REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES

Size: px
Start display at page:

Download "REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES"

Transcription

1 REQUEST FOR QUALIFICATIONS ANNUAL CONTRACT FOR CIVIL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES MECHANICAL ENGINEERING SERVICES STRUCTURAL ENGINEERING SERVICES CONSTRUCTION PROJECTS NOT TO EXCEED $2,000,000 Facilities Planning and Business Services 3750 Olson Drive, Daytona Beach Florida (386) SUBMITTALS DUE BY: 3:00 PM, FEBRUARY 12, 2016

2 TABLE OF CONTENTS PAGE TITLE 1 Cover 2 Table of Contents 3 Legal Notice 4 General Information 5-6 Submittal Instructions 7 Submittal Conditions 8 Required Services and Firm Selection Process ATTACHMENTS A FAC Document Standard Form of Agreement for Engineering Services 2 Engineering Services

3 Legal Notice Request for Professional Services Pursuant to Florida Statute and , Consultants' Competitive Negotiations Act (CCNA) and State Requirements for Educational Facilities (SREF), the hereby publicly announces the need to procure Civil Engineering, Electrical Engineering, Mechanical Engineering and Structural Engineering Services. The School Board will consider the contracting of engineering firms to provide professional services for individual construction projects with construction budgets not to exceed $2,000,000. The School Board may select more than one firm for each of these services. To be eligible for consideration interested firms must be certified by the School Board and shall hold a current Certificate of Qualification prior to the date of submission. Applications are available at: Requirements.aspx Solicitation information, RFQ and all other relevant documents are available via the Volusia County School District web site at: Documents are in PDF format and may be viewed, printed or saved to your computer. In order to be considered interested firms must submit one (1) original printed and bound submittal and one (1) CD or flash device of the submittal in combined PDF file format in the same order as the printed submittal with corresponding bookmarks for navigation. S ubmittals must be received no later than 3:00 PM on February 12, Only responses from firms that have submitted the required information per the RFQ and are prequalified by the School Board will be considered. The reserves the right to waive any informality in the selection process and to reject any or all submittals in the best interest of the District. Address submittal to: Ms. Janice Lucas Facilities Planning & Business Services 3750 Olson Drive Daytona Beach, Florida The School Board of Volusia County, DeLand Florida Ms. Ida D. Wright, Chairman 3 Engineering Services

4 GENERAL INFORMATION This contract shall provide the with continuing services for civil engineering, electrical engineering, mechanical engineering or structural engineering per Florida Statutes. The firm selected shall be able to offer both engineering and contract administration services with either staff or sub-consulting resources. The contract is for continuing services on an annual basis; the School Board having the option of renewing the contract for subsequent annual terms. The size, scope and complexity of specific projects under this contract will be determined based upon specific requirements of the project as determined by the School Board representatives and/or designated architects/engineers involved in the project. For purposes of consistency and simplicity, School Board may also include the School District of Volusia County and/or the Superintendent or designee. The School Board will select qualified firms under provisions of Florida Statutes to provide annual engineering services for various projects county wide; each project not to exceed $2,000,000. The School Board intends to award multiple contracts to provide engineering services as deemed to be in the best interest of the School District. Previous engineering experience with occupied school campuses is preferred. To be eligible for consideration, interested firms must be certified by the School Board pursuant to the Consultants Competitive Negotiations Act (CCNA) and the regulations of the School Board prior to the date of submission. It is the intent of the School District to utilize the internet to disseminate information for this request to include the RFQ, any/all addenda or subsequent information as applicable. Solicitation information, this RFQ and all other relevant documents are available via the Volusia County School District web site at: Documents are in PDF format and may be viewed, printed or saved to your computer. 4 Engineering Services

5 SUBMITTAL INSTRUCTIONS The following submittal format is intended to provide the selection committee with information regarding the qualifications of each prospective engineering firm. Submit one (1) original printed and bound submittal and one (1) CD or flash device of the submittal in combined PDF format in the same order as the printed submittal with corresponding bookmarks for navigation. Firm submittals shall contain the following information in the order indicated below. Submittals without these documents will be disqualified. 1. Letter of Interest a) Include a paragraph which states the firm s intent to qualify under Florida Statutes Chapter (CCNA). b) Letter must be signed by a person legally authorized to bind the firm. 2. Table of Contents 3. School Board of Volusia County Professional Qualifications Supplement (PQS) a) Provide current PQS certificate 4. Team Organization and Personnel Resumes a) Provide an organizational chart of the proposed design team including consultants. b) Provide resumes of key personnel, respective roles, education and their experience in civil engineering, electrical engineering, mechanical engineering or structural engineering and contract administration. Identify and highlight their experience as related to educational facilities. 5. Professional Registration a) Provide copies of professional registration licenses for the engineering firm. 6. Insurance a) Attach the firm s current certificate of professional liability insurance in the amount of $1,000, Engineering Project Experience a) Submit the engineering firm s experience documenting four (4) or more projects within the past five (5) years evidence of school civil engineering, electrical engineering, mechanical engineering or structural engineering experience. Identify: 1) Projects of comparable size and complexity; define specific services provided. 2) Information describing scope and cost. 3) Lead personnel and their respective responsibilities. 4) Client s name and contact person with address, phone numbers, dates of services performed and any written references. b) The firm s direct project experience must be differentiated from individual personnel experience; therefore, if you choose to identify individual s experience gained at other firms, this section should be clearly subdivided as follows: 1) Firm s Project Experience 2) Individuals Project Experience (while employed by other firms) 8. Project Examples Similar in Scope a) Provide graphic examples (photos, etc.) of projects that best represent the firm s ability to provide civil engineering, electrical engineering, mechanical engineering or structural engineering services for projects not to exceed $2,000, Engineering Services

6 Submittal Instructions 9. Technology Equipment and Resources a) Describe equipment and technology resources available to your firm. Indicate how these resources benefit the District as a potential client. b) Indicate office technologies and web based services the firm currently uses and how you intend to maximize their use for this contract. 10. Project Approach a) Describe the methods the firm will employ for the following tasks taking into consideration the school sites may be fully occupied during construction and the District may utilize the services of a Construction Manager: 1) Design Reviews and Coordination 2) Permitting 3) Scheduling and Phasing 4) Budgeting 5) Contract Administration 11. Availability and Location a) Provide the business addresses for the firm s offices from which any part of the work will be administered. b) Explain the status of current workload addressing the availability of lead personnel as it relates to the submittal. 12. Litigation a) Identify all legal action in which the firm has been a party to including litigation, mediation, arbitration, administrative proceedings, etc. during the last five (5) years involving a client for claims in excess of $100,000. b) Include a brief legal description of the dispute and its current status. c) Describe in detail any projects within the last five (5) years where liquidated damages, penalties, liens, defaults, cancellations of contract or termination of contract were imposed, sought to be imposed, threatened or filed against the firm. d) Identify any disputes or claims in which the firm has been a party and which were resolved without legal action. 13. Appendix a) Additional information deemed necessary by the firm. Indicate any other considerations the firm may wish to highlight or discuss such as awards, company brochures, letters of accommodation, periodical articles, etc. Submittals are due no later than 3:00 PM on February 12, 2016 and must be clearly labeled showing the name of the submitting firm. Address Submittals to: Ms. Janice Lucas Facilities Planning & Business Services 3750 Olson Drive Daytona Beach, Florida All firms will receive notification of the firms selected for further consideration and interview. 6 Engineering Services

7 SUBMITTAL CONDITIONS Issuance of this RFQ does not constitute a commitment by the School Board to award a contract. The School Board reserves the right to reject any or all submittals received in response to this RFQ or to cancel this RFQ if it is deemed in the best interest of the district. The School Board reserves the right to request clarification of information submitted and to request additional information from one or more firms. Submittals become the property of the School Board and will not be returned. The School Board operates under the public disclosure laws required of governmental agencies as part of its normal procedures. Proprietary information must be identified and will be protected to the greatest extent possible; however, there can be no guarantees. By making a submittal the firm agrees to comply with all applicable federal, state and local statutes and regulations. Cost of developing the submittal, attendance at an oral interview or any other such costs are entirely the responsibility of the firm and shall not be reimbursed in any manner by the School Board. The School Board reserves the right to proceed to interview without further discussion of submittals received, operating strictly under the Consultants Competitive Negotiations Act (CCNA). In the event shortlisted firms are invited for interview, the person(s) who will be assigned to the contract must attend the interview as well as any others deemed necessary by the applicant. In accordance with CCNA the School Board reserves the right to conduct or not conduct interviews at its sole discretion. The final selection shall be based on the written submittal, responses of references and (if applicable) the interview. Firms shall be ranked in accordance the CCNA provisions. In accordance with CCNA, the School Board shall negotiate agreements with the top ranked firms until an agreement has been reached or until impasse. Successful firms shall obtain approval from the School Board prior to reassigning any key personnel involved in the performance of any project. Approval will not unreasonably be withheld. The School Board may require removal of any contracted employee who the School Board deems unacceptable. News releases pertaining to this procurement or contract shall not be made without prior written approval from the Superintendent or designee. 7 Engineering Services

8 REQUIRED SERVICES AND FIRM SELECTION PROCESS Required Services Successful firms shall be responsible for all services as set forth in FAC Document 621, Standard Form of Agreement for Engineering Services, attached to this RFQ. Firm Selection Process This Request for Qualifications (RFQ) is the first step in the selection process. A selection committee will evaluate the submittals of interested firms. A short list of firms will be identified. Short listed firms may be asked to present their qualifications and design approach by interview to the same selection committee as part of the selection process; a final ranking will be established based on the interviews. The committee will make a recommendation to the School Board to negotiate with the top ranked firms to provide design and contract administration services. In general, the evaluation criteria is based on: 1. Experience and qualification of the firm. 2. Experience and qualifications of proposed team members to be assigned to the contract. 3. Experience and performance of the firm on school projects. 4. Project management and contract administration approach, including cost management and quality control procedures. 5. Technology use and equipment resources to improve service. 6. Availability to perform services and references. 7. Location of firm. 8. Responsiveness to the RFQ instructions. 8 Engineering Services

9 ATTACHMENT A

10 FAC Document 621 SCHOOL BOARD OF VOLUSIA COUNTY FLORIDA STANDARD FORM OF AGREEMENT BETWEEN OWNER and ENGINEER For Engineering Services - Various Projects County Wide on a One-Year Term AGREEMENT made as of the day of in the year of BETWEEN the Owner: The 200 North Clara Avenue (PO Box 2118) DeLand, Florida (DeLand, Florida ) the Engineer is: (Name and address) for the following Project: (Include detailed description of Project, project number, location, address and scope.) The Owner and Engineer agree as set forth below. Initial FAC Document 621 Page 1 of 15

11 ARTICLE 1 CONTRACT 1.1 OWNER S INTENT The Owner desires to obtain from the Engineer professional services necessary for the design and construction of various projects requiring engineering services in Volusia County, Florida, the estimated total construction cost of each individual project not to exceed $2,000, The Owner does hereby contract with the Engineer for a term of one year, expiring June 30 th of the following year from the date above, to perform the above described services, and other required professional services on an as-needed basis, as designated, authorized and/or assigned by the Owner, and the Owner agrees to compensate the Engineer for such services in accordance with the provisions contained in this Agreement The Owner may, at the Owner's option, at a regular or special board meeting, renew this Agreement It is understood that the primary intent of this document is to assure that the Owner has the Engineer "on call" with prior, mutually agreed upon conditions of service, and that the Owner has complied with all requirements of the Consultants Competitive Negotiations Act, in the selection of the Engineer and in negotiations for this Agreement The Engineer acknowledges that it has a professional duty of care in the performance of its duties under this Agreement. The Engineer will exercise its best efforts to ensure faithful performance of the Construction Agreement by both the Owner and Contractor. ARTICLE 2 SCOPE OF ENGINEER S BASIC SERVICES 2.1 BASIC SERVICES The Engineer s basic services consist of: all services necessary to design, prepare construction drawings and specifications, and provide contract administration services for the construction of various Projects as described in the Design Criteria, Article 17, developed by the Owner for each project. Such services shall include, but not be limited to, necessary conferences; preparation of a site plan (graphically depicting the complete use of the affected area); participation in a review of the educational or ancillary specifications and Project requirements; preparation of conceptual drawings; preparation of Schematic Design, Design Development, and Construction Documents in compliance with educational or ancillary specifications and Design Criteria requirements including working drawings; specifications; large-scale and full-size detail drawings; for architectural, structural, electrical, civil, mechanical and landscaping work as those disciplines relate to the overall Project requirements; estimates of cost of the work, assistance in the drafting of forms of proposals and contracts; assistance during bidding and award of contract(s); site visits and observation of the work; issuance of certificates of payments; and the general administration of the construction contract work as more specifically set forth herein. Basic Services include the Engineer reviewing applicable codes and regulations, verifying that the Construction Documents comply with all applicable codes and regulations, and making revisions to the Construction Documents requested by Governmental authorities or the Owner as needed to obtain governmental approvals The Engineer shall design the Project in accordance with:.1 The applicable edition of rules of the Florida State Board of Education, State Requirements for Educational Facilities (SREF), Administrative Rules for Educational Facilities, Section 1013 of the Florida Statutes, applicable building codes, including but not limited to all laws, regulations, or codes addressing storm water management, water wells, and sanitation..2 The Volusia County Schools Design Guidelines, current edition, Design Criteria developed by the Owner and any educational or ancillary specifications at the time each project is initiated. The Design Guidelines are available on the VCS Facilities Design & Construction website..3 During the design phase for each project at existing facilities, the Engineer shall review the Survey Report for Asbestos-Containing Building Materials and Management Plan for Asbestos-Containing Building Materials, on file in the Facilities Planning and Construction Department, for the facility affected by each project. Based upon said survey report the Engineer shall present to the Owner a written report of this review. This report shall identify the location or locations within the project area that contain any asbestos-containing building materials. In the event there are no locations within the project area that have asbestos containing materials, a report will need to be submitted stating such. The Owner shall be Initial FAC Document 621 Page 2 of 15

12 responsible for abatement of any asbestos containing material..4 Review of the Americans with Disabilities Act Transition Plan Survey of Volusia County School Board Facilities, located in the VCS Building Department, to indentify and correct noncompliant areas within the project The Engineer shall not specify any asbestos containing materials or products in the Project Design Professionals acceptable to the Engineer and the Owner shall be retained by the Engineer, at the Engineer s expense, as the Engineer s consultants for the structural, mechanical, civil, electrical, landscape architecture, architecture and such other portions of the Project where such services shall reasonably be required for the proper design, installation, or operation of such portions of the Project. Nothing in this paragraph, or elsewhere in this Agreement, shall relieve or absolve the Engineer from liability for damages to the Owner resulting from any breach or default under this Agreement, or any willful or negligent act or omission of the Engineer or any agent, or employee of the Engineer, including, but not limited to, any other consultant employed hereunder by the Engineer or any agent or employee of such other consultant The Engineer and relevant consultants shall meet with School Board personnel, and any other governmental bodies deemed necessary by the Owner, at pre-design conferences to discuss details and material specifications for the Project. Final approval of all design and construction matters must come only from the Owner. To the extent necessary for the Project, the Engineer shall provide water and sewer extension and water management review documentation through the Department of Environmental Protection, State of Florida, and the St. Johns River Water Management District; provide energy review (FLEET) analysis; and shall coordinate necessary utility modifications and confirm the modifications in writing with the local utility company If the Project requires the services of a Special Inspector for threshold buildings, the cost of this service will be negotiated with the Engineer as an additional service or will be provided by the Owner At the completion of Schematic Design, Design Development and Construction Documents the Owner may provide the Engineer with a written list of proposed changes and/or a redlined set of correction drawings and specifications. The Engineer shall make all corrections indicating compliance with yellow highlighter. The redlined set shall be returned to the Owner. Should the Engineer disagree with any correction requests the Engineer shall identify such items in writing to the Owner. 2.2 PROJECT REQUIREMENTS The Project shall be designed to avoid the construction cost exceeding the construction budget as outlined in the Design Criteria, Article 17. This amount represents the Project construction budget The net and gross square footage of the Project, if any, shall be in accordance with the figures for net and gross area totals set forth in the Design Criteria, Article EVALUATION OF BUDGET AND COST OF THE WORK The Engineer shall prepare a preliminary estimate of the cost of the work. As the design progresses through the end of the preparation of the construction documents, the Engineer shall update and refine the preliminary estimate of the cost of the work. If at any time the Engineer s estimate of the cost of the work exceeds the Owner s budget, the Engineer shall immediately notify the Owner in writing and make appropriate recommendations to the Owner to adjust the Project s size, quality or budget and shall proceed no further without written direction of the Owner If the budget for the cost of the work is exceeded by the lowest bona fide bid or negotiated proposal, the Owner shall:.1 give written approval of an increase in the budget for the cost of the work;.2 authorize rebidding or renegotiating the Project within a reasonable time;.3 terminate in accordance with subparagraph 13.2; or.4 assist in revising the Project scope and quality as required to reduce the cost of the work. Initial FAC Document 621 Page 3 of 15

13 2.3.3 If the Owner chooses to proceed under subparagraph , the Engineer, without additional compensation, shall modify the documents for which the Engineer is responsible as necessary to comply with the budget for the cost of the work. 2.4 SCHEMATIC DESIGN PHASE The Engineer shall review the program described in the Design Criteria, to ascertain the requirements of the Project and shall review the understanding of such requirements with the Owner The Engineer shall visit the site with the Owner and investigate existing conditions and facilities, review drawings or other information furnished by the Owner and shall generally verify all such information as it relates to the Project The Engineer shall provide a preliminary evaluation of the Project requirements and budget requirements, each in terms of the other The Engineer shall prepare and submit to the Owner conceptual documents setting forth preliminary plans and systems. Preliminary selections of major building systems and construction materials shall be noted on the drawings or described in writing The Engineer shall review with the Owner alternate approaches to the design and construction of the Project The Engineer shall submit to the Owner a preliminary estimate of Construction Cost based on current area, volume or other unit costs Schematic documents shall be complete upon written acceptance and approval of the Owner. 2.5 DESIGN DEVELOPMENT DOCUMENTS Based on the approved schematic documents and any adjustments authorized by the Owner in the educational or ancillary specifications, Design Criteria or budget requirements, the Engineer shall prepare, for review by the Owner, design development documents. The design development documents shall illustrate and describe the refinement of the design of the Project, establishing the scope, relationships, forms, size and appearance of the Project by means of plans, sections and elevations, typical construction details, and equipment layouts. The design development documents shall include specifications that identify major materials and systems and establish in general their quality levels The Engineer shall:.1 work with the Owner to identify the areas within the building design which offer the greatest potential for the elimination of unnecessary costs..2 evaluate alternative systems and materials in terms of their feasibility and life-cycle cost..3 develop selected alternative ideas in detail with emphasis on their technical durability and constructability..4 retain an independent estimator when approved by the Owner in writing. When this service is required, it will be considered to be an additional service and not included in the basic services of the Engineer..5 advise the Owner of any adjustments to the preliminary estimate of construction cost..6 provide to the Owner two (2) sets of dated plans, specifications and the facilities space chart prior to acceptance of design development documents by the Owner. Design development documents shall be complete upon written acceptance and approval of the Owner. 2.6 CONSTRUCTION DOCUMENTS Based on the approved design development documents and any further adjustments in the Design Criteria or budget requirements for the Project as authorized by the Owner, the Engineer shall prepare construction documents for review by the Owner. The construction documents shall set forth in detail the requirements for the construction of the Project. The construction documents shall include drawings and specifications that establish in detail the requirements for the construction of the project. Initial FAC Document 621 Page 4 of 15

14 2.6.2 The Engineer shall assist the Owner in the preparation of all construction contracts Unless otherwise required by the Owner, the Engineer shall include in the specifications the following Owner furnished documents: 630 Advertisement for Bid; 631 Instructions to Bidders; 632 Bid Form; AIA Document A Bid Bond; 633 List of Subcontractors; 634 Bidder Project Data for Self-Performed Portions of the Work; 635 Trench Safety Act Form; 636 Bid Protest Bond Form; the Volusia County Schools Revised AIA Document A Standard Form of Agreement (if applicable); the Volusia County Schools Revised AIA Document A General Conditions (if applicable); 625 Standard Form of Agreement for a Small Project (if applicable); 640 Performance and Payment Bond; 641 Contractor s Direct Material Purchase Affidavit; 642 Contractor Acknowledgement Form; 650 Notice to Proceed; AIA Document G702 Application and Certification for Payment; AIA Document G703 Application and Certification for Payment Continuation Sheet; 651 Architect s Field Report; 652 Architect s Supplemental Instructions; 653 Proposal Request; 658 Change Order; AIA Document G707A Consent of Surety to Reduction in or Partial Release of Retainage; 660 Certificate of Substantial Completion; AIA Document G707Consent of Surety to Final Payment; 661 Contractor s Affidavit; 662 Receipt and Release Form. No modifications to Owner provided documents are permitted without Owner s written consent. All current Division 0 documents are available on the Owner s web site The Engineer shall furnish the Owner with three (3) check sets of intermediate (50% complete) construction documents by all disciplines (plans and specifications) for review. Revisions, changes and corrections required by the Owner shall be indicated in writing to the Engineer within thirty (30) days, all of which shall be incorporated into the final documents The Engineer shall advise the Owner of any adjustments to previous preliminary estimates of construction cost indicated by changes in requirements or general market conditions Prior to acceptance by the Owner of construction documents, the Engineer shall provide to the Owner four (4) sets of construction documents, signed, sealed and dated by the Engineer and all consultants, as required by law, and, if required by scope of work, the facilities space chart describing square footage and usage of all spaces. Engineer will provide two (2) additional, not signed and sealed, sets for Owner s use The Engineer shall prepare, for execution by the Owner, documents required for the approval of governing authorities having jurisdiction, including the School Board of Volusia County Building Department, and arrange for review and approval by these governing authorities The Engineer, as part of Basic Services, shall revise the drawings and specifications to reflect any changes arising from these reviews in preparation for bidding, including a conformed set if required by Owner This phase shall be complete upon satisfaction of all code and other required regulatory agencies reviews and written acceptance and approval by the Owner. Acceptance and approval by the Owner will in no way relieve the Engineer of the Engineer s obligations and duties under this Agreement 2.7 BIDDING AND NEGOTIATION PHASE It is the Owner s intent to furnish bidding documents via the internet. The Engineer, following acceptance and approval by the Owner of the Construction Documents, shall prepare one combined PDF of all drawing sheets (plans) and one combined PDF of the project manual (specification). The plans combined PDF shall include Bookmarks for each plan sheet with the corresponding sheet number and title. The project manual combined PDF shall include Bookmarks for the cover, each Division 0 document and the first page of each specification section with the corresponding document or section number and title. These PDF files shall be saved to a CD, or provided by other Owner approved means of document transmittal, and delivered to the Owner (Construction Project Manager) one week prior to publishing the advertisement to bid and will be uploaded by the Owner s designee to the Owner s website for bidding purposes The Engineer shall schedule a mandatory pre-bid conference, to be held a minimum of one week prior to bid opening; the Engineer shall be required to attend. A log of attendees, to include valid contact, and complete minutes of the conference shall be maintained by the Engineer, and provided to the Owner. The Architect shall provide to the Owner a copy of the attendee log in combined PDF format on CD, or other Owner approved means of document transmittal, for upload by the Owner s designee to the Owner s website. Initial FAC Document 621 Page 5 of 15

15 Only items which may affect the Bid, or clarifications of the Bidding Documents shall be addressed at the meeting The Engineer shall respond in writing by way of Addendum to questions submitted by prospective bidders during Bidding and Negotiation Phase of the project. No Addenda shall be distributed without prior written consent of Owner. For each Addendum the Engineer shall prepare and distribute on CD, or by other Owner approved means of document transmittal, to the Owner (Construction Project Manager) each addendum in combined PDF format, to include all attachments. The Addendum will be uploaded by the Owner s designee to the Owner s website. The Owner s designee will contact the Engineer via that the Addendum has been uploaded; the Engineer shall notify the pre-bid attendees that the Addendum has been issued. All Addenda shall be issued in this manner The Engineer shall attend the Bid Opening, and shall assist the Owner in the analysis of the bids. The Engineer shall prepare on his own letterhead his recommendation as to the award or rejection of the bids, and shall present his recommendation to the Owner Upon award of the contract by the Board, the Owner shall prepare and forward the Contract and all other pertinent forms to the successful Contractor for execution. The returned executed Contract, bonds, and certificate of insurance from the Contractor will be reviewed and approved by the Owner Within ten (10) days of the award of construction of the Project to the successful Bidder, the Engineer shall disclose to the Owner any and all business relationships the Engineer has, or has had over the previous five (5) years, with the Contractor or any Subcontractors on the successful bidder s List of Subcontractors, including but not limited to participation with the successful Bidder in joint ventures and on design/build projects. This duty to disclose existing business relationships shall continue throughout the Project until final completion Upon review, and written approval by the Owner, the Engineer shall prepare and issue the Notice to Proceed to the Contractor stating the date of commencement and the date of substantial completion of the work Upon successful completion of bidding and award of the construction contract Engineer shall submit the following to the Owner: two complete printed sets of the most current construction documents including plans, specifications and all addenda; and digital documents of all drawings on CD or DVD in AutoCAD (.dwg format), and PDF, read-only files are not acceptable. AutoCAD drawings shall be bonded drawings with no external references allowed; include with each disc set copies of Engineer s plot configuration, special fonts, digital images and a Word or PDF document of the Index to Drawings. AutoCAD file names shall be identical to the sheet it represents (i.e.: A dwg, etc.). 2.8 CONSTRUCTION PHASE - ADMINISTRATION The Construction phase will commence with the award of the contract for construction and conclude with the issuance of the Certificate of Final Inspection (CFI) and the one-year warranty period, whichever is later During the construction phase of the Project, the Engineer shall perform the following:.1 The Engineer shall review shop drawings and other submittals received from the Contractor for conformance with information given and the design concept expressed in the Contract Documents; and take appropriate action. Action shall be taken within fourteen (14) days after receipt to avoid delays in the work. The Engineer shall keep an up-to-date log of all shop drawings and submittals which shall be provided to the Owner upon request..2 The Engineer shall review the Contractor's cost and provide recommendations regarding any changes requested in the work. Upon approval by the Owner, the Engineer shall prepare change orders for signature by the Contractor, Engineer, and the Owner. The Engineer shall ensure that required back-up materials accompany change orders..3 The Engineer shall be the interpreter of the requirements of the Contract Documents and will render interpretations as necessary for the proper execution and progress of the work. All interpretations or decisions shall be in writing or in the form of drawings..4 Within fourteen (14) days after presentation of an issue, request for information, claim and Initial FAC Document 621 Page 6 of 15

16 the furnishing of the facts by the Contractor to the Engineer and Owner, the Engineer shall make decisions in writing as to any contract interpretations. In the event of non-compliance, including omission of work or faulty workmanship, the Engineer shall recite the Engineer s decision in what respect there has been deviation from the results or materials of construction required by the Contract Documents. The Engineer will include in the Engineer s decision, suitable specifications or drawings indicating precisely the results and materials to be used in executing the correction or remedy of non-compliant work..5 As the Contractor is required to create as-built drawings, the Engineer shall review the Contractor's progress of the maintenance of "as-built" drawings, which shall indicate actual conditions, which differ from the Contract Documents. The intent is to identify, among other things, layouts of utility systems and functional building systems, such as lighting, electrical, water/wastewater, or any other matters relating to sanitation, communications, air conditioning, ventilation, or heating, and incorporating the actual changes made during construction of the Project which differ from the original Contract Documents..6 To meet requirements for the Florida Inventory of School Houses (F.I.S.H.) engineers designing a new facility shall provide a schematic site plan showing buildings (identified by number), parking lots, and drives, also schematic floor plans of each building, identifying each room by number and square footage. If designing an addition the engineer will up-date the facilities existing F.I.S.H. site plan and provide schematic floor plans of each building, identifying each room by number and square footage. If the design is a remodeling project the engineer shall up-date the existing schematic floor plan and identify the new work by room number and square footage. All F.I.S.H. drawings shall be to scale in AutoCAD submitted on CD or DVD..7 The Engineer, in agreement with the Owner, shall provide written approval of the Contractor s construction schedule for the work as prepared and submitted by the contractor. The Engineer will monitor the progress of the work for conformance to the schedule. The Engineer will review any revision to the schedule and advise the Owner of changes from the original schedule. The Engineer will use the Engineer s best efforts to require Contractor, subcontractors and suppliers to comply with the schedule but will not be responsible for their failure to do so..8 The Engineer shall provide administration of the Contract for Construction as set forth below and, as required, in AIA Document A , General Conditions of the Contract for Construction, as modified by the Owner, current as of the date of this Agreement The Engineer shall guard the Owner against defects and deficiencies in the work of the Contractor, but the Engineer does not guarantee the performance of the contract by the Contractor. In fulfillment thereof, the Engineer shall do as follows:.1 The Engineer (as the Owner s representative) shall visit the Project at weekly intervals during the construction, or as agreed upon, to familiarize the Engineer with the progress and quality of work, and to determine if the work is proceeding in accordance with the Contract Documents and the latest approved Construction Schedule. The Engineer shall prepare, in a form approved by the Owner, a written report covering each visit. On the basis of such onsite observations, the Engineer shall keep the Owner informed on progress and quality of the work. Copies of all reports shall routinely be provided to the Owner within three (3) working days of each site visit. Each engineer or other consultant of record shall visit the site to observe the work on all occasions when work included in the engineer's area of responsibility is in progress. Observations by the engineers shall be documented and reported to the Engineer on the same basis as reports by the Engineer. These reports shall be included with the Engineer report to the Owner..2 Upon discovery of defective work the Engineer shall immediately, by written notification to the Owner and Contractor, reject the defective work stating the reasons for such rejections and recommendations for correction. The Engineer shall not certify payment for defective work until it has been corrected and / or accepted..3 Within six (6) days of receipt of each completed application for payment the Engineer shall review the Contractor's applications for payment and determine the amount to be paid to the Contractor and will certify the applications for payment in such amounts. The certificates will be sent to the Owner with a copy to the Contractor. Based upon the Engineer s site observations, the schedule of values and any other data comprising the application for Initial FAC Document 621 Page 7 of 15

17 payment, these certificates will constitute a representation to the Owner that the work has sufficiently progressed to the point indicated. At each application for payment the Engineer shall certify to the Owner that, to the best of the Engineer s knowledge, the Project is being constructed in accordance with the contract documents. By submitting a certificate of payment, the Engineer shall not be deemed to represent that the Engineer has made any examination to ascertain how and for what purpose the Contractor has used the money paid toward the account of the construction contract sum..4 Before approving the Contractor's application for payment, the Engineer shall review the status of the Contractor's as-built records and verify that they are up-to-date and accurate to the best of the Engineer s knowledge..5 The Engineer shall establish the date of substantial completion for the Project, based on his determination and agreement of the Owner that the work is sufficiently complete for the Owner to occupy the facilities, or a designated portion thereof, for the use for which it is intended..6 The Engineer shall prepare a certificate of substantial completion..7 The Certificate of Substantial Completion shall include a list of items remaining to be completed or corrected by the Contractor..8 At completion of construction the Engineer shall obtain from Contractors all warranties, manufacturers' manuals of operation, the Contractor s Affidavit form, the Receipt and Release form, other documentation required by the contract documents and conduct a final inspection..9 The Engineer shall issue a final certificate for payment after conducting a final inspection certifying that the work has been constructed in accordance with the contract documents and upon the issuance and School Board approval of the Certificate of Final Inspection (CFI)..10 One (1) month before the end of the one (1) year warranty period provided in the Contractor s Agreement with the Owner, the Engineer shall schedule and conduct an inspection of the Project with the Owner and the Contractor to discover and report any deficiencies in the work covered by the bond, or any uncorrected deficiencies previously reported. The Engineer shall prepare and forward to the Owner and Contractor a list of all outstanding deficiencies at the time of inspection The responsibility of the Engineer for performing the Engineer s obligation under this Agreement and under the construction contract(s) is not relieved or affected in any respect by the presence of, or inspection by, employees or other agents of the Owner. The Engineer agrees that the responsibility assumed by the Engineer for approving and certifying work for payment is not shared by any employee of the Owner If, in the preparation of the drawings and specifications, the Engineer fails to include any portion of the work defined in the Project requirements or essential to any system, the Engineer shall be responsible to the Owner for all construction costs related to the remediation less the cost the Owner would have incurred had there been no omission During the course of construction, it may be necessary to make changes in the scope of the work, changes in the Project requirements which are required by the Owner and changes in the basic services as described herein. The Engineer shall prepare or revise drawings, specifications and supporting data and other services in connection with Owner-directed proposed changes. Owner approval is required prior to execution of the changes. The Engineer will be compensated in accordance with the fee schedule for "Additional Services", Article 6, subparagraph 6.5, herein. The Engineer will receive no fee for changes caused by the Engineer s errors or omissions. ARTICLE 3 ADDITIONAL SERVICES 3.1 GENERAL When approved by the Owner in writing the Engineer may perform additional services under this Agreement. 3.2 PROJECT REPRESENTATION BEYOND BASIC SERVICES Unless otherwise included in Basic Services, the following services are considered to be additional services and are not included in the basic services:.1 Land surveys and topographical drawings, and geotechnical testing. Initial FAC Document 621 Page 8 of 15

18 .2 Provisions of services of consultants, which have been approved in advance by the Owner, for other than the normal architectural, structural, mechanical, civil, landscaping and electrical engineering services..3 Providing services made necessary by the material default of the Contractor, by major defects or deficiencies in the Work of the Contractor, or by significant failure of performance of the Contractor under the Contract for Construction..4 Provision of additional services made necessary by changes in the scope of work as directed by the Owner, provided such changes are not made necessary because of Engineer s errors or omissions. With respect to Change Orders and Construction Change Directives that are not made necessary because of the Engineer s errors or omissions, preparation of such documents for and evaluating such Change Orders and Construction Change Directives that cumulatively are no more then 10% of the Construction Cost of the Project are included in Basic Services..5 Preparing to serve or serving as an expert witness when requested by the Owner in connection with any public hearing or legal proceeding..6 Providing prolonged contract administration and observation of construction should the construction time exceed 125% of the original construction time for Substantial Completion when the additional time is not due to the failure of the Engineer to provide the services required under this contract in a timely manner including additional services as described herein. This provision does not cover administration of correction of listed deficiencies at the time of final occupancy inspection..7 Providing consultation concerning replacement of any work damaged by fire or other casualty during construction and the warranty period and furnishing services as may be required in connection with the replacement of such work..8 Providing design related services for unforeseen conditions discovered during the course of construction..9 Providing services in connection with evaluating more than a reasonable number of substitutions proposed by the Contractor and making subsequent revisions to Drawings, Specifications and other documentation resulting therefrom. ARTICLE 4 OWNER'S RESPONSIBILITIES 4.1 The Owner shall provide full information regarding its requirements for the Project. 4.2 In order to avoid unreasonable delay in the Engineer s work the Owner shall render decisions within fourteen (14) days pertaining to written requests, submissions or proposals of the Engineer. 4.3 The Owner shall furnish information required as expeditiously as possible for the orderly progress of the work. 4.4 The Owner shall have the option to employ or retain inspectors or independent consultants as is deemed appropriate for the Project. The Engineer shall cooperate and provide information to the inspectors and consultants. The retention of such consultants and inspectors shall not relieve or modify the Engineer s responsibilities on the Project and shall be solely for the benefit of the Owner. 4.5 The Owner is the authority having jurisdiction for Florida Building Code compliance and the Owner s Building Official shall enforce the requirements of the Florida Building Code. Any acts or omissions by the Owner will not in any way relieve the Engineer of the Engineer s responsibilities under this Agreement. ARTICLE 5 TIME & ORDER OF ENGINEER'S SERVICES 5.1 GENERAL The Engineer shall furnish the documents and provide the services herein required in such sequence and at such times as may be necessary for the prompt execution of the work of design and construction of the Project The Engineer agrees to prepare and deliver to the Owner the following:.1 Schematic documents within the calendar days from the date of receipt of notice to proceed as outlined in the Design Criteria, Article 17, provided by the Owner..2 Design development documents within the calendar days from the date of receipt of notice to Initial FAC Document 621 Page 9 of 15

19 proceed as outlined in the Design Criteria, Article 17, provided by the Owner..3 Construction documents within the calendar days from the date of notice to proceed as outlined in the Design Criteria, Article 17, provided by the Owner..4 Failure to meet the contract schedule and any amendment thereto without written approval of the Owner shall be construed as a failure to perform The Engineer agrees to proceed with each succeeding phase after the Owner's written acceptance of each phase s documents The Engineer will be evaluated by the Owner at the end of the construction of the Project. The results of this evaluation may be considered at future selection of engineers. A copy of the evaluation will be available to the Engineer after its completion. ARTICLE 6 PAYMENTS TO THE ENGINEER 6.1 GENERAL The Owner will pay the Engineer for the Engineer s services as provided under this Agreement. 6.2 ENGINEER S FEE The Engineer s fee shall be a fixed fee paid pursuant to the provisions of Article 6, subparagraph 6.2.3, and 6.5 Additional Services, subparagraph Fixed hourly rates Should any requirement be made by the Owner at any time during the design, the nature of which would result in additional design costs, the Engineer shall immediately advise the Owner thereof in writing and only proceed with the written approval of the Owner Payment of Engineer s basic fee shall be made monthly by the Owner in the following manner and shall be in proportion to services performed within each phase of services..1 First Installment: An amount equal to 15% of the fixed fee, upon acceptance and approval of the schematic documents by the Owner..2 Second Installment: An amount sufficient to increase payment to 35% of the fixed fee, upon acceptance and approval of the design development documents by the Owner..3 Third Installment: An amount sufficient to increase payment to 70% of the fixed fee, upon acceptance and approval of the final Construction documents and issuance of a building permit by the Owner..4 Fourth Installment: An amount sufficient to increase to 75% upon award of the bid by the Owner..5 Construction Installment: The remaining 25% of the fee for basic services shall be due from time to time during construction in proration to the overall percentage of completion reflected in progress payments due the Contractor..6 No deduction shall be made from the fee on account of liquidated damages or other sums withheld from payment to the Contractor..7 If, after bids have been taken, the lowest and best bid exceeds the final budgeted amount and the Owner elects not to award a construction contract, no further payments shall be due the Engineer. 6.3 FINAL PAYMENT Final payment is due upon receipt of the items below..1 The work is completed by the Contractor and accepted by the Owner..2 Record copy of "as-built" plans, manufacturers' manuals and other Project related documentation are delivered to and approved by the Owner..3 The Certificate of Final Inspection (CFI) has been approved by the School Board of Volusia County Florida. 6.4 REIMBURSABLE EXPENSES Reimbursable expenses are in addition to compensation for Basic and Additional Services and include expenses incurred by the Engineer in the interest of the Project:.1 Fees paid by the Engineer to governmental authorities having jurisdiction over the Project for securing required approval or permitting of the Project or any phase or portion of it..2 Reasonable cost to the Engineer of the services of special consultants retained by the Initial FAC Document 621 Page 10 of 15

20 Engineer for unusual and extraordinary structural, mechanical, civil, electrical, architectural or other engineering consultation work on the Project when requested and approved in advance by the Owner..3 Expense of any renderings, models and mock-ups requested by the Owner..4 The costs for hand delivery couriers and overnight deliveries shall not be reimbursed by the Owner without advance written approval from the Owner..5 The Engineer s printing expense shall be reimbursed to the Engineer at the direct cost of printing plans and specifications. Engineer shall submit copies of the printing invoices along with the Engineer s invoice No type of travel or mileage expenses will be paid by the Owner All reimbursable expenses shall be itemized separately from services invoiced for the Engineer s fee Prior to incurring any of the aforesaid reimbursable expenses or any reimbursable expense not mentioned in this agreement, the Engineer must obtain the written approval and authorization of the Owner. No costs will be paid by the Owner to the Engineer for any such reimbursable expenses unless written approval and authorization is obtained by the Engineer from the Owner before such expenses are incurred. The Engineer shall specify in detail in writing to the Owner the nature and estimated amount and cost of such proposed reimbursable expenses and the need therefore Each month, the Engineer shall provide the Owner with its statement for any Additional Services and Reimbursable Expenses incurred in the preceding month. Any such Services or Expenses not included in said statement shall be deemed waived by the Engineer. 6.5 ADDITIONAL SERVICES Fees for additional services if required shall be in writing and shall indicate the number of professional hours of service by job category plus any additional charge Fixed hourly rates:.1 Principal $.2 Sr. Officers / Associates $.3 Sr. Project Engineer / Project Manager $.4 Project Engineer $.5 Specifications Writer / Cost Estimator $.6 Job Captain / Intern $.7 Sr. CADD Technician $.8 Jr. CADD Technician $.9 Clerical / Support Personnel $ Modify the list above to reflect staffing. ARTICLE 7 CONSULTANTS COMPETITIVE NEGOTIATION ACT (CCNA) 7.1 If the total fee paid to the Engineer exceeds the threshold amount provided in Florida Statute for Category Four, the following provisions of the Consultants' Competitive Negotiation Act, Section (5) (a), Florida Statutes, shall apply:.1 The Engineer shall execute and furnish to the Owner a "Truth-in-Negotiation Certificate", stating that wage rates and other factual unit costs supporting compensation are accurate, complete, and current at the time of executing the contract..2 The Owner will furnish the "Truth-in-Negotiation Certificate" form to the Engineer upon request..3 Should the Owner determine the contract amount was increased due to inaccurate, incomplete or non-current wage rates and other factual costs, the original contract amount and any additions thereto shall be adjusted to exclude any such sums. Initial FAC Document 621 Page 11 of 15

21 ARTICLE 8 CONTRACT REPRESENTATIVES 8.1 OWNER S REPRESENTATIVES The Owner's representative is the Superintendent or designee. 8.2 ENGINEER S REPRESENTATIVE The Engineer s authorized representative is. Any change in representation must be approved by the Owner. ARTICLE 9 OWNERSHIP OF DOCUMENTS All plans, drawings, specifications, computations, sketches, data, models, photographs, renderings and other like materials relating to the services Documents shall become the property of the Owner at the conclusion of the project, or termination of the services of the Engineer, whichever is earlier, and shall be delivered to the Owner clearly marked and identified and in good order. Notwithstanding anything contained within this Agreement to the contrary, the Owner shall be entitled to use the construction documents prepared by the Engineer under this Agreement for subsequent Projects of the. In the event the construction documents are used by the Owner for subsequent projects, the Engineer shall be paid a reasonable fee for specific site development, design revisions, and construction administration provided that the Owner deems such services are necessary and the Engineer is available to perform such services. However, under no circumstances shall the Owner be required to pay the Engineer a royalty or reuse fee for its use of the construction documents as contemplated herein. ARTICLE 10 INSURANCE 10.1 The total amount of professional liability insurance that must be maintained by the Engineer shall be $1,000,000 to protect the Owner against errors and omissions. The term of these policies shall be in force upon the date of execution of this Agreement and shall extend as long as the Engineer is providing services under the contract. These policies shall provide protection for the Owner for the maximum time period during which a claim may be filed under applicable statues of limitation. The Engineer shall provide to the Owner, upon execution of this Agreement, certificates of insurance providing for the coverage required above. These certificates shall state that the insurance company shall notify the Owner in the event of cancellation, termination, non-renewal or material change in these policies, including, but not limited to, any reduction in the coverage provided by the policies The Engineer shall require each consultant the Engineer retains to provide errors and omissions coverage on this Project. If the estimated construction value for work designed by said consultant is less than or equal to $1,000,000.00, the consultant s professional liability insurance coverage shall equal $500, If the estimated construction value for work designed by said consultant exceeds $1,000,000.00, the consultant shall have coverage of at least $1,000, Declining balance for defense cost Errors and Omissions insurance policies shall not be allowed. Should the Engineer or a consultant desire to submit a declining balance for defense cost policy, said policy will only be acceptable provided it is for double the coverage amounts provided herein, at no extra charge. Deductibles shall not exceed $50, The Engineer shall purchase and maintain the following insurance for the life of this contract Worker s Compensation.1 Statutory General Liability.1 Bodily Injury: $100, Per Claimant $300, Per Incident.2 Property Damage: $100, Per Claimant $300, Per Incident.3 Personal Injury, with Employment Exclusion deleted: $1,000,000 annual aggregate Initial FAC Document 621 Page 12 of 15

22 Automobile Liability.1 Bodily Injury: $300, Per Claimant $500, Per Incident.2 Property Damage: $100, Per Claimant.3 The insurance carrier shall provide the Owner with a certificate evidencing that all of the specified insurance is in force. ARTICLE 11 ENGINEER S RESPONSIBILITIES 11.1 The Engineer will provide copies of all contracts with the Engineer s consultants to the Owner. The Engineer will also provide copies of insurance certificates. The Engineer further agrees to provide copies of additions or revisions, as they occur, to the contracts and insurance certificates The Engineer shall be acting as an independent contractor at all times during the performance of Engineer s services. No provision of this Agreement shall create an employment or agent relationship between the parties INDEMNITY The Engineer hereby indemnifies and holds harmless the Owner, its officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney s fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Engineer and persons employed or utilized by the Engineer in the performance of this contract. ARTICLE 12 PROHIBITION AGAINST CONTINGENT FEES The Engineer warrants that the Engineer has not employed or retained any company or person, other than a bonafide employee working solely for the Engineer, to solicit or secure this Agreement and that the Engineer has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bonafide employee working solely for the Engineer, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this provision, the Owner shall have the right to terminate this Agreement without liability and, at its discretion, to deduct from the contracted fee or otherwise recover, the full amount of such fee, commission, percentage, gift or consideration. ARTICLE 13 TERMINATION 13.1 Time is of the essence in this Agreement. Upon failure of the Engineer to perform services herein provided or within the time limits herein provided or subsequently agreed upon, the Owner may terminate this agreement provided written notice of such failure is first given to the Engineer and such failure is not corrected within ten (10) days thereafter. The Engineer shall be paid for services performed to the date of receipt of notification of termination. However, the Owner shall not be required in such case to pay for work done on plans not completed and provided in a timely manner. The inclusion of this termination right in this agreement shall not bar the Owner from seeking other remedies, including damages, due to the Engineer s failure to perform The Owner may terminate this Agreement upon not less than seven (7) days written notice to the Engineer for the Owner s convenience and without cause If this Agreement is terminated by the Owner for any reason other than failure of the Engineer to comply with the Agreement stipulations, then payment shall be made to the Engineer for all work performed to date of termination. ARTICLE 14 LITIGATION AND MEDIATION Claims, disputes or other matters in question between the parties to this Agreement shall be first subject to presuit mediation prior to the filing of any legal claims or litigation. Completion of presuit mediation is a condition precedent to litigation. The obligation to mediate is a material and essential provision of this Agreement. Failing agreement of the parties on the selection of a mediator and the date of mediation, mediation shall be conducted pursuant to the Mediation Rules of the American Arbitration Association. The laws of the State of Florida shall govern this Agreement. Any legal actions arising from disputes, claims or Initial FAC Document 621 Page 13 of 15

23 other matters in question between the parties to this Agreement shall be brought to a state court located in Volusia County Florida, for their resolution. THE PARTIES HEREBY EXPRESSLY WAIVE VENUE IN THE FEDERAL COURTS OF THE UNITED STATES AND WAIVE TRIAL BY JURY. ARTICLE 15 EXTENT OF AGREEMENT This Agreement represents the entire and integrated agreement between the Owner and the Engineer and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both the Owner and the Engineer. ARTICLE 16 ENGINEER S RECORDS Records and Reimbursable Expenses and expenses pertaining to Additional Services and services performed on the basis of hourly rates and all records and documents prepared or received by Engineer related to the Project shall be available to the Owner or the Owner s authorized representative at mutually convenient times for at least five years after Substantial Completion of the Project. ARTICLE 17 DESIGN CRITERIA AND TIME FOR COMPLETION Various projects county wide. ARTICLE 18 OTHER CONDITIONS OR SERVICES 18.1 PEER REVIEW Plan and specification review services of various construction projects prepared by other design professionals (peer review) The Engineer s review services consist of: reviewing Schematic documents, Design Development documents, and Construction documents prepared by (selected) other design professionals for various new construction, renovation and remodeling projects, for compliance with educational or ancillary specification provisions of the Florida State Board of Education State Requirements for Educational Facilities (SREF) Administration Rules, and Section 1013 of the Florida Statutes, and all other applicable laws, regulations or codes The Engineer shall prepare a written report of the Engineer s review of plans and specifications. This written report shall be delivered to the Owner's representative within thirty (30) days after receiving the plans and specifications. The written report shall contain a list of deficiencies along with recommended corrections The Engineer shall endeavor to guard the Owner against deficiencies in the work of other professionals, but the Engineer does not guarantee the performance of the contract by other design professionals The Engineer shall be furnished calculations when, in the opinion of the Engineer, the review of calculations done by other design professionals would reduce the time to complete a review of the plans and specifications ENGINEER S FEES Engineer s fees for these services shall be a fixed fee as mutually agreed upon between Owner and Engineer. Initial FAC Document 621 Page 14 of 15

24 This Agreement is entered into as of the day and year first written above and is executed in at least three original copies, of which one is to be delivered to the Engineer for use in the administration of the Contract, and the remainder to the Owner. THE SCHOOL BOARD OF VOLUSIA COUNTY FLORIDA WITNESS (Signature) CHAIRMAN (Signature) (Printed name) (Printed name) WITNESS (Signature) SECRETARY (Signature) (Printed name) (Printed name) WITNESS (Signature) ENGINEER (Signature) (Printed name) (Printed name and title) Initial FAC Document 621 Page 15 of 15

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PIERSON ELEMENTARY REPLACEMENT SCHOOL PROJECT NO. 164519

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PIERSON ELEMENTARY REPLACEMENT SCHOOL PROJECT NO. 164519 REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR PIERSON ELEMENTARY REPLACEMENT SCHOOL PROJECT NO. 164519 School Board of Volusia County Florida Facilities Services 3750 Olson Drive, Daytona Beach

More information

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514 REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514 Contact: Mr. Tom Brown, Senior Construction Project Manager Facilities Services,

More information

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT ADVERTISEMENT: REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT The WALTON COUNTY SCHOOL DISTRICT will receive

More information

Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information

Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document

More information

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho REQUEST FOR QUALIFICATIONS Independent School District No. 1, Lewiston, Idaho ( District ) is seeking responses from individuals

More information

COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ).

COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ). COMMERCIAL CONSTRUCTION AGREEMENT This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between ( Owner ) and ( Contractor ). A. Contractor wishes to enter into the following Contract with

More information

Request for Qualifications 2015-162

Request for Qualifications 2015-162 Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015

More information

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder

AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder AGREEMENT made as of the day of in the year of (In words, indicate day, month and year) BETWEEN the Owner: (Name,

More information

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86

More information

Attachment 5 Electrical Engineering

Attachment 5 Electrical Engineering A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 5 Electrical Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or

More information

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES AGREEMENT FOR PROFESSIONAL DESIGN SERVICES This Professional Design Services (this "Agreement"), made as of 20 by and between the University of Cincinnati (the "University") by the Division of Administration

More information

LOUISIANA CAPITAL IMPROVEMENT PROJECTS PROCEDURE MANUAL FOR DESIGN AND CONSTRUCTION

LOUISIANA CAPITAL IMPROVEMENT PROJECTS PROCEDURE MANUAL FOR DESIGN AND CONSTRUCTION LOUISIANA CAPITAL IMPROVEMENT PROJECTS PROCEDURE MANUAL FOR DESIGN AND CONSTRUCTION 1985 Edition INCLUDING ADDENDA ONE AND TWO M.J. AMike@ Foster, Jr. Governor Mark C. Drennen, Commissioner of Administration

More information

CONSULTANT AGREEMENT. THIS CONSULTANT S AGREEMENT (the Agreement ) is effective this day of

CONSULTANT AGREEMENT. THIS CONSULTANT S AGREEMENT (the Agreement ) is effective this day of CONSULTANT AGREEMENT THIS CONSULTANT S AGREEMENT (the Agreement ) is effective this day of, 2011, by and between the TOWN OF UNIVERSITY PARK (the Town ), a municipal corporation of the State of Maryland,

More information

Design Development Agreement

Design Development Agreement Design Development Agreement June 2010 prepared by Larry Kirkland, PAN Council Member and The Law Office of Sarah Conley Disclaimer The Public Art Commission Agreement is made available as a service of

More information

OWNER-ARCHITECT AGREEMENT FOR DESIGN AND ADMINISTRATION SERVICES

OWNER-ARCHITECT AGREEMENT FOR DESIGN AND ADMINISTRATION SERVICES OWNER-ARCHITECT AGREEMENT FOR DESIGN AND ADMINISTRATION SERVICES MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY 735 East Michigan Avenue, Lansing, Michigan 48912 THIS AGREEMENT made on by and between (the

More information

ARCHITECTURAL SERVICES CONTRACT. THIS CONTRACT FOR ARCHITECTURAL SERVICES is made by and between the County of Nueces, hereinafter called County and

ARCHITECTURAL SERVICES CONTRACT. THIS CONTRACT FOR ARCHITECTURAL SERVICES is made by and between the County of Nueces, hereinafter called County and ARCHITECTURAL SERVICES CONTRACT STATE OF TEXAS COUNTY OF NUECES THIS CONTRACT FOR ARCHITECTURAL SERVICES is made by and between the County of Nueces, hereinafter called County and hereinafter called Architect

More information

Document Comparison. AIA Documents A134 2009 and A131CMc 2003

Document Comparison. AIA Documents A134 2009 and A131CMc 2003 Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections

More information

Request for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition

Request for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 [email protected] Request for Proposal No. RFP02658

More information

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES REQUEST FOR QUALIFICATIONS GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES NEW DINING HALL MONTANA STATE UNIVERSITY Bozeman, Montana PPA NO. 15-0103 Campus Planning, Design & Construction Plew Building

More information

TROUP COUNTY COMPREHENSIVE HIGH SCHOOL

TROUP COUNTY COMPREHENSIVE HIGH SCHOOL TROUP COUNTY BOARD OF EDUCATION REQUEST FOR SEALED COMPETITIVE PROPOSALS FOR CONSTRUCTION OF: RE-FLOORING TO: TROUP COUNTY COMPREHENSIVE HIGH SCHOOL LAGRANGE, GEORGIA TROUP COUNTY SCHOOL SYSTEM LAGRANGE,

More information

City of Powell Request for Proposals for a Total Compensation Survey

City of Powell Request for Proposals for a Total Compensation Survey City of Powell Request for Proposals for a Total Compensation Survey Section I The City of Powell is soliciting proposals from qualified consulting firms, experienced in the development of a job evaluation

More information

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property 73-101. Public lettings; how conducted. Whenever the State of Nebraska, or any department or any agency thereof,

More information

How To Get Construction Procurement Services

How To Get Construction Procurement Services Construction Procurement William C. Charvat, AIA, CSI Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 The procurement of construction services brings together the team

More information

BUYING AGENCY AGREEMENT

BUYING AGENCY AGREEMENT THIS AGREEMENT ( Agreement ) is made this day of, 20xx, by and between, with its principal place of business at referred to hereinafter as Buyer, and, with its principal office at, hereinafter referred

More information

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 For PROJECT : Renovation and Repair of Atlanta Jewish Academy

More information

Request for Proposal Permitting Software

Request for Proposal Permitting Software Request for Proposal Permitting Software Date Issued: October 7, 2015 Proposals Due no later than: 2:00pm EST on November 10, 2015 Page 1 of 10 Revised 10/5/2015 TABLE OF CONTENTS Section I Introduction

More information

TABLE OF CONTENTS. Purchasing and Contracts Division... 1. Purchasing Policies and Procedures... 1. The Competitive Process... 2

TABLE OF CONTENTS. Purchasing and Contracts Division... 1. Purchasing Policies and Procedures... 1. The Competitive Process... 2 TABLE OF CONTENTS Title Page Purchasing and Contracts Division... 1 Purchasing Policies and Procedures... 1 The Competitive Process... 2 Vendor Participation... 2 Vendor Database... 2 Web Site Information...

More information

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES. Responsibilities of Construction Manager Scope of Construction Manager s Basic Services

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES. Responsibilities of Construction Manager Scope of Construction Manager s Basic Services AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES Article I Article II Article III Article IV Article V Article VI Article VII Article VIII Article IX Responsibilities of Construction Manager Scope of Construction

More information

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes

More information

PERFORMANCE BOND LABOR AND MATERIAL PAYMENT BOND

PERFORMANCE BOND LABOR AND MATERIAL PAYMENT BOND Section 00 61 13.13 & 00 61 13.16 Douglas County School District Re.1 Castle Rock, Colorado PERFORMANCE BOND LABOR AND MATERIAL PAYMENT BOND 1. FORMS TO BE USED Two (2) separate bonds are required: Both

More information

Shawnee County ATTN: Bill Kroll 200 SE 7 th Street, Rm B-30 Topeka, KS 66603 Phone 785.251-4490 [email protected]

Shawnee County ATTN: Bill Kroll 200 SE 7 th Street, Rm B-30 Topeka, KS 66603 Phone 785.251-4490 Bill.Kroll@snco.us SECTION I Shawnee County is requesting qualifications/proposals for the renovation of 2600 SW East Circle Drive, Topeka, Kansas 66606 which will be utilized by the Shawnee County Health Agency per the

More information

388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email [email protected] ADDENDUM NO. 1

388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email aromaswd@aol.com ADDENDUM NO. 1 388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email [email protected] May 6, 2015 To: All Plan Holders From: Vicki Morris General Manager Subject: Water Serviceline Installation

More information

Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement

Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement Page 1 3-804 Professional Services and Construction A. Project Delivery Methods 1. A university may procure design services, construction and construction services, as applicable, under any of the following

More information

ACG Commissioning Guideline

ACG Commissioning Guideline ACG Commissioning Guideline Appendix A Sample Commissioning Specification NOTES TO APPENDIX A This appendix contains a sample Request for Proposal (RFP) for Commissioning Services as would be issued by

More information

St. Andrews Public Service District

St. Andrews Public Service District St. Andrews Public Service District Request for Qualifications for Architectural/Engineering (A/E) Consultancy Services for Fire Stations, Administrative Buildings, and Environmental Services Facilities.

More information

REQUEST FOR PROPOSAL NO. RFP09503 MIDDLE SCHOOL AND HIGH SCHOOL YEARBOOKS. Submittal Deadline: October 29, 2015. Time: 10:00 a.m.

REQUEST FOR PROPOSAL NO. RFP09503 MIDDLE SCHOOL AND HIGH SCHOOL YEARBOOKS. Submittal Deadline: October 29, 2015. Time: 10:00 a.m. Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 [email protected] REQUEST FOR PROPOSAL NO. RFP09503

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES ISSUED BY: INGLEWOOD UNIFIED SCHOOL DISTRICT Issued: November 20, 2015 Due: December 18, 2015 SCHEDULE OF EVENTS INGLEWOOD UNIFIED SCHOOL

More information

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February

More information

REQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES. The Battery Conservancy

REQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES. The Battery Conservancy REQUEST FOR PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES The Battery Conservancy Issue Date: March 23, 2012 Responses Due: April 20, 2012 Introduction The Battery Conservancy ( TBC ) is a 501(c)(3) not-for-profit

More information

REQUEST for STATEMENTS OF QUALIFICATIONS PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FOR. DESIGN of Two Parking Garages:

REQUEST for STATEMENTS OF QUALIFICATIONS PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FOR. DESIGN of Two Parking Garages: REQUEST for STATEMENTS OF QUALIFICATIONS PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FOR DESIGN of Two Parking Garages: 1. Expansion of Existing Bexar County Parking Garage (approx. 500 spaces) 2.

More information

TAFT LIBRARY ADDENDUM STANDARD FORM OF AGREEMENT BETWEEN TOWN OF MENDON ( THE TOWN ) AND ( ARCHITECT ) 1.1 Delete space if no additional information.

TAFT LIBRARY ADDENDUM STANDARD FORM OF AGREEMENT BETWEEN TOWN OF MENDON ( THE TOWN ) AND ( ARCHITECT ) 1.1 Delete space if no additional information. TAFT LIBRARY ADDENDUM STANDARD FORM OF AGREEMENT BETWEEN TOWN OF MENDON ( THE TOWN ) AND ( ARCHITECT ) This Addendum is attached to and modifies the Standard Form of Agreement between the Town and Architect,

More information

PENNSYLVANIA HOUSING FINANCE AGENCY ADDENDUM TO OWNER-ARCHITECT AGREEMENT FOR DESIGN SERVICES AND CONSTRUCTION CONTRACT ADMINISTRATION

PENNSYLVANIA HOUSING FINANCE AGENCY ADDENDUM TO OWNER-ARCHITECT AGREEMENT FOR DESIGN SERVICES AND CONSTRUCTION CONTRACT ADMINISTRATION PENNSYLVANIA HOUSING FINANCE AGENCY ADDENDUM TO OWNER-ARCHITECT AGREEMENT FOR DESIGN SERVICES AND CONSTRUCTION CONTRACT ADMINISTRATION THIS ADDENDUM shall amend the American Institute of Architects Document

More information

CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT

CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT THIS AGREEMENT made this day of Month, Year, by and between CSA CONSTRUCTION, INC., a Texas corporation whose principal

More information

CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2

CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2 CONTRACT FOR DESIGN SERVICES Contract Documents Design Services PS-0748-A Page 1 5/4/2016 Table of Contents Design Services Contract Contract references Attachments described below that will be provided

More information

Construction Management At-Risk

Construction Management At-Risk Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction

More information

CHAPTER 11 APPEALS AND DISPUTES

CHAPTER 11 APPEALS AND DISPUTES CHAPTER 11 APPEALS AND DISPUTES In this Chapter look for... 11. General 11.1 Deleted 11.2 Administrative Appeals 11.3 Disputes 11.4 Alternative Dispute Resolution (ADR) 11. General. The Virginia Public

More information

Chase Lincoln Realty & Property Management Company 7045 Summer Place Charlotte, NC 28213 Phone: 704-921-1912, Fax: 704-921-1914

Chase Lincoln Realty & Property Management Company 7045 Summer Place Charlotte, NC 28213 Phone: 704-921-1912, Fax: 704-921-1914 Chase Lincoln Realty & Property Management Company 7045 Summer Place Charlotte, NC 28213 Phone: 7049211912, Fax: 7049211914 EXCLUSIVE PROPERTY MANAGEMENT AGREEMENT Longterm Rental Property This Exclusive

More information

GALVESTON COUNTY HEALTH DISTRICT. Request For Proposal Health Insurance Broker Services RFP 15-011

GALVESTON COUNTY HEALTH DISTRICT. Request For Proposal Health Insurance Broker Services RFP 15-011 GALVESTON COUNTY HEALTH DISTRICT Request For Proposal Health Insurance Broker Services RFP 15-011 INTRODUCTION The Galveston County Health District (GCHD) is requesting Proposals for health insurance broker

More information

Request for Qualifications (RFQ) Number 01-15 PUBLIC WORKS CONTINUING CONSTRUCTION AND ENGINEERING INSPECTION AND PROJECT MANAGEMENT SERVICES

Request for Qualifications (RFQ) Number 01-15 PUBLIC WORKS CONTINUING CONSTRUCTION AND ENGINEERING INSPECTION AND PROJECT MANAGEMENT SERVICES City of DeBary Request for Qualifications (RFQ) Number 01-15 PUBLIC WORKS CONTINUING CONSTRUCTION AND ENGINEERING INSPECTION AND PROJECT MANAGEMENT SERVICES The City of DeBary, Florida is seeking standby

More information

CITY OF BONITA SPRINGS, FLORIDA RFP # 14-019

CITY OF BONITA SPRINGS, FLORIDA RFP # 14-019 CITY OF BONITA SPRINGS, FLORIDA RFP # 14-019 Pursuant to Florida Statutes, Chapter 287, The City of Bonita Springs hereinafter referred to as the City, will accept sealed Responses for Qualifications and

More information

Recitals. NOW, THEREFORE, the parties hereto agree as follows: Agreement

Recitals. NOW, THEREFORE, the parties hereto agree as follows: Agreement THIS INDEPENDENT CONTRACTOR SERVICES AGREEMENT (this Agreement ) is made this day of, 20 (the Effective Date ), regardless of the date of execution, by and between Sierra Field Services, Inc., a Nevada

More information

STANDARD FORM OF CONTRACT FOR DESIGN-BUILD CONSULTANT SERVICES

STANDARD FORM OF CONTRACT FOR DESIGN-BUILD CONSULTANT SERVICES STANDARD FORM OF CONTRACT FOR DESIGN-BUILD CONSULTANT SERVICES Document No 501 Second Edition, 2010 Design-Build Institute of America Washington, D.C. TABLE OF CONTENTS Article Name Page Article 1 Consultant

More information

ASBESTOS/LEAD SURVEY AND CONSULTING AGREEMENT BY AND BETWEEN NEW YORK UNIVERSITY / NYU HOSPITALS CENTER - OWNER - AND - CONSULTANT - --------- PROJECT

ASBESTOS/LEAD SURVEY AND CONSULTING AGREEMENT BY AND BETWEEN NEW YORK UNIVERSITY / NYU HOSPITALS CENTER - OWNER - AND - CONSULTANT - --------- PROJECT APPENDIX A ASBESTOS/LEAD SURVEY AND CONSULTING AGREEMENT BY AND BETWEEN NEW YORK UNIVERSITY / NYU HOSPITALS CENTER - OWNER - AND - CONSULTANT - --------- PROJECT DATED AS OF ASBESTOS/LEAD SURVEY AND CONSULTING

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the th day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client

More information

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT is made and entered into this day of, 2007, by and between the University of Washington ( Owner ) and, ( Project

More information

May 5 th, 2014. Dr. Andrew Keith Optimal Spine & Health 2361 S Azusa Ave West Covina, CA 91792

May 5 th, 2014. Dr. Andrew Keith Optimal Spine & Health 2361 S Azusa Ave West Covina, CA 91792 May 5 th, 2014 Dr. Andrew Keith Optimal Spine & Health 2361 S Azusa Ave West Covina, CA 91792 Thank you for considering InTouch Marketing as a potential provider of marketing services for your organization.

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS ADVERTISEMENT FOR BIDS Bids will be received at the office of the Niles City School District, 100 West Avenue, Niles, Ohio, 44446 until 12:00 PM on Friday, March 22, 2013 and will be opened and read immediately

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

CONSULTANT AGREEMENT. THIS CONSULTANT S AGREEMENT (the Agreement ) is effective this day of

CONSULTANT AGREEMENT. THIS CONSULTANT S AGREEMENT (the Agreement ) is effective this day of CONSULTANT AGREEMENT THIS CONSULTANT S AGREEMENT (the Agreement ) is effective this day of, 2012, by and between the TOWN OF UNIVERSITY PARK (the Town ), a municipal corporation of the State of Maryland,

More information

Performance Bond. Business):

Performance Bond. Business): Performance Bond CONTRACTOR (Name and Address): (Name and Address of Principal Place of Business): OWNER (Name and Address): City of Cedar Rapids City Clerk, 101 First Street SE Cedar Rapids, IA 52401

More information

CITY OF LEMOORE REQUEST FOR PROPOSALS FOR CREDIT CARD PROCESSING SERVICE. City of Lemoore Finance Department 119 Fox St Lemoore, CA 93245

CITY OF LEMOORE REQUEST FOR PROPOSALS FOR CREDIT CARD PROCESSING SERVICE. City of Lemoore Finance Department 119 Fox St Lemoore, CA 93245 CITY OF LEMOORE REQUEST FOR PROPOSALS FOR CREDIT CARD PROCESSING SERVICE City of Lemoore Finance Department 119 Fox St Lemoore, CA 93245 Notice is hereby given that the City of Lemoore is soliciting proposals

More information

STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment)

STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment) State License #CGC048773 STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment) This Agreement is made this day of, 200, by and

More information

SECTION 00900 PERFORMANCE BOND., hereinafter called PRINCIPAL, and

SECTION 00900 PERFORMANCE BOND., hereinafter called PRINCIPAL, and SECTION 00900 PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: THAT (Name or Contractor) a (Address of Contractor) (Corporation, Partnership, or Individual), hereinafter called PRINCIPAL, and (Name

More information

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS NEGAUNEE PUBLIC SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 26, 2010 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF NEGAUNEE

More information

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER Project: BT Project Name: Architect/Engineer: April 2016 Edition AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This Agreement Between Owner and Architect/Engineer

More information

TABLE OF CONTENTS. Prefacej... 1

TABLE OF CONTENTS. Prefacej... 1 TABLE OF CONTENTS Prefacej... 1 How Can I Receive Copies Of Solicitations?j... 2 Bidder s List... 2 Vendor Registration System... 2 Public Notice/Advertisement... 3 Posting... 3 Internet... 3 Pre-Bid Conferences...

More information

AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES. THIS AGREEMENT, effective this 20th day of April in the year, 2015, between:

AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES. THIS AGREEMENT, effective this 20th day of April in the year, 2015, between: AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES THIS AGREEMENT, effective this 20th day of April in the year, 2015, between: MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS, a political subdivision

More information

HACC, Central Pennsylvania s Community College Harrisburg, Pa.

HACC, Central Pennsylvania s Community College Harrisburg, Pa. RFP15-03 Integrated Marketing Communications Services HACC, Central Pennsylvania s Community College Harrisburg, Pa. Request for Proposal RFP15 03 For Integrated Marketing Communications Services Issued:

More information

CITY OF LANCASTER RFP NO. 621-15 LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M.

CITY OF LANCASTER RFP NO. 621-15 LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M. CITY OF LANCASTER RFP NO. 621-15 LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE July 24, 2015 BY 11:00 A.M. SUBMIT TO: Office of the City Clerk Lancaster City Hall 44933 Fern Avenue

More information

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland

More information

Four Seasons Property Management Inc 2334 The Plaza Charlotte, NC 28205

Four Seasons Property Management Inc 2334 The Plaza Charlotte, NC 28205 Four Seasons Property Management Inc 2334 The Plaza Charlotte, NC 28205 EXCLUSIVE PROPERTY MANAGEMENT AGREEMENT Long-term Rental Property This Exclusive Property Management Agreement is entered into by

More information

Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing

Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing CITY OF DEARBORN ADVERTISEMENT FOR NATURAL GAS PROVIDER TO THE CITY OF DEARBORN, MICHIGAN Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing Agent, 2951 Greenfield, Dearborn,

More information

REQUEST FOR QUALIFICATIONS. For ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS. For ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS For ENGINEERING SERVICES For FY17/FY18 Fiscal Years Mecklenburg County Storm Water Services (MCSWS) Projects Mecklenburg County, North Carolina June 14, 2016 Submittal Deadline:

More information

CONSULTANT AGREEMENT

CONSULTANT AGREEMENT Douglas County School District Re.1 Castle Rock, Colorado CONSULTANT AGREEMENT This agreement, dated effective as of is made and entered into by and between the Douglas County School District Re.1, Douglas

More information

CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS

CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS 48-01.2-01. Definitions. In this chapter, unless the context otherwise requires: 1. "Agency construction management" means a public improvement delivery

More information

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE SANTEE SCHOOL DISTRICT 1 .......... 2 1. Effective January 1 st, 2014,

More information

AGREEMENT FOR SECURITY AND TRANSPORT SERVICES

AGREEMENT FOR SECURITY AND TRANSPORT SERVICES AGREEMENT FOR SECURITY AND TRANSPORT SERVICES THIS AGREEMENT For Security Services (the Agreement ) is made and entered into effective this day of, 20, by and between CITY OF Commerce City, COLORADO, a

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS ROWAN COUNTY 130 West Innes Street Salisbury, NC 28144 Tel: (704) 216-8174 Email: [email protected] REQUEST FOR PROPOSALS FOR REPLACEMENT OF COMMERCIAL ROOFTOP AIR CONDITIONING UNIT Issued

More information

Agreement between Owner and Architect

Agreement between Owner and Architect Agreement between Owner and Architect This AGREEMENT is made as of the - day of - in the year - BETWEEN the Owner: Drexel University - 3141 Chestnut Street - Philadelphia, Pa 19104 - - - and the Architect:

More information

MANTON CONSOLIDATED SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

MANTON CONSOLIDATED SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS MANTON CONSOLIDATED SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 16, 2010 1 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF MANTON

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL General Insurance Brokerage Services Date of Issue: December 6, 2012 Closing Location:Prince Rupert, B.C. Mail or courier: Dan Rodin Chief Financial Officer City of Prince Rupert 424-3

More information

THIS AGREEMENT is made effective as of this day of in the year of.

THIS AGREEMENT is made effective as of this day of in the year of. STANDARD FORM OF CONSTRUCTION MANAGEMENT AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER (Where the basis of payment is Cost of the Work with a guaranteed maximum price) THIS AGREEMENT is made effective

More information

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES (Construction Manager At-Risk) FOR PROJECTS IN THE CENTER UNIFIED SCHOOL DISTRICT April 7, 2005 The ( District ) is seeking Statements

More information

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117 Introduction The Board of Education for Jacksonville School District 117 is soliciting Statements of Interest and Qualifications pursuant to 50 ILCS 510/0.01 from qualified firms to provide comprehensive

More information

Agreement Number: F.E.I.D. Number: Procurement Number: D.M.S. Catalog Class Number:

Agreement Number: F.E.I.D. Number: Procurement Number: D.M.S. Catalog Class Number: Page 1 of 9 Agreement Number: F.E.I.D. Number: Procurement Number: D.M.S. Catalog Class Number: This Master University Agreement ( Agreement ), entered into this day of, ( Effective Date ), between the

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS CAMPUS PLANNING, DESIGN & CONSTRUCTION Sixth Avenue and Grant Street PO Box 172760 Bozeman, Montana 59717-2760 Phone: (406) 994-5413 Fax: (406) 994-5665 INSTRUCTIONS TO BIDDERS 1. Table of Contents Provided

More information

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER AT SAN ANTONIO and PROJECT ARCHITECT for A PROJECT OF LIMITED SIZE OR SCOPE

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER AT SAN ANTONIO and PROJECT ARCHITECT for A PROJECT OF LIMITED SIZE OR SCOPE AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER AT SAN ANTONIO and PROJECT ARCHITECT for A PROJECT OF LIMITED SIZE OR SCOPE This Agreement is made as of, 20 (the Effective Date ), by and

More information

Small Public Work Contract

Small Public Work Contract City of Bellevue 450 110 th Ave. NE Bellevue, WA 98004 Small Public Work Contract City of Bellevue Contract Identification Information: Contract Title: This CONTRACT is entered into the date

More information

AIA Document A310 TM 2010

AIA Document A310 TM 2010 AIA Document A310 TM 2010 Bid Bond CONTRACTOR: OWNER: «Lane County» «125 East Eighth Avenue BOND AMOUNT: $ PROJECT: (Name, location or address, and Project number, if any) «Lane County Adult Corrections

More information

ENGINEERING AGREEMENT

ENGINEERING AGREEMENT ENGINEERING AGREEMENT STATE OF LOUISIANA PARISH OF JEFFERSON This Agreement is made and entered into on this day of, 200 by and between the Parish of Jefferson, State of Louisiana, acting herein by and

More information