Lean Maintenance for Lean Manufacturing



Similar documents
Clean hydraulics, oils and lubricants. Three ways to big savings & lean maintenance reliability by Howard C. Cooper, Amemco.net

Predictive Maintenance

Autonomous Maintenance

ECONOMIC JUSTIFICATION

Process Cutting Heating Assembly Hrs per unit Total hours available 100, , ,000

MAINTENANCE PRODUCTS AND SERVICES S O S SM. Services

6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy

The potential benefits Calculate your potential savings based on raw materials losses:

Evaluating Real Costs for Building Maintenance Management

Enhance Production in 6 Steps Using Preventive Maintenance

Mobile Equipment Safety

FaciliWorks. Desktop CMMS Software. Making Maintenance Manageable

Exclusive Stock for total peace of mind. Your private reserve of original spare parts

Chapter 3 Notes Page 1

Cummins. Remanufacturing. Genuine Performance. Every Time.

Part 1 : 07/28/10 08:41:15

How Small Businesses Can Use a Cycle-Count Program to Control Inventory

Bob s Top 10 Little-Known Benefits to Starting a Courier Service Today

Understanding maintenance strategies

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

Could a Managed Services Agreement Save Your Company Tens of Thousands of Dollars Each Year?

ABB Drive Services Your choice, your future

THE BEGINNER S GUIDE TO LEAN

Computer Integrated Manufacturing Course Description

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

The title 5S refers to five activities within the tool as follows (in brief):

Customer Support Agreements

TPM at the heart of Lean - March 2005 Art Smalley

New & Affordable. VariDome. Achieve a quicker payback from your investment in Doming Equipment! MDS MiniDome 1 MDS MiniDome 2 MDS VariDome

The Cost of Production

Lean Principles by Jerry Kilpatrick

Fluid Automation: The Unsung Contributor to Plant Economic Performance. A Management Brief From ASCO Numatics

Identifying Relevant Costs

Essential Power System Requirements for Next Generation Data Centers

Section B: Electricity

When Assessing CANTIER Manufacturing ERP Software, BENEFIT comes 1 st while COST should only be Secondary

The Profit WIN Numbers Jim Silverman Automotive Training Institute

IoT Changes Logistics for the OEM Spare Parts Supply Chain

Maximizing Equipment Uptime

12 Tips for Negotiating with Suppliers

Compressed Air System Leaks:

Linear Programming Supplement E

Fluid Automation Solutions

WELL-MANAGED LIFT TRUCK FLEETS INCREASE PRODUCTIVITY, REDUCE COSTS

Advantages of Outsourced Clinical Engineering Model Outweigh In-House Model. By Richard P. Miller, President and CEO, Virtua Health

Changing locations every day. Can service be as mobile as a locomotive?

Intelligent Process Management & Process Visualization. TAProViz 2014 workshop. Presenter: Dafna Levy

ADVANTAGES OF Tankless Adhesive Melting Systems For End-of-Line Packaging

October Safety Subject

For illustrative purposes only, we will look at the logical flow of the Data Pro Job Cost package as a general contractor might use it.

Closing the Business Analysis Skills Gap

The Two Key Criteria for Successful Six Sigma Project Selection Advantage Series White Paper By Jeff Gotro, Ph.D., CMC

Speeding Up CNC Machining with ZW3D Tool Path Editor. ZW3D CAD/CAM White Paper

Improving Management Review Meetings Frequently Asked Questions (FAQs)

CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN

TRAINING SESSION SUMMARIES FOR MANUFACTURING

Internship Overview EX 1. years now. And during this time I have learned a great deal about project management and leadership.

The Ten Principles of Material Handling

SMA SERVICE FOR PV POWER PLANTS

Unlocking Return on Investment for Maintenance

Fleet & Asset management software

The following information has been obtained in relation to the contract:

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK

Nicolet Plastics Quick Response Manufacturing Strategy

Master Protection Extended Powertrain Warranty Program. Master Maintenance And Full Maintenance Programs

CAD/ CAM Prof. P. V. Madhusudhan Rao Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture No. # 03 What is CAD/ CAM

Four strategies to help move beyond lean and build a competitive advantage

Chapter 3 Productivity, Output, and Employment

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1

AGENDA: MANAGERIAL ACCOUNTING AND COST CONCEPTS

10 TIPS. for better Fleet Management WHITE PAPER. Who should read this paper? CEOs CFOs COOs Fleet managers Finance executives

Average producers can easily increase their production in a larger office with more market share.

If you feel your car has symptoms of this nature and you want to repair them, this article will assist in guiding you through the repair.

White Paper. Enterprise Asset Management for Microsoft Dynamics AX 2012

Neve V-Series Console Restoration Technical Brief

Inventory Costing Repair and Restoration

Tank Terminals Proven Solutions for Liquid Bulk Storage and Distribution Terminals

cams Management Systems Technology focused on conserving energy Performance. Period.

DISCUSSION AND CONCLUSIONS

E1 Enterprise Operations

Operational Business Intelligence in Manufacturing

Load Cell Troubleshooting

LECTURE NOTES ON MACROECONOMIC PRINCIPLES

4 Tips and 3 Pitfalls to Avoid when Sourcing Professional Services

Transcription:

Lean Maintenance for Lean Manufacturing (Using Six Sigma DMAIC) Before putting new and 30 or 40 year old machines together into Lean Manufacturing lines, do you know how to get the near 100% uptime required? Or, will "maintenance" become the "tail that wags your dog"? 'Your Achilles heel? A Barrier To Lean To compete in today's global economy and to increase profits, many factories are moving to "Lean Manufacturing," the next step beyond "Just In Time." Others claim "lean" but hedge on the concept with hidden WIP inventories because they fear what they've seen in the past, when critical path machines go down for a "maintenance break." Other managers simply budget for and bolster their maintenance department with people, training, equipment and spare parts so they can more quickly "put out the fires" when downtime occurs. Others increase budget (expense) to hand off maintenance responsibility to outside subcontractors. Outside service vendors may or may not service you better, but its sure nice to be able to point the finger outside when downtime cripples production. But, its still your downtime. The Maintenance Problem The underlying problem here is equipment reliability and uptime (some call it maintenance reliability). The solution is to find ways to eliminate unscheduled equipment downtime. The problem with downtime is that most maintenance people think, "It just happens. Then we fix it." The problem with downtime is, "You can monitor it, measure it, log it, report it, track it, attack it, or delegate it, but downtime will not go away until you "eliminate it" - prevent it from happening in the first place. A Solution (Lean Maintenance) What? How does one "fix a machine so it doesn't break down again"? Answer: To prevent downtime from happening before it occurs, you must eliminate the basic stresses that cause the downtime. What is needed is a methodology for protecting computers, automation controllers, PLCs, CNC machines, etc. and protect their electronic and hydraulic control systems from the stresses that cause malfunctions and failures. The author has been applying this methodology and perfecting it since 1977. He calls it "Lean Maintenance for Lean Manufacturing." This practical and most cost effective methodology can help most any facility from data centers to telecom to medical, from semi-conductor manufacturing to plastics & metal manufacturing. Within 30-60 days, you can thus avoid malfunctions, failures, unscheduled downtime, scrap parts, re-work, missing delivery schedules, etc. and get the near 100% reliability, repeatability, yield, and uptime needed to increase profits.

Improved uptime is also needed as companies push to lower costs by shedding: 1. Onsite spare parts 2. Onsite board or component repair, and 3. Onsite technicians, maintenance engineers, etc. The few skilled technicians are getting old. In 3-7 years most of this rare breed will be retiring and replacements are not present in training. "Lean Maintenance" can help by providing methods that allows reduced maintenance support and reduced maintenance overhead (often 50% or better) while achieving maximum permanent reduction of unscheduled downtime, typically; 50% reduced mechanical downtime 80% reduced hydraulic systems downtime 92% reduced electronic systems downtime Cost of Downtime So what is the cost of downtime? Is it something worth eliminating? Different companies calculate or toss different figures; typically $500 per hour for a stand-alone machine, $1,500 - $8,500 per hour for a cell or line of machines, and up to $3,500 per minute ($181,500 per hour) for an entire auto factory line. One practical way to give your "cost of downtime" figures a reality check is to compare them to the price you would pay, or do pay, when you have to "farm out" a part or assembly because your capacity is temporarily or permanently limited. What do they charge you per hour for this capacity? That's the cost of your downtime. Believe it. Any profit margin they have calculated in is quickly offset by your own continued need to pay support and regular production personnel who often stand idle. Add to this your scrap and rework costs and you see the true hourly cost of downtime. Cost of Scrapped Parts $ + Other Error Costs $ + Cost of Hourly Downtime $ (Manually add your costs as calculated here.) x Hours of Downtime Hours TOTAL COST OF DOWNTIME $ Cost of Scraped Parts + Error Cost + Hourly Cost of DT x DT Hrs. = $. Only after you have a firm grasp on your cost of downtime can you then calculate the importance and impact Lean Maintenance methods can provide by way of increased profits, decreased cost of goods sold and the impact this can have on increased market share.

In Lean Manufacturing the cost of a single machine going down for maintenance is multiplied by the number of machines in that cell. With no parts in inventory, a single machine going down results in no parts shipped. Broken delivery schedules that cannot be made up, if the next parts made are "just-in-time." It's not only lost sales, its reduced level of integrity and less satisfied customers which can result in long term loss of sales revenue. Downtime then results in a higher cost-of-goods sold which means reduced ability to expand or maintain sales and business volume. Lean Maintenance - Methodology The key objective of Lean Maintenance is to give your company the near 100% equipment uptime and reliability it demands while cutting your maintenance expense, often by 50% or more. This is done by systematically surveying or analyzing each machine and control system to determine which basic stresses are effecting each machine, over time, and laying out a scheme to protect each machine, computer, or control system from the stresses to which it is subject. This certainly includes but goes far beyond the normal oil change, filter change PM procedures given in the maintenance manual. You must first understand the three categories of downtime: 1. Downtime from Operator or Programmer Error 2. Downtime from inadequate PM procedure or performance 3. Downtime from chronic wear & stress to circuit boards, hydraulic components and other system components. Stresses such as: a. Heat b. Vibration c. Oxidation & Corrosion d. Dirt build-up e. Electrical voltage transients and current surges f. Hydraulic contaminations of dirt, water & acids, etc. Six-Sigma, ISO-9000 and TPM books and strategies often cover the first two issues (above), yet they often get passed over. "Lean Maintenance" stresses the importance of all three (above) and focuses on the third. "It's like preventing fire hazard," You can have fuel stored or flowing anywhere, but do away with oxygen and heat and you cannot have a fire. Similarly if you do away with the chronic stresses that cause 'maintenance fires,' then you cannot have maintenance malfunctions, errors, failures, rework, scrap and downtime. The beautiful thing about this method is, for the most part, it's all "one time installation" of protective devices to produce ongoing savings. It in no way changes your current product flow, personnel, procedures, operations, or policies. Yet, you are able to reclaim older or less reliable systems to near 100% uptime." You might call this kaizen for maintenance reliability, or how to jump from "four sigma to six sigma." Six Sigma, D.M.A.I.C. - Steps to implement Lean Maintenance Define the problem: Unscheduled equipment malfunctions and the resulting rework, scrap parts, downtime and lost production. Why is this a problem? Because now days the machines and computers do all our work. If you don't believe it, just go unplug all your computers and machines for two or three

days and see how much product goes out the back door. Watch the 99% decrease in information or services provided. We must realize that the machines and computers are productive employees of the company. The machines are just as much employees as the humans. Each is paid a per hour wage based on their value to the companies products and services. Usually the machine's wages are much higher than human wages. When they take a break, make a mistake, or take a day off, the company looses profits. To state the problem clearly, reminds me of a plaque that used to hang in my mother's kitchen which read, "When Momma ain't happy, ain't no one happy." Maybe we should hang a plaque in the company office that reads, "When machines ain't runnin', ain't nothin' gettin' done!" That's the problem. Monitor & Measure the problem: Monitor your downtime and measure or calculate what it is really costing (see above). If you have a CMMS (computer maintenance management system) or a good purchase order and work order system, then we can estimate the potential savings and increased profits that should come from addressing this "problem." Measure and report the following (from the past year) 1. How many "work orders" or "tickets" for maintenance assistance on unscheduled downtime have you had the past few months, and the past year? 2. How many hours of unscheduled downtime, from your CMMS or "work orders." How many maintenance hours by in-house or by contracted support personnel? How many electrical, hydraulic, mechanical? 3. From your "purchase orders," how many dollars in equipment repair? 4. How many dollars in electronic module repair (in-house or out sourced)? 5. How many dollars in hydraulic module repairs (in-house or out sourced)? 6. How may dollars spent on hydraulic fluid? 7. How many dollars spent on hydraulic oil disposal? 8. How many hydraulic systems? 9. How many machines or computer controlled systems are employed here? 10. Where are the most critical areas or departments needing equipment reliability? (Critical Path Machines)? 11. What is your average "cost per hour" for equipment downtime? 12. Multiply this hourly "cost of downtime" by the total downtime hours in #1 & #2 above. If you had eliminated 70% - 92% of #12, is it a number worth your attention? Is it worth the Companies attention?

Analyze how to solve or eliminate the problem: Your maintenance engineer, or an experienced consultant or contract engineer will analyze and identify, for each computer, each machine and each control system how to most cost-effectively achieve ongoing protection from the above stresses. Have them write a report detailing, machine by machine, the exact means to protect from each these stresses (as each may apply) and give protective device model numbers, connection points and installation instructions along with costs for each and a total cost summary. The investment needed can then be justified against increased uptime benefits and increased profits that will come from item #12 in the above measurement section. Then Install and Implement Installation instructions from above should be specific enough that your own maintenance personnel can easily and quickly install the needed protective devices, methods, or changes. Controlling this project Controlling Lean Maintenance in the future should require little to no effort. Steps taken to avoid hydraulic system malfunctions and downtime can actually reduce by 90% current labor for hydraulic system PM and scheduled downtime, while prolonging machine tool life. Most other methods are single step protective methods that need no future monitoring or PM labor effort. How Amemco Can Help We can have Lean Maintenance installed and effective within 30 days! Our first time through the process took five years. The second company took two years. We then got it down to 3-6 months. Now, after 25 years experience, we help most clients maximize uptime, reliability, yield and profits and do it within 30 days! Engage Amemco for 30 days, "It does't cost, it pays." Amemco conducts an Analysis survey of your facility and equipment. We start with a three hour in-plant Lean Maintenance orientation seminar for all responsible personnel from VP of Mfg. down to engineers and maintenance technicians. This orientation reveals exactly how these stresses cause malfunctions and downtime and our various proven methods for eliminating these stresses once and for all! We also discuss and look at other common or factory specific anomalies, causing you unscheduled downtime. We then do a 2-4 day equipment stress/reliability analysis survey, taking notes on each system and machine to later generate a 20-30 page report detailing a protective solution package for each machine and control system. Conclusion "Lean Maintenance" is basically reliability and reduced need for maintenance troubleshooting and repairs. Lean Maintenance comes from protecting against the real causes of equipment downtime -- not just their symptoms. Any maintenance engineer or manager can begin Lean Maintenance by protecting automation, electronics, hydraulics

and computer-controlled equipment from the real cause of malfunctions, failures, and downtime-chronic stress discussed above. Circuit board failures, hydraulic system failures and other malfunctions are only symptoms, not the underlying cause of unscheduled equipment downtime. Over 25 years of experience, Amemco has learned to move client companies through implementation of Lean Maintenance in 30 days (normally), rather than taking years. Which means; 1. Increased Profits, 2. Near 100% uptime required for Lean Manufacturing, 3. Greatly reduced maintenance overhead, and 4. Reduced dependence on outside support. Lean Maintenance is maximizing uptime, yield, productivity, and profitability. Author: Howard C. Cooper www.amemco.net hcooper@amemco.net 801-859-2073