2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Similar documents
BIM. Guidelines & Standards for Architects, Engineers, and Contractors. Initiated: Sept. 10th, Revised: July 1st, 2015

PROJECT REQUIREMENT, PR 20 VIRTUAL DESIGN & CONSTRUCTION (VDC), BUILDING INFORMATION MODEL (BIM)

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Facilities Management

OPTIONAL IMAGE OR RENDERING OF BUILDING OR SITE

CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1.

Element D Services Plumbing

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Design Development Quality Management Phase Checklist Project Phase Checklist Series

(BIM) Guidelines version 1.6

1 TABLE OF CONTENTS. 1. BIM Execution Plan. BIM Execution Plan- UF Minor Projects Template UF of 20 pages Processes...

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION

Aurora Mall. Aurora (Denver), Colorado

SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

Revit MEP. Autodesk Navisworks

DRAFT BUILDING INFORMATION MODELING SCOPE OF SERVICES AND REQUIREMENTS FOR ARCHITECTS AND ENGINEERS

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

BIM GUIDE. Developed for

Olilo's AEC Design Services. SrinSoft Inc, Partners of

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

PLAN SUBMITTAL INFORMATION

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

TENANT DESIGN MANUAL UPDATED JULY 2015

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

RESOURCE GUIDE. A guide for implementing Building Information Modeling in State of Maryland and Washington DC public school construction projects

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Exhibit C: Scope of Work and Schedule of Deliverables

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Building Permit Application

Certified Instructors & Curriculum

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

HEANEY General Contracting, Inc.

Electrical. This section applies to the design and installation of building power distribution systems.

Does Wall Township require an inspection by the building department on resale of a home?

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Element Z General Design Requirements Standards and Other Requirements

Nominal Life Expectancy for Building Components

Construction Technologies Career Field Pathways and Course Structure

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

city of edmonds development information

HOMEOWNER S PERMIT GUIDE

Building Condition Assessment Report

Gramercy Place Condo Association, Inc.

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

LACCD Building Information Modeling Standards For Design-Bid Build Projects

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

City of Oviedo Commercial Shell Building Permit Application Guidelines

Schedule B to By-law

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

TABLE OF CONTENTS 1 2 APPENDIX A. MPA BIM USES EXISTING CONDITIONS MODELING DESIGN AND BUILDING SYSTEM AUTHORING ANALYSIS AND REPORTING

WESTERN MICHIGAN UNIVERSITY

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

PDmB, Inc. Definitions

Execution Plan Template Design Modeling

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

South Carolina Home Inspector Standards of Practice

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

How To Use Building Information Modeling (Bim)

Building Information Modeling Guidelines and Standards for Architects and Engineers

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

Acumen Enterprises, Inc.

City of St. Charles Basement Finish or Remodel

Turner Innovation Series BIM Conference Istanbul May Brian Krause, Dan Gramer, Turner Construction Company

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS

City of Elk River BASEMENT Office Use Only

Transition to 3D Fabrication Workflows

Element D Services Plumbing

Design and Construction Design Phase Deliverables

Element D Services Heating, Ventilating, and Air Conditioning

Scope: Communications and Electronic Systems addressed in this section include:

Realizing the Future of Sustainable Design through BIM and Analysis

Schedule B to By-law Part A Fees Payable for Permits

CAD Standards Guideline For Facility Documentation and Construction Projects

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

CAD Standards Guideline For Facility Documentation and Construction Projects

BUILDING SAFETY UNIT

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

BUILDING INFORMATION MODELING SCOPE OF SERVICES AND REQUIREMENTS FOR CONSTRUCTION CONTRACTOR IN A DESIGN- BID-BUILD PROCESS

Transcription:

A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested during any point in the project and at the conclusion of each design phase. Submitting BIM files does not relieve the consultant from the responsibility of submitting final project files in the AutoCAD.DWG file format following the University s CAD Standard Guidelines. B. Office of Architecture, Engineering and Construction Management (AECM) Requirements 1. Architects shall use BIM software when directed to do so as part of the design project. Building information models shall be created that include all geometry, physical characteristics and product data needed to describe the design and construction work. All drawings and schedules required for assessment, review, bidding and construction shall be extractions from this model. 2. Structural Engineers, Mechanical, Electrical, Plumbing, Fire Protection, and Civil Engineers shall use BIM software or discipline-specific 3D modeling software. Models shall be created that include all geometry, physical characteristics and product data needed to describe the design and construction work. Drawings and schedules required for assessment, review, bidding and construction shall be extractions from this model. Software shall be capable of interfacing with the Architect s version of the software. In all cases, model building and infrastructure systems shall be developed to a level that allows the team to verify clearances, analyze conflicts/clashes and properly coordinate the work with all other aspects of the project. 3. Other Specialty Consultants shall use BIM software or discipline-specific 3D software. Models shall be created that include all geometry, physical characteristics and product data needed to describe the design and construction work. Drawings and schedules required for assessment, review, bidding and construction shall be extractions from this model. Software shall be capable of interfacing with the Architect s version of the software. In all cases, model components to a level that allows the team to verify clearances, analyze conflicts/clashes and properly coordinate the work with all other aspects of the project. C. BIM Software 1. A/E s shall use one or a combination of the following BIM software for AECM projects. a. Autodesk Revit Architecture 2011/2012 b. Autodesk Revit Structure 2011/2012 c. Autodesk Revit MEP 2011/2012 d. Autodesk Civil 3D 2011/2012 e. Autodesk NavisWorks 2011/2012 2. AECM will consider other software products subject to their capabilities, features and benefits to the Campus. 3. Note: other BIM tools may be used for analysis, specialty design, and other project needs; however final design document files must be Revit or NavisWorks compatible. D. Geo-referenced Model: A/E s shall geo-reference site plans and building models to coordinate with the Office of Campus Planning s (OCP) GIS Standards. Refer to the information on the OCP website at http://www.albany.edu/facilities/campusplanning/standards.html AECM Building Information Modeling Guidelines 2012 1

E. Model Submittal: With submittal of documentation at the end of each design phase, A/E s shall also submit the Revit model(s) in native application's format. Any future changes to, or extractions from the model(s) will be the responsibility of the party making the changes. F. Levels of Development (LODs): The LOD descriptions identify the specific content requirements for each model element at five detailed levels of completeness. Each LOD builds upon and enhances the characteristics of the previous level. The A/E shall strive to meet the following requirements at each design phase: a. Concept / LOD 200 Concept phase elements should be modeled as generalized systems or assemblies with approximate size, quantities, location and orientation. b. Schematic (SD) / LOD 300 Elements are modeled as specific assemblies accurate in their respective size, quantities, location and orientation. c. Design Development (DD) and Construction Documents (CDs) / LOD 400 Elements are accurate in terms of size, shape, location, quantity and location with complete fabrication, assembly and detailing information with non-geometric information. d. As-Built A/E Contract Closeout / LOD 500 Model with constructed assemblies, actual and accurate in terms of size, quantities, location and orientation with non-geometric information. G. Model Object Requirements Appropriate to Phase 1. A/E s are encouraged to use electronic programming and planning tools that integrate into their BIM software to capture early cost, schedule and program information. 2. A/E s may use any method to begin the design process but shall be using a BIM or 3D model(s) at a design phase requested by the University. All information needed to describe the design shall be graphically or alphanumerically included in and derived from these models. The Campus expects A/Es to use analysis tools, static images and interactive 3D to describe the design concepts. 3. Existing conditions - A/E s shall model all existing conditions needed to explain the extent of the construction work for alterations and additions projects. The extent of modeling beyond the affected areas and the level of information to be included will be identified in the University s Scope of Services. These requirements may be stated in the project program or discussed during the project kickoff meeting. 4. Comparative Cost Analysis - A/E s shall extract quantity information using BIM software and other BIM integrated tools to support comparative costs analysis of options studied. Analysis and options may include: building perimeter, square foot zones by cost type, exterior envelope area, construction type, envelope materials, and/or others appropriate to the project. Outputs shall be converted to spreadsheets and submitted as part of the design solution justification at end of each appropriate phase. 5. Comparative Energy and Sustainability Analysis - A/E s are encouraged to use building envelope energy modeling tools integrated with the BIM software to develop comparative energy analysis. Variables shall include orientation, massing, form, sun controls, wall construction, natural ventilation, area of glass, daylighting and other factors appropriate to decision making. Modeling parameters shall be based on local climate data and actual site conditions. Output format shall clearly communicate and be appropriate to project needs and submitted as part of the design solution justification at the end of the phase. AECM Building Information Modeling Guidelines 2012 2

6. Program and Space Validation - A/E s shall use the BIM software or other analysis tools to compare and validate stated program requirements with the actual design solution. The following shall be developed automatically from the building information model: a. Assignable Areas (ASF) and Non-assignable Areas (NaSF) measured to inside face of wall objects. b. Gross Area (GSF) measured to the outside face of wall objects. 7. Architectural Systems - Model the following architectural elements to a level that defines the design intent and accurately represents the design solution. a. Architectural Site Plan. b. Existing conditions to the extent required. c. Demolished items to the extent required. d. New interior and exterior walls. e. Floor, ceiling and roof systems. f. Elevators, stairs, ramps including railing systems. g. Casework, shelving, fireplaces and other interior architectural elements. h. Fixed furniture and other specialty equipment (food service, medical, etc); model mechanical, electrical and plumbing items that require architectural space. i. Clearance zones for handicap access, door swings, service space requirements, gauge reading, and other operational clearance must be modeled as part of all equipment and checked for conflicts with other elements. j. Wall types including openings. 8. Structural Engineering - Model the following basic structural elements such as: a. Appropriate foundation styles. b. Structural framing members. c. Load-bearing walls. 9. HVAC Systems - Model the following HVAC elements: a. Fans, VAV s, compressors, etc. b. Supply, return, exhaust, relief and outside air ductwork modeled to outside face. c. Ductwork and duct insulation (whichever is greater). d. Diffusers, grilles, louvers, hoods, radiant panels, perimeter units, wall units. e. Pipes sized at and over 2 OD; include any insulation in model. f. Clearance zones for access, door swings, service space requirements, gauge reading, and other operational clearance must be modeled as part of the HVAC equipment and checked for conflicts with other elements. 10. Electrical systems - Model the following electrical elements: a. Power. b. Interior and exterior transformers and other equipment. c. Main and distribution panels and switchgear including access clearances. d. Feeders and conduit at and over 2 OD. e. Outlets, switches, junction boxes. f. Permanently mounted lighting fixtures (moveable, plug-in fixtures need not be modeled as part of the electrical package). AECM Building Information Modeling Guidelines 2012 3

g. Clearance zones for access, door swings, service space requirements, gauge reading, valve clearances and other operational clearance must be modeled as part of the electrical equipment for collision checking. 11. Plumbing and Fire Protection Systems - Model the following plumbing and fire protection elements: a. Waste and vents b. Piping sized at and over 2 OD; include any insulation. c. Roof and floor drains, leaders, sumps, grease interceptors, tanks, water treatments and other major items. d. Supply Piping sized at and over 2 OD include any insulation in model. e. Fixtures: sinks, toilet fixtures, water tanks, floor sinks. f. Fire protection sprinkler lines at and over 2 OD. g. Sprinkler heads. h. Stand pipes, wall hydrants, fire department connections, risers, including valve clearances. i. Clearance zones for access, service space requirements, gauge reading, valve clearances and other operational clearance must be modeled as part of the plumbing and fire protections system and checked for conflicts with other elements. 12. Specialty Consultants - Model the following specialty consultant elements to correct size and location. Extent of specialty consultant modeling shall be coordinated with the prime A/E : a. Equipment provided or specified by said consultants (Audio-Visual, Telecommunications, Data, Security, etc.). b. Rough-in connections points for power, data, communications, water service and waste, gas, steam, or other needed utilities. c. Clearance zones for access, doors swings, service space requirements, controls, gauge reading, and other operational clearance must be modeled as part of the equipment and checked for conflicts with other elements. 13. Civil Engineering Coordinate with Autodesk Civil 3D. All items must be geo-referenced such that all elements can be viewed as an overlay in the BIM model and the correct location in a GIS system. The Engineer is encouraged to model the following items: a. Existing site conditions. b. Utilities underground and overhead. c. Sediment and erosion controls. d. Trees and shrubs. e. Paving, curbs, gutters, striping. f. Site amenities or structures. g. Hazardous waste remediation H. Final Design Construction Documents Phase: A/E s shall continue development of the BIM (or 3D Models for Consulting Engineers and Specialty Consultants) created in previous phases. Maintain parametric links within the respective models to enable automatic generation of all plans, sections, elevations, custom details, schedules and 3D views. All information needed to describe the implementation documents shall be graphically or alphanumerically included in and derived from these models only. Specifications are not required to be linked in BIM. AECM Building Information Modeling Guidelines 2012 4

I. Bidding Phase: A/E s shall update the models with all addendum, accepted alternates and/or value enhancement proposals. Republish documents and deliverable files. J. Award and Construction Phases: A/E s are encouraged to provide the final bid document Revit model to the awarded contractor in order to facilitate collaboration between the A/E, the contractor and the University. A/E s are expected to continuously maintain and update the model(s) with changes made during construction. K. Conflict Checking: A/E s shall use conflict checking software to resolve clashes between all disciplines and specialties during the design process. Hard clashes between the various elements and soft clashes between an element and a required clearance shall be identified and resolved prior to submittal. Submit the report generated by the checking software showing conflicts have been resolved. L. Other Analysis and Checking Tools: A/E s are encouraged to analyze the design using software that interacts with the model in order to confirm program and refine daylighting, natural ventilation, acoustics, code issues and design issues. M. Quantity Take-off and Cost Control: A/E s are encouraged to use quantity take-off features of the BIM and 3D tools coupled with unit costs to assist in construction cost control. N. Program and Program Verification: A/E s shall use the methodologies described above to reconfirm program. O. A/E Contract Close-out: A/E s shall submit one complete consolidated Revit model with contractor recorded changes and republish record documents to the AECM project manager. Provide LOD 500. AECM Building Information Modeling Guidelines 2012 5