Man/days atribuition for GHG verification

Similar documents
CCS in the Oil refining Industry System Solutions and Assessment of Capture Potential

California s Cap-and-Trade Voluntary Renewable Electricity Program

Greenhouse Gas Emissions Reporting Services

How To Track Rsw Certified Material

An Overview of California s Cap and Trade Program

California Energy Commission California Perspective on Biofuels and Energy

Inventory of LCPs in Turkey LCP Database introductory presentation

Techno-economic assessment of introduction of hydrogen in Oslo, Telemark and Rogaland

Greenhouse Gas Emissions Data Request Form. Resolved Example (Suppliers Case).

Overview of UK Carbon Pricing Policies

Self Evaluation Report (Univ) Study cycles already in operation

The California GHG Emissions Reporting Tool

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

TGE TECH. Waste and Green Energy Management For a best future TEL HAY JUNE 2008

Implications of changing natural gas prices in the United States electricity sector for SO 2. and life cycle GHG emissions: Supplementary Information

The Development of the 500MW Co-firing facility at Drax Power Station

LTES Environmental Management System (EMS) Compliance

Small Business Economic Impact Statement Chapter WAC Reporting of Emission of Greenhouse Gases

Compliance, Tools & Synchronization: A Guide to Climate Action Planning Resources in California

Technical Note: Conversion of fuel data to MWh

Electric Utilities. Introduction to the module

Category 3: Fuel- and Energy-Related Activities Not Included in Scope 1 or Scope 2

How To Understand And Understand The Energy Mix In Brazilian Power Production

It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns

Well-to-Wheels Energy and Emission Impacts of Vehicle/Fuel Systems Development and Applications of the GREET Model

ETHANOL AS PREFERENTIAL FUEL FOR THE FUTURE OF INTERNAL COMBUSTION ENGINE. Ricardo Simões de Abreu Frente Inovar-Auto 2 - Sindipeças Julho de 2015

Low-Carbon Development for Mexico (MEDEC)

Life Cycle Inventory of Brazilian Methanol: Contribution for National Database

CDP7 and OneReport Comparison

Business Transformation and Green Fleet Achievements. City of Sacramento

Energy Efficiency of Ships: what are we talking about?

System Basics for the certification of sustainable biomass and bioenergy

NAP II in Denmark The challenges

Ecological, Carbon and Water Footprint

The European Renewable Energy Directive and international Trade. Laurent Javaudin Delegation of the European Commission to the U.S.

LONG-TERM ENERGY SECURITY RISKS FOR EUROPE: A SECTOR-SPECIFIC APPROACH

Thermax Sustainable Energy Solutions Limited

Greenhouse Gas Emissions Verification (January 2013 December 2013)

Egypt & Climate Change

Information Leaflet Sustainable Biomass Production. First Interfaces - First Gathering Points - 3/7

Proposed Local Law No. 3 Of County Of Ulster

Biogas from Sewage Treatment used to Electric Energy Generation, by a 30 kw (ISO) Microturbine

A European Partnership

Pacific Gas and Electric Company

Tips from the Help Desk

GEMI Survey. EHS Metrics and Processes. April Mark Hause GEMI Benchmark Chair

Garry Kaufman Colorado Air Pollution Control Division May 14, 2014

DEVELOPMENT AND STATUS OF THE USE OF AGRICULTURAL RESIDUES FOR ENERGY IN DENMARK HISTORY AND POLICY DRIVERS

Massachusetts Clean Energy and Climate Plan for Executive Office of Energy and Environmental Affairs

Summit County Energy Plan - Goals A. Explanation and Comparison: State and Summit County Goals B. Measurement and Verification

equivalents (CO2e) emitted by a person or business. Usually expressed in the number of CO2e tons emitted per unit of time (per year) or

AGRICULTURE FOR FOOD AND FOR BIOENEGY: IS IT POSSIBLE?

Biogas in the Nordic countries

New business segments for the energy saving industry Energy efficiency and decentralised energy systems in the building & housing sector

Concrete Example of CDM Project : Lages Methane Avoidance Project

The Journal of Science Policy & Governance

Annual Electricity and Heat Questionnaire

ChevronTexaco Corporate Energy and GHG Inventory System: SANGEA

Country Report, SWEDEN

Assignment 8: Comparison of gasification, pyrolysis and combustion

IBM and the U.S. EPA s SmartWay SM Transport Partnership

LET S RENEW WWF dismantles the myths of renewable energies in Spain

Smart Cities and Sustainable Technology

Innovation For Cool Earth Forum (ICEF) 2 nd Annual Meeting

Promotion of energy efficiency and renewable energy experiences from Norway

Sample Scope 3 GHG Inventory Reporting Template

Alternative drivmidler

Energy Generation with Landfill Biogas

Renewable Energy LORD Green Real Estate Strategies, Inc.

Consultation response: PPC Technical Guidance Note 35 Anaerobic Digestion

Oil and Gas Air Quality Regulations and Permitting

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

System Basics for the certification of sustainable biomass and bioenergy

Improving the quality of certification, measurement, verification and validation of conformity assessment results Dr Elsabe Steyn

Fact sheet. Conversion factors. Energy and carbon conversions 2011 update

Transcription:

Man/days atribuition for GHG verification joao.bolina@apambiente.pt

New Process Need of new solution Levelling of the market Higher quality of verification

Good old classic System Dimension/number of employee Complexity

Complexity VS days (EMS) Diagram 1 - Guidance for determination of number of Auditor Days 25 High 20 Environmental Complexity: Limited Low Medium Number of Auditor Days 15 10 Medium High Low Limited 5 0 0 10 30 100 500 2000 Number of Employees

Man/day table CONTINUUM Number of employees High complexity Medium complexity Low complexity 10 4 ± 1 3 ± 1 3 ± 1 3 ± 1 30 7 ± 2 6 ± 2 4 ± 1 3 ± 1 100 11 ± 3 8 ± 3 6 ± 2 4 ± 1 500 16 ± 5 12 ± 3 9 ± 3 6 ± 2 2000 23 ± 7 18 ± 5 13 ± 4 8 ± 2 Limited complexity

GHG verification Small doesn't necessarily means easy Dimension of the installation my be not relevant

WHY? Clarity for the market Stop a biding war Try to focus on quality of verification process

Factors to consider for the determination of days to impute to an installation in GHG verification process: Number of emission sources Number of fuels Structure of the data management system of the installation Monitoring level Emission level Type of fuel

Cálculo para a duração da verificação CELE Tabela 1 Table 2 Measured Measured Factors to be consider: Factors A e B value of value of (QT) factor A factor B A- Number of emission sources Factor C - Instalações por valores anuais de emissão 1 1 1 (table 1); small instalation (< de 50.000 ton CO 2 1 a 2 2 3 B - Number of fuels (table 1); medium size installation - Natural Gas (>= 50.000 e < 500.000 ton CO 2 3 a 6 3 5 medium size installation (>= 50.000 e < 500.000 ton CO 2 C - type of installations (table 7 a 10 4 10 CO 2 >10 5 25 2); Big installations (>=500.0000 ton CO 2 Refinaries with "flares",crakers" and destilation units (>=500.0000 ton CO 2 0 Table 3 be the highest ev el indicated Table 4 Factor D Measured Value D - Monitoring lev el (table 3). the v alue to be consider shall in the permit; E - Confidance on the Nível 1 2 high confidance Nível 2a 4 structure of data collection of parcial confidance Nível 2b 6 the instalation (table 4); low confidance Nível 3a 10 F - type of fuel (table 5); Nível 3b 18 Nível 4a 25 Nível 4b 35 Factor E - Confidance on data system sructure of the operator Table 6. Nº of days = table1+ table 2+table 3+ table 4+ table 5 Table 5 Measured values 7-15 16-37 38-55 56-75 76-100 >100 Factor F - type of fuels Days 1 2-3 4-5 6-7 8-9 10 Natural gas or biomass Liquid fuels + biomass ou natural gal Calculation Combination (between liquid, solid or gas fuels) Other combinations (fuels generated internaly or bought in the exterior) Nota: o número de dias por v erificador. 0 0 0 0 0 João 0 Bolina

Table 1 A- Number of emission sources (nº of points) B number of fuels (nº of points) 1 1 1 2-3 2 3 4 a 6 3 5 7-10 4 10 +10 5 25

Type of installation Table 2 Type of installation (nº points) Small installation (<50.000 ton CO 2 /year 1 Medium installation - natural gas (>50.000 ton 5 CO2/year e <500.000 ton CO2/year) Medium installtion(<50.000 ton CO2/year 8 Medium installation with process emission (<50.000 ton CO2/year e <500.000 ton CO2/year) 12 Big installation <500.000 ton CO2/year 20 Refineries with several combustion installations, flares, crakers 35

Monitoring level Table 3 Monitoring level Nº points level 1 2 level 2a 4 level 2b 6 level 3a 10 Level 3b 18 level 4a 25 level 4b 35

Confidence on data system structure of the operator Table 4 Data system structure of the operator nº Points High confidence 1 Medium confidence 5 Low confidence 10

Type of fuels Table 5 Type of fuels nº points Natural Gas /biomass 1 Liquid fuels + biomass or natural gal 3 Combination (between liquid, solid or gas fuels) 8 Other combinations (fuels generated internaly or bought in the exterior) 12

Calculation method Table 6 Number of days Table 1 (A+B) + Table 2 + Table 3 + Table 4 + Table 5 7-15 16-37 38-55 56-75 76-100 >100 Days 1 2-3 4-5 6-7 8-9 10

Cálculo para a duração da verificação CELE Tabela 1 Table 2 Measured Measured Factors to be consider: Factors A e B value of value of (QT) factor A factor B A- Number of emission sources Factor C - Instalações por valores anuais de emissão 1 1 1 (table 1); small instalation (< de 50.000 ton CO 2 1 a 2 2 3 B - Number of fuels (table 1); medium size installation - Natural Gas (>= 50.000 e < 500.000 ton CO 2 3 a 6 3 5 medium size installation (>= 50.000 e < 500.000 ton CO 2 C - type of installations (table 7 a 10 4 10 CO 2 >10 5 25 2); Big installations (>=500.0000 ton CO 2 Refinaries with "flares",crakers" and destilation units (>=500.0000 ton CO 2 0 Table 3 be the highest ev el indicated Table 4 Factor D Measured Value D - Monitoring lev el (table 3). the v alue to be consider shall in the permit; E - Confidance on the Nível 1 2 high confidance Nível 2a 4 structure of data collection of parcial confidance Nível 2b 6 the instalation (table 4); low confidance Nível 3a 10 F - type of fuel (table 5); Nível 3b 18 Nível 4a 25 Nível 4b 35 Factor E - Confidance on data system sructure of the operator Table 6. Nº of days = table1+ table 2+table 3+ table 4+ table 5 Table 5 Measured values 7-15 16-37 38-55 56-75 76-100 >100 Factor F - type of fuels Days 1 2-3 4-5 6-7 8-9 10 Natural gas or biomass Liquid fuels + biomass ou natural gal Calculation Combination (between liquid, solid or gas fuels) Other combinations (fuels generated internaly or bought in the exterior) Nota: o número de dias por v erificador. 0 0 0 0 0 João 0 Bolina

Thank you www.apambiente.pt http://www.apambiente.pt/portal/page?_pageid=73,40 8080&_dad=portal&_schema=PORTAL&docs=1013965 9 Joao.bolina@apambiente.pt