MANAGING THE PROJECT RECORD



Similar documents
AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT CONSTRUCTION AUDIT PROGRAM

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES

Owner s project control review Baker Tilly Virchow Krause, LLP

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

Request for Qualifications (RFQ NO ) CONSTRUCTION MANAGEMENT/OWNERS REPRESENTATIVE SERVICES APRIL 16, 2015

PITTSBURG UNIFIED SCHOOL DISTRICT

TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

Clean Water Revolving Funds (SRF & SWQIF) Loan Application Instructions for Completing the Project Cost Worksheet

Project Document Manager

Florida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects

Design-Build Process for Project Managers

By: Pat Derdenger, Partner Steptoe & Johnson LLP 201 East Washington Street, 16 th Floor Phoenix, Arizona

Project Closeout Module 1 Construction Closeout Checklist

Construction Company Capacity Assessment

TIPS FOR ORGANIZATION

REQUEST FOR PROPOSAL (RFP) ELECTRONIC HEALTH RECORD SYSTEM (EHRS) ON DEMAND TECHNICAL SERVICES RFP #OPS September 29, 2014

CULVER CITY UNIFIED SCHOOL DISTRICT 4034 Irving Place Culver City, CA (310) REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES

ADVERTISING, SALE & AWARD

Contractor s Guide. April 2016

AGREEMENT BETWEEN CONTRACTOR AND OWNER FOR CONSTRUCTION

Suggested Procedures for School Boards

APPLICATION FOR HISTORIC MIRAMAR COMMERCIAL REHABILITATION PROGRAM (TARGET AREA)

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

IRVINE UNIFIED SCHOOL DISTRICT. 100 Nightmist Irvine, California (949) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Covance Construction Management Staffing Plan Chandler, Arizona

Construction Management Standards of Practice

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

THE TOWN OF NORTH SMITHFIELD

Projectmates User Guide for Montclair State University Facilities Construction Projects

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP Notice No. Notice

Electrical Contractor Pre-Qualification Packet. CHEM R/R Bus Duct & Generator (DMI) Project No. CP Notice No

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

ACCOUNTING FOR CAPITAL PROJECTS

FIRST AND FINAL ADDENDUM RFP FOR ROOFING SERVICES FOR DISASTER RECOVERY ASSISTANCE

Public Works Contract Completion

The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH

REIMBURSEMENT PROCEDURE for FEMA PUBLIC ASSISTANCE

Design-Build Demonstration Program Volume IV Document Management Plan

REQUEST FOR PROPOSALS FOR DISASTER RECOVERY ADMINISTRATIVE SERVICES

Request for Proposal (RFP) Open-End Contract for Media Buying Service

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

FUNCTIONS OF THE NIGHT AUDIT MAIN PURPOSE: To verify the accuracy and completeness of guest and non-guest accounts.

Executive Office for Administration & Finance. Request for Qualifications For Construction Management Services

Work Breakdown Structure Element Dictionary Construction

Construction Contract

Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. October 19, 2015

SAMPLE CONTRACT LANGUAGE. 2.0 Terms and Conditions. 2.1 Scope of Services: Contractor will perform the services described in Exhibit A

COMMERCIAL REHABILITATION LOAN PROGRAM

School Facility Program Handbook A guide to assist with applying for and obtaining grant funds

DINUBA UNIFIED SCHOOL DISTRICT East El Monte Way Dinuba CA Request for Qualifications For Construction Management Services

:: REQUEST FOR INFORMATION :: DEMOLITION SERVICES

Classification: Subject to recoupment of funds by NWICA if the standard is Not Met.

Project Management Procedures

Request for Proposal No. RFP Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition

ALABAMA STATE DEPARTMENT OF EDUCATION

LEXINGTON COUNTY MINOR HOME REPAIR PROGRAM POLICIES AND PROCEDURES

AGREEMENT FOR PROGRAM MANAGEMENT SERVICES WITH SINGLE GENERAL CONTRACTOR DELIVERY (Ocean View Elementary School Project)

MASSWORKS INFRASTRUCTURE PROGRAM 2011 GRANT RECIPIENT HANDBOOK

Construction Conversion and Renovation Mortgages

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES

Chapter 4: Contractor Quality Control

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ACEDP LOW- AND MODERATE-INCOME HOOKUPS PROCESS

Accounting Policies and Procedures Manual (Sample)

Control of Fixed Assets

REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES Various Projects RFQ/RFP No

1. Is it required that each company that bids on this RFP be pre-registered or pre-qualified prior to bidding?

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

REQUEST FOR QUALIFICATIONS Environmental and/or Industrial Hygiene Consultants September 2013 September 2016

VILLAGE OF ARLINGTON HEIGHTS

SAMPLE CONTRACT FOR CONSTRUCTION WITH GUARANTEED MAXIMUM PRICE (GMP) BETWEEN

Program/Construction Management Request for Qualifications

Transcription:

MANAGING THE PROJECT RECORD Project Record Filing System 2 Agency Submittals 2 Site Acquisition 3 Planning 3 Pre-Qualification of Bidders 3 Bidding 4 Construction 4 Inspection 4 Legal 5 Contracts 5 Accounting 6 Labor Compliance 6 Public Relations 6 Submittals 7 Warranty Records/Operations Manuals 7 As-Built Drawings 7 Helpful Hints 8,

Project Record Filing System 2 PROJECT RECORD FILING SYSTEM The following filing system was developed for use during facility construction projects. The files then become the historical and Office of Public School Construction (OPSC) audit records for the project. Each section can be kept in a binder with tabs for the various bullets. Some sections will require more than one binder for a large project. The entire system can be easily adapted to files. Each binder should be labeled with the project site, project title, project year and the project number. When it is a state School Facility Program project, you may want to use the state number. AGENCY SUBMITTALS OPSC - SAB 50-01 - SAB 50-02 - SAB 50-03 - SAB 50-04 (Additional forms may be applicable to a specific project; see www.opsc.dgs.ca.gov/sab+forms/default.htm for more information.) CDE - SFPD 4.0 - SFPD 4.1 - SFPD 4.2 - SFPD 4.3 - Substantial Enrollment Certification (or waiver) (Additional forms may be applicable to a specific project; see www.cde.ca.gov/facilities/field/forms.htm for more information.) DSA - SSS 102 - SSS 5 - SSS 6 (Inspectors and Contractors) - SSS 6AE (Architects) This binder should contain every submittal and every document received from a public agency for the project. Identify them by tabs, indicating the form number, so that each document can be easily located. Include copies of everything you send with a form, such as Board Agenda items. Also include each response letter that constitutes an approval. (Each form submitted/approval received should be cross-filed in the Form Files for the district.) Some forms may be included in more than one project record.

Project Record Filing System 3 SITE ACQUISITION Appraisals Testing & Surveys CEQA Documents Site Approvals Eminent Domain Escrow Acquisition Correspondence (Legal) The testing and survey documents contained in this section are those performed during the due diligence phase of the project, they should not be confused with tests and surveys necessary for planning or those required during construction. Each type should be filed with the appropriate phase of the project. PLANNING (Architecture & Engineering) Needs Assessment Building Data Educational Programming Utility Location Analysis Design Committee Meeting Minutes Cost Estimates Architect Correspondence Various architectural drawings will be a part of this phase and should be labeled with the same information as the binder. PRE-QUALIFICATION OF BIDDERS Advertisements Tally of Submittals (Qualified potential bidders) Successful bidder s pre-qualification packet Pre-qualification of bidders is not required and will not be appropriate to all projects. If you do choose to pre-qualify bidders, you will need to store additional records. During pre-qualification a folder for each submitting company is created. Conversations and correspondence can be logged on the inside cover of the folder. This can provide helpful notation for legal reference. All correspondence, reference calling logs, and notes to file go together in that company s file. Only the successful bidder s packet goes forward to the project records. Be sure that all confidential information is appropriately marked when you place it in the project record.

Project Record Filing System 4 BIDDING Bid Advertisements Specification Document Addenda to Specifications Bid Tally Sheet Bid Documents from top 3 bids The Specifications may be too large to add to this binder and may be a separate document. I find it helpful to request one copy of the spec delivered to me unbound and 3-hole drilled for this binder. This binder copy allows you to make photocopies of pages, which is difficult with the bound editions. This section would also include DVBE compliance documentation when appropriate. CONSTRUCTION Notice to Proceed Project Schedules Construction Meeting Minutes Requests for Information (RFI s) Bulletins (also known as Construction Change Directives, or Architect s Supplemental Instructions (ASI).) Construction Correspondence This binder can be taken to the job meetings so that you have reference information from previous meetings with you. Architect and contractor terms for RFI s, bulletins, change order directives, etc. may vary. This binder often becomes a series of binders. When you need to split the binder up, do so by whole sections. For example move all of the schedules and Minutes to a separate binder. You may want to keep the most recent of each section in your meeting binder. During construction you will receive 20-day notices from sub-contractors. You need to keep them, but don t spend any time on them. Just place them in files by project. On the rare occasion that you need one, your legal counsel will ask you to look for it. INSPECTION Inspector s Log Inspection Notices Testing Reports Punch Lists Photographic Documentation

Project Record Filing System 5 The quality of the inspector s log is very important for the district. I require a copy of the month s log to be submitted with the inspector s payment application. This provides the district with an up-to-date record of the project and gives you the opportunity to review the quality of the log. The photographs may need to be kept in separate photo books. They should be dated and annotated by the inspector. Video logs may also be kept. This photo record can be significant in later resolving the status of the project at specific dates. It can also establish values in case of a disaster qualifying for FEMA reimbursement. Digital photos may not prove as useful for court documentation as traditional photos because they are so easily altered. LEGAL (CONFIDENTIAL) Legal Correspondence If the only legal correspondence you have is the review of the contracts and bid documents, then skip this one and include the correspondence as a section in another binder. (I am an optimist and don t usually create a Legal Binder until I see that one is needed.) CONTRACTS Copy of every contract for this project - Architect - Surveys - Testing - Inspection - Contractor Modifications to Contracts Change Orders Stop Notices and Lien Releases Notice of Completion All Board Actions for the project This binder will be required for project close-out by OPSC. Any information required for the OPSC record should be included here or in the Accounting Binder.

Project Record Filing System 6 ACCOUNTING SAB 184/SAB 50-06 with 184a or 50-06 worksheets Record of every warrant issued for the project by object category Copy of Pay Request or Invoice Copy of Purchase Order This binder is set up with a divider for each object code to be used during the project. These object codes should correspond to the SAB 184A/50-06 columns. When a purchase order is created, a copy of that PO goes in the appropriate object code section. (You are therefore filing by use of funds.) As a payment application or invoice is received and processed, a copy of the pay ap/inv is filed in the binder with a notation of the warrant issued and the warrant date (or a copy of the warrant.) A copy of the year end warrant register should be kept for audit verification (usually it is kept by Fiscal.) When it is time to submit SAB 184 or 50-06 to the OPSC, you already have the payments in order of the columns by order of your tabs. After you have completed the 184 or 50-06, it becomes an index to that binder and should be placed in the front of the binder. At this time I place a large red notice on the binder that no documents can be added to or taken from this binder. If additional expenditures are made for the project, another binder should be started. This binder is also useful in verifying the accounting ledger for the project. The expenditures should follow the ledger by object code by date. Accounting will have cross-files by vendor and Purchasing should have cross-files by PO number. LABOR COMPLIANCE Labor Compliance Agreement approved by Dept. of Industrial Relations Wage Rates Verifications Spreadsheets LC correspondence (At this writing his is a new area and the information to be retained by the district is still under development.) PUBLIC RELATIONS Groundbreaking Program Press Releases Newspaper Articles Public Contact Log I keep a log of calls and letters received during planning and construction. I note the name and number of each caller, the gist of the message, and any comments or

Project Record Filing System 7 commitments made. I have a place to note when I told the Superintendent about the call. I keep these logs at my desk for all current projects (all department staff also keep a log) after the completion of the project the logs go into the binder. SUBMITTALS Because of their bulk, submittals are not kept in a binder. We designate a submittal box for each project. As submittals are approved by the architect/district, they are stamped and numbered by the architect. Approved submittals are then placed in the box in number order. We place color papers with the submittal number at the start of each submittal (like a bookmark.) The architect s submittal log is kept at the front of the box to be used as an index. At the end of the project the submittal box is forwarded to the Maintenance Department along with the Warranty Binder. This provides them information for replacement parts, service, and repair. WARRANTY RECORDS/ OPERATIONS MANUALS This binder is prepared by the contractor and is generally supplied directly to the maintenance department when they receive the training on the building systems. You need to be sure that it is prepared and supplied per contract requirements. AS-BUILT DRAWINGS The as-built drawings for a project are not maintained in the binder system, but are mentioned here because they do become part of the project record. Inspector Set I request that my DSA inspector maintain a set of drawings that annotate any RFI responses, bulletins issued, etc. These changes are noted on the drawings and incorporated into the record set. Contractor Set The contractor is by contract required to maintain a set of drawings that indicate how he actually constructed the project. He should indicate any deviation from the architect s drawings. Some deviation may be necessary and appropriate due to site conditions and RFI s. The most significant changes that you will need to know later often occur when they are doing the layout for underground utilities. It is important that the contractor make these entries in the as-built set, as the work occurs not at the end of the contract! By that time the sub-contractor who did the work will be gone and you will not get an accurate document. The inspector can require that the as-built drawings are up to date on a monthly basis as part of the payment approval process.

Project Record Filing System 8 HELPFUL HINTS Standardize the notebook size. I prefer 3 because they are large, yet small enough to carry easily. Get quality notebooks. This historical record that you are compiling is important and should be protected. Cheap notebooks have problems when they get loaded with material. Use a large-size hole punch. Do not allow original documents to leave the office. If you will need to send originals to other parties, have multiple signature copies. ORGANIZING BY COLOR I prefer to establish a color for each site in the district, or in a larger district for each project. Binder labels can be done in the project color. File folders or labels, pending filing boxes, etc. can be done in the project color. This will assist in quick project identification.