Our works Designing Public buildings The sculptor s workshop of Péter Raab Párkányi Budaörs Realization: 2002, 2006., implementation, on-the-spot technical management Parish hall and chapel Kozárd The year of realization and consecration 2006. (2003.), on-the-spot technical management Home for the elderly with an improved level of services Salgótarján Salgótarján Beginning of construction: 2006- Health- and wellness-centre Dunabogdány Date of planning: 2006- Our activities: Concept plan Office building Budapest, Clark Ádám tér Date of planning: 1993 2006. Mansion Ecseg Date of planning: 2006. Our activities: Feasibility study Country tavern and grocery Kozárd Realization: 2003. (2002.), implementation, on-the-spot technical management Info-house Kozárd Residential community Fótliget Holiday house Kozárd, Zrínyi köz 5., interioir design Office building Váci út Holiday park Balatonalmádi Concert hall and film-studio München, Germany Date of planning: 1993., general contracting
Market place in Újpest Budapest Date of planning: 1992-93. District administrative centre München, Germany Date of planning: 1990-91. Our activities: preparation of a proposal as co-designer Extension of the psychiatric institute Budapest, Hidegkúti u. Date of planning: 1989-90. Hotels Hunguest Hotels Sun Resort Herceg Novi, Montenegro Duration of construction: 2005-2007. and delivery in consortium with Samo Doo Hotel Salvus Spa- and Sports-hotel Bükkszék Beginning of construction: 2006- Hotel Silver Beach Siófok Date of planning: 2006-, interior design Grandhotel Galya Galyatető Realization: 2004., interior design and general contracting Hotel Helios hostel, thermal bath, external pool, connection to the internal pool Hévíz Realization: 1999-2003., interior design, general contracting Sport Hotel Lillafüred Date of planning: 2001-2003., interioir design, general contracting Hotel Panoráma Hévíz Realization: 2002., interioir design, general contracting The reconstruction of the room-wing of Hotel Erkel Gyula Realization: 2001., interioir design, general contracting Hotel Millennium Budapest, VIII. Üllői út 94-98. Realization: 1998, 2000. Hotel Rotunda Nagyszénás
The reconstruction of the Hotel Szieszta, and the expansion of the pool Sopron, Lővérek Realization: 1998-2000., interior design, general contracting Hőforrás Hotel Hajdúszoboszló Vízeséspark Hotel Wadduwa, Sri Lanka Aquamarin Hotel Hévíz Date of planning: 1999. Hotel Flóra Eger Realization: 1998-99., interior design, general contracting Hotel Maróni Sopron Date of planning: 1999., general contracting Hotel Répce Bükfürdő Realization: 1999., interior design, general contracting Hotel Szilvás Szilvásvárad Date of planning: 1999. Hotel Béke Hajdúszoboszló, interior design, consulting, technical inspection Hotel Forrás Szeged, interior design, consulting, technical inspection Hotel Kikelet Pécs, interior design, consulting, technical inspection Hotel Nagyerdő Debrecen, interior design, consulting, technical inspection Hotel Palota Lillafüred, interior design, general contracting Flandria Hotel Budapest Date of planning: 1997.
Hotel Griff (hotel wing, squash, conference centre) Budapest Realization: 1997., general contracting Residential buildings Town-house apartment Budapest, Ménesi út Realization: 2007., on-the-spot technical management Family house Hody, Szlovákia Beginning of construction: 2006., interior design, on-the-spot technical management Extension of a family house Budapest, Kuruclesi u. 43 Date of construction: 2003., interior design, on-the-spot technical management Multiple dwelling condominium Budapest, Ormódi u. Cottage and wine cellar Szentendre Date of construction: 2003., interioir design, implementation, on-the-spot technical management Family house Budapest, Kocsola u. Date of construction: 2002., interioir design, on-the-spot technical management Hospitable family house Kozárd, Fő u. Date of construction: 2001. Cottage Budapest, Nevegy u. Our activities: preparation of a draught plan Interior design Office 22 Budapest, XXII.ker. Date of planning: 2007. Our activities: internal design planning, on-the-spot technical management The secretary s office of the CEO of ÉMI, Budapest Realization: 2005., on-the-spot technical management Ringa Rt., Central Marketing Office Realization: 2004. Our activities: internal design planning, on-the-spot technical management Pick Szeged Szalámigyár and Húsüzem Rt., Central Marketing Office Budapest, Krisztina krt. Realization: 2003., on-the-spot technical management
Swap Brokerage Office Budapest, Bartók Béla út Realization: 2003., on-the-spot technical management Cottage on the Csillag mountain, on-the-spot technical management Aboriginal restaurant Budapest Realization: 1995. as co-designer Videotheque Budapest, István u. Realization: 1995. Texastel shops Budapest, Arany János u., Csepel Pláza, Duna Pláza Realization: 1994-97., on-the-spot technical management Robinson restaurant Budapest Realization: 1987., on-the-spot technical management Urban studies The sequence of areas observed by the eyes and the mind Pilisszentkereszt és Dobogókõ Date of planning: 2007. Our activities: Feasibility study Town-planning programme Herceg Novi, Igalo (Montenegro) Date of planning: 2007. Our activities: feasibility study in consortium with Samo Doo The revitalization of the town centre Gödöllő Date of planning: 2006. Our activities: Feasibility study The feasibility plan of the Kopaszi-dam and the bay of Lágymányos Budapest, XI. kerület Our activities: feasibility plan with factual architectural plans Suggestion for the development of the meadow in Kõérberek, the soil of which is saturated with native soda Budapest Our activities: concept plan Plans for the parcelling out of the lots of a residential district, and plans for the establishment of the settlement centre Fótliget Our activities: the feasibility plan for apartment house and the settlement centre, utilization plan of the existing buildings The structure plan of the settlement centre Kozárd Our activities: master plan
Recreation area on the lakeside Kozárd Our activities: Plans for the parcelling out of the lots of the recreation park, together with plans of ready-cut houses Flórapark Törökbálint Our activities: draught development plans, designing a lodging house in the green belt Proposals Sculpture-proposal Salgótarján Date of planning: 2006. Our activities: Development of proposal plan with Péter Raab Párkányi, sculptor artist The result of the proposal: first prize Vodafone shop Hungary Date of planning: 2006. Our activities: Vodafone shops interior design proposal Proposal for a covered hydro-theme park Budapest, Lágymányos bay Date of planning: 2004. Our activities: development of a proposal plan in consortium with EEA Budapest Kft. The result of the proposal: secound prize WTC Memorial Site New York, USA Our activities: Development of the proposal plan of a memorial park on the territory of the commercial centre, together with Péter Raab Párkányi, sculptor artist. Graphidea Proposal Budapest Our activities: The proposal plan of a. event hall on the bank of the river Danube MIBC - administrative centre Moszkva, Russia Our activities: the development of the proposal plan of the administrative centre and the office complex of the Duma together with Péter Raab Párkányi, sculptor artist. The extension of the museum Azuma, Japan Our activities: The proposal plan for the restructuring and extension of the Tomoihiro Hoshino museum Condominium Aomori, Japan Our activities: Brainstorming for the proposal in connection with the condominium of the future to be built in the heart of the Japanese city Implementation General contracting Grandhotel Galya Galyatető Realization: 2004., interior design and general contracting
Hotel Helios hostel, thermal bath, external pool, connection to the internal pool Hévíz Realization: 1999-2003., interior design, general contracting Hotel Panoráma Hévíz Realization: 2002., interioir design, general contracting The reconstruction of the room-wing of Hotel Erkel Gyula Realization: 2001., interioir design, general contracting Hotel Millennium Budapest, VIII. Üllői út 94-98. Realization: 1998, 2000. The reconstruction of the Hotel Szieszta, and the expansion of the pool Sopron, Lővérek Realization: 1998-2000., interior design, general contracting Hotel Flóra Eger Realization: 1998-99., interior design, general contracting Hotel Maróni Sopron Date of planning: 1999., general contracting Hotel Répce Bükfürdő Realization: 1999., interior design, general contracting Hotel Palota Lillafüred, interior design, general contracting Hotel Griff (hotel wing, squash, conference centre) Budapest Realization: 1997., general contracting Concert hall and film-studio München, Germany Date of planning: 1993., general contracting Consulting Hunguest Hotels Sun Resort Herceg Novi, Montenegro Duration of construction: 2005-2007. and delivery in consortium with Samo Doo
Hotel Béke Hajdúszoboszló, interior design, consulting, technical inspection Hotel Forrás Szeged, interior design, consulting, technical inspection Hotel Kikelet Pécs, interior design, consulting, technical inspection Hotel Nagyerdő Debrecen, interior design, consulting, technical inspection Renewable energy sources Hunguest Hotels Sun Resort Herceg Novi, Montenegro Duration of construction: 2005-2007. and delivery in consortium with Samo Doo The heating-cooling energy source, and the hot water used for utility purposes is basically provided by a heat-pump utilizing the energy of the seawater, which, in the case of the hot water used for utility purposes is supplemented by the support of solar collectors. The sequence of areas observed by the eyes and the mind Pilisszentkereszt és Dobogókõ Date of planning: 2007. Our activities: Feasibility study According to the plans, the heating-cooling energy source, and the hot water used for utility purposes is going to be provided by the heat of the soil, in other words by geothermal energy. A considerable part of the electric power-supply is provided by solar cells and the recycling of wood waste. Waste-water is treated in a separate waste water treatment plant using biological methods. Hotel Salvus Spa- and Sports-hotel Bükkszék Beginning of construction: 2006- The heating-cooling energy source, and the hot water used for utility purposes is provided by heat-pumps utilizing thermal energy with the help of 60 borings equipped with soil samplers. Waste-water is treated in a separate waste water treatment plant, using biological methods. Hotel Silver Beach Siófok Date of planning: 2006-, interior design According to the plans, the heating-cooling energy source, and the hot water used for utility purposes is going to be provided by a heat-pump utilizing the thermal energy of the water in the lake Balaton. A considerable part of the electric power-supply is provided by the utilization of windand solar energy.
Home for the elderly with an improved level of services Salgótarján Salgótarján Beginning of construction: 2006- According to the plans, the heating-cooling energy source, and the hot water used for utility purposes is going to be provided by the heat of the soil, in other words by geothermal energy. A considerable part of the electric power-supply is provided by solar cells and the recycling of wood waste. Health- and wellness-centre Dunabogdány Date of planning: 2006- Our activities: Concept plan According to the plans, the heating-cooling energy source, and the hot water used for utility purposes is going to be provided by the heat of the soil, in other words by geothermal energy. A considerable part of the electric power-supply is provided by solar cells and the recycling of wood waste. Waste-water is treated in a separate waste water treatment plant, using biological methods. Proposal for a covered hydro-theme park Budapest, Lágymányos bay Date of planning: 2004. Our activities: development of a proposal plan in consortium with EEA Budapest Kft. The result of the proposal: secound prize The heating-cooling energy source, and the hot water used for utility purposes is basically provided by the heat of the soil, in other words by geothermal energy. A considerable part of the electric power-supply is provided by a separate power plant utilizing wind, solar, and water energy.