Method Statement. Static Pile Load Test



Similar documents
METHOD OF STATEMENT FOR STATIC LOADING TEST

Method Statement for Static Load Testing (Compression) for Micropiles

Step 11 Static Load Testing

STATIC PILE LOAD TEST MANUAL. GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4

Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by

Objectives. Experimentally determine the yield strength, tensile strength, and modules of elasticity and ductility of given materials.

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Standard Test Methods for Deep Foundations Under Static Axial Tensile Load 1

Design of pile foundations following Eurocode 7-Section 7

SECTION 1 GENERAL REQUIREMENTS

ALLOWABLE LOADS ON A SINGLE PILE

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

Instrumentations, Pile Group Load Testing, and Data Analysis Part II: Design & Analysis of Lateral Load Test. Murad Abu-Farsakh, Ph.D., P.E.

ABSTRACT 1. INTRODUCTION 2. DESCRIPTION OF THE SEGMENTAL BEAM

METU DEPARTMENT OF METALLURGICAL AND MATERIALS ENGINEERING

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE

DYNAMIC TESTING OF MICROPILES. COMPARISON OF STATIC AND DYNAMIC TEST RESULTS

PILE TESTING SPECIFICATION

PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall

APPENDIX F VIBRATION TESTING PROCEDURE

Federation of Piling Specialists Testing Datasheet No 1

Experiment 5. Strain Gage Measurements

3. Standards: Comply with ISO, BS, ASTM, JIS standard and so on.

ME 354, MECHANICS OF MATERIALS LABORATORY

TEST PROCEDURE FOR FIELD WITHDRAWAL RESISTANCE TESTING

TEST REPORT. Rendered to: LMT-Mercer Group, Inc. For: PRODUCT: 4" x 4" and 5" x 5" PVC Porch Posts with Aluminum Reinforcing

High Strain Dynamic Load Testing of Drilled Shafts

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

Pent Up Load and Its Effect on Load Test Evaluation

MaraMeter. Indicating Snap Gages

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

CONTENTS 1. INTRODUCTION METHODOLOGY RESULTS & FINDINGS...9 APPENDIX

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

OPERATOR S MANUAL SUPPORTED TORQUE CALIBRATION BEAM. Part Number Issue 4 Original Instructions (English)

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

HUS-H Screw Anchor. Technical data. Seismic design data. HUS-H Carbon steel screw anchor. HUS-H diameter 8, 10, 14. Seismic design data

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

vulcanhammer.net Visit our companion site

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014

1.2 Advantages and Types of Prestressing

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS Materials Materials shall be in accordance with the following:

Full-Scale Load Testing of Steel Strutting System. For. Yongnam Holding Limited

CEEN Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

Shrinkage and Creep Properties of High-Strength Concrete Up To 120 MPa

Calibration and Use of a Strain-Gage-Instrumented Beam: Density Determination and Weight-Flow-Rate Measurement

The International Workshop on Micropiles, 2007

Joist. Reinforcement. Draft 12/7/02

Determining Measurement Uncertainty for Dimensional Measurements

HR-200/300/400/500 Series

MONO BLOCK DIRECTIONAL CONTROL VALVE TS1120TSLB

GUARDRAIL POST STEEL

Computerized Electronic Univesal Testing Machine WDW-20Y

Technical Data. 7. Bearing Fits. 7.1 Interference. 7.2 Calculation of interference F B LLLLLLLLL( A-54

vulcanhammer.net This document downloaded from

LATERAL LOAD TESTING OF MODEL PILES - PHASE 1

Digital pressure gauge for industrial applications Model DG-10-S, Standard version Model DG-10-E, Enhanced version

LOCATION DEPENDENCY OF POSITIONING ERROR IN A 3-AXES CNC MILLING MACHINE

9. Force Measurement with a Strain gage Bridge

T U R B I N E G A S M E T E R

Axial Behaviour of Hollow Core Micropiles Under Monotonic and Cyclic Loadings

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

EASY STATIC LOAD TESTS: EXPERT RESULTS

PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA. Pile Dynamic Load test as alternative to Static Load test

L I V E T O O L F O R O K U M A

A Simple Method of Gripping Prestressing Strands for Tension Tests

Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens

SAMPLE FORMAL LABORATORY REPORT. Fatigue Failure through Bending Experiment Adapted from a report submitted by Sarah Thomas

Stress Strain Relationships

Eco Green Labs India Pvt. Ltd., Ground Floor, Plot No. 100, New Sidco Industrial Estate, Srinagar, Hosur, Tamil Nadu

Keywords: Torque, calibration, uncertainty, torque tools, torque testers. Contents

C E L CONSULTING A D I V I S I O N O F C O N S O L I D A T E D E N G I N E E R I N G FOR THE

Jack-in Piling Environmental Friendly Piling System

ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P

COLORADO MODEL. 35 x 65 SPECIFICATIONS

TPES Torque measurement from very accurate & reliable strain gages (>98% accuracy) TPES Eskridge Pin

SECTION GUARDRAILS

Standard Test Method for Mechanical Cone Penetration Tests of Soil 1

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

Technical handbook Panel Anchoring System

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC.

Hilti, Inc South 122 nd East Avenue Tulsa, OK

Bimetal thermometer Model 52, industrial series

RATCHET RELEASE SHACKLE

ISORIA. Centered disc butterfly valves with AMRING elastomer liner. 240 PSI: 1½ to PSI : 10 to 24

Electronic Pressure Switch EDS 300

TENSIONMETER ** code 183_LNRSTW **

Dynamic Load Testing of Helical Piles

Method Statement FOR. Soil Investigation

Uniaxial Tension and Compression Testing of Materials. Nikita Khlystov Daniel Lizardo Keisuke Matsushita Jennie Zheng

Machine Screws, Dowel Pins and Hardware

Practical Alignment Tools and Techniques

Transcription:

Method Statement FOR Static Pile Load Test (Compression Test,Tension Test and Lateral Test) PREPARED BY 1

METHOD STATEMENT FOR COMPRESSION, TENSILE AND LATERAL PILE LOAD TEST PROJECT INFORMATION Owner :.. Client :.. Main Contractor :. Contractor :. Location :. TEST PILE INFORMATION Pile No. 385 Pile No. 368 Pile No. 416 Pile Type 40 x 40 Driven 40 x 40 Driven 40 x 40 Driven Pile Tip 4.2 m. 4.2 m. 4.2 m. Pile Top 0.0 m. 0.0 m. 0.0 m. Design Load 65 tons 15 tons 7 tons Maximum Test Load (200 % of design 130 tons 30 tons 14 tons Load) Test Type Axial Compression Test Axial Tension Test Lateral Test Anchor Piles 367, 368, 416, 417 367, 369 432, 417, 385 Testing Standard ASTM D1143-81 (Reapproved 1994) ASTM D3689-90 (Reapproved 1995) ASTM D3966-90 (Reapproved 1995) 2

1.0 TESTING APPARATUS 1.1 Reaction Beam The steel girders will be laid across the test pile with system set up similar to that shown in Appendix A. 1.2 Hydraulic Jacks Axial Compressive Test : One hydraulic jack (1x400) ton capacity will be provided on top of the pile head as loading apparatus. Axial Tension Test : One hydraulic jack (1x165) ton capacity will be provided on top of the pile head as loading apparatus. Lateral Test : One hydraulic jack (1x59) ton capacity will be provided on the side of the pile head as loading apparatus. 1.3 Ball Bearing To provide non-eccentric load to the pile head, a ball bearing shall be inserted in between the reaction beam and the hydraulic jack. 1.4 Dial gauges Four dial gauges (Mitutoyo brand) will be provided to monitor the pile movements by mounting between the pile head and reference beams. The micrometer has a range of 0-50 mm and an accuracy of 0.01 mm. 1.5 Reference Beam Two reference beams (channel 125x65x5 mm) will be cross-connected and laid on support, firmly embedded in ground with one end fixed and the other end freed. 1.6 Leveling instrument Relative movements of the test pile head, reference beam and anchor pile will be checked by a Shokisha precise leveling instrument with an accuracy of 0.01 mm. Readings will be made on ruler scale fixed on the reading points (1 point at pile head, 2 points at reference beams and 1 point at each anchor pile). 2.0 TEST PROCEDURE 2.1 Compression Pile Load Test The test shall conform to the modified ASTM D 1143-81(Reapproved 1994) item 5.0 Standard Loading Procedure with load sequence in percentage of design load. Three cycles of test will be performed. Cycle 1 (maximum to 100% of the design load) A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, and 100% of the design load. B. When each load increment will be achieved, the next load increment will be added only when the settlement rate will be less than 0.25 mm per hour or after 2 hours, whichever shall occur first. C. At each load increment, load, settlement and time will be recorded at 1, 2, 4, 8, 15, 30, 60, 90, 120, 240 minutes and every 2 hours with an accuracy of at least 0.01 mm. D. The maximum load will be kept constant for at least 24 hours and then reduced to 75%, 50%, 25% and 0% of the design load, respectively. Each load will be maintained until the rate of settlement would not be greater than 0.25 mm per hour or after two hours, whichever shall occur first. E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a constant settlement will be reached. Cycle 2 (QUICK TEST, maximum to 200% of the design load) 3

A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%, 125%, 150%, 175% and 200% of the design load. B. When each load increment will be achieved, the next load increment will be added every after 5 minutes.. C. At each load increment, load, settlement and time will be recorded at 1 and 5 minutes with an accuracy of at least 0.01 mm. D. The load will then be reduced to 175%, 150%, 125%, 100%, 75%, 50%, 25% and 0% of the design load, respectively E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a no further settlement will be experienced. F. The test pile will be considered failure when a rapid progressive movement of the pile in the direction of loading under a constant load or physical failure of the test pile is observed or a settlement of more than 15% of the diagonal dimension of the pile, which is equivalent to 90 mm. 2.2 Tension Pile Load Test The test shall conform to the ASTM D 3689-90 (Reapproved 1995) Standard Test Method for Individual Piles Under Static Axial Tensile Load. with load sequence as explain below. The test will be conducted until the pile exhibit signs of failure. Cycle 1 (maximum to 100% of the design load) A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, and 100% of the design load. B. When each load increment will be achieved, the next load increment will be added only when the settlement rate will be less than 0.25 mm per hour or after 2 hours, whichever shall occur first. C. At each load increment, load, settlement and time will be recorded at 1, 2, 4, 8, 15, 30, 60, 90, 120, 240 minutes and every 2 hours with an accuracy of at least 0.01 mm. D. The maximum load will be kept constant for at least 24 hours and then reduced to 75%, 50%, 25% and 0% of the design load, respectively. Each load will be maintained until the rate of settlement would not be greater than 0.25 mm per hour or after two hours, whichever shall occur first. E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a constant settlement will be reached. Cycle 2 (QUICK TEST, maximum to 200% of the design load) A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%, 125%, 150%, 175% and 200% of the design load. B. When each load increment will be achieved, the next load increment will be added every after 5 minutes.. G. At each load increment, load, settlement and time will be recorded at 1 and 5 minutes with an accuracy of at least 0.01 mm. H. The load will then be reduced to 175%, 150%, 125%, 100%, 75%, 50%, 25% and 0% of the design load, respectively I.At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a no further settlement will be experienced. J. The test pile will be considered failure when a rapid progressive movement of the pile in the direction of loading under a constant load or physical failure of the test pile is observed or a settlement of more than 4

15% of the diagonal dimension of the pile, which is equivalent to 90 mm. 2.3 Lateral Pile Load Test The test shall conform to the ASTM D 3966-90 Standard Test Method for Individual Piles Under Lateral Load. with load sequence as explain below. The test will be conducted until the pile exhibit signs of failure. A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%, 125%, 150%, 170%, 180%, 190% and 200% of the design load. B. When each load increment will be achieved, the next load increment will be added after each load duration shown in Table 3. C. At each load increment, load and time will be recorded at 1, 5, 10 minutes with an accuracy of at least 0.01 mm. D. The test pile will be considered failure when a rapid progressive movement of the pile in the direction of loading under a constant load or physical failure of the test pile is observed. During the load test, records including plots of load vs. time and load vs. settlement will be maintained progressively. 3.0 RESULTS OF TEST The test results will then be reported in the form of: Time, load, pile head movements, settlements and reference beam movements. Load-settlement curve. Time-settlement curve. Time-load curve. Report and recommendations on the ultimate pile capacity. 5

Fc'= 400 ksc. Pile Dia.= 0.46 m. Q= 270 Tons L= 12.8 m. A= 0.16 sq.m. Ec= 29,427 Mpa Ec= 3.00E+06 Tons/sq.m. Settle-1= 7.02 mm. Settle-1= 2.81 inch Settle-2= 0.50 inch Settle-2= 1.27 mm. Settle-3= 0.14 inch Settle-3= 0.35 mm. Total Settle= 3.44 inch Davidson Offset Line Limit= 3.44 inch Davidson Offset Line Limit= 8.75 mm. ESTIMATION OF ULTIMATE LOAD FROM PILE LOAD TEST BY DAVISSON METHOD

APPENDIX A TABLES, FIGURES & DESIGN CALCULATIONS

Table 1 Schedule of Loading Kaeng Khoi 2 Power Plant (Com pression Testing) Pile No. 385 Design Load = 65 Tons FS = 2 Test Load = 130 Tons Hydraulic Jack No./s 905 CYCLE 1: Maximum to 100% of the design load. Date Start Interval Load Pressure Remarks Time (hours) (Tons) (Bars) (%) 3-Jul 09:00 1 16.3 18.0 25% 10:00 1 32.5 34.0 50% 11:00 1 48.8 50.1 75% 12:00 1 65.0 66.1 100% 13:00 24 48.8 56.0 75% 4-Jul 13:00 1 32.5 39.9 50% 14:00 1 16.3 23.8 25% 15:00 2 0.0 0.0 0% CYCLE 2: QUICK TEST; Maximum to 200% of the design load. Date Start Interval Load Pressure Remarks Time (min) (Tons) (Bars) (%) 4-Jul 17:00 5 16.3 18.0 25% 17:05 5 32.5 34.0 50% 17:10 5 48.8 50.1 75% 17:15 5 65.0 66.1 100% 17:20 5 81.3 82.1 125% 17:25 5 97.5 98.1 150% 17:30 5 113.8 114.1 175% 17:35 5 130.0 130.2 200% 17:40 5 113.8 120.4 175% 17:45 5 97.5 104.3 150% 17:50 5 81.3 88.2 125% 17:55 5 65.0 72.1 100% 18:00 5 48.8 56.0 75% 18:05 5 32.5 39.9 50% 18:10 5 16.3 23.8 25% 18:15 120 0.0 0.0 0%

Table 2 Schedule of Loading Kaeng Khoi 2 Power Plant(Tension Testing) Pile No. 368 Design Load = 15 Tons FS = 2 Test Load = 30 Tons Hydraulic Jack No./s 912 CYCLE 1: Maximum to 100% of the design load. Date Start Interval Load Pressure Remarks Time (hours) (Tons) (Bars) (%) 6-Jul 09:00 1 3.8 18.3 25% 10:00 1 7.5 31.8 50% 11:00 1 11.3 45.3 75% 12:00 24 15.0 58.8 100% 12:00 1 11.3 71.9 75% 7-Jul 12:00 1 7.5 58.3 50% 13:00 1 3.8 44.7 25% 13:00 2 0.0 0.0 0% CYCLE 2: QUICK TEST; Maximum to 200% of the design load. Date Start Interval Load Pressure Remarks Time (min) (Tons) (Bars) (%) 7-Jul 15:00 5 3.8 18.3 25% 15:05 5 7.5 31.8 50% 15:10 5 11.3 45.3 75% 15:15 5 15.0 58.8 100% 15:20 5 18.8 72.3 125% 15:25 5 22.5 85.9 150% 15:30 5 26.3 99.4 175% 15:35 5 30.0 112.9 200% 15:40 5 26.3 126.4 175% 15:45 5 22.5 112.8 150% 15:50 5 18.8 99.2 125% 15:55 5 15.0 85.6 100% 16:00 5 11.3 71.9 75% 16:05 5 7.5 58.3 50% 16:10 5 3.8 44.7 25% 16:15 120 0.0 0.0 0%

Table 3 Schedule of Loading K aeng K hoi 2 Power Plant(Lateral Testing) Pile No. 416 Design Load = 7 Tons FS = 2 Test Load = 14 Tons Hydraulic Jack No./s 8 CYCLE 1: Maximum to 100% of the design load. Date Start Interval Load Pressure Remarks Time min (Tons) (Bars) (%) 10-Jul 09:00 10 1.8 36.2 25% 09:10 10 3.5 51.9 50% 09:20 15 5.3 67.6 75% 09:35 20 7.0 83.2 100% 09:55 20 8.8 98.9 125% 10:15 20 10.5 114.5 150% 10:35 20 11.9 127.1 170% 10:55 20 12.6 133.3 180% 11:15 20 13.3 139.6 190% 11:35 60 14.0 145.8 200% 12:35 10 10.5 118.0 150% 12:45 10 7.0 86.0 100% 12:55 10 3.5 54.1 50% 13:05 0.0 0.0 0%

ASTM ASTM Testing Co., Ltd. 1032/217 Phaholyothin 18/1 Road, Bangkok 10900 : (662)+ 272-2474!5 : (662)+ 272-2475 CALIBRATION OF ONE HYDRAULIC JACK FOR STATIC PILE LOAD TESTING Kaeng Khoi 2 Power Plant (Compression Testing) LOADING UNLOADING Gage Rdg. LOADING (Tons) Gage Rdg. UNLOADING (Tons) in bars (Y) 905 TOTAL (X) in bars (Y) 905 TOTAL (X) 0 0 0.0 0 0 0.0 50 49.5 49.5 50 43.5 43.5 100 100.5 100.5 100 93.5 93.5 150 150.5 150.5 150 143.5 143.5 200 199.5 199.5 200 193.5 193.5 250 250.0 250.0 250 244.0 244.0 300 302.0 302.0 300 295.0 295.0 350 352.0 352.0 350 345.5 345.5 400 403.5 403.5 400 395.5 395.5 450 456.5 456.5 450 448.0 448.0 480 485.0 485.0 Calibrated Regression Output : Regression Output : Constant 2.00762866 Constant 7.72212362 Std Err of Y Est 1.18920934 Std Err of Y Est 0.74816827 R Squared 0.99994275 R Squared 0.99997388 No. of Observations 10 No. of Observations 9 Degrees of Freedom 8 Degrees of Freedom 7 X Coefficient(s) 0.98578527 X Coefficient(s) 0.99023655 LOADING (Y) = 0.9858 * X + 2.0076 UNLOADING (Y) = 0.9902 * X + 7.7221

ASTM ASTM Testing Co., Ltd. 437-441 Kampangpeth III Road, behind Jatujak Park, Bangkok 10900 THAILAND : (662)+ 272-5966~7, 272-4565, 272-5973, 272-4582 : (662)+ 272-4583 CALIBRATION OF ONE HYDRAULIC JACK FOR STATIC PILE LOAD TESTING Kaeng Khoi 2 Power Plant(Tension Testing) LOADING UNLOADING Gage Rdg. LOADING (Tons) Gage Rdg. UNLOADING (Tons) in bars (Y) 912 TOTAL (X) in bars (Y) 912 TOTAL (X) 0 0 0.0 0 0 0.0 100 27.0 27.0 100 20.0 20.0 200 53.5 53.5 200 46.0 46.0 300 82.0 82.0 300 73.0 73.0 400 109.0 109.0 400 101.0 101.0 500 138.0 138.0 500 130.0 130.0 600 165.0 165.0 Calibrated Regression Output : Regression Output : Constant 4.72899540 Constant 31.03357124 Std Err of Y Est 2.27054121 Std Err of Y Est 3.92681306 R Squared 0.99988216 R Squared 0.99953740 No. of Observations 6 No. of Observations 5 Degrees of Freedom 4 Degrees of Freedom 3 X Coefficient(s) 3.60596349 X Coefficient(s) 3.63468147 LOADING (Y) = 3.6060 * X + 4.7290 UNLOADING (Y) = 3.6347 * X + 31.0336

ASTM ASTM Testing Co., Ltd. 437-441 Kampangpeth III Road, behind Jatujak Park, Bangkok 10900 THAILAND : (662)+ 272-5966~7, 272-4565, 272-5973, 272-4582 : (662)+ 272-4583 CALIBRATION OF ONE HYDRAULIC JACK FOR STATIC PILE LOAD TESTING Kaeng Khoi 2 Power Plant(Lateral Testing) LOADING UNLOADING Gage Rdg. LOADING (Tons) Gage Rdg. UNLOADING (Tons) in bars (Y) 8 TOTAL (X) in bars (Y) 8 TOTAL (X) 0 0 0.0 0 0 0.0 50 3.0 3.0 50 3.0 3.0 100 9.0 9.0 100 9.0 9.0 150 15.0 15.0 150 14.5 14.5 200 20.0 20.0 200 19.0 19.0 250 25.5 25.5 250 25.0 25.0 300 31.0 31.0 300 30.0 30.0 350 37.0 37.0 350 35.5 35.5 400 42.0 42.0 400 41.0 41.0 450 48.0 48.0 450 47.0 47.0 500 54.0 54.0 500 53.0 53.0 550 59.0 59.0 Calibrated Regression Output : Regression Output : Constant 20.57458863 Constant 22.09718515 Std Err of Y Est 2.76858801 Std Err of Y Est 4.16489690 R Squared 0.99974914 R Squared 0.99932717 No. of Observations 11 No. of Observations 10 Degrees of Freedom 9 Degrees of Freedom 8 X Coefficient(s) 8.94812089 X Coefficient(s) 9.13006552 LOADING (Y) = 8.9481 * X + 20.5746 UNLOADING (Y) = 9.1301 * X + 22.0972

367 368 Main Beam 385 416 417 Main Beam Hydraulic Jack Figure 1 Compression Test KHAENG KHOI 2 Power Plant Project ASTM TESTING CO., LTD.

Hydraulic Jack Reaction Beam 367 368 369 Hydraulic Jack 367 369 368 Figure 2 Tension Test KHAENG KHOI 2 Power Plant Project ASTM TESTING CO., LTD.

385 416 417 432 Hydraulic Jack 1.0 m. 416 417 Figure 3 Lateral Test KHAENG KHOI 2 Power Plant Project ASTM TESTING CO., LTD.

APPENDIX B SAMPLE PRESENTATION OF RESULTS

Infratech ASTM CO., LTD. APPENDIX C EQUIPMENT DETAILS 1

Infratech ASTM CO., LTD. APPENDIX D COMPANY REFERENCE PROJECTS 2