Field Verification and Drafting



Similar documents
Drawing a Bedroom Floorplan

TurboCAD Architectural

University of Northern Iowa Design Documents Standards. October 2014

House Design Tutorial

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

Getting Started Guide

Excel 2007 Basic knowledge

Advanced Microsoft Excel 2010

Slope Density. Appendix F F-1 STATEMENT OF PURPOSE DISCUSSION OF SLOPE

Hewlett-Packard Development Company, L.P., 8000 Foothills Boulevard, Roseville, California

CREATING A 3D VISUALISATION OF YOUR PLANS IN PLANSXPRESS AND CORTONA VRML CLIENT

1. Concrete: T W L / 27 = Concrete C.Y. Multiply Feet Thickness x Feet Width x Feet Length / 27 = Cubic Yards.

Effective Collaboration

Q&As: Microsoft Excel 2013: Chapter 2

Roof Tutorial. Chapter 3:

Geometry Notes PERIMETER AND AREA

Perimeter, Area, and Volume

Indicator 2: Use a variety of algebraic concepts and methods to solve equations and inequalities.

CAD Standards Guideline For Facility Documentation and Construction Projects

Window Glass Design 5 According to ASTM E 1300

Use this translator to save ArchiCAD layouts/views in DXF/DWG format if you plan to continue

Free Pre-Algebra Lesson 55! page 1

Dimensioning and Estimating Brick Masonry

Rough Guide to processing a building elevation in LSS. In this rough guide we re going to produce this building elevation.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals

2013 Getting Started Guide

Drawing a histogram using Excel

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

SketchUp Instructions

Residential Decks. Planning and Development Services Department

EXAM GUIDE. Schematic Design. Overview 2. Interior Layout Vignette 3 Sample Passing Solution 5 Sample Failing Solution 6

Applies to: All Employees within the Facilities Management Department (FMD)

COMMONLY USED RESIDENTIAL BUILDING CODES

Chapter 30: How to import a DWG drawing not created with MasterChef

Multi-user Collaboration with Autodesk Revit Worksharing

House Design Tutorial

Professional CAD System

Roof Tutorial. Chapter 3:

Kitchen and Bath Design Tutorial

Assignment 3 Floor Plan CAD Fundamentals I Due February 1 Architecture 411

Geometry Notes VOLUME AND SURFACE AREA

MS Excel. Handout: Level 2. elearning Department. Copyright 2016 CMS e-learning Department. All Rights Reserved. Page 1 of 11

3rd Annual Design Drafting Contest

Explore architectural design and act as architects to create a floor plan of a redesigned classroom.

Special Use Commercial Properties

Layout Tutorial. Getting Started

The following is an overview of lessons included in the tutorial.

Requirements for Building Application Submission

Mobile Home Pre-Inspection Checklist

Measurement Standards for Structures

The CAD interface is comprised of two different screens: the graphic/drawing screen and the text screen.

Building Visualization using Autodesk VIZ

Installation & Technical Guide

Autodesk Civil 3D Styles: A Guide to the Fundamentals

INSTALLATION INSTRUCTIONS

How To Draw In Autocad

Solving Geometric Applications

To launch the Microsoft Excel program, locate the Microsoft Excel icon, and double click.

MATH 110 Landscape Horticulture Worksheet #4

Applications of the Pythagorean Theorem

Interior Design Tutorial

Formatting Formatting Tables

Building Code Clarifications - 7. Fire Resistance

The Center for Teaching, Learning, & Technology

Microsoft Excel 2013 Step-by-Step Exercises: PivotTables and PivotCharts: Exercise 1

SolidWorks. SolidWorks Teacher Guide. and Student Courseware

How Do I: Convert DEM Units Meters to Feet

Indiana County Assessor Association Excel Excellence

Chapter 23: Drafting in Worksheet View

Radius Maps and Notification Mailing Lists

Microsoft Excel Introduction to Microsoft Excel 2007

Microsoft Excel Basics

Microsoft Excel 2010 Part 3: Advanced Excel

Intro to Excel spreadsheets

Sample Problems. Practice Problems

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Peoria Area Association of REALTORS Guidelines For Measuring Property Square Footage

Excel -- Creating Charts

June 7, 2010 Page 1 of 5

FUNDAMENTALS OF LANDSCAPE TECHNOLOGY GSD Harvard University Graduate School of Design Department of Landscape Architecture Fall 2006

Guide To Creating Academic Posters Using Microsoft PowerPoint 2010

How To Draw A Similar Figure From A Different Perspective

What s New V 11. Preferences: Parameters: Layout/ Modifications: Reverse mouse scroll wheel zoom direction

AutoCAD Structural Detailing Getting Started with AutoCAD Structural Detailing, Reinforcement module


drawings_how_to?? Arch 172: Building Construction 1 Fall 2013

Lesson 3.1 Factors and Multiples of Whole Numbers Exercises (pages )

Online Bill Pay Guide

Three daily lessons. Year 5

Unit 1 Number Sense. In this unit, students will study repeating decimals, percents, fractions, decimals, and proportions.

Site Development Information Worksheet for single family residential development

Laser Cutter User Manual

Site Analysis / Research. STEP 1: In Illustrator open your class-02 file _ go to the main menu File _ Export

Elevations Certificates: Update 2009 Presented by Wendy Lathrop, PLS, CFM

FORMULA FOR FINDING THE SQUARE FEET OF A RECTANGLE L x W = A

Spatial Adjustment Tools: The Tutorial

Building Measurement Services

AutoCAD Architecture 2012 UK Content Tools


Microsoft Office. Mail Merge in Microsoft Word

Transcription:

Field Verification and Drafting Standards for the CWRU Architectural Services Department Case Western Reserve University Architectural Services Department ArchitecturalServices@case.edu 7/1/2010

Purpose: These standards will outline the method used by the Architectural Services Department for creating base floor plans for CWRU buildings in AutoCAD. Creation of these base floor plans allows Case Western Reserve University (CWRU) to maintain accurate, up to date, digital floor plans for the buildings on campus. In an effort to obtain accurate AutoCAD drawings for all the buildings on campus, the Architectural Services Department implements a careful process of field verification and drafting to create floor plans that allow for space analysis and future planning. Checking for Existing AutoCAD Drawings: In some cases, CWRU already has AutoCAD floor plans for a building from recent renovation projects. Thus, the first step in developing a building footprint is to search the Archive Database for any relevant AutoCAD drawings. Begin by opening the database and searching for the building of interest. From experience, projects from 2003 to current are more likely to have AutoCAD drawings. As time progresses, more projects are generated in AutoCAD. Therefore, it is more likely to find a project in AutoCAD from 2008 than from 2004. If AutoCAD floor plans do not exist within the database then skip this step. If such floor plans do exist, check the accuracy of the drawings before moving forward. Take several field measurements (see Field Verification section for process) of significant building features such as overall hallway lengths, large room dimensions, or wall locations. Compare these measurements to the corresponding dimensions in the AutoCAD drawing. If the measurements and the digital file agree to within half of an inch, accept the drawing as accurate. Convert the drawing to CWRU standards (see the Standard AutoCAD Documentation guide for details) and proceed to the next drawing. If the measurements disagree with the AutoCAD drawing by more than half of an inch, assume that the drawing is not accurate and proceed with the field verification process. Page 2 of 10

Gathering Information for New Drawings: When existing AutoCAD drawings are not available, it is necessary to create new floor plans based on existing conditions. Because various renovations and projects occur throughout the lifetime of the building, it is likely that no singular set of drawings will contain all of the information needed to accurately draft the plans. Thus, it is necessary to collect information from multiple existing drawings, as well as taking field measurements. While in the Archive Database, search for the most recent project that shows an entire floor plan for the area of interest. Print copies of these floor plans on 11x17 (tabloid) sized paper, breaking the plans up onto multiple sheets as necessary to allow room for writing and note taking. Be sure to overlap the floor plans between sheets so as to allow all notes for one room to be included on one page. These prints will serve as the sheets on which field verifications will be recorded. Search the database for original construction documents for the building of interest. Though in many cases these drawings are old and out dated, they contain valuable information for creating new floor plans. Though much in a building may change through renovations, the exterior walls and columns are highly unlikely to be changed or moved without major building reconstruction. Thus, the column grid and exterior walls from the original construction documents should be equivalent to existing conditions. Using dimensions from the original construction drawings, draft in AutoCAD a building footprint containing the exterior walls as well as the column grid. With a footprint created and note sheets in hand, proceed to the building for field verification. Page 3 of 10

Field Verification: Measurements taken in the field are significantly more accurate than those taken from blueprints with an architect s scale. Additionally, it has been found that the dimensions on blueprints may vary from those actually built. As such, accurate AutoCAD drawings can only be generated from field verification. This process involves measuring the location and size of every wall, window, door, and stair set contained within the building. All field measurements should be rounded to the nearest ¼ when recorded in order to maintain a high level of accuracy while allowing for some small error. Beginning with a known base point (such as a column, exterior door, stairwell, etc.), measure all wall, window, and door lengths and placements. Avoid continuous measuring whenever possible, favoring baseline measuring instead. Continuous measurement (i.e. measuring the distance from one wall to a window, the length of the window, and the distance from the window to another wall) results in a summation of error. If each measurement is incorrect by ¼, the distance from one wall to the other could be incorrect by as much as ¾. Baseline measurement (i.e. measuring the distance from a wall to a window, the size of the window, and from the initial wall to another wall) reduces error. If each measurement is incorrect by ¼, the error in the distance from one wall to the other would only be ¼. All walls should be measured from one corner to another except when dealing with overall room or hall dimensions, in which case a representative measurement is acceptable. When possible, include a wall thickness measurement, as this will help dictate the structural distance between rooms. This measurement is obtained easiest at doors or other entrances to each room. In more contemporary buildings that use studs and drywall for walls, the interior walls are generally 5 thick. However, depending on the building materials, wall thickness can range from 2 to 24. Check original construction documents for external wall thickness. Page 4 of 10

All doors should be measured to include both jamb and door swing. The door measurement should be recorded in fractional form, such that the door jambs are included in the numerator and the swing in the denominator. For example, a door measuring 40/36 would have a 36 swing with 2 jambs on either side. The direction of the door swing should be clearly indicated on the drawing notes. All windows should be measured to include both jamb and pane, as per the specifications for door measurements. In the event that multiple doors and/or windows have shared jambs, list the dimensions of each door, window, and jamb individually. Each staircase must be measured to show placement, number of stairs, dimensions of stairs, and dimensions of runners. The distance from the top and/or bottom stair to a known wall should be measured. The width of the stairs as well as their runners should be measured similarly to the process of door/window measurements, such that the total width is listed over the stair width. The number of stairs, tread, and width should all be listed together. For example, a stair set with ten stairs, one foot tread, four foot width, and two inch runners on either side should be listed as 10 @ 12 T, 52/48. The upward or downward direction of each staircase should be noted. The staircase landings between floors are not required for drafting. All room numbers should be recorded. When unavailable, assign a description to each room that will identify it and separate it from other rooms of similar purpose. Page 5 of 10

Figure 1. Standard Drawing with Field Measurements Indicated in Red Page 6 of 10

Drafting Floor Plans: Once the field measurements have been obtained, the floor plans can be drafted within the building footprint that was developed from the original construction documents. This process shall be carried out according to the standards defined in the Standard AutoCAD Documentation guide. Other standards and guidelines also apply for floor plans created from field verifications. When drafting from field measurements, everything should be drawn with an error of 1 being considered acceptable. When field measurements cause walls, windows, etc. to be out of line by less than 1, adjust the objects as necessary to maintain continuity. When creating floor plans for an entire building, begin with a floor that has verifiable base points or a floor plan that can be easily reproduced. Rooms with rounded corners as well as windy corridors can prove very difficult to place. As such, floors containing these features should be avoided, when possible, until other, simpler floor plans are drafted first. Each subsequent floor should be drawn using base points from the floor that was drawn first. Stairwells, elevator shafts, or other constant structures should be used to place the later floors. As later floors are added, any structure that remains constant (stairwells, elevator shafts, etc.) throughout the building should be checked on all floors and adjusted as necessary. Dynamic blocks should be used for all door swings with correct directions shown and with the jambs shown as rectangles to either side. Rectangles on the 0 (zero) layer should be used to connect walls that are otherwise broken by doors. All window jambs and stair runners should be shown in the AutoCAD drawings. Page 7 of 10

All room numbers (or descriptions) should be included in the AutoCAD drawings on the U SPAC RMNO or U SPAC IDEN layer, as appropriate. When room numbers are unavailable, fill the typical label with XXX instead of a number. If there is a construction project going on during the time of field verification and drafting, no measurements of the area should be taken. The drafter is to wait until the project is completed and As Built drawings are submitted, for more on this see Architectural Services Department section of the Project Close Out Procedure green sheets. Spatial Analysis: One major purpose of these floor plans is to provide accurate spatial analysis of each of the buildings and departments on campus. Once the drawings are completed, AutoCAD makes a square footage analysis relatively simple. Using the U SPAC NET layer and Boundary Creation tool ( bpoly ), boundary polylines should be created for each room. The area of each boundary should be displayed in a field that will be shown within the space of that room. All areas should be rounded to the nearest whole number and displayed in square feet without a unit label. Area fields can be created quickly by loading the laf AutoLISP application ( Tools > AutoLISP > Load Application ). The t2 AutoLISP should also be loaded at this time. Once loaded, the command laf will allow the user to create an area field that will automatically center itself within the room simply by clicking on the boundary polyline. For some non rectangular rooms, the center (and thus the field) will not be within the confines of the room s walls. When this is the case, move the field to a suitable location within the room. In the event that a room contains an isolated column or any other island, the area of the island must be manually subtracted from the area of the boundary polyline. Page 8 of 10

Ensure that the field has the correct properties (U SPAC SQFT layer, 9 text height, etc.). A square footage table that displays all room numbers or descriptions and their associated square footages should be created. Each room number and square footage in the table should be a field that obtains its information from the text or field already displayed in the drawing. To quickly create fields within the table, the AutoLISP application t2 should be used. Simply type t2 and select the text, mtext, or field that needs to be represented in the table. Then, click in the cell in the table in which the object belongs. A boundary polyline should also be created for the exterior building footprint on the U SPAC GROSS layer. This can be done by creating a box around the exterior of the building and using the bpoly command, clicking between the box and the footprint. This method will create additional boundary polylines within the building, and these must be deleted accordingly. A boundary polyline should also be created for any areas that are open to below. Open to below is defined as any area within the space of the building footprint that does not have a floor on a particular level of the building. The area of the exterior footprint boundary should be represented by a field in the table. This field should be in a cell next to another cell labeled GROSS SQ.FT. The table should also include cells labeled NET SQ.FT. and STRUCTURAL, though values for these will not be included in AutoCAD. In some instances, an OPEN TO BELOW cell will be necessary. Such a cell should only be included as needed, along with a field representing the sum of all areas that are open to below. Once the table is completed, it should be exported as a comma delineated file (.csv). To do this, simply select the table, right click, and choose export. Then, this file should be opened in Microsoft Excel and saved as an Excel Workbook. Format the table in Excel such that all column data and titles are visible and aligned. Also, sort the data by room number (from smallest to largest, then alphabetically). Page 9 of 10

Using Excel, determine and include the NET SQ.FT. value by summing the values from all of the rooms on the floor. Using Excel, determine and include the STRUCTURAL value by subtracting the net square footage from the gross. In the event that there is space defined as OPEN TO BELOW, subtract this area as well as the net square footage from the gross in order to determine the structural area. Page 10 of 10