1 # Borssele Offshore wind energy Wind Farm Zone in the Netherlands Project & Site Description The roadmap from 1,000 to 4,500 MW offshore wind capacity >> Sustainable. Agricultural. Innovative. International.
2 2 Offshore wind energy in the Netherlands
3 Introduction The Netherlands is working on a transition to a sustainable, reliable and affordable energy supply for everyone. Drivers are the climate change, the declining availability of fossil fuels, and the dependence on international energy suppliers. The National Energy Agreement, a goal of 16% sustainable energy in 2023 was agreed upon with over forty organisations including Ministries, energy organisations, employers organisations, unions, NGO s and others. All available sustainable energy sources are needed to reach this goal, including wind energy both land based and offshore. The conditions for offshore wind energy in the Netherlands are excellent: relatively shallow waters, good wind resource, good harbour facilities, experienced industry and a robust support system. This brochure gives a brief overview of the road map to increase offshore wind capacity from todays 1,000 MW to 4,500 MW in 2023 as part of this National Energy Agreement. The Dutch government has designated three wind farm zones where new wind farms can be developed in the coming years. In consultation with the wind energy sector, a new system was designed for the deployment of these new wind farms. The government is responsible for a greater part of the preliminary works: consents, electrical infrastructure and insight in the physical environment. Companies that want to develop a wind farm can base their Front End Engineering Design (FEED) studies on these preliminary works and register for one of the selected sites. The company with the lowest bid will be awarded with both the permit and grant to develop the wind farm. This approach contributes to efficient use of space, cost reduction and an acceleration of the deployment of offshore wind energy. The roadmap from 1,000 to 4,500 MW offshore wind capacity 3
4 Offshore wind farms in the Netherlands The existing offshore wind farms and those under construction have a capacity of approximately 1,000 MW. The first two wind farms built in the North Sea off the coast of the Netherlands are the offshore Wind Farm Egmond aan Zee (OWEZ, 2006) and the Princess Amalia Wind Farm (2008). The OWEZ Wind Farm lies km off the coast and comprises 36 Vestas 3 MW turbines. It is owned by Noordzeewind, a joint venture between utility company NUON and oil company Shell. Utility company Eneco owns the Princess Amalia Wind Farm, located outside the 12-mile zone, 23 km off the coast. It comprises 60 Vestas 2 MW turbines. Two projects are currently (2015) under construction: Wind farm Luchterduinen and the Gemini wind farm. Wind farm Luchterduinen is owned by Eneco and Mitsubishi Corporation and comprises 43 Vestas 3 MW turbines located 23 km off the coast. It is expected that this wind farm will be fully operational in The Gemini wind farm will be constructed with 150 Siemens 4 MW turbines on the twin locations Buitengaats and Zee-Energie, 85 km off the coast. Gemini is owned by Northland Power, Siemens, Van Oord and HVC. This wind farm is expected to be fully operational in Offshore wind energy in the Netherlands
5 The roadmap towards 4,500 MW offshore wind power In 2013 more than forty organisations laid the basis for a robust, future-proof energy and climate policy for the Netherlands in the Energy Agreement for Sustainable Growth. An important part of this agreement is scaling up offshore wind power. In 2014 the Minister of Economic Affairs presented a road map to the parliament enabling the Government to achieve this expansion of offshore wind in accordance with the time line agreed upon in the Energy Agreement. The road map towards 4,500 MW offshore wind power foresees an annual tendering of 700 MW in the period , it is a precondition that the cost of offshore wind power will decrease by 40% in the coming years. The Government has decided that three offshore wind farm zones will be used for the deployment of the 3,500 MW new offshore wind capacity: Borssele (1,400 MW), South Holland coast wind farm zone (1,400 MW) and North Holland coast wind farm zone (700 MW).The tenders to select parties for realising the offshore wind farms will be done according to this schedule: Year Power Wind farm zone MW Borssele wind farm zone MW Borssele wind farm zone MW South Holland coast wind farm zone MW South Holland coast wind farm zone MW North Holland coast wind farm zone Wind farms will become operational within four years after a decision on funding and can use the state-of-the-art technology available by that time. The legal bases of this road map will be a new Offshore Wind Energy Law. The roadmap from 1,000 to 4,500 MW offshore wind capacity 5
6 The Offshore Wind Energy Law The Dutch government developed a framework in which designated offshore wind areas, each with different sites, will be tendered. These sites will be consented based on an environmental impact assessment and will have a grid connection to the main land. Also the site data of the physical environment is to be made available by the government. This procedure is expected to reduce social cost compared to previously developed wind farms, in which developers were responsible for consents and investigations to provide input for their Front End Engineering Design (FEED) studies. High cost were incurred before they could apply for subsidy. The new approach is presented in the Offshore Wind Energy Law (Wet Windenergie op Zee), which is expected to enter into force in July The bill was sent to the parliament in October The new approach was designed in consultation with the wind energy sector. It contributes to a higher efficiency in the use of space, cost reduction and it accelerates the deployment of offshore wind energy. The system has five distinct aspects: 1. Wind farms are only allowed in designated wind farm zones Under the National Water Plan, wind farm zones have been designated. Only on sites within these zones, the construction of wind farms will be allowed. Any location outside these wind farm zones will not be consented Elementen van de routekaart Nader te bepalen gebieden, minimaal 10 NM uit de kust Aangewezen gebieden Indicatief kabeltrace Indicatief platform Overige informatie Bestaande parken en parken in aanbouw Nautische 12 mijl 0 1,75 3,5 7 10,5 nm km Designated wind farm zones in the Netherlands continental shelf. 6 Offshore wind energy in the Netherlands
7 2. Wind farm sites consented by government In these wind farm zones the government decides on sites where wind farms can be constructed. Each zone can contain several sites. The Ministries of Economic Affairs and of Infrastructure and the Environment will take the so-called wind farm site decisions ( kavelbesluiten ). A wind farm site decision is the necessary consent required to build a wind farm and specifies the location for the wind farm and the conditions under which it may be constructed and operated. These conditions will provide flexibility for the design of the wind farm. This gives commercial parties the best opportunities for choosing the best technical options within the natural and environmental framework and realise their project at the lowest possible costs. Wind farm site decisions are subject to an environmental impact assessment (EIA), which will be commissioned by the Ministry of Economic Affairs and the Ministry of Infrastructure and Environment. 3. Government provides site data The Government investigates the physical environment of the wind farm site: the soil- wind- and water conditions. This site data will be made publicly available and provide commercial parties with information for their FEED studies and competitive bids in the tendering procedure for the grant possibilities. The Netherlands Enterprise Agency (RVO.nl) will publish the site data. This site data includes: a. Geological, morphodynamical and geomorphological data b. Archaeological and Unexploded Ordnance analysis c. Metocean data d. Wind resource assessment e. Geophysical and geotechnical data (based on surveys) 4. TSO TenneT realises grid connection To create economies of scale the national electricity Transmission System Operator TenneT will construct five standardised platforms with a capacity of 700 MW each within the wind farm zones. They will each be connected to the national grid with two 220kV export cables. As soon as a 380kV subsea cable is available, this can be applied to reduce the amount of required cables. Connecting wind turbines directly to the TenneT platform implies no need for an OWF platform investment. 5. Grant tendering Grants for the wind farm sites will be awarded through a dedicated call for tender under the Stimulation of Sustainable Energy Production. Under this scheme, producers receive financial compensation for the electricity they generate for a fixed number of years (15 years for wind farms). The lowest bidder will be awarded. The bid must be equal or lower than the maximum amount (in /kwh) set for the specific wind farm site. The lowest bidder will be rewarded with both the grant and the consent to build and operate a wind farm according to the wind farm site decisions. The roadmap from 1,000 to 4,500 MW offshore wind capacity 7
8 This brochure is commissioned by RVO.nl, agency of the Ministry of Economic Affairs, and drafted with great care. RVO.nl cannot guarantee the completeness and accuracy of all information in this brochure. RVO.nl does not accept liability as a result of the use of this brochure. Contacts Netherlands Enterprise Agency (RVO.nl) Croeselaan BJ Utrecht P.O. Box RE Utrecht / Netherlands Enterprise Agency (RVO.nl) January Offshore wind energy in the Netherlands
Borssele Wind Farm Zone
Borssele Wind Farm Zone Project & Site Description >> Sustainable. Agricultural. Innovative. International. Foreword The Netherlands wants sustainable, reliable and available energy that is affordable
SDE+ tender Borssele december 2015
SDE+ tender Borssele december 2015 Wind farm site decisions (incl. EIA and crossings) Soil, water, wind investigations wind farm sites National consenting procedure TenneT substation and export cables
European Subsea Cable Report & Forecast 2015-2025
European Subsea Cable Report & Forecast 2015-2025 J/15/1226 May 2015 4C Offshore - OrbisEnergy Centre, Lowestoft, NR32 1XH T: +44 (0)1502 307 037 E: [email protected] Table of Contents 1. Executive Summary
A E O L I S F O R E C A S T I N G S E R V I C E S WIND FARM ENERGY ASSESSMENT - FEASIBILITY STUDY. Kees van Vliet
A E O L I S F O R E C A S T I N G S E R V I C E S WIND FARM ENERGY ASSESSMENT - FEASIBILITY STUDY Kees van Vliet September 2007 K o n i n g s l a a n 11 2 3 5 8 3 G V U t r e c h t T h e N e t h e r l
Offshore Wind in Germany
Offshore Wind in Germany Lessons to be learned voor NL ir. Han van Asten, Programma manager TenneT Den Haag, KIVI NIRIA, 'Wind op Zee = Winst voor Nederland', 20 sep 2012 KIVI NIRIA Wind op Zee = Winst
PPT Dutch offshore wind sector
PPT Dutch offshore wind sector Een presentatie over een presentatie > Agnes Agterberg RVO 2 december 2015 Inhoud Aanleiding PPT Dutch offshore wind sector Betrokken partijen In vogelvlucht door de PPT
North Sea offshore wind Developments in the Netherlands
September 2015 North Sea offshore wind Developments in the Netherlands This updated briefing focuses on the legal framework and recent developments in offshore wind in the Netherlands. We expect to publish
Optimization of the coupled grid connection of offshore wind farms
Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven
Dutch wind energy strength
Dutch wind energy strength Chris Westra (senior consultant ECN) (general manager We@Sea) www.we-at-sea.org www.ecn.nl www.haveneilandopzee.nl 2010 The start in 1972 here we are now: 2010 Drivers for offshore
Offshore Wind Project Management
DEPARTMENT S, POST-GRADUATE AND MASTERPROGRAMMES ENGINEERING EN LIFE SCIENCES Experts by Experience! Offshore Wind Project Management BUILT ENVIRONMENT Offshore Wind Project Management (OWPM) Experts by
Environmental aspects of offshore wind energy. Jakob Asjes Jakob Asjes IMARES, Institute for Marine Resources and Ecosystem Studies
Environmental aspects of offshore wind energy Jakob Asjes Jakob Asjes IMARES, Institute for Marine Resources and Ecosystem Studies Contents Part 1 8.45 9.30 hrs Overview Dutch/North Sea situation Dutch/European
How Dutch innovations support 40% cost price reduction. June 13th 2013 How Dutch innovations support 40% cost price reduction 1
How Dutch innovations support 40% cost price reduction June 13th 2013 June 13th 2013 How Dutch innovations support 40% cost price reduction 1 Dutch Top Sector Policy Government policy to further strengthen
Database of measurements on the offshore wind farm Egmond aan Zee
Database of measurements on the offshore wind farm Egmond aan Zee A.J. Brand J.W. Wagenaar P.J. Eecen M.C. Holtslag 1 1 TU Delft, Faculty Aerospace Engineering Presented at the the EWEA 2012 conference,
Offshore Windfarm Egmond aan Zee 4 years of Operation
Offshore Windfarm Egmond aan Zee 4 years of Operation CUEN Offshore Wind Energy Conference 28 June 2011, Cambridge Elke Delnooz Operations Support Manager www.noordzeewind.nl 1 Contents Project description
User manual data files meteorological mast NoordzeeWind
User manual data files meteorological mast NoordzeeWind Document code: NZW-16-S-4-R03 Version: 2.0 Date: 1 October 2007 Author: ing. HJ Kouwenhoven User manual data files meteorological mast NoordzeeWind
October 2015. TKI Wind op Zee Cost reduction options for Offshore wind in the Netherlands FID 2010-2020
Cost reduction options for Offshore wind in the Netherlands FID 20102020 Introduction This study has been commissioned by. The research for this report is being conducted by PricewaterhouseCoopers Advisory
TenneT. Stakeholder engagement and Consultation Process OWFs. Day 1 ONL 15-162. Michiel Müller / Rob van der Hage
TenneT ONL 15-162 Stakeholder engagement and Consultation Process OWFs Day 1 Expert Meeting, 15-16.04.2015, Arnhem Michiel Müller / Rob van der Hage Stay tuned. Safety first! Voor uw en onze veiligheid
The Netherlands Licensing procedure offshore windfarms. Sander de Jong Rijkswaterstaat Noordzee
The Netherlands Licensing procedure offshore windfarms Sander de Jong Noordzee Stralsund, Wednesday 25.01.2012 Offshore windfarms in NL - Today s Situation Round 1 2 windfarms operational (220 MW) offshore
Polish Offshore Grid SA
OFFSHORE GRID DEVELOPMENT 1 Offshore wind farm development in selected European countries Country Installed capacity by the end of 2010 [MW] Approved projects [MW] 2020 targets [MW] UK 1.341 2.591 13.000
Profile. Offshore Wind Projects. Sustainable EPC and Marine Contractors
Profile Offshore Wind Projects Sustainable EPC and Marine Contractors Offshore Pipeline Installation Svanen, heavy lift installation vessel Company profile Van Oord is a pre-eminent contractor for dredging,
Connection and Transmission Agreement
PAGE 1 of 13 Disclaimer: the content of this draft is disclosed for information and discussion purposes only. In no way does this draft constitute rights for (potential) connected parties, or bind TenneT
Siemens Financial Services
Siemens Financial Services London, January 8, 2010 Joint press release of Siemens Project Ventures and Mainstream Renewable Power Siemens Project Ventures and Mainstream Renewable Power win contract to
Assessment wind measurement strategy
ENERGY Assessment wind measurement strategy Options for Hollandse Kust Zuid - Draft 1 DNV GL 2015 2016 10014447 SAFER, SMARTER, GREENER Introduction and assignment In December 2014 DNV GL made the following
Getting smart(er) in Offshore Wind O&M
Getting smart(er) in Offshore Wind O&M 26-9-2014 Prof.dr. Gerard J.W. van Bussel Leerstoel Windenergie Faculteit Luchtvaart- en Ruimtevaarttechniek Delft University of Technology Challenge the future Inhoud
Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009
Preliminary Information Memorandum Thanet Offshore Transmission Assets July 2009 SUMMARY In April 2009 Ofgem distributed a teaser document, UK Offshore Transmission Investment Opportunity, to investors
De Industrie. KIvI Niria Jaarcongres 2010. De uitdagingen voor windenergie op zee. Ballast Nedam Offshore. Dolf Elsevier van Griethuysen
KIvI Niria Jaarcongres 2010 De uitdagingen voor windenergie op zee De Industrie Ballast Nedam Offshore Dolf Elsevier van Griethuysen Arnhem, 6 oktober 2010 Offshore Windpark Egmond aan Zee (2006) HLV Svanen
Offshore Work Packages
Rampion Offshore Wind Farm Offshore Work Packages Meet The Buyer Naren Mistry, Engineering Manager 26 th Feb 2014 Rampion Offshore Project Scope Design, manufacture, transportation and Installation: Up
Current Profiles at the Offshore Wind Farm Egmond aan Zee J.W. Wagenaar P.J. Eecen
Current Profiles at the Offshore Wind Farm Egmond aan Zee J.W. Wagenaar P.J. Eecen OWEZ_R_122_Current_profiles_20101111 ECN-E--10-076 NOVEMBER 2010 Abstract NoordzeeWind carries out an extensive measurement
Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.
Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey
Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency
Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters
Effects of Underwater Noise
Effects of Underwater Noise Impact pile driving noise prediction Marten Nijhof, Christ de Jong, Bas Binnerts, Michael Ainslie 2 Wind energy agenda Dutch energy agreement for sustainable growth (2013):
Underwater Noise and Licensing of Offshore Windfarms in the Netherlands. Sander de Jong Rijkswaterstaat Noordzee
Underwater Noise and Licensing of Offshore Windfarms in the Netherlands Sander de Jong Noordzee Amsterdam, Friday 10.02.2012 Offshore windfarms in NL - Today s Situation Round 1 2 windfarms operational
ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012
ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012 The most ambitious energy plan of the world In March 2012 a historic new Energy Agreement was reached in Denmark. The Agreement
Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.
Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most
Wind Energy in Egypt
Wind Energy in Egypt Mohamed Salah Elsobki (Jr.) Energy Efficiency and Renewable Energies Manager Industrial Modernization Programme Adjunct Professor Faculty of Engineering Cairo University Egypt Wind
The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)
The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for
6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging. Eneco wind. Ernst van Zuijlen
6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging Eneco wind Ernst van Zuijlen Eneco Targets... Maximise the use of renewable energy 2012: 25% of electricity produced sustainable (50% wind)
Winddag 2015: Innovation need and necessity. Bob Meijer 20 juni 2015
Winddag 2015: Innovation need and necessity Bob Meijer 20 juni 2015 Objectives of the TKI Wind op Zee Economic benefits Cost reduction 174 Expedite the Energy Transition 40% 100 12 juni 2015 Winddag 2015:
MULTI-FUNCTIONAL USE OF OFFSHORE WIND FARMS, AN INVENTORY OF CHALLENGES AND OPPORTUNITIES
MULTI-FUNCTIONAL USE OF OFFSHORE WIND FARMS, AN INVENTORY OF CHALLENGES AND OPPORTUNITIES The WE@SEA research programme conducts multiple studies on future offshore wind energy application subdivided into
NEW CABLE? - Understanding the cost to connect renewable generation in Orkney
New Holland, Holm 500kW Partner of Choice in Mid-Size Wind NEW CABLE? - Understanding the cost to connect renewable generation in Orkney Hammer, Westray 500kW Colin Risbridger Windflow UK Development Manager
Profile. Marine ingenuity In just two words, we show what we do, how we do it, and what makes us different. Dredging and Marine Contractors
Profile Marine ingenuity In just two words, we show what we do, how we do it, and what makes us different Dredging and Marine Contractors Company profile Artemis is one of the most powerful self-propelled
Offshore Wind Development
1 Danish Experiences from Offshore Wind Danish Experiences from Offshore Wind Development Danish Experiences from Offshore Wind 2 TABLE OF CONTENTS 1. INTRODUCTION 3 1.2 KEY LEARNINGS 4 2. HISTORY AND
Council of the European Union Brussels, 20 May 2016 (OR. en)
Council of the European Union Brussels, 20 May 2016 (OR. en) 8673/1/16 REV 1 ER 141 CLIMA 43 NOTE From: To: Subject: General Secretariat of the Council Delegations Political declaration on energy cooperation
Realisation Agreement
PAGE 1 of 11 Disclaimer: the content of this draft is disclosed for information and discussion purposes only. In no way does this draft constitute rights for (potential) connected parties, or bind TenneT
Latest Offshore Developments in Sweden
Latest Offshore Developments in Sweden Conference Copenhagen Offshore Wind, Offshore Wind Markets Myths and Realities Bella Center, 27 October 2005 Kenneth Averstad, Vattenfall AB Renewable Energy within
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity
Strategy of the German Government on the use of off-shore wind energy
Strategy of the German Government on the use of off-shore wind energy in the context of its national sustainability strategy Ministries involved: Federal Ministry for the Environment, Nature Conservation
Offshore Wind: some of the Engineering Challenges Ahead
Offshore Wind: some of the Engineering Challenges Ahead David Infield CDT in Wind Energy Systems Institute of Energy and Environment University of Strathclyde International context (from IPCC report) Greenhouse
HVDC Light Cables. Submarine and land power cables
HV Light Cables Submarine and land s The HV Light s to offshore platform The light and robust HV Light s can be laid with very cost effecient methods HV Light System HV Light is a transmission system in
INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS
POWER Offshore Summer School 2006 INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS Gerard van Bussel The Netherlands Offshore transport and installation vessels Semi Submersible Sheer leg crane Ship type
Cost Reduction Potential in the Offshore Grid
Cost Reduction Potential in the Offshore Grid Dr. Markus Glatfeld, Managing Director, TenneT Offshore GmbH TenneT two TSOs, one company Europe s first transnational TSO Connections to 10 TSOs in the center
COWI offshore wind marine engineering services
COWI offshore wind marine engineering services 2 COWI expertise COWI is a highly versatile and multidisciplinary company. We provide services within engineering, environment and economics and operate worldwide
QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL...
POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.2 Number of J-Tubes Filename ONL 15-060-T2_ J tubes_ bays_pp_v2 Version 3 - Public
WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN
WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN H. Kazemi Karegar a,b, A.Zahedi a,v. Ohis a, G. taleghani b and M. Khalaji b a Department of Electrical & Computer Systems Engineering, PO Box 35, Monash University,
Case Study: European Offshore Wind Farms - A Survey for the Analysis of the Experiences and Lessons Learnt by Developers of Offshore Wind Farms -
: European Offshore Wind Farms - A Survey for the Analysis of the Experiences and Lessons Learnt by Developers of Offshore Wind Farms - Final Report Final Report Deutsche WindGuard GmbH Deutsche Energie-Agentur
Energy Valley and NNOW in Offshore Wind an example
Energy Valley and NNOW in Offshore Wind an example Rimini, 6 November 2013 Albert van der Hem, MSc. Programme Manager Offshore Wind Contents Energy Valley NNOW Offshore Wind Market Features Infrastructure
Energinet.dk and the Danish Energy System
Energinet.dk and the Danish Energy System South African delegation Fredericia, 22 October 2015 Peter Jørgensen, Vice President 22 October 2015 Energinet.dk and the Danish Energy System 1 Agenda Introduction
Renewable energy report
Renewable energy report Part 1 Implementation 2003-2013 + SDE+, SDE, OV-MEP & MEP Annual report 2013 >> Sustainable. Agricultural. Innovative. International. Introduction Competition between green and
OFFSHORE WIND TOWARD 2020 ON THE PATHWAY TO COST COMPETITIVENESS
1 OFFSHORE WIND TOWARD 2020 ON THE PATHWAY TO COST COMPETITIVENESS April 2013 Contents A B C Offshore market volume of EUR 130 bn by 2020 Agenda 2020 Markets Trends Competition Page 3 Value chain evaluation
Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).
Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ
The Electricity Supply Bill 1
Bill no. 234 Folketinget (Danish Parliament) 1998-99 Unauthorised translation 30 June 1999 Submitted on 29 April 1999 by the Minister for Environment and Energy (Svend Auken) Adopted by Folketinget on
DONG Energy offshore wind experience
DONG Energy offshore wind experience Future Tendering Process for Offshore Wind Energy February 10th 2011 Per Hjelmsted Pedersen Head of Project Development DONG Energy Renewables DONG Energy Renewables
Design of Offshore Wind Farms Prepared by Flemming Jakobsen & Andrass Ziska Davidsen LICENGINEERING A/S
Design of Offshore Wind Farms Prepared by Flemming Jakobsen & Andrass Ziska Davidsen Types of Foundations Overview of selected support structure and foundation types. From top left: 1. Monopile; 2. Tripod;
Power output of offshore wind farms in relation to atmospheric stability Laurens Alblas BSc
Power output of offshore wind farms in relation to atmospheric stability Laurens Alblas BSc Photo: Vestas Wind Systems A/S 1 1. Introduction Background Atmospheric stability is known to influence wind
Meteo Dashboard a decision support system for offshore wind farms. Delft Software Days Jan-Joost Schouten Harbour, Coastal and Offshore Engineering
Meteo Dashboard a decision support system for offshore wind farms Delft Software Days Jan-Joost Schouten Harbour, Coastal and Offshore Engineering Content: Objective Intro offshore wind System components
Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis
Renewable Electricity and Liberalised Markets REALM JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN By ICCS / NTUA K. Delkis October 1999 INTRODUCTION AND BACKGROUND Background to Renewable Energy
Developing Estonian energy policy hand in hand with EU energy packages
Developing Estonian energy policy hand in hand with EU energy packages Einari Kisel Secretary General of Energy of the Estonian Ministry of Economic Affairs and Communications 2008 will go down in history
TKI Wind op Zee Subsidy schemes and tax regimes
Final report Subsidy schemes and tax regimes This study has been commissioned by the. The research for this report is conducted by PricewaterhouseCoopers Advisory N.V. ('PwC') in cooperation with Ecofys
The UK Offshore Wind Experience
The UK Offshore Wind Experience Tom Simchak Policy Advisor, Energy British Embassy, Washington EESI Briefing, 28 September 2015 UNCLASSIFIED The United Kingdom is The global market leader in offshore wind:
Financing Renewables and Energy Efficiency Projects in Developing Countries
Mobilising Private Capital to reduce Climate Change Instruments and Policies to mobilise International Green Energy Investment Berlin June 29-30, 2010 Financing Renewables and Energy Efficiency Projects
TENNET, NL OFFSHORE WIND FARM TRANSMISSION SYSTEMS
TENNET, NL OFFSHORE WIND FARM TRANSMISSION SYSTEMS 66 kv Systems for Offshore Wind Farms TenneT Report No.: 113799-UKBR-R02, Rev. 2 Document No.: 74107077-1 Date: 2015-03-05 Project name: Tennet, NL Offshore
Background Information
Background Information Munich, June 4, 2015 ehighway: a vision of electrified freight traffic As it will not always possible to transfer more freight traffic to the rail, this traffic will have to be carried
CLIMATE CHANGE AND NATURE,
CLIMATE CHANGE AND NATURE, INTEGRATION OF SPATIAL POLICIES WITH A LAND USE MODEL Michiel van Eupen 1, Eveliene Steingröver 1, Sabine van Rooij 1 Eric Koomen 2 & Chris jacobs 2 Rotterdam 29 September 2010
Mpeketoni Electricity Project
Session 4.1 Mpeketoni Electricity Project Mr Danson Mwangi Kinyanjui & Mr Paul Mutinda Kituku Rural Electrification Workshop March 1-3, 2006 Nairobi Mpeketoni Electricity Project Community Based Electricity
THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE. Ole Odgaard Denmark
Workshop on Best Practices in Policies and Measures, 11 13 April 2000, Copenhagen THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE Ole Odgaard Denmark Abstract: The
COMMISSION OPINION. of 28.2.2012
EUROPEAN COMMISSION Brussels, 28.2.2012 C(2012) 1236 final COMMISSION OPINION of 28.2.2012 relating to the draft permit for the permanent storage of carbon dioxide in block section P18-4 of block section
The Renewable Energy Sector in Cyprus
Energie The Renewable Energy Sector in Cyprus Dr. Isabelle Riesenkampff, German Energy Agency (dena) Cologne, 29 November 2010 Conference Solar Industry in the Republic of Cyprus Outline: The Renewable
FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION
FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION NOVEMBER 20, 2014 PRESENTATION OUTLINE Overview of Ghana s Energy Situation
UK renewable energy an update
UK renewable energy an update 30 October 2014 Robert Hull, Managing Director Renewable energy key challenges 1 2 3 Costs to Climate change: Risks to security consumers: decarbonising of supply: short affordability
Tufts Consulting Group: Macedonian Energy
March 2010 CENTER FOR EMERGING MARKETS ENTERPRISES STUDENT RESEARCH SERIES Tufts Consulting Group: Macedonian Energy An Executive Summary Opportunity In the more than 18 years since its independence from
Future Offshore Wind Power Sites -2025
Danish Energy Authorithy Amaliegade 44 DK-1256 Copenhagen K Tel 33 92 67 00 Fax 33 11 47 43 CVR-nr: 59 77 87 14 [email protected] www.ens.dk Rubrik Verdana Bold 18 punkt Underrubrik Verdana 18 punkt Brødtekst
Grid connection of near shore wind farms
Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1 Topics Methods Preconditions Technical and socio-economic analysis 5. Marts 2015 2 60, 150 and 400