ELECTRIC/DIESEL FIRE PUMP CHECK LIST



Similar documents
Fire Pump Plan Review March 2010

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

TECHNICAL ADVISORY BULLETIN

FAIRBANKS NIJHUIS FIRE PUMPS.

CHAPTER. Fire Pumps FIRE PUMP OVERVIEW. Fire Pump Unit Defined. Fire Pump Unit Responsibility

FAIRBANKS NIJHUIS PACKAGED FIRE PUMP SYSTEMS.

Design & Construction Standards, Revised January

Diesel Engine Driven Generators Page 1 of 6

NFPA31FuelOilPiping 1 Revised

The following definitions apply with regard to requirements specified in this document:

SECTION DIESEL-DRIVEN, FIRE PUMPS

SPP Pumps Inc. Atlanta

Pressure Limiting Driver (PLD)

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

KODAK VERSAMARK, INC.

C I T Y O F S E L M A F I R E D E P A R T M E N T

Risk Control Bulletin Inspection, Testing & Maintenance (ITM) of Water-Based Fire Protection Systems

NFPA 25 FAQs. 1. When inspecting an old system (60 years or older), when/where does NFPA 25 require a system to be upgraded to present standards?

HYDROSTATIC TEST PUMPS

Inspection and Testing of Water-Based Systems

Model 1210C Battery Powered Pump Shown. Description

Oil and Coolant Circulating Heating System. Model - OCSM

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

TECHNICAL INFORMATION Bulletin

FIRE PROTECTION SYSTEMS ACCEPTANCE INSPECTION AND TESTING PROCEDURE

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

Maintaining Fire Protection Systems

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

Automatic Fire Sprinkler Submittal Requirements

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Installation Manual DIAPHRAGM WELL TANK

Section 11 - System Diagrams

MODEL INSTALLATION INSTRUCTIONS

BOWL ASSEMBLY SELECTION Select impeller in exactly the same manner as for lineshaft type pump. Note comments under WELL SIZE.

Section 6 - System Diagrams

OREGON FIRE CODE Interpretations and Technical Advisories

2010 Residential Water Heater Replacement Check List

The following definitions apply with regard to requirements specified in this document:

FLASH TANK ECONOMIZER PRODUCT GUIDE

AIR LINE VALVES AND GAUGES

BLADDER SURGE CONTROL SYSTEM

300 Series PA Pump and Cooler Assemblies

Installation Manual DIAPHRAGM WELL TANK

NAVIEN AMERICA INC FITCH AVENUE

Approval Standard for Water Motor Gong

TOPIC: KNOWLEDGE: K1.01 [3.3/3.5] Which one of the following contains indications of cavitation in an operating centrifugal pump?

Horizontal Split Case Fire Pumpset Diesel Engine Driven

INSPECTION AND TESTING OF EMERGENCY GENERATORS

Example. Fluid Power. Circuits

Element D Services Plumbing

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Rexroth Hydraulic Pump A10VO Series User Manual

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

CTV-1500 Cooling Tower Vacuum Operating & Maintenance Manual

FIRE INSPECTION CHECKLIST

Medical Air Systems: Scroll

TECHNICAL INFORMATION Bulletin

Horizontal Split Case Fire Pumpset Electric Motor Driven 50 Hz

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

Division 21. Fire Suppression

PC1130 Electric Air Compressor

TROUBLESHOOTING GUIDE

D Youville College July 31, 2008 New Academic Building Cannon Design Project No

Prime Power Services, Inc. Georgia, Carolinas NFPA 110 Standards for Emergency & Stand by Generators June 1, 2010

AKRON EDUCTORS TROUBLESHOOTING GUIDE OPERATION & THEORY OF EDUCTORS GENERAL OPERATING AND MAINTENANCE INSTRUCTIONS

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

World-Class Fire Suppression Pumping Solutions

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Purpose:

Compressor Service & Maintenance Manual

LOAD BANK TESTING PROCEDURE

PC1131 Electric Air Compressor

I N S T A L L A T I O N I N S T R U C T I O N S F O R T H E H i l k o i l Energy S aving Hot Water Kit

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

CARING FOR YOUR WATER HEATER

OUR PRODUCTS TRH-TRS-TRM-TRV. LIQUID RING VACUUM PUMPS AND COMPRESSORS Capacity up to 2100 ACFM Vacuum to 29 Hg. Our Other Products.

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

BERMAD Fire Protection

Element D Services Plumbing

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

Clark County Fire Prevention

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

How To Clean Up A Reactor Water Cleanup

CHAPTER. Standpipes and Hose Systems OVERVIEW. Standpipe and Hose Systems Defined

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps

Goulds Water Technology

SELECTION, APPLICATION AND MAINTENANCE

Transcription:

BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested at 200 psi or 50 psi above maximum system pressure whichever is greater Electric wiring including control wiring, emergency supply been checked by electrical contractor Indoor fire pump units separated from all other areas of building by 2-hour rated construction, 1-hour if protected by sprinkler system If fire pump unit is located outdoors or if fire pump installation is in a building other than that building being protected by the fire pump, it is located at least 50 feet away from the protected building A suitable means for maintaining 40 degrees ambient temperature provided; 70 degrees if driver is diesel engine Was a copy of the manufacturer s certified pump test curve available for comparison to the results of the acceptance test? Pump room/house provided with normal lighting and emergency lighting Pump room/house adequately ventilated and floor is pitched toward drain Horizontal pump/driver on common base plate and connected by a listed flexible coupling Guard provided for flexible couplings and flexible connecting shafts Baseplate securely attached to concrete foundation Suction piping is the proper size. (5 for 500 gpm)(6 for 750 gpm)(8 for 1000-1500 gpm)(10 for 2000-2500 gpm) OS&Y valve provided in the suction piping No backflow prevention or other devices are in the suction piping. (unless installed per distances as indicated on sketch) No elbows perpendicular to impeller of horizontal pump are within 10 pipe diameters of the intake flange Reducer at pump intake is eccentric and installed with flat side up A bypass, at least the required size of the discharge pipe, is provided if the suction supply is of sufficient pressure to be of material value without the pump Listed indicating type valves are on each side of the check valve in the bypass and are normally open A 3-1/2 gauge having a rating of at least 100 psi and a range of at least twice the maximum suction pressure, on suction piping March 2014 1

A 3-1/2 gauge having a rating of at least 200 psi and a range of at least twice the working pressure of the pump near discharge casing Discharge piping properly sized. (5 for 500 gpm)(5 for 750 or 1000 gpm)(8 for 1250 or 1500 gpm)(10 for 2000 or 2500 gpm) Listed indicating valve is installed on the fire protection system side of the pump. See diagram. Check valve is provided between the discharge valve and the pump. See diagram. No valves are installed in the relief valve piping A properly sized relief valve has been provided if pump is diesel driven or if churn pressure can exceed rating of system components. (5 for 500 gpm)(6 for 750 gpm)(8 for 1000 and 1500 gpm)(10 for 2000 gpm) Test header piping is of the proper size (4 for 500 gpm)(6 for 750 and 1000 gpm)(8 for up to 2500 gpm)(10 for 2500 gpm) Proper number of listed 2-1/2 hose valves is provided on test header (2 for 500 gpm)(3 for 750 gpm)(4 for 1000 gpm)(6 for up to 2500 gpm) If test header piping is over 15 in length, the next larger pipe size is used A drain valve is located at a low point of the test header pipe between the normally closed test header valve and the test header If a flow meter is provided, meter system piping is of the proper size. (5 for 500 and 750 gpm)(6 for 1000 and 1250 gpm)(8 for up to 2500 gpm) The sensing lines both tap the discharge pipes between the check valve and the discharge control valve of the pumps they respectively serve. See diagram. Both sensing lines are ½ brass, copper, or series 300 stainless steel piping, tube, and fittings (2) check valves are installed in each pressure sensing line at least 5 apart. See diagram. No shut off valves in the sensing lines Verify that all valves are supervised open. (test header and flowmeter valves should be supervised shut) For electric pumps, verify that the following alarms are operative Pump running Loss of power Phase reversal Diesel For diesel engine drivers, there are two storage battery units provided and rack-supported above the floor, secured against displacement, and located where they are readily accessible for servicing and not subject to excessive temperature, vibration, mechanical injury, or flooding. For diesel engine driver, storage battery units are provided with battery chargers specifically listed for fire pump service, arranged to automatically charge at the maximum rate whenever required by the stat of charge of the battery, and arranged to indicate loss of current. For diesel engine driver cooled by a heat exchanger, the cooling water supply is from the discharge of the pump and taken prior to the discharge check valve. March 2014 2

The heat exchanger piping for a diesel engine driver is equipped with an indicating manual shutoff valve, an approved flushing-type strainer, a pressure regulator, an automatic valve listed for fire protection service, and a second indicating manual shutoff valve. Heat exchanger piping of a diesel engine driver is equipped with a pressure gauge installed in the cooling water supply system on the engine side of the last manual valve. Heat exchanger piping of a diesel engine driver is provided with a bypass line. The outlet provided for the wastewater line from the heat exchanger has a discharge line not less than one size larger than the inlet line, discharges into a visible open waste cone, and has no valves. Diesel fuel supply tank has a capacity of 1 gallon per engine horsepower plus 10% Diesel fuel supply tank is located aboveground. Exposed fuel lines are provided with guard or protecting pipe For diesel driven pumps, verify that the following alarms are provided on the controller and operative: Low oil pressure Battery failure/battery missing Shutdown on overspeed High engine temperature Failure to start Battery charger failure Low (less than 2/3) fuel level For diesel driven pumps, verify that the following alarms are provided and transmit to a constantly attended locations Controller main switch in a position other than automatic Trouble on controller or engine Pump running TESTING PROCEDURE: Start motor 3 times from manual source and run for 5 minutes minimum from main source of power. Start motor 3 times from automatic source and run for 5 minutes minimum from main source of power. Start motor 3 times from manual source and run for 5 minutes minimum from alternate source of power. Start motor 3 times from automatic source and run for 5 minutes minimum from alternate source of power. (Note: an engine driver is not required to run for 5 minutes at full speed between successive starts until the cumulative cranking time of successive starts reaches 45 seconds.) When normal power was restored, did retransfer from emergency to normal power occur without overcurrent protection devices opening on either line? Upon simulation of power failure, while the pump is operating at peak load, did the transfer switch transfer from the normal power to the emergency source without overcurrent protection devices opening on either line? (when the primary power source is interrupted while flowing 150% of rated pump capacity, the transfer switch and the alternate power source should be achieved within 60 seconds (low rise) 10 seconds (high rise). Electric motor phase reversal test on normal and alternate power. March 2014 3

March 2014 4

March 2014 5

NC Building Code, Chapter 35 Referenced Projects permitted under NC Building Code 2009 - NFPA20 2003 Projects permitted under NC Building Code 2012 - NFPA20 2007 REFERENCE INFORMATION TO ASSIST SYSTEM INSPECTION *Note: These items are not intended to meet all of the criteria for NFPA 20 testing requirements. March 2014 6