Mayplas. The Insulation Converter. 551 Timber Frame Cavity Barrier 552 Masonry Cavity Stop Sock

Similar documents
Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Contents. APA Construction Details. Full fill cavity walls Partial fill cavity walls Solid externally insulated walls 26-37

Excerpts from the Canadian National Building Code (NBC)

Section Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

ONLINE VERSION. The Building Regulations 2010 The Building (Approved Inspectors etc) Regulations 2010 ONLINE VERSION

Rockwool Flexi Insulation Application Guide

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

fire separating walls #2

H-Stud Area Separation Wall System

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

Module 3.7. Thermal bridging

- 5 - Table1. Maximum Compartment Volumes

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

FIRE AND SMOKE PROTECTION FEATURES

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

FIRE-RESISTANCE-RATED CONSTRUCTION

Fire safety in timber buildings

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

GENERAL FIRE SAFETY TERMS & DEFINITIONS

Composite Panel Firewall Systems

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

FIRE AND SMOKE PROTECTION FEATURES

PRODUCT GUIDE lower tolerances high quality

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

FIRE-RESISTANCE-RATED CONSTRUCTION

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 199

CHAPTER 6 CONSTRUCTION TYPES

Agrément Certificate 06/4300 Product Sheet 1

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

The right solutions. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare?

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

CI/SfB (31.9) BETTER BY DESIGN PRODUCT GUIDE COMPLETE GUIDE TO THE IG PRODUCT RANGE.

Fiberglas, Exterior Wall Thermal Insulation

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: TEC-WOOD ( )

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

800 Communications Circuits

FireWall. High performance fireresistant. FireWall.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Certification: Building Plans Examiner. Exam ID: B3

Introduction. CE marked construction products

Innovation - High performance roof, wall and floor insulation board. delivering better performance

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA)

Approved Document Q: Security

KINGSPAN INSULATION KINGSPAN KOOLTHERM K12 FRAMING BOARD INSULATION

POST AND FRAME STRUCTURES (Pole Barns)

WARMFILL CAVITY WALL INSULATION WARMFILL CAVITY WALL INSULATION FOR MASONRY CAVITY WALLS

Building Control Guidance Note

The Kingspan Insulation Price List 1 st January 2013

rationel WINDOWS WITH VISION

Rockwool Cladding Roll

Fire Barriers & Fire Stopping

PYROSWISS VETROFLAM CONTRAFLAM

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

Terms and Definitions In Canada

Code of Practice for fire resisting metal doorsets

TIMBER FRAME STANDARD DETAILS SEPTEMBER 09

Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01

Guidance on loft conversions in two-storey houses

LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual

EcoTouch Insulation with PureFiber Technology

Fire Barrier Systems. For inhibiting the spread of fire and smoke in concealed spaces

K17.12 Door closers K17. Doors

Best Barns USA Assembly Book

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

Contents. 1. Introduction 1.1 Reason for this Guide Interpretation 1.3 Principles of Fire Safety 1.4 Legal Provisions 4

Gypsum Board Systems Manual

Squash Court Design general points

SIG SIG CAVITY WALL INSULATION

New Ontario Building Code Highlights

Fire Barrier Duct Wrap 15A

FIRE RATED GLAZING System Guide

Passive Fire Protection Guidance for the Fire Risk Assessor. Niall Rowan Technical Officer Association for Specialist Fire Protection

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

Light Steel Modular Construction

Hanson Building Products. precast basement solutions

Fire-resistant barriers: background on requirements and determination method. Reading guide for test reports.

Dubai Municipality Standard DMS 1: Part 5: 2004

Hoesch Matrix System individuell. ThyssenKrupp Steel Europe Thinking the future of steel

Solar Panel Installations

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

CONDENSATION IN REFRIDGERATED BUILDINGS

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Technical Notes 3B - Brick Masonry Section Properties May 1993

FIRE RATED WIRING. What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager

Decree of the Ministry of the Environment on fire safety of ventilation systems

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Partitioning & Ceiling Product Information

Transcription:

Mayplas The Insulation Converter 551 Timber Frame Cavity Barrier 552 Masonry Cavity Stop Sock Meets the requirements of:- * 2000 Approved Document B Fire Safety * 2003 Approved Document E Sound Resistance * Robust Details Part E * NHBC Standards 2005 * Standard 1 hour and Deluxe 2 hour ranges * 2 hour Party Wall Range * Polythene sleeved mineral wool * Made to measure sizes for perfect cavity fit * Tested by Warrington Fire Research

Mayplas Cavity Barriers - General Information Manufactured using polythene enclosed non combustible rockfibre in bespoke sizes designed to be compressed by 15mm within the cavity - this made to measure cavity barrier design provides a minimum of 1 hour fire resistance and is crucial in sound applications where flanking transmission can be the weak link of an otherwise robust construction - 551 Standard Range has been tested by Warrington Fire Research (WFRC No: C83002) to provide 1 hour fire resistance - double the minimum requirement - meets Part B and Part E (incl Robust Details) of The Building Regulations 2000-552 Standard Range has been tested by Warrington Fire Research (WFRC No: C82327) to provide 1 hour fire resistance - double the minimum requirement - meets Part B and Part E (incl Robust Details) of The Building Regulations 2000 - Mayplas Deluxe and Party Wall Ranges have been assessed by Warrington Fire Research to provide 2 hours fire resistance (WFRC No: 14354 Issue 2) - meets Part B and Part E (incl Robust Details) of The Building Regulations 2000 Fitting Mayplas 551 Timber Frame Cavity Barriers Vertical Barriers are stapled (at 150mm centres) to the inner timber sheathing by both flanges - joints are close butted. 551 is designed to be compressed in the cavity by 15mm as the brickwork is built up Horizontal Barriers are stapled (at 150mm centres) to the inner timber sheathing by the upper flange only - joints are close butted. Cavity Barrier is designed to be compressed by 15mm in the cavity as the brickwork is built up Fitting Mayplas 552 Cavity Stop Socks Vertical Stop Socks are compressed and friction fitted between the outer brickwork and inner blockwork - joints are close butted. 552 is designed to be compressed by 15mm in the cavity as the brickwork is built up Horizontal Stop Socks are compressed by 15mm and friction fitted between the outer brickwork and inner blockwork - joints are close butted. A dpc cavity tray with a minimum upstand of 100mm should be installed immediately above the stop sock (not when used as closer in external cavity wall at eaves level or at ceiling and roof junction) Full Fill & Partial Fill Cavity Insulation in Masonry Constructions 1) Where full fill cavity insulation is specified a cavity stop sock not always required (see cavity insulation manufacturer s product data for confirmation) 3) Where partial fill cavity insulation is specified the cavity insulation should be cut away to allow the cavity stop sock to fill the entire cavity

551 Timber Frame Cavity Barrier For separating floor junctions and eaves level For junctions of external cavity wall and internal wall Party Wall Range for junctions of external cavity wall and internal wall Sizes Standard 1 hour Deluxe 2 hour Party Wall 2 hour to suit 50mm external cavity 65mm x 65mm x 1200mm 65mm x 150mm x 1200mm 65mm x 380mm x 1200mm to suit 60mm external cavity 75mm x 90mm x 1200mm 75mm x 150mm x 1200mm 75mm x 380mm x 1200mm to suit 70mm external cavity 85mm x 90mm x 1200mm 85mm x 150mm x 1200mm 85mm x 380mm x 1200mm to suit 75mm external cavity 90mm x 120mm x 1200mm 90mm x 150mm x 1200mm 90mm x 380mm x 1200mm to suit 85mm external cavity 100mm x 120mm x 1200mm 100mm x 150mm x 1200mm 100mm x 380mm x 1200mm to suit 90mm external cavity 105mm x 120mm x 1200mm 105mm x 150mm x 1200mm 105mm x 380mm x 1200mm to suit 100mm external cavity 115mm x 120mm x 1200mm 115mm x 150mm x 1200mm 115mm x 380mm x 1200mm to suit 115mm external cavity 130mm x 150mm x 1200mm 130mm x 380mm x 1200mm other sizes available to suit up to 150mm cavity width - details on request 552 Masonry Cavity Stop Sock For separating floor junctions and eaves level For junctions of external cavity wall and internal wall Party Wall Range for external cavity wall and internal cavity wall junctions

Meeting the Sound Flanking Transmission Guidance given in 2003 Approved Document E for Timber Frame Constructions (see below for Approved Document page references) Section 2 of Approved Document E (2003 Edition) of The Building Regulations 2000 states - in order for the construction to be fully effective, care should be taken to correctly detail the junctions between the separating wall and other elements, such as floors, roofs, external walls and internal walls. Recommendations are also given for the construction of these elements, where it is necessary to control flanking transmission (paragraph 2.9 on page 16) Section 3 of Approved Document E (2003 Edition) of The Building Regulations 2000 states - in order for the construction to be fully effective, care should be taken to correctly detail the junctions between the separating floor and other elements, such as external walls, separating walls and floor penetrations. Recommendations are also given for the construction of these other elements where it is necessary to control flanking transmission (paragraph 3.10 on page 38) In timber frame constructions Mayplas 551 Timber Frame Cavity Barrier is the ideal solution for the control of sound flanking transmission and can be used in all wall and floor junctions detailed in Approved Document E where cavity stop or flexible closer are mentioned Mayplas 551 Timber Frame Cavity Barrier meets the requirements of Robust Details Part E in constructions where close cavity with flexible cavity stop is specified Section 2: Separating Walls & associated flanking constructions for new buildings Wall Type 1: Solid Masonry - Guidance for Junctions Page 22: Diagram 2-9: junctions with an external cavity wall with timber frame inner leaf Wall Type 2: Cavity Masonry - Guidance for Junctions Page 27: Diagram 2-22: junctions with an external cavity wall with timber frame inner leaf Wall Type 4: Framed walls with absorbent material - Guidance for Junctions Page 36: Diagram 2-38: junctions with an external cavity wall with timber frame inner leaf Page 37: Paragraph 2.161: junctions with ceiling and roof space - the junction between the separating wall and the roof should be filled with a flexible closer Page 37: Paragraph 2.163: external cavity wall at eaves level - where there is an external wall cavity, the cavity should be closed at eaves level with a suitable material Section 3: Separating Floors & associated flanking constructions for new buildings Floor Type1: Concrete base with ceiling and soft floor covering - Guidance for Junctions Page 42: Paragraph 3.36 (a): junctions with an external cavity wall with timber frame inner leaf - where the external wall is a cavity wall the cavity should be stopped with a flexible closer Floor Type 2: Concrete base with ceiling and floating floor - Guidance for Junctions Page 47: Paragraph 3.74 (b): junctions with an external cavity wall with timber frame inner leaf - where the external wall is a cavity wall the cavity should be stopped with a flexible closer Floor Type 3: Timber frame base with ceiling and platform floor - Guidance for Junctions Page 50: Paragraph 3.109 (b): junctions with an external cavity wall with timber frame inner leaf - where the external wall is a cavity wall the cavity should be stopped with a flexible closer

Meeting the Sound Flanking Transmission Guidance given in 2003 Approved Document E for Masonry Constructions (see below for Approved Document page references) Section 2 of Approved Document E (2003 Edition) of The Building Regulations 2000 states - in order for the construction to be fully effective, care should be taken to correctly detail the junctions between the separating wall and other elements, such as floors, roofs, external walls and internal walls. Recommendations are also given for the construction of these elements, where it is necessary to control flanking transmission (paragraph 2.9 on page 16) Section 3 of Approved Document E (2003 Edition) of The Building Regulations 2000 states - in order for the construction to be fully effective, care should be taken to correctly detail the junctions between the separating floor and other elements, such as external walls, separating walls and floor penetrations. Recommendations are also given for the construction of these other elements where it is necessary to control flanking transmission (paragraph 3.10 on page 38) In traditional masonry constructions Mayplas 552 Masonry Cavity Stop Sock is the ideal solution for the control of sound flanking transmission and can be used in all wall and floor junctions detailed in Approved Document E where cavity stop or flexible closer are mentioned Mayplas 552 Masonry Cavity Stop Sock meets the requirements of Robust Details Part E in constructions where close cavity with flexible cavity stop is specified Section 2: Separating Walls & associated flanking constructions for new buildings Wall Type 1: Solid Masonry - Guidance for Junctions Page 21: Diagram 2-5: junctions with an external cavity wall with masonry inner leaf Page 21: Diagram 2-7: tied junction - external cavity wall with internal masonry wall Page 23: Diagram 2-13: ceiling and roof junction Page 23: Diagram 2-14: external cavity wall at eaves level Wall Type 2: Cavity Masonry - Guidance for Junctions Page 26: Diagram 2-19: junctions with an external cavity wall with masonry inner leaf Page 27: Diagram 2-20: junctions with an external cavity wall with masonry inner leaf - stagger Page 27: Diagram 2-21: tied junction - external cavity wall with internal masonry wall Page 28: Diagram 2-25: ceiling and roof junction Page 29: Diagram 2-26: external cavity wall at eaves level Wall Type 3: Masonry between independent panels - Guidance for Junctions Page 32: Diagram 2-31: junctions with an external cavity wall with masonry inner leaf Page 32: Diagram 2-32: junctions with an external cavity wall with internal timber wall Page 34: Diagram 2-35: ceiling and roof junction Section 3: Separating Floors & associated flanking constructions for new buildings Floor Type1: Concrete base with ceiling and soft floor covering - Guidance for Junctions Page 42: Diagram 3-5: junctions with an external cavity wall with masonry inner leaf Floor Type 2: Concrete base with ceiling and floating floor - Guidance for Junctions Page 47: Diagram 3-16: junctions with an external cavity wall with masonry internal leaf Floor Type 3: Timber frame base with ceiling and platform floor - Guidance for Junctions Page 50: Paragraph 3.103 (b): where the external wall is a cavity wall the cavity should be stopped with a flexible closer

Meeting the Fire Cavity Barrier Guidance given in 2000 Approved Document B for Masonry & Timber Frame Constructions (see below for Approved Document page references) Section 10 of Approved Document B (2000 Edition) of The Building Regulations 2000 states - concealed spaces or cavities in the construction of a building provide a ready route for smoke and flame spread. Provisions are made to restrict this by interrupting cavities which could form a pathway around a barrier to fire, sub-dividing extensive cavities, and by closing the edges of openings (paragraph 10.1 on page 73) The Regulations require that every cavity barrier should be constructed to provide at least 30 minutes fire resistance (paragraph 10.6 on page 76) In timber frame constructions Mayplas 551 Timber Frame Cavity Barrier is the ideal cavity barrier solution and can be used in cavities up to 150mm wide - the Standard Range has been tested by Warrington Fire Research (WFRC No: C83002) to provide 1 hour fire resistance - double the minimum requirement In traditional masonry constructions Mayplas 552 Masonry Cavity Stop Sock is the ideal cavity barrier solution and can be used in cavities up to 150mm wide - the Standard Range has been tested by Warrington Fire Research (WFRC No: C82327) to provide 1 hour fire resistance - double the minimum requirement Mayplas Deluxe and Party Wall Ranges have been assessed by Warrington Fire Research to provide 2 hours fire resistance (WFRC No: 14354 Issue 2) Mayplas 551 Timber Frame Cavity Barrier can be used as required in Table 13 Provision of Cavity Barriers (page 74) as follows:- 1: At the junction between an external cavity wall and a compartment wall that separates buildings; and at the top of such an external cavity wall 3: At the junction between an external cavity wall and every compartment floor and compartment wall 4: At the junction between a cavity wall and every compartment floor, compartment wall, or other wall or door assembly which forms a fire-resisting barrier 8: To sub-divide any cavity so that the distance between cavity barriers does not exceed the dimensions given in Table 14 (page 75) 10: At the edges of cavities (including around openings such as doors and window frames) Maximum Dimensions of Concealed Spaces Paragraph 10.10 (page 77) states: with the exceptions given in paragraphs 10.11 to 10.13 extensive concealed spaces should be sub-divided to comply with the dimensions in Table 14 (page 75) Mayplas 552 Masonry Cavity Stop Sock can be used as required in Table 13 Provision of Cavity Barriers (page 74) as follows:- 1: At the junction between an external cavity wall and a compartment wall that separates buildings; and at the top of such an external cavity wall 3: At the junction between an external cavity wall and every compartment floor and compartment wall 4: At the junction between a cavity wall and every compartment floor, compartment wall, or other wall or door assembly which forms a fire-resisting barrier 8: To sub-divide any cavity so that the distance between cavity barriers does not exceed the dimensions given in Table 14 (page 75) 10: At the edges of cavities (including around openings such as doors and window frames) Maximum Dimensions of Concealed Spaces Paragraph 10.10 (page 77) states: with the exceptions given in paragraphs 10.11 to 10.13 extensive concealed spaces should be sub-divided to comply with the dimensions in Table 14 (page 75)

Ordering Information - sizes - pack quantities - product codes Standard range 1 hour fire resistance which exceeds requirements of 2000 Approved Document B meets guidance on control of sound flanking transmission in 2003 Approved Document E and Robust Details Part E 551 Timber Frame Cavity Barrier 552 Masonry Cavity Stop Sock 65mm x 65mm x 1200mm 40 per pack 48 lin m pack for 50mm cavity 194020652 194030651 75mm x 90mm x 1200mm 35 per pack 42 lin m pack for 60mm cavity 194020752 194030751 85mm x 120mm x 1200mm 20 per pack 24 lin m pack for 70mm cavity 194020862 194030852 90mm x 120mm x 1200mm 20 per pack 24 lin m pack for 75mm cavity 194020902 194030902 100mm x 120mm x 1200mm 20 per pack 24 lin m pack for 85mm cavity 194021020 194031052 105mm x 120mm x 1200mm 20 per pack 24 lin m pack for 90mm cavity 194021052 194031054 115mm x 120mm x 1200mm 15 or 20 per pack 18 or 24 lin m pack for 100mm cavity 194021157 194031155 Deluxe range provides 2 hours fire resistance which exceeds requirements of 2000 Approved Document B meets guidance on control of sound flanking transmission in 2003 Approved Document E and Robust Details Part E 551 Timber Frame Cavity Barrier 552 Masonry Cavity Stop Sock 65mm x 150mm x 1200mm 20 per pack 24 lin m pack for 50mm cavity 194020654 194030655 75mm x 150mm x 1200mm 20 per pack 24 lin m pack for 60mm cavity 194020753 194030753 85mm x 150mm x 1200mm 20 per pack 24 lin m pack for 70mm cavity 194020865 194030853 90mm x 150mm x 1200mm 20 per pack 24 lin m pack for 75mm cavity 194020903 194030904 100mm x 150mm x 1200mm 15 per pack 18 lin m pack for 85mm cavity 194021021 194031051 105mm x 150mm x 1200mm 15 per pack 18 lin m pack for 90mm cavity 194021053 194031057 115mm x 150mm x 1200mm 10 or 15 per pack 12 or 18 lin m pack for 100mm cavity 19402115X 194031159 130mm x 150mm x 1200mm 10 per pack 12 lin m pack for 115mm cavity 194021315 194031300 all other sizes available to suit cavities up to 150mm wide Party Wall range provides 2 hours fire resistance for party wall cavities up to 80mm wide - for party wall cavities over 80mm contact Sales Office meets guidance on control of sound flanking transmission in 2003 Approved Document E and Robust Details Part E 551 Timber Frame Cavity Barrier 552 Masonry Cavity Stop Sock 65mm x 380mm x 1200mm 10 per pack 12 lin m pack for 50mm external cavity 194023065 194033050 75mm x 380mm x 1200mm 5 per pack 6 lin m pack for 60mm external cavity 194023075 194033060 85mm x 380mm x 1200mm 5 per pack 6 lin m pack for 70mm external cavity 194023078 194033068 90mm x 380mm x 1200mm 5 per pack 6 lin m pack for 75mm external cavity 194023080 194033075 100mm x 380mm x 1200mm 5 per pack 6 lin m pack for 85mm external cavity 194023085 194033085 105mm x 380mm x 1200mm 5 per pack 6 lin m pack for 90mm external cavity 194023090 194033090 115mm x 380mm x 1200mm 5 per pack 6 lin m pack for 100mm external cavity 194023100 194033100 130mm x 380mm x 1200mm 5 per pack 6 lin m pack for 115mm external cavity 194023115 194033115 all other sizes available to suit external cavities up to 150mm wide www.mayplas.co.uk Sales - Tel: 0161-447-8320 Fax: 0161-447-8333 e-mail: sales@mayplas.co.uk

Mayplas qüé=fåëìä~íáçå=`çåîéêíéê= Sales Office Opening Hours Monday - Thursday: 0830-1730 Friday: 0830-1700 www.mayplas.co.uk 09/05 Sales - Tel: 0161-447-8320 Fax: 0161-447-8333 e-mail: sales@mayplas.co.uk