Ventura Countywide. Stormwater Quality Management Program. Presentation to Ventura Watershed Committee January 8, Public Works Agency



Similar documents
Greater Los Angeles County Region

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

modeling Stormwater Retention

Baltimore City Phase II Watershed Implementation Plan (WIP) July 2, 2012

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

A Developer s Guide: Watershed-Wise Development

Overview of Proposition 1 TRACIE BILLINGTON, CHIEF FINANCIAL ASSISTANCE BRANCH DIVISION OF INTEGRATED REGIONAL WATER MANAGEMENT

CWSRF Project Descriptions and Examples for Green Project Reserve

ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

Presentation Program Outline

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

FY Springs Funding Projects

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

County Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact

NAPA COUNTY WATERSHED SYMPOSIUM

How To Amend A Stormwater Ordinance

9.1. Adequacy of Available Data and Monitoring Efforts

Santa Barbara County IRWM

Use of Regional Detention Basins for Stormwater Quality Management

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Partnerships in Achieving Green Infrastructure Goals

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve

Introduction to the Envision Sustainability Rating System

Kansas City s Overflow Control Program

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

EPA Trends for wastewater Treatment in California

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

Chesapeake Conservation Corps Member Application Instructions

Foothill Municipal Water District Recycled Water Project

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Reference: CA Urban Streams Partnership s White Paper on Funding Urban Watershed Projects Recommendations for a 2014 Water Bond

The Planning Process. 1 O WOW 1.0 Plan Moving Towards Sustainability

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

REQUEST FOR PROPOSALS NEW YORK-NEW JERSEY HARBOR & ESTUARY PROGRAM

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

Fairlington Community Center

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

Quantifying LID Triple Bottom Line Benefits Milwaukee Case Study Kimberly Brewer, A.I.C.P. Tetra Tech

12/3/2015 MUNICIPAL STORMWATER RESPONSIBILITIES YOU NEED TO KNOW WHAT IS STORMWATER? WHY?

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT

5. Environmental Analysis

Green Infrastructure In New Jersey The Current State of Implementation. Prepared for Sustainable Jersey by the Natural Resources Defense Council

Integrated Water Management in Maryland. Anwer Hasan, Senior Vice President

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011

Proposed General Plan Update Goals, Policies, and Implementation Actions

Attachment 6: Monitoring, Assessment, and Performance Measures

Asset Management Stormwater Management Facilities and Wetlands

Frequently Asked Questions

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

PRECIPITATION AND EVAPORATION

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study

Ecosystem Services, Wetlands and Houston s Growth. Jim Lester

Planning Resource Guide. Climate Change Adaptation through Land Use Planning

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Water Resource Management Planning

MS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS

Addressing Declining Elevations in Lake Mead

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Engineering Major Service Actual Budget Projected Request Executive Adopted

5.14 Floodplains and Drainage/Hydrology

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets

Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS

Sustainable Drainage Systems (SUDS) A guide for developers

Overview of Water Quality Trading Programs

Green Infrastructure in Action: Examples, Lessons Learned & Strategies for the Future December 2014

Milwaukee Metropolitan Sewerage District STRATEGIC PLAN

Innovative Stormwater Solutions in Coastal Areas 2015 APWA Stormwater Conference

Title: Guiding Models and Norm Study for Water Storage: A new way of thinking?

Excellence in Engineering Since 1946

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico

Section 7: Data Management, Technical Analyses, and Plan Performance

Triple Bottom Line Discussion. Scott Struck, Ph.D. Senior Professional Geosyntec Consultants

Section 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About?

City of Powder Springs

North Branch Chicago River Watershed-Based Plan

Richmond City s Green Infrastructure Assessment

Section 4 General Strategies and Tools

Planning, Health and Environment Division

FIVE-YEAR ASSESSMENT REPORT

GOALS, OBJECTIVES AND POLICIES

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

Building Resilient Infrastructure for the 21 st Century

Water Management, Conservation, and Preservation

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems

Integrated Liquid Waste and Resource Management

Transcription:

Ventura Countywide Stormwater Quality Management Program Presentation to Ventura Watershed Committee January 8, 2016

Overview Who we are Why we are interested in developing a Stormwater Resource Plan Stormwater Resource Plan Guidelines Prop 1 Stormwater Grant Funding Overview Our Project Opportunities for Input

Ventura Countywide Stormwater Quality Management Program Coalition of Municipal Stormwater Permittees Ventura County Water Protection District County of Ventura Cities of Camarillo, Fillmore, Moorpark, Ojai, Oxnard, Port Hueneme, Santa Paula, Simi Valley, Thousand Oaks, and Ventura

Ventura Countywide Stormwater Quality Management Program Permittee Responsibilities NPDES Countywide MS4 Stormwater Permit Programmatic requirements (control measures) Receiving Water Limits (RWL) Total Maximum Daily Loads (TMDLs) Ventura River and Estuary Trash (Algae & Nutrients not in Permit) New Permit Likely in 2016

Next NPDES Permit Watershed Management Planning Options Voluntary; may be developed collaboratively or individually Vehicle for addressing TMDLs and Water Quality Standards Allows for customization of control measures Requires MS4 discharges: Achieve applicable WQBELs in TMDL provisions Do not cause or contribute to exceedances of RWL Do not include non-stormwater discharges that are a source of pollutants Reasonable Assurance Analysis

Next NPDES Permit Enhanced WMP Option Comprehensively evaluates opportunities with emphasis on multi-benefit regional projects Collaboration among permittees and other partners on multi-benefit regional projects Wherever feasible retain: 1) All non-stormwater runoff and dry weather runoff 2) All stormwater runoff from the 85 th percentile, 24 hour storm event For all drainage areas tributary to projects Where retention of the 85th percentile is not feasible, include other watershed control measures that ensure compliance

SB-985 Stormwater Resource Planning Authorizes a city, county, or special district to develop a SRP to list and prioritize multibenefit projects geared towards capturing stormwater and dry weather runoff. Requires public agencies to develop a storm water resource plan (SRP) to apply and receive funding for storm water and dry weather runoff capture project funded partially or entirely with state funds

SB-985 Stormwater Resource Planning No SRP = No Grant Funding

SB-985 Stormwater Resource Planning Recognizes storm water as a resource Emphasizes multiple benefit projects Emphasizes use of publicly owned lands to capture and reuse storm water

Storm Water Resource Plans Guidelines Watershed-based approach to stormwater management SRP developed on a watershed scale Coordinate and collaborate during plan development with local government agencies, nonprofits organizations, water utilities, and public Plans must be submitted to local IRWMP

Storm Water Resource Plans Guidelines Existing planning documents may be functionally equivalent (if meets guidelines), including but not limited to: Ventura River Watershed Management Plan, integrated resource plans, urban water management plans, or similar plans that include storm water and dry weather runoff capture and use as a component of their goals and objectives (TMDL Implementation Plans)

Storm Water Resource Plan Guidelines All projects must be multiple benefit Projects designed to achieve watershed-based storm water management objectives Include metrics-based analysis of multiple benefits of each project to maximize: water supply, water quality, flood management, environmental, and other community benefits within the watershed Prioritization of projects in the Plan (high, medium and low)

Storm Water Resource Plan Guidelines Metrics-Based Analysis of Multiple Benefits Example Metrics Benefit Example Metric Unit(s) Water Quality Benefits Increased filtration or pollution load reduction Reestablishment of natural water drainage and treatment Pollution Load Reduction lbs/day or mg/l Volume Treated million gallons per day (mgd) or acre-feet per year (afy) Water Supply Benefits Potable water offset million gallons per day (mgd) or acre-feet per year (afy) Flood Control Benefits Environmental Benefits Community Benefits Decreased flood risk Reduced sanitary sewer overflows Restoration benefits Reduced Energy Use Increased Urban Green Space Enhanced recreational or public use areas Rate or Volume Cubic feet per second (cfs) or acre-feet (af) Number of events Restoration of Stream Flow or Wetlands Acres or cubic feet per second (cfs) Reduction of Greenhouse Gases Amount of carbon sequestration Size and/or economic value Population served or acres

Storm Water Resource Plan Guidelines Prioritization of Projects in the Plan High, Medium, Low Projects should be prioritized on the following minimum elements Financial support for ongoing operation and maintenance Use of metrics-based geospatial (GIS) analysis of multiple benefits Use of public lands Creation of habitat and watershed processes

Storm Water Resource Plan Guidelines Examples of different types of projects Distributed Water Quality Projects Regional Water Quality Projects Flood Control Projects Water Supply Projects Environmental Benefit Projects Community Benefit projects

Prop 1 Stormwater Grants Of the funds authorized by Section 79740, $200 million shall be available for grants for multi-benefit stormwater management projects. Granting Agency: Storm Water Resource Control Board Funding Round 1 anticipated Spring 2016 Up to $100 million of funds available for FY 2015-2016 Minimum local funding match of 50% of total project cost Grant categories: Planning grants Implementation grants

Prop 1 Stormwater Grants Planning Grants To develop a stormwater resource plan or modify existing plans in accordance with SB 985 requirements and the Storm Water Resource Guidelines Funds for project specific planning and design

Prop 1 Stormwater Grants Implementation Grants Project included in IRWMP and Storm Water Resource Plan Designed to infiltrate, filter, store, evaporate, treat, or retain storm water or dry weather runoff Respond to climate change, contribute to regional water security Contain a minimum of two benefits: water quality, water supply, flood management, environmental, community Consistent with applicable the water quality control plan (Basin Plan) Capable of sustained, long-term water quality benefit at minimum of 20-years Project may be on public or private land

Prop 1 Stormwater Grant Implementation Grant Eligible Projects Types of eligible projects include: Green infrastructure Rainwater and storm water capture projects Storm water treatment train facilities (includes LID) Program element for a Storm Water Resource Plan; i.e. Green Streets and curb cut programs (must be designed to achieve specific quantified performance goals identified in the SRP) Preference given to projects that capture and re-purpose storm water for a variety of potential benefits including water supply, flood control, habitat enhancement/restoration, and creating green spaces.

Prop 1 SWGP Solicitation Workshop Wednesday, February 3 rd : Regional Water Quality Control Board, 320 W Fourth Street, Los Angeles, Planning Workshop: 1:00 PM to 3:00 PM Implementation Workshop: 3:00 PM to 5:00 PM Tuesday, February 9 th : WebEx Planning Workshop: 9:00 AM to 11:00 AM Implementation Workshop: 11:00 AM to 1:00 PM Must RSVP by January 20, 2016 http://www.waterboards.ca.gov/water_issues/programs/grants_loans/swgp/prop1/

Our Project: Create a Countywide Stormwater Resources Plan Identify and develop eleven new concept multi-benefit projects for publicly owned parcels to capture stormwater

Our Project: Task 1. Task 2. Task 3. Task 4. Task 5. Summarize existing plans and the projects capable of achieving SRP goals Develop criteria to prioritize publicly owned parcels Develop concept projects for priority parcels and quantify their runoff capture capability Evaluate the multiple benefits of each concept project to prioritize projects for each watershed from Task 3 Community participation in the SRP development

Timeline Updates at all Watershed Meetings Complete by June 2016 Present at July WCVC

Opportunities for Input Storm Water Resource Plan shall provide for community participation in plan development and implementation Engage stakeholders: Multi-benefits and potential conflicts Project design and implementation; Disadvantaged and climate vulnerable communities within the Plan

Opportunities for Coordination and Collaboration Coordination with existing planning documents Desired Input and Coordination From Water supply agencies Other potential valuable partners include school districts, universities, conservancies and other public agencies that have public lands and easements for multiple benefit project Nongovernmental organizations and state conservancies working on storm water and dry weather resource planning or watershed management Watersheds Coalition of Ventura County

Questions?

These next slides are extra

Distributed Stormwater Capture Programs

Underground infiltration chambers

Engineered wetlands

Greenways

Enhanced Spreading Grounds

Metrics-Based Analysis of Projects Minimum level of information to be included in an integrated metrics-based analysis for different types of projects Water quality projects Reduction of priority pollutant load/discharge after plan implementation Storm water capture and use projects Where feasible should capture 85 th percentile, 24-hour storm event Water supply and flood control projects Volume of infiltration to groundwater Volume of Potable water offset Environmental and community benefits projects In-stream flow augmentation Reduced greenhouse gases and heat island effect

Watershed-based approach A watershed-based approach to storm water management seeks to replicate natural hydrology and watershed processes by managing storm water and dry weather runoff onsite or within the watershed where rainfall occurs. Reduces volume of runoff, thus reducing the pollutants discharged Provides multi-benefits including social and community benefits