Environmental and Social Baseline Studies. Leeanne E. Alonso, PhD Biodiversity Specialist

Similar documents
Lesson Overview. Biodiversity. Lesson Overview. 6.3 Biodiversity

Biodiversity Concepts

Facts on biodiversity

CHAPTER 2: APPROACH AND METHODS APPROACH

How To Improve The Health Of The Zambezi River

The Colorado River Delta

Doing Business, Small & Medium Enterprise Support and Information Access

Restoration Planning and Development of a Restoration Bank

Restoring Ecosystems. Ecosystem Restoration Services

WATER: ENVIRONMENTAL SCIENCE Syllabus

SLOW ONSET EVENTS. climate change impacts on BIODIVERSITY

Natural surface water on earth includes lakes, ponds, streams, rivers, estuaries, seas and oceans.

The Role of the Lender Common Infrastructure Design and Scoping Issues ESIA: The Management Planning Process Case Study Cross Cutting Themes:

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

Effective Environmental Impact Assessment: Good practices, Methods and Processes

First Technical Working Group Meeting and Training Workshop on Integrated River Basin Management in Key River Basins in Lao PDR

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

Designing in Sustainability in an Utility Scale Photovoltaic Array. Tim Green, Brookhaven National Laboratory Richard Chandler, BP Solar October 2010

Oregon. Climate Change Adaptation Framework

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

Flora and Fauna. Section 4.9: Flora and Fauna

XAYABURI HYDRO POWER PLANT, LAO PDR

A Struggle for Power in China: The Three Gorges Dam

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

Environmental Assessment

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference

Thank you to all of our 2015 sponsors: Media Partner

Michigan Wetlands. Department of Environmental Quality

Monitoring for Conservation Planning and Management. Environmental Evaluators Forum EPA Headquarters, USA June 14 15, 2007

High Conservation Value Forests 3.1. Old Growth Forests. Management & Monitoring Framework

Center for Urban Ecology Strategic Plan

Monitoring the Critically Endangered Bird Species (White-shouldered Ibis) in Western Siem Pang Important Bird and Biodiversity Area (IBA)

Markets for Ecosystem Services on Agricultural Lands: Experience and Outlook in the United States

Frequently Asked Questions (FAQs) on Hydropower

Tanzania: Lower Kihansi Hydropower Station / Hydropower plants

Inland Waterway Infrastructure - Mekong River cruise promoting factor. Tokyo September 2010

Colorado Natural Heritage Program

Marine Protected Areas POLICY

Pledge Supporting NJ Wildlife Action Plan

The Albert J. and Mary Jane Black Institute for Environmental Studies

1.7.0 Floodplain Modification Criteria

Green Infrastructure Case Study Template

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

ENDANGERED AND THREATENED

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Overcoming uncertainties regarding newly discovered species resilience to habitat disturbance in the context of EIA

Proposed Terms of Reference for EIA studies

Eshete Dejen (PhD) Lake Tana and it s environment: Threats for sustainable management

Importance of Wildlife

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT

Pond Ecosystem Field Study MOLS

A Resource Guide to In State Hydropower Production

Great Crested Newt Habitat Suitability Index

Global Environment Facility GEF OPERATIONAL PROGRAM #13 ON CONSERVATION AND SUSTAINABLE USE OF BIOLOGICAL DIVERSITY IMPORTANT TO AGRICULTURE

Water Environmental Management in Cambodia

APPLICATION OF GEOSPATIAL TECHNOLOGIES FOR SUSTAINABLE ENVIRONMENTAL MANAGEMENT

Comment Invited on Proposal to Protect the Bristol Bay Watershed

U.S. Fish & Wildlife Service West Virginia Ecological Services Field Office

Performance Standard 8:

Aiding the Hydro-scheme development process. Web-links to useful information sources

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

Chapter 8. List of Preparers

When Money Flows Upstream: Payment for Watershed Services in Guatemala.

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists

WHAT IS WORLD FISH MIGRATION DAY (WFMD)?

PROPOSED TOR FOR EIA STUDY

Human Impacts on the World Ocean

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta

AP Environmental Science Syllabus

Natural Resource Management Profile

Guide to Writing a Water Quality Monitoring Plan

How To Write A Listing Policy For A Species At Risk Act

Biodiversity App-Mt Region is Exceptional

Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems

Mizuho Bank. Environmental and Social Checklist (Mining)

Sustainable Tourism Management - an overview -

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

IBAT (Integrated Biodiversity Assessment Tool)

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

Expected Duration of Assignment : Final product to be submitted by March 18, 2016

The importance of Lebanon for the migratory soaring birds & the flyway. April Bassima Khatib SPNL Assistant Director General

Principles for Responsible Investment in Farmland

Introduction to protection goals, ecosystem services and roles of risk management and risk assessment. Lorraine Maltby

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

Comparison of HSESAP Revisions 2 and 3

CHAPTER I: INTRODUCTION. Background

Environmental Review Process

Performance Standard 8:

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS

STREAMFLOW RESTORATION PRIORITY AREAS

SEMESTER AT SEA COURSE SYLLABUS University of Virginia, Academic Sponsor

How To Decide If A Dam Removal Is Safe For Water Quality

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN

FOUR RIVERS RESTORATION PROJECT

Wetland Vocabulary Organizer

A ROCHA INTERNATIONAL S INVOLVEMENT IN PAPUA NEW GUINEA

Resources, Publications, Tools, Input from AWCC

Transcription:

Environmental and Social Baseline Studies Leeanne E. Alonso, PhD Biodiversity Specialist

My Experiences 1998-2011 13 years as Director of Rapid Assessment Program (RAP) at Conservation International (NGO) Baseline biodiversity and socioeconomic surveys To guide conservation planning >40 field surveys worldwide Currently: Consultant to IFC to review biodiversity aspects of projects (hydro, mining, oil, roads, infrastructure, chemicals etc.) particularly baseline biodiversity surveys Global Wildlife Conservation NGO) - Director of Global Biodiversity Exploration NGO Lender Client perspectives

What are Baseline Studies? Studies to determine the current environmental and/or social condition of an area Studies to evaluate how these conditions will develop in the absence of a project Baseline Information needed for ESIA Forms the basis for planning, decisions, and mitigation

When to do Baseline Studies? General studies should be ongoing to provide data for conservation and planning BEFORE project impacts start to identify environmental and social values BEFORE project to select best site for hydropower that has least impacts

Large Large reservoir (160,000 ha) hydropower plant produces only 30 MW Plans to dam additional rivers to the south to increase power output Will flood indigenous villages and rainforest

ESIA Process

Steps for a Baseline Study 1. Compile existing data: Review existing literature, reports and datasets Consult experts and stakeholders Identify gaps 2. Collect new data as needed Field studies Stakeholder consultations Consult and involve experts 3. Analyze data Compare to other sites Feed into project planning and decision making Data management and storage 4. Distribute of data Publications Project reports Stakeholder presentations

Environmental and Social Aspects for which baseline studies are needed Water/ecological flow Water quality Sediments Biodiversity (habitats and species) Aquatic Terrestrial Ecological services such as fisheries Socio-economic parameters Human and ecosystem health

Baseline studies need good*: Objectives (why) Geographic scope (where) Background Research Time (when and how long) Selection of parameters/measurements (how) Internationally accepted methodologies Expertise (who) Analysis *Follow and meet international standards and good practice

Why do Baseline Studies? Provide quality information to make best planning decisions for an area Evaluate global importance of a site Comply with national and international laws and standards Comply with lenders requirements

International Finance Corporation (IFC) Performance Standards Performance Standard 1: Assessment and Management of Environmental and Social Risks and Impacts Performance Standard 2: Labor and Working Conditions Performance Standard 3: Resource Efficiency and Pollution Prevention Performance Standard 4: Community Health, Safety, and Security Performance Standard 5: Land Acquisition and Involuntary Resettlement Performance Standard 6: Biodiversity Conservation and Sustainable Management of Living Natural Resources Performance Standard 7: Indigenous Peoples Performance Standard 8: Cultural Heritage

Why do Baseline Studies Assess potential impacts of planned projects on environmental and social parameters Develop mitigation plans to reduce impacts

Magnitude of Impact Value of Resource/ Sensitivity Negligible Small Medium Large Within normal range of natural variation Perceptible difference from baseline conditions Clearly evident change from baseline conditions Change dominant in comparison to baseline conditions Negligible No specific value or sensitivity Not Significant Not Significant Not Significant Not Significant Low Locally valued, slight sensitivity Not Significant Not Significant Minor Moderate Medium regional/natio nal value, moderate Not Significant Minor Moderate Major High National/inter national value, high Not Significant Moderate Major Critical

Why do Baseline studies Assess and mitigate impacts on the project Sedimentation Community relations Water flow and quality Invasive species Global biodiversity issues

Kihansi Gorge, Tanzania Kihansi Spray Toad Extinct in the Wild (2004) 180 mega-watt Lower Kihansi Hydropower Project (LKHP) No baseline biodiversity studies before project started

Habitat re-created with mist sprinkler system Population rebounded but then hit by chytrid fungus Captive breeding started with 499 individuals Reintroduced 1700 to the wild in 2012

Where - Geographic scope Regional/national level ongoing data collection is best Potential project footprint at all stages (pre- project, feasibility, construction, operations) Area of influence - direct and indirect impacts Terrestrial and Aquatic Areas Each habitat type multiple sampling in each Surrounding area on an ecological and/or socially relevant scale IFC s PS6 requires biodiversity assessment at an ecological scale that encompasses an entire habitat type area or watershed Other watersheds for potential offset sites

Many projects use Watershed scope Sampled all habitat types in each area MV Febrero 2010 RP 1:50.000 SC La Hig ue ra 069-2402 Plano 1. 0

At 4,350km it is the 12 th longest river in world, and the 7 th longest in Asia Watershed: 795,000 sq km Starting in Tibetan Plateau, from China along Myanmar, Thailand, Lao PDR, through Cambodia to Vietnam One of the richest areas of biodiversity in the world 90 million people depend on Mekong River River Mekong

Unexpected geographic impacts Reventazon River, Costa Rica Meso-American Biological Corridor (Jaguars)

When and How long If additional field studies are needed, adequate time must be devoted to obtain quality data to be able to measure and assess changes Start before project impacts begin Quick walk-through of area not sufficient Terrestrial - min. 5 days for biodiversity survey Aquatic need repeated sampling Seasonal and periodic sampling needed to assess natural variation If possible, continue studies through project

How to do Baseline Studies Parameters informative to decision making Environmental or Social Aspect Example Parameters to Measure Water/Ecological Flow Water Quality Sediments Terrestrial Biodiversity Aquatic Biodiversity Fisheries Socio-economic Human and ecological health Flow rate and volume, water depth, temporality ph, oxygen, turbidity, minerals, pollutants Deposition rate, level, source, seasonality Habitat extent, threatened species, diversity, endemic species, corridors Habitat diversity, species diversity, indicator groups, migratory species Commercial species biology, volume of catch, frequency, number of fishers Population size, distribution, age classes, economic profile, livelihoods, natural resources use Health issues, local diseases, frequency, vectors

Now a few examples of baseline studies approaches More examples and details will be presented today and tomorrow from around the world

Water Quality Centrales Hidroeléctricas La Higuera, Chile

At each sampling point (2 control and 2 impact) they measured: Habitat (water velocity, substrate, width, depth) Water quality (conductivity, dissolved oxygen, ph, temperature, turbidity) Biological Community (6 Surber samples of 0.09 m 2 ) Calculated index using SIGNAL 2

Biological Indicators Invertebrate Families recorded: Chironomidae. Family tolerant of adverse conditions (e.g. Low oxygen) Plecoptera. Family indicator of good quality water

SE Suriname Biodiversity Survey

Make Vegetation Map to select sampling sites in different habitat types

5 sampling locations 5 days at each location Different habitat types Terrestrial sampling Plants Mammals Birds Reptiles and Amphibians 4 insect groups Aquatic sampling Fishes Aquatic plants Aquatic invertebrates Water Quality

Socio-economic aspects Of AmerIndian Village Population size Age structure Livelihoods Fisheries Natural Resource Use and Mapping

Sampling methods

Aquatic Biodiversity Mekong Delta

Over 1200 fish species (maybe 1700 species) High endemism in hill streams (upper reaches)

Fisheries - Cambodia Cambodian inland capture fisheries ranks 4 th in the world in terms of total catch Most intense inland capture fishery in the world in terms of fish caught per capita Over 400,000 tonnes of freshwater fish caught annually more than that of USA and Canada combined Fish are a major natural asset for Cambodia, essential for food security, contributing around 12% of Cambodia s GDP in recent years

Bill Robichaud Camera-trap image of Saola Pseudoryx nghetinhensis in Annamite Mountains, Lao PDR. Species was discovered in 1993 and is Critically Endangered.

Methodologies to Determine Ecological Flow (EF) 1960 s Hydrological/Hydraulic Methods IFIM-PHABSIM: Río Carrión (Palencia) Transecto 1 Habitat Simulation / Holistic (requires biological information) Present

Who - Expertise Who does the studies is very important Qualified individuals needed to ask the right questions and collect quality data and analyze results Consulting firms may need to bring in outside expertise Expert guidance is essential- either direct involvement or as advisors Partnerships with NGOs and other groups encouraged

Baseline Studies Data Analysis Analyze the baseline data to determine: 1. Feasibility of the projects 2. Best sites for projects 3. Environmental and social needs 4. Significance of impacts of project 5. Mitigation measures Avoid Minimize Remedy Offset remaining impacts

Baseline studies and Monitoring Are they the same? No, baseline studies need to establish a good dataset of the current condition so should be more comprehensive Monitoring involves repeated measurement of a selected set of indicators from the baseline dataset that can assess changes or measure progress of mitigation actions

All of us here come from different perspectives Government (national, local) Hydropower Industry NGOs Development Organizations Lenders Academics Quality baseline information is essential for making the best decisions and planning for Hydropower projects

Good Baseline Studies need to include: International standards and good practice Broad geographic scope Solid Background Research Adequate time and frequency before project starts Selection of parameters/measurements Internationally accepted methodologies Expertise Analysis of values With the objective of documenting the current environmental and/or social conditions

I look forward to discussing baseline studies with you during the workshop Thank you!