Alkali-Aggregate Reaction (AAR) of Concrete Structures



Similar documents
Documents last published in CSA A23.1 Concrete materials and methods of concrete construction

1.5 Concrete (Part I)

Cementitious Materials Update The effect of ggbs, fly ash, silica fume. concrete.

Shotcrete Quality Control and Testing for an Underground Mine in Canada

Chapter Two Types of Cement The properties of cement during hydration vary according to:

Mass Concrete. Robert Moser CEE8813A Material Science of Concrete. Definitions & Standards, Thermal Cracking, and Temperature Rise

Example Specification for Concrete using Current Building Code Requirements

PROPERTIES AND MIX DESIGNATIONS

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

SULPHATE ATTACK AND CHLORIDE ION PENETRATION: THEIR ROLE IN CONCRETE DURABILITY

(T indicates a Tropicalised version with extended workability. No change has been made to the formulation)

GROUND GRANULATED BLAST FURNACE SLAG & SLAG CEMENT

Seminarium Vatten i anläggningsprojekt Göteborg Beständighet av cement och betong i tunnelmiljö

Sustainable Concrete: The Role of Performance-based Specifications

Concrete Repair and Protection

Rapid Chloride Permeability Testing

Recycled Concrete Pavement and Other Recycled Materials in Concrete Pavements

To go into depth on fly ash would be beyond the scope of this paper. Nevertheless, believe us ASH IS CASH.

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY

Moisture Mitigation for Concrete Slabs

CEMENT AND CONCRETE IN AFRICA PRESENTATION OF UNIVERSITY OF THE WITWATERSRAND SOUTH AFRICA AKINDAHUNSI A. A

HIGH PERFORMANCE CONCRETE STRUCTURES: A WORK IN PROGRESS

CEMENT CHEMISTRY & TYPES OF CEMENT

CONSTRUCTION MATERIAL TESTING

Concrete Waterproofing Systems. Integral Protection.

Concrete Waterproofing by Crystallization. General Construction Foundations

Assessment of corrosion-damaged concrete bridge decks - a case study investigation. Amleh, L.; Lounis, Z.; Mirza, M.S.

Service Life of Chloride-Contaminated Concrete Structures

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

A new approach to improving the durability of concrete pavements

CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE

MODEL CLAUSES FOR CIVIL ENGINEERING WORKS

Strength of Concrete

2. PREPARATION OF TEST SPECIMENS

Shrinkage and Creep Properties of High-Strength Concrete Up To 120 MPa

Construction Materials Testing. Classes of Test

Strategies for Minimising the Whole of Life Cycle Cost of Reinforced Concrete Bridge Exposed to Aggressive Environments.

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

Dissimilar Metal Corrosion

Optimum Curing Cycles for Precast Concrete

Elevated Roads for Sri Lanka

STRENGTH AND DURABILITY OF ULTRA-HIGH PERFORMANCE CONCRETE

E-learning tools for understanding and testing of a range of concrete properties

Concrete for industrial floors

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Properties of Concrete with Blast-Furnace Slag Cement Made from Clinker with Adjusted Mineral Composition

Chesapeake Section AWWA Symposium

Ultra-High Strength Concrete Mixtures Using Local Materials

APPLICATION: This technical note should be consulted before any of the methods described in REMR Technical Notes CS-MR-3.2 through 3.11 are applied.

EVALUATION OF THE PERFORMANCE OF THE PROTECTIVE SURFACE COATINGS FOR CONCRETE

Forensic Investigation of Hardened Concrete: Water-Cement Ratio

GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS

Fire and Concrete Structures

Specialty Cements. Dr. Kimberly Kurtis School of Civil Engineering Georgia Institute of Technology Atlanta, Georgia.

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

Specification for tunnelling third edition. The British Tunnelling Society and The Institution of Civil Engineers

Acceptance Criteria for Durability Tests

The Strength of Concrete

AC Tech Project Survey

A Study on the Flexural and Split Tensile Strengths of Steel Fibre Reinforced Concrete at High Temperatures

SECTION PRECAST CONCRETE STRUCTURES

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT

Types and Causes of Concrete Deterioration

RELIABLE, SIMPLE AND CHEAP PERFORMANCE FIELD TESTS FOR PREDICTING LONG TERM DURABILITY OF CONCRETE STRUCTURES

A Decade of Performance of FRP-Repaired Concrete Structures

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

Cement and clinker trade flows in Asia

XYPEX AUSTRALIA CHLORIDE PENETRATION TESTS ON XYPEX ADMIX C-1000NF MODIFIED COMMERCIAL CONCRETES. By Gary Kao B.Mat.E, MSc, UNSW Research Engineer

Analysis of M35 and M40 grades of concrete by ACI and USBR methods of mix design on replacing fine aggregates with stone dust

Life-365 Service Life Prediction Model Version 2.0

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Specification for the Manufacture, Curing & Testing of Glassfibre Reinforced Concrete (GRC) Products.

PmB Expansion Joints World leaders in expansion joint technology

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS

Guide Specification Precast Concrete Products

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS

Types and Causes of Concrete Deterioration

Installation PowerPoint for Grasscrete Formers

Chapter 2 Basis of design and materials

Guide to Specifying Concrete Performance

The Concrete Life Cycle: Maintain to Sustain. Fred Goodwin BASF Construction Chemicals (EB-N) Beachwood OH

THORO. Waterproofing Systems

Frost Damage of Roof Tiles in Relatively Warm Areas in Japan

Dubai Municipality Standard DMS 1: Part 5: 2004

Service-Life Prediction State-of-the-Art Report

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

Non-Destructive Testing of Wisconsin Highway Bridges. Final Report

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

Durability of reinforced concrete pipe the hard facts!

Epoxy Crack Injection (the basics)

Bridge Type Selection

Transcription:

Alkali-Aggregate Reaction (AAR) of Concrete Structures

Outline What is AAR? How does AAR work? How to assess AAR? How to minimise AAR risk in new concrete structures?

AAR Alkali-silica Reaction (ASR): - only type of AAR occurred in HK Alkali-silicate Reaction Alkali-carbonate Reaction

Concrete failure due to ASR

Concrete failure due to ASR

Effect of ASR Concrete Quality Loss of strength, stiffness, impermeability Affect concrete durability and appearance Premature failure of concrete structures Economic Costs Maintenance cost increased The life of concrete structure is reduced Overall Result No concrete structures had collapsed due to ASR damage Some concrete structures/members were demolished because of ASR

Example: Daqing Railway Bridge, China Alkali-Aggregate Reactions in Railway Bridge Railway Bridge built in 1987 Precast prestressed concrete beams cast at Gaogezhuang, North of Beijing

Example: Daqing Railway Bridge, China

Example: Daqing Railway Bridge, China

Local Example in HK Shek Wu Hui Treatment plant Built in early 1980s ASR was reported in 1991

Local Example in HK Shek Wu Hui Treatment plant

Local Example in HK Shek Wu Hui Treatment plant

Local Example in HK Shek Wu Hui Treatment plant

Local Example in HK Shek Wu Hui Treatment plant

Local Example in HK Shek Wu Hui Treatment plant

Local Example in HK Shek Wu Hui Treatment plant

Local Examples of ASR Structures Affected by ASR: Site Year constructed Year ASR reported Approx. time for ASR to develop Shek Wu Hui Treatment Works Fan Ling Footbridges 1980-1983 1991 about 9-12 years 1982 1998 16 years North Point Govt. School 1987 about 1999 about 12 years Hill Road Flyover 1982 1997 15 years

Local History of ASR Background ASR was first diagnosed in HK (1991) AAR Sub-Committee under SCCT was set up Hong Kong Specification WBTC 14/94 issued 3 Kg/m³ limit on reactive alkali content in concrete Quality Scheme for the Production and Supply of Concrete (QSPSC) Cl. 7.1.1(e) Use of chemical method ASTM C289 Increasing use of AMBT (included in PS) in major

How to assess ASR

Test for Potential ASR Reaction of alkali with silica is slow ASR can be accelerated by: - increasing temperatures, - increasing moisture availability, - increasing alkali concentrations

Common Test Methods to assess ASR Petrographic Examination Chemical Test Accelerated Mortar Bar Test (AMBT) Concrete Prism Test (CPT) Accelerated Concrete Prism Test (ACPT)

Common Test Methods to assess ASR Test Method RILEM ASTM Standard Canadian Standard British Standard Petrographic Examination AAR-1 ASTM C295 --- BS 812:Part 104 Accelerated Mortar Bar Test (AMBT) AAR-2 ASTM C1260 CSA A23.2-25A DD 249: 1999 Concrete Prism Test (CPT) AAR-3 ASTM C1293 CSA A23.2-14A BS 812:Part 123 Accelerated Concrete Prism Test (ACPT) AAR-4 --- --- --- Chemical Method ASTM C289

Petrographic Examination Petrographic examination of concrete cores from Shek Wu Hui Treatment Plant Crack running through aggregate particle and into surrounding cement paste

Use of Chemical Method in HK Use of Chemical Method (ASTM C289)

Use of AMBT in HK PWL CON 5.5 Method RILEM AAR-2 Others: ASTM C1260, CSA A23.2-25A GEO Technical Note TN 6/2002 issued in December 2002

AMBT : RILEM AAR-2 Public Works Central Laboratory Flow Chart for Rilem TC-106-2 Cure at 20 ± 1 C and RH >90% Immerse in distilled water at room temp and put in oven at 80 ± 2 C Immerse in 1M NaOH at 80 ± 2 C L n 24 ± 2 hrs 24hrs 1day 4days 2days 5 days 2 days Demould (L i ) (L 0 ) L1 1day L5 5day L7 7day L12 12day L14 14day CASTING 1 DAY 2 DAY 3 DAY 7 DAY gauge length = L 0-2studs length Ln L0 Expansion (%) = 100% Gauge length 9 DAY 14 DAY 16 DAY

AMBT : RILEM AAR-2

AMBT: RILEM AAR-2

AMBT: RILEM AAR-2

AMBT Results of Local & Reference Aggregate

AMBT Results of Local & Reference Aggregate 0.5 0.4 0.3 0.2 0.1 0 C1 (Gran ite) C2 (Gran ite) C3 (Gran ite) C4 (Granite) C5 (Gran ite) HK1 (Gran ite) C6 (Gran ite) C7 (Gran ite) C8 (Diorite) HK2 (Granite) HK3 (Granite) C9 (Gran o d iorite) C1 0 (Ash tuff) HK4 (Ash tuff) Spratt (Referen ce) Legend: PWCL CON5.5 ASTM C1260 (94) CSA A23.2-25A (94) RILEM AAR-2 Mean Percentage Expansion (%)

Rilem AAR-3 ( TC 106-3 ) Detection of Potential Alkali-reactivity of Aggregates Flow Chart of Measurement Cure at 20 + 2 o C and RH > 90% under moist covers Cure inside the container in environment of 20 + 2 o C Cure inside the container in environment of 38 + 2 o C, 24 hours before each measurement, allow container with prism to cool at 20 + 2 o C. Measurement of weight (Wn) and length comparator reading (Rn). 24 + 0.5 hours 24 hours 5 days 1 week 2 weeks 9 weeks 13 weeks 26 weeks Demould, wrapped with cotton cloth, polyethylene tubing, and polyethylene bag, stored in container. Measure initial length (Li), initial weight (W2) & length comparator reading (R2) Measurement at day 7 ( R7, W7) Measurement at 2 weeks ( R14, W14) Measurement at 4 weeks ( R28, W28) Measurement at 13 weeks ( R91, W91) Measurement at 26 weeks ( R182, W182) Measurement at 52 weeks ( R364, W364) Casting 1 day 2 days 1 week Percentage increase in weight ( % ) = Wn W2 x 100 % Where W n is the weight at n days age. W2 2 weeks 4 weeks Percentage increase in length ( % ) = Ln L2 x 100 % Li Where Ln is the length of prism with studs at n days age. ( Ln = Rn + calibrated length of reference bar). 13 weeks 26 weeks 52 weeks

CPT: RILEM AAR-3

CPT: RILEM AAR-3 Steel Mould with Gauge Studs

CPT: RILEM AAR-3

CPT: RILEM AAR-3

CPT: RILEM AAR-3

CPT: RILEM AAR-3 Interior of Container

CPT: RILEM AAR-3 Interior of Oven

CPT: RILEM AAR-3

ACPT A Faster test when compared with CPT Determination of alkali threshold limit Performance test for concrete mix Development of ACPT will be the next task of PWCL

ASR Testing Methods Hong Kong Experience Chemical test is not reliable AMBT show reliable result CPT is under development by PWCL Development of ACPT will be the next task

Preventive Measures against ASR in New Concrete Structures

Factors affecting ASR Reactivity Reactivity of the siliceous material total alkali content of the concrete supply of moisture

Preventive Measures against ASR Cements Limiting the alkali content of the mix, means that a low-alkali cement have to be used most countries adopted the limit of 0.60% Na2O equivalent

Preventive Measures against ASR Restriction of alkali level in concrete Canada, Denmark South Africa 1.8 to 3.0 Kg/m³ Na2O equivalent, depending on information about AAR reactivity of aggregate and the level of risk 2.0 to 4.5 Kg/m³ Na2O equivalent, depending on information about AAR reactivity of aggregate New Zealand 2.5 Kg/m³ Na2O equivalent UK 2.5 to 5.0 Kg/m³ Na2O equivalent, depending on information about AAR reactivity of aggregate Belgium, China, Japan, USSR 3.0 Kg/m³ Na2O equivalent France 3.0 to 3.5 Kg/m³ Na2O equivalent, depending on information about variability of cement alkalis Ireland 4.0 Kg/m³ Na2O equivalent but 4.5 Kg/m³ Na2O equivalent if reactive aggregate is only Carboniferous chert

Preventive Measures against ASR Supplementary Cementitious Materials (SCM) Pulverized-fuel ash (PFA) Ground granulated blastfurnace slag (GGBS) Microsilica, also called silica-fume

Preventive Measures against ASR Use of Cementitious Replacement Materials PFA, GGBS used in most countries microsilica used in Australia, Belgium, Canada, Denmark, Iceland, New Zealand, South Africa & USA Usual Range of Replacement Levels 15 to 40% PFA 25% to 70% GGBS 7% to 15% microsilica

Preventive Measures against ASR Aggregates If the aggregate is non-reactive, no other precautions are necessary If not, a variety of precautions are invoked Preclusion of reactive aggregates from particular uses.

Preventive Measures against ASR Moisture Reduce the access of moisture and maintain the concrete in a sufficiently dry state

Preventive Measures against ASR Others Modify the properties of any gel such that it is non-expansive, e.g. using lithium salts

Review of International Practice with ASR 3 Basic Approaches (1) aggregates are classified as reactive or innocuous; mitigation measures are prescribed for use with reactive aggregates. (2) the reactivity of an aggregate is first classified; mitigation measures are prescribed for use of the aggregate according to the nature of the structure and the environment it is in. (3) consideration starts with the nature of structure to be constructed and the service environment; aggregate reactivity is considered for the choice of supply sources and the mitigation measures needed to prevent AAR

Typical Framework Determination the level of precaution Characterisation of the structural needs Characterisation of the environment

Classes of Structures Structures classified by risk category S1 some deterioration from AAR is acceptable, e.g. temporary or short service life structures, easily replaceable elements S2 minor AAR and resulting cosmetic cracking is acceptable, e.g. most building and civil engineering structures S3 no AAR damage is acceptable, even if only cosmetic - long service life or highly critical structures, e.g. nuclear installations, dams, tunnels, exceptionally important bridges or viaducts, structures retaining hazardous materials

Classes of Environment Characterisation of the environment E1 protected from external moisture, e.g. internal concrete within buildings, external concrete protected by cladding E2 exposed to external moisture,.e.g. internal concrete within buildings where humidity is high (laundries, swimming pools), external concrete exposed to atmosphere E3 exposed to external moisture + aggravating factors such as de-icing salts, freezing and thawing or a marine environment

Level of Precaution An example of Level of Precaution P1 no special precautions against ASR P2 normal level of precaution P3 special level of precaution Environment Category E1 E2 E3 Category of Structure S1 P1 P1 P1 S2 P1 P2 P2 S3 P2 P3 P3

Example of Control Framework: RILEM: Draft International Specification to Minimise Damage from ASR in Concrete Level of Precaution P1 no special precautions against ASR P2 normal level of precaution M1: Restrict the alkalinity of pore solution, e.g. limit the alkali content of concrete, use of low alkali cement, include PFA, GGBS, etc. M2: Avoid the presence of a critical amount of reactive silica, e.g. identify non-reactive aggregate M3: reduce the access of moisture and maintain the concrete in a sufficiently dry state, e.g. use external cladding or tanking M4: modify the properties of any gel such that it is nonexpansive,.e.g. use lithium salts P3 special level of precaution Combined application of at least two of the precautionary measures from level 2

What shall we do? What we know: Which reactants involved and their sources How alkali-silica gel is created ASR prevention can be achieved by using low alkali cement and non-reactive aggregate Cement replacement such as PFA, GGBS and microsilica help mitigate ASR damage What we don t know: Cement Replacement: its mechanism of inhibition, which compounds work best, how much of each compound is needed to prevent expansion, its long term performance Which test method most suit local aggregate

What shall we do? SCCT: Review of Concrete Related Standards (1) Cement Standard (2) Aggregate Standard (3) Unifying Concrete Specification (4) CS1 - Concrete Testing (5) CS2 Reinforcement Bar Proposed framework for controlling risk of ASR in Hong Kong is being prepared and will be circulated to relevant parties

THANK YOU