Flight Leader Concept for Wind Farm Load Counting and Performance Assessment



Similar documents
Operation and maintenance cost estimator (OMCE) to estimate the future O&M costs of offshore wind farms

Turbulence assessment with ground based LiDARs

Measurements at the ECN Wind Turbine Test Location Wieringermeer

Database of measurements on the offshore wind farm Egmond aan Zee

Current Profiles at the Offshore Wind Farm Egmond aan Zee J.W. Wagenaar P.J. Eecen

Controlling Wind in ECN s Scaled Wind Farm J.W. Wagenaar L.A.H. Machielse J.G. Schepers

Controlling Wind in ECN s Scaled Wind Farm

Critical Limitations of Wind Turbine Power Curve Warranties

A E O L I S F O R E C A S T I N G S E R V I C E S WIND FARM ENERGY ASSESSMENT - FEASIBILITY STUDY. Kees van Vliet

Title: IEC WT 01 vs. IEC Development of a new standard and innovations in certification of Wind Turbines. mike.woebbeking@gl-group.

User orientated simulation strategy to analyse large drive trains in SIMPACK

User manual data files meteorological mast NoordzeeWind

THE NEW GUIDELINE FOR THE CERTIFICATION OF WIND TURBINES, EDITION 2010

Power output of offshore wind farms in relation to atmospheric stability Laurens Alblas BSc

POWER CURVE MEASUREMENT EXPERIENCES, AND NEW APPROACHES

Uncertainty of Power Production Predictions of Stationary Wind Farm Models

Coupled CFD and Vortex Methods for Modelling Hydro- and Aerodynamics of Tidal Current Turbines and On- and Offshore Wind Turbines

Power Performance Testing: Truly Useful of Just Box Ticking. Mark Young 2 July 2012

EST.03. An Introduction to Parametric Estimating

COMPARISON OF LIDARS, GERMAN TEST STATION FOR REMOTE WIND SENSING DEVICES

Siemens D3 platform 3.0-MW, 3.2-MW, 3.3-MW, and 3.4-MW direct drive turbines. Reduced complexity, increased profitability. siemens.

Results of wake simulations at the Horns Rev I and Lillgrund wind farms using the modified Park model

Far and Large Offshore Wind innovation program (FLOW) Presentatie IRO CEDA. Ernst van Zuijlen, 9 maart 2010, Den Haag

Transient Wind Events and Their Effect on Drive-Train Loads INTERNATIONAL. siteurpublications

Databases. by David Cerda Salzmann

O&M Cost Modelling, Technical Losses and Associated Uncertainties

Bank Customers (Credit) Rating System Based On Expert System and ANN

ENERGY YIELD ASSESSMENT

Comparative Cost Study of a 35m Wind Turbine Blade using Infusion and Prepreg Materials Technology

German Test Station for Remote Wind Sensing Devices

A Study to Predict No Show Probability for a Scheduled Appointment at Free Health Clinic

Development and demonstration of the Operation & Maintenance Cost Estimator (OMCE) to estimate the future O&M costs

22nd European Photovoltaic Solar Energy Conference Milan, Italy, September 2007

Advanced analytics at your hands

ANN Based Fault Classifier and Fault Locator for Double Circuit Transmission Line

GE Renewable Energy. GE s 3 MW Platform POWERFUL AND EFFICIENT.

Joseph Twagilimana, University of Louisville, Louisville, KY

Load verification of the Arklow Bank Offshore Wind Farm

V MW & V MW (OFFSHORE)

MAXIMISING YOUR. Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES

2 Session Two - Complex Numbers and Vectors

QUALIFICATION OF MATERIALS AND BLADES FOR WIND TURBINES. Jakob Wedel-Heinen and Josef Kryger Tadich

Sound Power measurements according to IEC

Environmental aspects of offshore wind energy. Jakob Asjes Jakob Asjes IMARES, Institute for Marine Resources and Ecosystem Studies

Risø-R-1374(EN) Design of a 21 m Blade with Risø-A1 Airfoils for Active Stall Controlled Wind Turbines

REGIONAL COUNCIL KOP VAN NOORD-HOLLAND KOP & MUNT INTERREG PROJECT POWER PUSHING OFFSHORE WIND ENERGY REGIONS WORKPACKAGE 2, SUPPLY CHAIN

Offshore Wind Project Management

Case Study 5 Use of Wind Turbine Technology

Software Development Cost and Time Forecasting Using a High Performance Artificial Neural Network Model

The Effects of Start Prices on the Performance of the Certainty Equivalent Pricing Policy

QUALITY OF WIND POWER. How does quality affect the cost of electricity generation from wind power?

Environment Protection Engineering APPROXIMATION OF IMISSION LEVEL AT AIR MONITORING STATIONS BY MEANS OF AUTONOMOUS NEURAL MODELS

The MAINTENANCE MANAGER Collecting and Analysing Maintenance Data of Wind Turbines. L.W.M.M. Rademakers H. Braam

Dutch wind energy strength

Modelling and Big Data. Leslie Smith ITNPBD4, October Updated 9 October 2015

Analecta Vol. 8, No. 2 ISSN

How Dutch innovations support 40% cost price reduction. June 13th 2013 How Dutch innovations support 40% cost price reduction 1

Simplified Design as Secret to higher Performance: Siemens Direct Drive Technology

Power Prediction Analysis using Artificial Neural Network in MS Excel

Experimental Wind Turbine Aerodynamics

Data, Measurements, Features

GE Power & Water Renewable Energy. Digital Wind Farm THE NEXT EVOLUTION OF WIND ENERGY.

Neural Network Add-in

The Combination Forecasting Model of Auto Sales Based on Seasonal Index and RBF Neural Network

Offshore Wind Farm Layout Design A Systems Engineering Approach. B. J. Gribben, N. Williams, D. Ranford Frazer-Nash Consultancy

Wind Farm Zone. Offshore wind energy. in the Netherlands. Project & Site Description. # Borssele

Aeroelastic Investigation of the Sandia 100m Blade Using Computational Fluid Dynamics

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh

V MW. Your best option for low cost energy production at low and medium wind sites. Federico Gonzalez Vives. Director Technology.

A Neural Network and Web-Based Decision Support System for Forex Forecasting and Trading

Stationary uplift measurement as a diagnostic tool for pantograph monitoring. H. Möller, H. Maly, B. Sarnes

Partial Estimates of Reliability: Parallel Form Reliability in the Key Stage 2 Science Tests

Impelling Heart Attack Prediction System using Data Mining and Artificial Neural Network

The Reliance on Wind Energy Depends on Advancements in Blade Pitch Control

Getting smart(er) in Offshore Wind O&M

Comparison of K-means and Backpropagation Data Mining Algorithms

The information in this report is provided in good faith and is believed to be correct, but the Met. Office can accept no responsibility for any

Chapter 2 The Research on Fault Diagnosis of Building Electrical System Based on RBF Neural Network

SITE SPECIFIC WIND TURBINE FOUNDATION CERTIFICATION

Credit Card Fraud Detection Using Self Organised Map

Nordex SE. Capital Markets Day Products & Sales - Lars Bondo Krogsgaard

Offshore Wind Turbine Support Structures

Session 7 Bivariate Data and Analysis

Validation n 2 of the Wind Data Generator (WDG) software performance. Comparison with measured mast data - Flat site in Northern France

Impact of Feature Selection on the Performance of Wireless Intrusion Detection Systems

A Color Placement Support System for Visualization Designs Based on Subjective Color Balance

Siemens D7 platform 6.0-MW and 7.0-MW direct drive wind turbines. The new standard for offshore. siemens.com/wind

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

An Implementation of Active Data Technology

Extend Table Lens for High-Dimensional Data Visualization and Classification Mining

WindScanner Research Infrastructure to measure 3D wind with scanning Lidars

Predict Influencers in the Social Network

Abstract. 1 Introduction

INTELLIGENT ENERGY MANAGEMENT OF ELECTRICAL POWER SYSTEMS WITH DISTRIBUTED FEEDING ON THE BASIS OF FORECASTS OF DEMAND AND GENERATION Chr.

Aeroelastic models for wind turbines

Cash Forecasting: An Application of Artificial Neural Networks in Finance

Comparison of Supervised and Unsupervised Learning Classifiers for Travel Recommendations

Web Usage Mining: Identification of Trends Followed by the user through Neural Network

newenergylabel.eu The new European energy label: the success story continues

6.2.8 Neural networks for data mining

Transcription:

Flight Leader Concept for Wind Farm Load Counting and Performance Assessment T.S. Obdam L.W.M.M. Rademakers H. Braam This report has been presented at the European Wind Energy Conference 2009, Marseille, France, 16-19 March 2009 ECN-M--09-054

Flight Leader Concept for Wind Farm Load Counting and Performance Assessment T.S. Obdam, L.W.M.M. Rademakers, H. Braam Energy Research Centre of the Netherlands (ECN) Wind Energy P.O. Box 1 1755 ZG Petten Tel. (+31) 224 56 4395 Fax. (+31) 224 56 8214 obdam@ecn.nl Abstract ECN is developing the Flight Leader model, which is based on a concept with which the accumulated mechanical loading of all turbines in an offshore wind farm can be estimated at acceptable costs. This information can be used to optimise and lower the cost of Operation & Maintenance (O&M), for example by prioritising inspections and replacements. In this paper the background and general concept of the Flight Leader model are presented. Key to the application of the Flight Leader concept are the relations between standard (SCADA) signals and load indicators. The more accurate these relations, the more reliable are the calculations of accumulated loading. Using measurements from ECN s EWTW wind farm it will be shown how artificial neural network (ANN) techniques can be used for accurately estimating load indicators using only 10-minute statistics of standard SCADA parameters. Keywords: Load Monitoring, Offshore Wind Energy, Operation & Maintenance 1. Introduction Operation & Maintenance (O&M) costs for offshore wind farms account for up to 30% of the kwh price [1]. Lowering these costs is an important prerequisite for the economical exploitation of large offshore wind farms. The adequate planning of condition based maintenance is one aspect that could decrease the O&M costs; instead of having similar maintenance and inspection schemes for all turbines, the O&M requirements for each turbine can be made more dependent on its accumulated mechanical loading [2]. The most obvious way to get insight in the loading of all turbines in an (offshore) wind farm is to instrument all turbines with load measurements on the critical components. However, in practice after a wind farm is built, the actual loads on components are measured in only very few occasions. This is mainly caused by the fact that an adequate measurement campaign is labour intensive, costly and time consuming, especially if all turbines need to be measured. Figure 1: General structure of the flight leader computer model.

ECN is developing the Flight Leader concept, which is a methodology where only a small number of turbines at strategic locations in the offshore wind farm are equipped with mechanical load measurements. Using the measurements at these so-called Flight Leader turbines relations are established between standard (SCADA) signals and load indicators. Combining these relations with the standard signals of all other turbines in the wind farm, offers the possibility to keep track of the accumulated mechanical loading of all turbines in the offshore wind farm at low costs. This is illustrated in Figure 1. ECN is currently developing a demo version of a software model [3, 4], which includes all aspects of the Flight Leader concept. The software is intended to be used by operators of offshore wind farms and is used to process the SCADA data and mechanical load measurements from the offshore wind farm. The main output of the model is a comparison of the accumulated mechanical loading of all turbines in the offshore wind farm. This information can subsequently be used to optimise O&M strategies, for example by prioritising the inspection or replacement of certain components on the heavier loaded turbines. The structure and functionality of the software model is explained in more detail in chapter 2. Key to the application of the Flight Leader concept are the relations between standard (SCADA) signals and load indicators. The more accurate these relations, the more reliable are the calculations of accumulated loading. Using measurements from the ECN Wind turbine Test location Wieringermeer (EWTW), it will be shown how artificial neural network (ANN) techniques can be used for accurately estimating load indicators using only 10-minute statistics of standard SCADA parameters. First a short introduction on the EWTW wind farm and neural networks is given in chapter 3 and 4 respectively. In chapter 5 the approach is discussed and the actual results of the analysis are presented. 2. The flight leader model In this chapter the structure of the flight leader model will be treated in more detail. The general structure for the flight leader computer model is shown in the flowchart in Figure 2. In the following subsections the different parts of the flight leader model will be discussed in more detail. Figure 2: General structure of the flight leader computer model. 2.1 Data input The input for the flight leader model is the data that are collected from the offshore wind farm. Two types of data can be distinguished; (1) SCADA data, which are being collected from all turbines and (2) mechanical load measurements, which are being collected only from the flight leader turbines. Both data should be collected as 10-minute statistics. 2.2 Data categorisation Unfortunately a wind turbine does not always operate in normal power production mode. Furthermore, when located in an (offshore) wind farm, wind turbines do not always experience free-stream wind conditions. Both mentioned conditions are expected to have an effect on the mechanical loading. In order to take this into account the first step of the flight leader model is to categorise each timestamp in the dataset in one of the possible combinations of the five pre-defined turbine states j and three pre-defined wake conditions

k. 1 The possible combinations are indicated in Table 1. Table 1: Possible combinations of turbine states & transitional modes and wake conditions. ID Turbine state or transitional mode j tion k Wake condi- 1.1 Free-stream 1.2 Normal power production Partial wake 1.3 Full wake 2.1 Parked/Idling 3.1 Start-up 4.1 Normal shutdown Free-stream 5.1 Emergency shutdown 2.3 Empirical database After all available data have been categorised the measurements from the flight leader turbines can be used to establish relations between (standard) SCADA parameters and load indicators, which are representative for the damage, aging or degradation of a certain component. As mentioned in the previous section, these relations are expected to differ for the identified turbine states & transitional modes and wake conditions. Therefore the relations between SCADA parameters and load indicators have to be determined for each of the possible combinations shown in Table 1. The software model offers the possibility to characterise the relations using more traditional methods such as interpolation or multivariate regression but also using artificial neural network techniques. 2.4 Simulated database In the period directly after the commissioning of the offshore wind farm little measured data are available. Therefore it might be beneficial to incorporate the results of aero-elastic simulations into the flight leader model. This is particularly interesting for those situations with a low probability of occurrence, such as emergency shutdowns or extremely high wind speeds. 2.5 Estimating load indicators Next step is estimating the load indicators at all turbines in the offshore wind farm. This is achieved by combining the SCADA data, collected at all turbines, with the relations between SCADA parameters and load indicators as stored in the empirical database. Optionally, for this process also results from aero-elastic simulations can be incorporated. 1 It is assumed that wake conditions are only relevant in case a wind turbine operates in normal power production. The situation might occur that for a certain turbine for a certain amount of time no SCADA data are available. For these periods the load indicators cannot be estimated neither with the empirical nor the simulated database. In order to ensure a fair comparison of the total accumulated loading the software also contains a procedure for handling missing data. 2.6 Output Finally, the last part of the model is the process of generating and displaying the desired output of the flight leader model. The main output consists of a comparison of the accumulated mechanical loading of all turbines in the offshore wind farm. This output needs to be shown for the several load indicators (e.g. blade root bending, tower bottom bending or main shaft torque). Besides the main output the software model can calculate and display various breakdowns of the accumulated loading. For instance the contribution of each turbine state or transitional mode or wake condition to the total accumulated loading can be displayed. Furthermore the load accumulation per time period can be studied. These outputs can be used to get more insight in the performance of the offshore wind farm and what operating conditions have the largest impact on the loading of the turbines in the offshore wind farm. 3. The EWTW wind farm In this chapter some brief information regarding the EWTW wind farm is presented. 3.1 Location The ECN Wind turbine Test location Wieringermeer (EWTW) [5, 6, 7] is located in the Wieringermeer, a polder in the northeast of the province Noord-Holland, 3 km north of the village of Medemblik and 35 km east of ECN Petten. The test location and its surroundings are characterised by flat terrain, consisting of mainly agricultural area, with single farmhouses and rows of trees. The lake IJsselmeer is located at a distance of 2 km east of EWTW. 3.2 Layout The EWTW contains two rows of wind turbines; a row of five research Nordex N80 turbines and a row of four prototype turbines. For wind speed measurements three meteorological masts are located at the EWTW; meteorological mast 3 just south of the row of research turbines and meteorological masts 1 and 2 just south of the row of prototype turbines.

An overview of EWTW is shown in Figure 3. Figure 3: Overview of the ECN Wind turbine Test location Wieringermeer (EWTW). 3.3 Measurement campaign Since October 2004 various measurements campaigns have been carried out at the EWTW find farm. The data collected from the five research Nordex N80 turbines include: Maintenance sheets; SCADA data (134 signals, 10-minute statistics) for all five Nordex N80 turbines. The data are obtained from Nordex on a daily basis; Measured SCADA data (25 Hz) from all five Nordex N80 turbines; o Turbine operational mode; o Wind speed; o Wind direction; o Electrical power output; o Generator speed; o Yaw direction; o Pitch angle. Mechanical load measurements at 2 Nordex N80 turbines (N6 & N8): o Blade root bending moments; o Tower bottom bending moments; o Tower top torsion; o Main shaft torque and bending moments; o High speed shaft torque. The measurements at the Nordex N80 turbines have been used for various types of research. Examples are wake analyses, characterising failure behaviour, evaluating condition monitoring techniques and developing and evaluating new (wind farm) control strategies. 4. Artificial neural networks Besides the more classical techniques of interpolation and regression so-called artificial neural networks can also be applied to model the relationship between two or more variables. 4.1 General description A neural network in fact represents a mathematical model, where a number of (transfer) functions are connected in parallel and, possibly, also in series. Based on the weighted sum of multiple input signals each transfer function calculates a value, which subsequently serves as input for the next transfer function. The transfer function, including the weighted summation of multiple input signals, is labelled as neuron. A neural network with a sufficient number of neurons is, in theory, able to approximate every possible function. A schematic representation of a neuron and a neural network (consisting of two hidden layers of neurons) is shown in Figure 4. Input Factor Factor Factor Σ Neural network Hidden layers Transfer function Output Figure 4: Schematic representation of a neuron and a neural network. 4.2 Application For the analyses that will be described in chapter 5 the MATLAB Neural Network Toolbox TM has been used. The neural networks are trained using the Levenberg-Marquardt backprogagation algorithm. In order to prevent overfitting the early stopping technique is used. 5. Estimating load indicators using neural networks In this chapter it will be discussed how the relations between SCADA parameters and load indicators can be accurately characterised using artificial neural network (ANN) techniques. 5.1 Previous work Some previous work in this field has already been performed. Using prototype measure-

ments Germanischer Lloyd [8] showed that neural networks can be applied to accurately estimate fatigue load distributions of different components. A similar study has been performed at the SWE group at the University of Stuttgart [9], where based on simulations with an aero-elastic code neural networks have been applied to estimate fatigue load distributions. Although this previous research has proven that neural networks are an excellent measure for estimating mechanical loading using standard signals, some important questions have to be answered: Are the results obtained on a single turbine applicable to the same turbine type placed at a different location? Are the results that have been determined using only free-stream data also applicable for estimating the loads on a turbine that operates in wake conditions? 5.2 Approach The analysis, of which the results will be presented in this chapter, has been performed for two load indicators. The first step in developing an empirical neural network model is preliminary identifying which standard signals could be used as independent variables in the neural network. This has to be done for each of the identified load indicators. Next a representative dataset should be selected where it is essential that the mechanical load measurement data are pre-processed in order to remove measurement errors such as spikes. After selecting the representative dataset the artificial neural network should be trained to fit the relation between the independent variables and the load indicator. A validation dataset should always be used in order to halt network training at the point where generalisation stops improving. The accuracy of the relations is judged by comparing the predicted outputs by the model with the measured values (targets). The coefficient of determination R 2 and the mean difference between output and target Δ m are used to characterise the accuracy. 5.3 Load indicators The approach discussed above will be followed for two load indicators; the 1 Hz damage equivalent load range of (1) the blade root flapwise bending moment, and (2) the tower bottom for-aft bending moment. The damage equivalent load range F EQ is the load range that for some arbitrarily chosen number of cycles N would, in theory, produce the same damage as all actual load ranges (which follow from rain flow counting) combined: n ΔF m i i m i Δ FEQ = (1) N where m is the Wohler coefficient, n i the actual number of cycles and F i the actual load range for each occurring case i. 5.4 Independent variables The measured SCADA data parameters, as described in section 3.3, are possible input candidates for the artifical neural network. Initially only the first two statistical moments (arithmetic mean and standard deviation) of the nacelle wind speed, electrical power output, generator speed and pitch angle will be used as independent variables in the neural network. 5.5 Dataset For both turbine 6 and 8 at EWTW both a freestream and a wake dataset are selected. The respective turbines should be in normal power production. For the free-stream set only data are considered with timestamps between 2008-01-01 and 2008-10-01. Since wake conditions at EWTW occur less frequently for the wake set data are considered with timestamps between 2007-01-01 and 2008-10-01 in order to ensure a dataset of sufficient size is available. Furthermore, all independent variables and load indicators should have a valid value. 5.6 Results In this section the results from the analyses, as have been described in section 5.2 will be presented. 5.6.1 Generalisability free-stream conditions The first goal is to determine whether an accurate relation between SCADA parameters and both load indicators can be established for a turbine in normal power production and under free-stream conditions. In addition to this the generalisability of this relation is assessed. The neural network is trained using only data from turbine 6. Data from turbine 8 is used as

validation set, which is a measure for network generalisation. The training is halted as soon generalisation stops improving. The results for blade root flapwise and tower bottom for-aft are shown in Figure 5 and Figure 6 respectively. 5.6.2 Validity for wake conditions In order to assess whether the neural network, trained using only free-stream data, can also be applied to a turbine operating in wake conditions, a dataset is selected where turbine 6 operates in (partial and full) wake conditions. This dataset is now used as a validation set which is used to halt training when the generalisation capacities of the neural network (which is trained using data where turbine 6 operates in free-stream conditions) stop improving. The results for blade root flapwise and tower bottom for-aft bending are indicated in Figure 7 and Figure 8 respectively. Figure 5: Blade root flapwise bending. Left: Relation between turbine 6 in free-stream conditions). Right: Relation between turbine 8 in free-stream conditions). Figure 7: Blade root flapwise bending. Left: Relation between turbine 6 in free-stream conditions). Right: Relation between wake conditions) and target (measured values at turbine 6 in wake conditions). Figure 6: Tower bottom for-aft bending. Left: Relation between turbine 6 in free-stream conditions). Right: Relation between turbine 8 in free-stream conditions). The results (left graph in the figures) indicate that it is possible to accurately estimate the load indicators of both blade root flapwise bending and tower bottom for-aft bending (R 2 = 0.92 and R 2 = 0.96 respectively) using the independent variables as listed in 5.4. Furthermore, the generalisability of these relations (right graph in the figures) is encouraging as is indicated by R 2 = 0.90 and R 2 = 0.95 for blade root flapwise and tower bottom bending respectively. Figure 8: Tower bottom for-aft bending. Left: Relation between turbine 6 in free-stream conditions). Right: Relation between wake conditions) and target (measured values at turbine 6 in wake conditions). The results shown in Figure 7 and Figure 8 clearly indicate that the neural network trained using only free-stream data cannot be applied to estimate the load indicators of a turbine operating in wake conditions. If this would be done the value of the load indicators of the blade root flapwise bending and tower bottom bending would, on average, be underestimated by 13.6% and 10.6% respectively. 5.6.3 Generalisability wake conditions The results presented in the previous section indicate that a neural network trained using only free-stream data cannot be applied to estimate the values of the load indicators of a turbine operating in wake conditions. Therefore it will be necessary to train a separate neural network for both free-stream conditions and wake conditions.

In this section the same approach as in section 5.6.1 is followed with the only difference being the fact that instead of only free-stream conditions now only wake conditions are considered. The results are presented in Figure 9 and Figure 10. 5.7 Conclusions The analyses have shown that artificial neural networks are an excellent method for estimating the values of load indicators using just 10- minute statistics of standard SCADA parameters. For free-stream conditions the relations determined are very accurate and when applying the trained network to another turbine encouraging results are obtained. Furthermore the research has shown that a network trained using data of a turbine operating in free-stream conditions cannot be applied to accurately estimate the values of the load indicators for a turbine operating in wake. Figure 9: Blade root flapwise bending. Left: Relation between wake conditions) and target (measured values at turbine 6 in wake conditions). Right: Relation between output (prediction by ANN trained at turbine 6 in wake conditions) and target (measured values at turbine 8 in wake conditions). When training a separate network for wake conditions an excellent accuracy is found, although the generalisability of these relations appears slightly less compared to the network for free-stream conditions. 6. Status and future work Functional and technical specifications for the Flight Leader software model have been completed. On the basis on these detailed specifications a demo version of the Flight Leader software model has been programmed in MATLAB. Figure 10: Tower bottom for-aft bending. Left: Relation between wake conditions) and target (measured values at turbine 6 in wake conditions). Right: Relation between output (prediction by ANN trained at turbine 6 in wake conditions) and target (measured values at turbine 8 in wake conditions). The left graphs in Figure 9 and Figure 10 indicate that both load indicators can be estimated equally well for a turbine operating in wake conditions as for a turbine operating in freestream conditions. However, the load indicators at turbine 8 are, on average, slightly overpredicted by the neural network trained at turbine 6. Therefore it can be said that the generalisability of the relation between independent variables and load indicators for wake conditions is slightly less compared to free-stream conditions. More research is required in order to determine the cause for the lesser generalisability of the network trained in wake conditions compared to the network trained in free-stream conditions. Using the demo software model further analyses of the EWTW data will be performed, where the same approach (as has been presented in this paper) will be applied for load indicators relevant for other wind turbine components. The accuracy of the Flight Leader concept will be evaluated and, if necessary, the software model will be adjusted. Finally, the demo version of the Flight Leader software model will be applied to the Offshore Wind farm Egmond aan Zee (OWEZ). Acknowledgements This study is carried out and co-financed by the Bsik programme Large-scale Wind Power Generation Offshore of the consortium We@Sea (http://www.we-at-sea.org).

References [1] L.W.M.M. Rademakers, H. Braam, M.B. Zaaijer, G.J.W. van Bussel; Assessment and Optimisation of Operation and Maintenance of Offshore Wind Turbines; Proceedings European Wind Energy Conference 2003. [2] L.W.M.M. Rademakers, H. Braam, T.S. Obdam; Estimating Costs of Operation & Maintenance for Offshore Wind Farms; ECN-M--08-027; Presented at the European Wind Energy Conference 2008, Brussels. [3] T.S. Obdam, L.W.M.M. Rademakers, H. Braam; Functional Specifications for the Flight Leader; ECN-X--08-049; June 2008. [4] T.S. Obdam; Technical Specifications and Model Description for the Flight Leader; ECN-X-- 08-098, October 2008. [5] P.J. Eecen, J.P. Verhoef; EWTW Meteorological database; Description June 2003 - May 2006, ECN-E-06-004; September 2006. [6] P.J. Eecen, et. al.; Measurements at the ECN Wind Turbine Test Location Wieringermeer; ECN-RX--06-055; February 2006. [7] P.J. Eecen, et. al.; LTVM statistics database; ECN-CX--05-084; September 2005. [8] S. Schwarz, R. Dittmar, A. Anders; Determination of Actual Fatigue Loading on Wind Turbines Based on Neural Networks; 2005. [9] N. Cosack, M. Kühn; Prognose von Ermüdungslasten an Windenergieanlagen mittels Standardsignalen und neuronaler Netze; Presented at the Dresdner Maschinenelemente Kolloquium, Dresden; December 2007.