V3 Planning, Protection and Optimization (PPO) Certification Program - 5 Days

Solution. Industry. Challenges. Client Case Study. Legacy Systems too Costly to Maintain. Supply Chain Advantage. Delivered.

Datasheet. PV4E Management Software Features

CS 360 Software Development Spring 2008 Tuesdays and Thursdays 3:30 p.m. 4:45 p.m.

SaaS Listing CA Cloud Service Management

Business Intelligence and DataWarehouse workshop

Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd

Business Continuity Management Policy

State of Wisconsin. File Server Service Service Offering Definition

Multi-Year Accessibility Policy and Plan for NSF Canada and NSF International Strategic Registrations Canada Company,

EE1 Introduction for User Groups

Transcription:

UNC Charltte Netwrk Replacement Prject Prject Charter Release 1.11 December 16, 2010 Dcument Infrmatin and Revisin Histry File Name Netwrk Management Charter.dc Original Authr(s) Haya Ajjan Current Revisin Authr(s) Versin Date Authr(s) Revisin Ntes 1.10 May 2 Haya Ajjan Infrmatin cllected during meeting with Ms. Pat Barber, Dr. Jay Dminick, and Mr. Tm Lamb 1.20 May 10 Pat Barber Updated Prject Team Stakehlders: Executive Spnsr: Prject Spnsr(s): 1 Last Updated: 12/16/2010

Intrductin The main purpse f this prject is t replace existing legacy infrastructure cmpnents as they reach their end-f-life with current cyber infrastructure. This prject is requested t prvide an enabling framewrk that: 1- Increase netwrk reliability and speed 2- Increase netwrk flexibility 3- Prvide imprved netwrk security 4- Reduce single pints f failure 5- Imprve netwrk scalability 6- Prvide end-users with a better secure mbile experience 7- Imprve end-user satisfactin 8- Prvide new needed services that are currently nt pssible due t utdated infrastructure cmpnents 9- Imprve current telephne system 10- Reduce maintenance cst (is this ne f the gals?) Prject Scpe Prject Gals and Objectives Gals Increase netwrk reliability and speed Objectives Imprve reliability by replacing equipment that serves a critical functin n campus but that is s ld that it is n lnger maintained by the vendr. Meet high perfrmance research needs by increasing the bandwidth between buildings t 10Gigabits/Secnd. Increase bandwidth within a building t be able t deliver 1 GB/Secnd everywhere and up t 10 GB/Sec in limited cases. Deply special purpse virtual netwrks t supprt research and peratinal needs withut having t physically rewire the netwrk. Replace existing wireless netwrk infrastructure with a higher perfrming netwrk that prvides cmplete cverage acrss campus indr spaces. Upgrade backbne cmpnents t imprve reliability, remve single pints f failure and increase perfrmance. Upgrade existing netwrk cabling in lder buildings including thse n the quad t permit higher speed netwrking. Imprve netwrk flexibility Deply a new technlgy called MPLS t allw the creatin f special purpse netwrks within netwrks. Imprve the student experience n the wireless netwrks thrugh the deplyment f new technlgy fr authenticatin and netwrk cnfiguratin. 2 Last Updated: 12/16/2010

Upgrade phne system Upgrade telephne systems t VOIP single phne and single vice mail system t replace existing phne switch Imprve user satisfactin Prvide new services that are needed but currently nt pssible due t utdated infrastructure. Supprt the campus virtualizatin strategy by prviding the high speed, reliable netwrks necessary fr peple t trust using cmputers that aren t lcated underneath their desks. Imprve verall netwrk perfrmance, reducing the time fr dwnlads, file transfers and imprving access time t all f ur central systems. Prvide imprved functinality fcused n increased mbility and increased capacity Prject Management Apprach Apprach/Methd Supprting Infrmatin Risk Management Apprach Ptential Risks: Dwntime assciated with the implementatin Staff learning the new technlgy Key staff retirement Resurce cmmitment Managing resurce pl ver nine mnths perid Electrical facility prject interdependency Sub-cntractrs/ installer Gaining access t ffices Financial Risk Depend n ne time funding Envirnmental risk (hrizntal cabling) Limited physical space risk (ex. Denny, Bernard) Backup cnfiguratin Technical risk assciated with prper deplyment f MPLS End users training Lease cntract risk/ lease terms finalizatin Resurce cnstraints Building size (ex. Wdward) Scpe Management Apprach New access, distributin, and cre netwrk infrastructure New telephne system Cmmunicatins Management Apprach Pssible apprach: hire FTE t be respnsible fr cmmunicating prgress t stakehlders Change Integratin Prcess Establish a change management apprach Apprach Staged planned implementatin Extensive training prgram Vendr supprt Extensive dcumentatin (ex. pen a ticket when a change is intrduced) Change cntrl meetings Prject Cnclusin Apprach Last cnnectin is installed 3 Last Updated: 12/16/2010

Phnes migrated t VOIP Switch-ff ld vicemail system Test data turned-ver Dcumentatin turned-ver User training cmplete Vendr check list Prject acceptance dcument 4 Last Updated: 12/16/2010

Prject Organizatin Executive Spnsr Prject Spnsr Rle Descriptin Assignment UNCC Prject Manager CTI Prject Manager. CTI Inventry Manager Netwrk Technician Netwrk Technician MPLS Lead WIFI Lead Rack Persnnel Cabling Persnnel Security Security Installatin Lead CTI Trainer Cisc Technical Lead Cisc Technical Expert Cmmunicatin Crdinatr Has ultimate authrity ver and is respnsible fr a prject, its scpe & deliverables Assists in develping the prject charter and prject plans, executes prject reviews, & dispses f issues and change requests Develps and maintains prject charter and prject plans, executes prject reviews, tracks & dispses f issues & change requests, manages the budget, and is respnsible fr technical quality f the slutin Respnsible fr all layer 1 infrastructure related issues invlved in the prject. Respnsible fr all layer 2 infrastructure and partial layer 1 respnsibility fr any f these issues invlved in the prject. Respnsible fr all layer 3 and MPLS related issues invlved in the prject. Respnsible fr all 802.11x issues invlved in the prject. Respnsible fr staging and installatin f all switching, ruting and ther electrnics assciated with the prject. Als respnsible fr reprting inventry infrmatin and as built diagrams and reprts back t the inventry cntrl lead. Respnsible fr all hrizntal cabling installatin, testing and dcumentatin assciated with the prject. Respnsible fr the verall design, cnfiguratin and installatin f the security verlay assciated with the prject. Respnsible fr all installatin, testing and dcumentatin fr the security verlay assciated with the prject. Respnsible fr MPLS and ther technical training assciated with the prject. Respnsible fr any and all issues escalated t Cisc fr reslutin assciated with the prject. Respnsible fr supplying technical expertise in any specific technical area as needed thrughut the prject. Is respnsible fr the cmmunicating the prject prgress t key stakehlders. Dr. Jay Dminick Tm Lamb Try Russell Dale Crk Dn Lattimre Brian Fruits 4-12 Vendr Prvided 4-8 Vendr Prvided Carter Heath Tby Andrews Bianca Wng Thmas 1-2 Vendr Prvided Vendr Meru is the primary prvider f the 802.11x cmpnent f the prject t include installatin, testing and technical supprt. Presidi Netwrks is the Cisc partner that will prvide prject management, rack and Meru Netwrk, Presidi Netwrk Slutin, Cisc, Airtight netwrk 5 Last Updated: 12/16/2010

Facility Management Crdinatr Department Crdinatr stack services, inventry cntrl and ther technical assistance as needed. AirTight is the supplier f the 802.11x security verlay cmpnent. Cisc is the OEM supplier f the switching and ruting equipment. Prject Assumptins Assumptin Spnsrship cmmitment Apprpriate resurces Resurce cmmitment Business cmmitment Apprpriate change management checkpints and feedback Apprvals as needed t mve frward Descriptin The Vice Chancellr fr ITS will be the spnsr fr the prject and is cmmitted t ensuring its success. ITS des nt have the Human Resurces necessary t implement the upgrade n its wn. We will cntract fr thse resurces thrugh the prject. The ITS staff that are required fr the prject will be dedicated 90% t the prject. Prject Plan Summary Prject Wrk plan Summary Prject milestnes are listed belw. Date Milestne 5/24/10 Apprval f prject charter Define prject team Define cmmunicatin plan Define design plan Define Rll ut plan 6/1/10 Funding apprval and cmmitment 6/15/10 Sign cntracts with vendrs 7/1/10 Prject kick ff Rll ut Plan Phased regin plan Phased cre plan 6 Last Updated: 12/16/2010

Phased wireless plan Phased phne plan Wireless plan executin Regin plan executin Cre plan executin Phne migratin Testing and Finalizatin Prcess/ dcumentatin update Required training implementatin Prject Staffing Summary Staffing Summary fr Cre Team Resurce Type Number f FTE s Duratin (weeks) Hurs ITS Business TOTAL Detailed Prject Staffing Mnth ITS Resurces Expert Name May June July August September Octber Prject Spnsr Prject Manager Prject Team Prject Team Cmmunicatin Team 7 Last Updated: 12/16/2010

Ttal ITS Wrk Hrs ITS Cntingency Hrs ITS Staffing Csts Other department Resurces Facilities Cntact Business Manager Ttal Wrk Hrs Ttal Staffing Csts Prject Budget Infrmatin Budget Infrmatin Was this prject included in the current years Budget? If yes state the amunt budgeted fr the prject. If n explain hw the prject will be funded and any resulting budget variance handled. Yes/N $0.00 - n incremental cst. 8 Last Updated: 12/16/2010